Attachment 4 APP Checklist.pdf

PDF 362 KB Posted

Attached to
Lift Station Repairs at Williston Resource Office Federal contract opportunity
Solicitation number
W9128F23Q0099
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document contains an Accident Prevention Plan checklist for a federal contract to repair a lift station in Williston, North Dakota. The checklist reviews elements that must be included in an Accident Prevention Plan such as background information on the contractor and project, safety training requirements, inspection procedures, emergency response plans, and hazard-specific plans. It indicates items that are included "Yes" in the plan and items marked "No" or "N/A" that require remarks. The related federal contract opportunity is solicitation number W9128F23Q0099 from the Department of the Army Corps of Engineers Omaha District for lift station repairs at the Williston Resource Office. The checklist will be used to evaluate accident prevention plans submitted in response to this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Lift Station Repairs at Williston Resource Office, newest first.
File Type Posted
RFIs and Responses Williston Lift Station 9.14.23.pdf PDF
RFIs and Responses Williston Lift Station 9.14.23.pdf PDF
Attachment 3 Photos.pdf PDF
Attachment 2 Drawing M-001.pdf PDF
RELEASED_W9128F23Q0099 Lift Station.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description Yes No N/A

1. Signature sheet

a. Includes the name, signature, and title of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC )

b. Includes the name, signature, and title of the Plan Approver (e.g. owner, company president, regional vice president ) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).

c. Includes the name(s), signature(s), and title(s) for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project

QC. )

2. Background information

a. Includes the Contractor Name.

b. Includes the Contract Number.

c. Includes the Project Name.

d. Includes the Brief Project Description.

e. Includes the Location of the Project (map).

f. Includes the Contractor Accident Experience (Copy of OSHA

g. Includes the Listing of Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).

3. Statement of Safety and Health Policy. Includes a copy of the corporate safety policy. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention

4. Responsibilities and Lines of Authorities

a. Includes the identification and job responsibilities of personnel responsible for safety - at both corporate and project level – including their resumes.

b. Includes the lines of authority.

CESO Form A-02 Sep 13

Remarks (Any NO or N/A item)

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist

Date of Inspection

Location (Plant or Facility) Contract Number

Contractor Name Project Name

Inspector Name (Print) Inspector Signature

This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated XX Sept 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.

5. Training

a. Includes the list of subjects to be discussed with employees at safety indoctrination.

b. Includes the list of mandatory training and certifications applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE ) and any requirements for periodic retraining / recertification.

c. Includes the identity requirements for emergency response training.

d. Includes the outline requirements (who attends, when given, who will conduct, etc. ) for supervisory and employee safety

6. Safety and Health Inspections

a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees )

b. Includes proof of inspector's training / qualifications.

c. Indicates when inspections will be conducted.

d. Furnished sample forms upon which inspections will be recorded.

e. Indicates deficiency tracking system and follow-up procedures.

f. Includes the names of competent and / or qualified person(s) and proof of competency / qualification to meet specific OSHA competent / qualified person(s) requirements.

g. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard )

7. Safety and Health Expectations, Incentive Programs, and Compliance

a. Includes the company's written safety program goals, objectives, and accident experience goals.

b. Includes a brief description of the company's safety incentive programs (if any ).

c. Includes the policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements).

d. Includes the written company procedures for holding managers and supervisors accountable for safety.

8. Mishap Reporting

a. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).

b. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs.

c. The plan identifies how, when, and who shall make immediate notification of major mishaps.

CESO Form A-02 Sep 13

Remarks (Any NO or N/A item)

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

9. Plans (Programs, Procedures) required by the Safety Manual

a. Fatigue Management Plan (01.A.20)

b. Emergency response plans:

(1) Procedures & Test (01.E.01)

(2) Spill Plans (01.E.01, 06.A.02)

(3) Fire Fighting Plan (01.E.01; 19.A)

(4) Posting of Emergency Telephone Numbers (01.E.05)

(5) Man overboard/abandon ship (19.A.04)

