KO W9128F22B0003 Bid Abstract.pdf

PDF 383 KB Posted

Attached to
Gavins Point Concrete Repairs Powerhouse Bridge
Solicitation number
W9128F22B0003
Issued by

About this file

This document contains details of a federal contract solicitation for concrete repairs at the Gavins Point Powerhouse Bridge. The U.S. Army Corps of Engineers, Omaha District is seeking bids for labor, equipment, and materials to perform concrete spall and delamination repairs on the powerhouse bridge and its approaches. Repairs include sealing surfaces, maintaining joints, and re-sloping an abutment wall deck. Site visits will be held on March 24th and bids are due on April 18th. The primary NAICS code is 237310 for highway, street, and bridge construction. The incumbent is responsible for commencement upon award and completion within 365 days of the notice to proceed. Questions should be directed to the specified contracting specialist. The location of work will be at Gavins Point Dam in Nebraska. Registration on SAM.gov may be required to access solicitation documents, which will be posted there.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

17-Mar-22 18-Apr-22

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

C. REASONABLE CONTRACT

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT

CLIN 0001

All plant, material, and labor required for concrete spall/delamination repairs (including new reinforcement where needed), on horizontal surfaces as shown on Sheets S-102 through S-104.

175 CF $221.00 $38,675.00 500.00$ $87,500.00 730.00$ $127,750.00

CLIN 0002 Entire work complete, all other work excluding Items 0001 and 0003-0006.

1 JOB 422,200.00$ $422,200.00 430,160.00$ $430,160.00 335,000.00$ $335,000.00

CLIN 0003

Option 1 - All plant, material, and labor required for concrete spall/delamination/crack repairs adjacent to two crane stops as shown on Sheet S-902. 1 JOB 102,400.000$ $102,400.00 128,900.00$ $128,900.00 35,000.00$ $35,000.00

CLIN 0004

Option 2 - All plant, material, and labor required for concrete spall/delamination repairs (including new reinforcement where needed), on vertical and overhead surfaces as shown on Sheets S-901 through S-903.

First 300 CF of concrete placed. 300 CF 783.00$ $234,900.00 745.00$ $223,500.00 540.00$ $162,000.00

CLIN 0005

Option 3 - All plant, material, and labor required for concrete spall/delamination repairs (including new reinforcement where needed), on vertical and overhead surfaces as shown on Sheets S-901 through S-903.

Next 150 CF of concrete placed. 150 CF 802.00$ $120,300.00 866.00$ $129,900.00 520.00$ $78,000.00

CLIN 0006

Option 4 - All plant, material, and labor required for concrete spall/delamination repairs (including new reinforcement where needed), on vertical and overhead surfaces as shown on Sheets S-901 through S-903.

Next 150 CF of concrete placed. 150 CF 802.00$ $120,300.00 866.00$ $129,900.00 520.00$ $78,000.00

TOTAL $1,038,775.00 $1,129,860.00 $815,750.00

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Connie Ellard - Contracting Officer/ Brianna Boehne - Contracting Specialist

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F22B0003

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

(Without Profit)

(Including Profit)

A. OFFEROR A. OFFEROR

IGE

A. HIRED LABOR

McGill Restoration Olympus Painting Contractors

B. REASONABLE CONTRACT

Bid Security 20% C. AMENDMENTS ACKNOWLEDGED Yes

Bid Security 20% C. AMENDMENTS ACKNOWLEDGED Yes

6. NUMBER OF AMENDMENTS ISSUED : 2

Gavins Point Powerhouse Bridge

18 Apr 2022

File details come from the government source that posted it. Updated .