This document contains an amendment to a solicitation and the related federal contract opportunity. The amendment modifies the solicitation for concrete repairs to the powerhouse bridge at Gavins Point Dam in Nebraska. It provides details on allowing drilling into the concrete structure to attach scaffolding, with confirmation of locations required via ground penetrating radar scans. It also allows for removal and replacement of the existing handrail and fence to accommodate under-deck repairs, contingent on submitting and obtaining approval for plans regarding fall protection and barriers during removal. The pre-solicitation opportunity is for highway, street and bridge construction services with an estimated value under $40 million. The site visit was on March 24th and bids are due by April 18th, 2022. The work includes concrete repairs, resurfacing an abutment wall, sealing structures, and maintaining joints over a 365-day period. The solicitation and any amendments are available through SAM.gov using the provided number. The point of contact for questions is named and contact information is given. Performance will be at the dam location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate Amendment No. 0001 to the Specifications. See Am0001 in SF30 Block 14 Continuation Page for description of amendment changes. All other terms and conditions remain the same.

Concrete Repairs Pow erhouse Bridge Gavins Point Dam, NE Government POC: Brianna Boehe

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F22B0003

X 9B. DATED (SEE ITEM 11)

17-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2022

CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128F22B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AM0001

Solicitation No. W9128F22B0003

Date of Issue: 17 March 2022 Date of Opening: 18 April 2022

SUBJECT: Amendment No. 0001 to Specifications and Drawings for Construction of Concrete Repairs Powerhouse Bridge Gavin’s Point Dam, NE.

TO: Prospective Bidders and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 01 12 00 Page 2, paragraph 1.3

Add in a subparagraph after main paragraph that reads:

“Government will allow drilling into concrete elements to attached scaffolding for under deck repairs but rebar must be avoided. It is expected that contractors shall confirm exact locations with GPR scans. Drill plan with locations to be added as a submittal item.”

(2) Section 01 12 00 Page 2, paragraph 1.3

Add in an additional subparagraph after the main paragraph that reads:

“Removal of the existing handrail and the fence will be allowed to accommodate under deck repairs. The handrail and the fence must be replaced to the original condition after the work is completed. The Contractor must submit complete plan for removing and reinstalling the handrail/fence for the Government approval. The Contractor must follow EM 385-1-1 Safety and Health Requirements include but not limited to:

- Temporary Guard rail meeting EM 385-1-1 and OSHA 1926 Standards must be put in place.- When temp guard rail is removed for equipment access, employees must be in fall restraint per EM 385-1-1 and OSHA.

- If vehicles and heavy equipment are used on bridge when guard rail is removed, temporary equipment/vehicle barrier shall be provided to include stop logs or barriers.”

(3) Section 01 12 00 Page 4, paragraph 1.8

W9128F22B0003

Insert the following two submittals after Proposed Methods of Operations:

“-Drilling Plan with Locations for Scaffolding Installation

- Plan for Removing and Reinstalling the Handrail/Fence”

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

Pages or Sections Deleted Pages or Sections Substituted or Added

Submittal Register Submittal Register Am0001

2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.

a. See Section 00 21 00 Instructions to Bidders, on how to submit electronic bids.

3. Electric bids will be received until 2:00 p.m., local time at place of bid opening, 18 April 2022.

Attachments:

Spec Pages listed in 1.b. above

U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

31 March 2022

JAC 2100

(End of Summary of Changes)