(6) Medical Support. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (Section 03.A; 03.D)

c. Plan for prevention of alcohol and drug abuse (01.C.02)

d. Site Sanitation Plan (Section 02.B)

e. Medical Support Plan, (03.A.01; 03.A.06; 03.D)

f. Bloodborne Pathogen Plan (03.A.05)

g. Exposure Control Plan (03.A.05)

h. Site Layout Plan (04.A)

i. Access/Haul road Plan (04.B)

j. Hearing Conservation Program (05.C)

k. Respiratory Protection Plan (05.G)

l. Health Hazard Control Program (06.A)

m. Process Safety Management Plan (06.B.04)

n. Lead Abatement Plan (06.C & Specs)

o. Asbestos Abatement Plan (06.C & Specs)

p. Radiation Safety Program (06.F)

q. Abrasive Blasting Plan (06.I)

r. Heat/Cold Stress Monitoring Plan (06.J)

s. Indoor Air Quality Management Plan (06.L)

t. Mole Remediation Plan (06.L.04)

u. Chromium (VI) Exposure Evaluation (06.M)

v. Crystalline Silica Assessment (06.N)

w. Lighting Evaluation (07.A)

x. Lighting Plan for Night Operations (07.A.09) CESO Form A-02 Sep 13

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:

Remarks (Any NO or N/A item)

9. Plans (Programs, Procedures) continued.

y. Traffic Control Plan (08.C.05)

z. Fire Prevention Plan (09.A.01)

aa. Wild Land Fire Management Plan (09.L)

bb. Arc Flash Hazard Analysis (11.B)

cc. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, App D)

dd. Hazardous Energy Control Plan, (12.A.01)

ee. Standard Pre-Lift Plan (LHE) (16.A.03, 16.L.15)

ff. Critical Lift Plan – LHE (16.H)

gg. Naval Architectural Analysis (16.L)

hh. Contingency Plan for Severe Weather (19.A.03)

ii. Man Overboard/Abandon Ship (19.A.04)

jj. Float Plan (19.F.04)

kk. Fall Protection Program, (21.D);

ll. Demolition/Renovation Plan (to include engineering survey), (23.A.02)

mm. Rope Access Program, (24.H.02)

nn. Excavation/Trenching Plan, (25.A.01)

oo. Underground construction fire prevention and protection Plan, (26.D.01)

pp. Compressed Air Plan, (26.I.01)

qq. Formwork and Shoring Erection and Removal plan, (27.C)

rr. PreCast Concrete Plan, (27.D) ss Lift. slab plans, (27.E)

tt. Masonry Bracing Plan, (27.F.01)

uu. Steel Erection Plan, (28.B)

vv. Explosives Safety Site Plan (ESSP) (29.A)

ww. Blasting Plan, (29.A; 26.J)

xx. Underwater Dive Operations Plan, (30.A.14, 16, )

yy. Tree Felling/Maintenance Program, (31.A)

zz. Aircraft/Airfield Construction Safety & Phasing Plan, (32.A.02) aaa. Site Safety and Health Plan (HTRW), (33.B) bbb. Confined Space Entry Program, (34.A.06, 07)

10. Risk Management Processes. Detailed project-specific hazards shall be identified and controls provided via Activity Hazard CESO Form A-02 Sep 13

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:

Remarks (Any NO or N/A item)

Other Remarks:

