W9128F22R0054 - Sec 001000 Pricing Schedule (for industry)v2.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Draft RFP/Industry Day Notice - B-21 RF Hangar (PIVOT) Federal contract opportunity
- Solicitation number
- W9128F22R0054
About this file
This federal contract opportunity notice provides information for an upcoming solicitation seeking construction services for a B-21 Radio Frequency Facility at Ellsworth Air Force Base in South Dakota. Key details include the project scope of constructing a 60,000 square foot hangar and associated facilities for radio frequency testing of the B-21 aircraft. The magnitude of construction is estimated between $60-80 million. The notice explores using a Price Includes Variation Over Time pricing strategy to account for inflation, requesting industry feedback on this approach by August 26th. A virtual industry day will be held on August 19th to discuss the potential use of the PIVOT strategy and address other questions. The period of performance for construction is 900 calendar days from notice to proceed. The solicitation is expected to utilize a design-bid-build project delivery method.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Slide-Deck_Industry-Day_B21-RF-Hangar.pdf | ||
| Slide-Deck_Industry-Day_B21-RF-Hangar.pdf | ||
| DRAFT_Slide-Deck_Industry-Day_B21-RF-Hangar.pdf | ||
| 20220801 - 00 22 00 - RF - clean (PIVOT Language)_DRAFT.pdf | ||
| 20220720 - 00 10 00-3_DRAFT.pdf | ||
| PIVOT Brief.pdf | ||
| W9128F22R0054_Draft RFP_B21 RF Hangar.pdf | ||
| 20220729 - Summary of Work_B-21 RF Hangar.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING CLIN SCHEDULE
SOLICITATION NUMBER: W9128F22R0054
Section 00 10 00: PRICING CLIN SCHEDULE
Project Title:
B-21: Radio Frequency Facility (RF Hangar)
Location:
Ellsworth Air Force Base, Rapid City, South Dakota
| Base Contract Line Item Number (CLIN) Schedule | ||||||
| Item No. | Description | Quantity | Unit | Unit Price | Period #1 | |
| (0-60 days*) | Period #2 | |||||
| (61-120 days*) | Period #3 |
(121-180 days*) Entire work complete for Construction of the B-21 Radio Frequency Facility (RF Hangar), complete to the five-foot line, excluding items separately listed below. Scope includes construction of the design and associated systems described above and throughout this Contract. (MILCON)
| 1 | JOB | XXX |
| 0002 |
Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the B-21 RF Hangar, excluding items listed separately below. (MILCON)
| 1 | JOB | XXX |
| 0003 |
Entire work complete for Demolition of Dock 63 and associated existing Features, Paving, Airfield Paving, Utilities and Infrastructure on the B-21 RF Hangar site excluding items separately listed below and as communicated in the Demolition drawings and specifications. (MILCON)
| 1 | JOB | XXX |
| 0004 |
Entire work complete for Construction of all Flightline paving - including Airfield Concrete, Airfield Ground Support Equipment (GSE) paving, and Airfield Shoulder Paving – to include all site preparation, base, drainage layer, underdrains, earthwork, underdrains, and pavement markings - excluding bid option paving listed separately below. (MILCON)
| 1 | JOB | XXX |
| 0005 |
Entire work complete for cybersecurity documentation, and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements. (MILCON)
| 1 | JOB | XXX | ||||
| TOTAL BASE OFFER | - | $0.00 | $0.00 | $0.00 | ||
| OPTION CLIN SCHEDULE | ||||||
| 0006 |
Entire work complete for Procurement and Installation of a 5-Part ESD Fuel Resistive Resinous Flooring System per specification 09 67 23.16 in lieu of a 3-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.15. (MILCON)
| 1 | JOB | XXX |
| 0007 |
Entire work complete for Construction of additional asphalt shoulders - to include all associated site preparation, base, earthwork, and pavement markings. (MILCON)
| 1 | JOB | XXX |
| 0008 |
Entire work complete (cost add) to perform finishing phases of project with US Citizens only in lieu of US Citizens or US Persons per specification 01 14 00 Work Restrictions. (MILCON)
| 1 | JOB | XXX |
| 0009 |
Entire work complete for Procurement and Installation of FF&E. (O&M)
| 1 | JOB | XXX |
| 0010 |
Entire work complete for Procurement, Installation, Commissioning, and Cybersecurity of Intrusion Detection System (IDS), and Access Control System (ACS). (O&M)
| 1 | JOB | XXX |
| 0011 |
Entire work complete for removal and disposal of additional asbestos containing material (ACM) measured in square feet (SF) (i.e., tile, mastic, cladding, etc.) in Dock 63 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. Assume 2,500 SF of material for this CLIN. See CLIN 0012 for ACM measured in LF. (MILCON)
| 1 | JOB | XXX |
| 0012 |
Entire work complete for removal and disposal of additional asbestos containing material (ACM) measured in linear feet (LF) (i.e., insulation, pipe insultation, etc.) in Dock 63 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. Assume 500 LF of material for this CLIN. See CLIN 0011 for ACM measured in SF. (MILCON)
| 1 | JOB | XXX |
| 0013 |
Entire work complete for additional removal and disposal of contaminated soils not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. Assume 500 CY of material for this CLIN. (MILCON)
| 1 | JOB | XXX |
| 0014 |
Entire work complete for removal and disposal of non-adhered lead based paint in Dock 63 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. Assume 2,500 CY of material for this CLIN. (MILCON)
| 1 | JOB | XXX |
| 0015 |
Entire work complete for removal and disposal of additional ACM piping not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. Assume 250 LF of material for this CLIN. (MILCON)
| 1 | JOB | XXX | |||
| TOTAL OPTION OFFER | $0.00 | $0.00 | $0.00 | ||
| TOTAL (Base + Option) OFFER PRICE | $0.00 | $0.00 | $0.00 | ||
| GOVERNMENT WEIGHTS (By Period) | 65% | 25% | 10% | ||
| ADJUSTED PRICE (Total Base + Options * Weighted Periods) | $0.00 | $0.00 | $0.00 |
TOTAL ADJUSTED PRICE (TAP) $0.00 Period of Performance (number of calendar days after issuance of Notice to Proceed) 900
NOTES:
1. See SECTION 00 21 01, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items 0006 and 0008 within 90 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0007, 0009, and 0010 within 730 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0011 - 0015 within 365 days of Notice to Proceed. Abbreviation: Operations and Maintenance (O&M).
2. Prices must be entered for all items of the schedule (highlighted in yellow). Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump sum prices and the total amount, the lump sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.
4. Contract duration is for award basic and option items. No contract duration extension will be provided upon award of any option items.
5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause FAR 52.211-18 “Variation in Estimated Quantities”.
6. In addition to the Supplemental Price Breakdown, please provide a short narrative that communicates primary cost drivers of the base bid that that may not be clearly depicted in the Supplemental Price Breakdown to be submitted with your proposal. Contents of narrative is at the Contractors’ discretion, but may used to gauge current market trends/conditions, may be used in the development of future projects, and may be used in determining if an amendment should be issued for this project. Please note that the contents of your response will have no impact on the award decision.
Section 00 11 00 Page &P
File details come from the government source that posted it. Updated .