RFIs and Responses Williston Lift Station 9.14.23.pdf

PDF 136 KB Posted

Attached to
Lift Station Repairs at Williston Resource Office Federal contract opportunity
Solicitation number
W9128F23Q0099
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document contains questions and responses regarding solicitation number W9128F23Q0099 from the Department of the Army Corps of Engineers Engineering District Omaha for lift station repairs at the Williston Resource Office. One question asked if the motor requirements could be changed to a higher RPM of 3450 without the explosion proof requirement, to which the response was that the higher RPM is acceptable but the motor still needs to be Group D. A second question asked about the source and location of electrical power for the control panel, to which the response indicated the power comes from the office building and no new power needs to be pulled by moving the control station to the east.

View the file

Other files for this federal contract opportunity

Other files attached to Lift Station Repairs at Williston Resource Office, newest first.
File Type Posted
RFIs and Responses Williston Lift Station 9.14.23.pdf PDF
Attachment 3 Photos.pdf PDF
Attachment 4 APP Checklist.pdf PDF
Attachment 2 Drawing M-001.pdf PDF
RELEASED_W9128F23Q0099 Lift Station.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W9128F-23-Q0099

Williston Lift Station Repairs

RFI and Responses

14 September 2023

1. Can the requirements be changed to 3450 rpm and the explosion proof requirement be dropped?

USACE Response: The higher RPM is acceptable however the motor needs to be Group D.

2. Where is the electrical power coming from to feed the control panel and is it from a breaker panel located close to the lift station? Or is it coming from a meter and where is it located?

USACE Response: The power is fed from the office building and with moving the control station to the east, there should no issue with needing to pull any new power.