CESO Form A-02 Sep 13

LOCATION: Williston Resource Office
CONTRACT NUMBER:
CONTRACTOR:
PROJECT: Repair Lift Station - Williston Resource Office
INSPECTOR:
1: Yes
2: Off
3: Off
4: Yes
5: Off
6: Off
7: Off
8: Off
9: Yes
10: Yes
11: Off
12: Off
t1:
t2:
t3:
t4:
13: Yes
14: Off
15: Off
t5:
16: Yes
17: Off
18: Off
19: Yes
20: Off
21: Off
22: Yes
23: Off
24: Off
25: Yes
26: Off
27: Off
28: Yes
29: Off
30: Off
31: Off
32: Off
33: Yes
34: Yes
35: Off
36: Off
37: Yes
38: Off
39: Off
t6:
t7:
t8:
t9:
t10:
t11:
t12:
t13:
DATE:
40: Yes
41: Off
42: Off
43: Yes
44: Off
45: Off
46: Yes
47: Off
48: Off
49: Yes
50: Off
51: Off
52: Yes
53: Off
54: Off
55: Yes
56: Off
57: Off
58: Yes
59: Off
60: Off
61: Yes
62: Off
63: Off
64: Yes
65: Off
66: Off
67: Yes
68: Off
69: Off
70: Off
71: Off
72: Yes
73: Off
74: Off
75: Yes
76: Off
77: Off
78: Yes
79: Off
80: Off
81: Yes
82: Off
83: Off
84: Yes
85: Yes
86: Off
87: Off
88: Yes
89: Off
90: Off
91: Yes
92: Off
93: Off
t14:
t15:
t16:
t17:
t18:
t19:
t20:
t21:
t22:
t23:
t24:
t25:
t26:
t27:
t28:
t29:
t30:
t31:
94: Off
95: Off
96: Yes
97: Yes
98: Off
99: Off
101: Off
102: Off
103: Yes
104: Off
105: Off
106: Yes
107: Off
108: Off
109: Yes
110: Yes
111: Off
112: Off
113: Off
114: Off
115: Yes
116: Yes
117: Off
118: Off
119: Off
120: Off
121: Yes
122: Yes
123: Off
124: Off
125: Yes
126: Off
127: Off
128: Yes
129: Off
130: Off
131: Off
132: Off
133: Yes
134: Off
135: Off
136: Yes
137: Off
138: Off
139: Yes
140: Off
141: Off
142: Yes
143: Off
144: Off
145: Yes
146: Off
147: Off
148: Yes
149: Off
150: Off
151: Yes
152: Off
153: Off
154: Yes
155: Off
156: Off
157: Yes
158: Off
159: Off
160: Yes
161: Off
162: Off
163: Yes
164: Off
165: Off
166: Yes
167: Off
168: Off
169: Yes
170: Off
171: Off
172: Yes
173: Off
174: Off
175: Yes
t32:
t33:
t34:
t35:
t36:
t37:
t38:
t40:
t41:
t42:
t43:
t44:
t45:
t46:
t47:
176: Off
177: Off
178: Yes
t48:
t49:
t50:
t51:
t52:
t53:
t54:
t55:
t56:
t57:
t58:
179: Off
180: Off
181: Yes
t59:
t60:
t61:
182: Off
183: Off
184: Yes
t62:
185: Off
186: Off
187: Yes
188: Off
189: Off
190: Yes
191: Off
192: Off
193: Yes
194: Off
195: Off
196: Yes
197: Off
198: Off
199: Yes
200: Yes
201: Off
202: Off
203: Off
204: Off
205: Yes
206: Off
207: Off
208: Yes
209: Off
210: Off
211: Yes
212: Off
213: Off
214: Yes
215: Off
216: Off
217: Yes
218: Yes
219: Off
220: Off
221: Off
222: Off
270: Off
223: Yes
224: Off
225: Off
226: Yes
227: Off
228: Off
229: Yes
230: Off
231: Off
232: Yes
233: Off
234: Off
235: Yes
236: Off
237: Off
238: Yes
239: Off
240: Off
241: Yes
242: Off
243: Off
244: Yes
245: Off
246: Off
247: Yes
248: Off
249: Off
250: Yes
251: Off
252: Off
253: Yes
254: Off
255: Off
256: Yes
257: Off
258: Off
259: Yes
260: Off
261: Off
262: Yes
263: Off
264: Off
265: Yes
266: Off
267: Off
268: Yes
t63:
t64:
t65:
t66:
t67:
t68:
t69:
t70:
t71:
269: Yes
271: Off
t72:
t73:
t74:
t75:
t76:
t77:
t78:
t79:
t80:
272: Off
273: Off
274: Yes
t81:
t82:
t83:
t84:
t85:
t86:
t87:
t88:
t89:
t90:
t91:
276: Yes
277: Off
278: Off
t92:
t93:
Other Remarks:

File details come from the government source that posted it. Updated .