SPECIFICATIONS AND
DRAWINGS
Solicitation No. W9128F21R0076
IDCC Road Rehab Fort Randall, SD
May 2021
US Army Corps of Engineers Omaha District
This page was intentionally left blank for duplex printing.
IDCC Road Rehab Fort Randall, SD
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 SOLICITATION, OFFER AND AWARD
00 10 00-3 PRICING SCHEDULE
00 21 00 INSTRUCTIONS TO OFFERORS
00 22 00 PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS AND
EVALUATION
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 GENERAL CONDITIONS (CONTRACT CLAUSES - IFB)
00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS)
DIVISION 01 - GENERAL REQUIREMENTS
01 12 00 CONSTRUCTION GENERAL
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 41 26.01 24 (SOUTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES FROM CONSTRUCTION SITES
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 22 GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 COLD MILLING/PAVEMENT DEMOLITION
32 01 17.61 SEALING CRACKS IN ASPHALT PAVEMENTS
32 11 23 MATERIAL STOCKPILING AND CONCRETE AND ASPHALT
CRUSHING/MIXING
32 12 13 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 36.13 ASPHALTIC SEAL AND FOG COATS
32 15 00 AGGREGATE BASE AND SURFACE COURSE
32 16 19 CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W9128F21R0076
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
The offeror hereby agrees to do all work described in the documents entitled:
IDCC Road Rehab For Fort Randall Dam, SD
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), AND SECTION 00 45 00.
ELECTONIC COPIES OF OFFER ARE ACCEPTABLE.
THIS SOLICITATION IS RESTRICTED 100% TO SMALL BUSINESS INTERESTS.
8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
POC: Constance Ellard (W9128F21R0076) Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
CT
Constance Ellard (402) 995-2726
1 of 37 ___05/07/2021 local time 06/08/2021
2:00 pm
* See Section 00 73 00
X
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
DUNS Number or Unique Entity Identifier Number:
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
SEE ATTACHED CLIN SCHEDULE
Contractor’s Fax No.____________ CAGE CODE ________________ Contractor’s E-Mail address_______________
00 10 00 Page 3
PRICING SCHEDULE – BASE YEAR #1
ITEM
NO.
DESCRIPTION
MINIMUM
QUANTITY
UNIT OF
MEASURE
UNIT
PRICE
AMOUNT
0100. Construction Support Activities
0100AA Surveying and Field Work 1 EA
0100AB Temporary Storm Water Pollution Control
1 EA
0101. EARTHWORK (31 00 00)
0101AA Mobilization/Demobilization For Unclassified Excavation
1 EA
0101AB Unclassified Excavation
(25-100 CY)
25 CY
0101AC Unclassified Excavation (Over 100 CY)
101 CY
0101AD Mobilization/Demobilization For Borrow (Government Furnished)
1 EA
0101AE Borrow (Government Furnished)
(25-100 CY)
25 CY
0101AF Borrow (Government Furnished) (Over 100 CY)
101 CY
0101AG Mobilization/Demobilization For Borrow (Contractor Furnished)
1 EA
0101AH Borrow (Contractor Furnished)
(25-100 TON)
25 TON
0101AI Borrow (Contractor Furnished) (Over 100 TON)
101 TON
0101AJ Salvaging, Stockpiling, and Placing Topsoil
50 CY
0101AK Existing Surface Preparation 50 SY
0101AL Ordinary Roadway Shaping 500 SY
0101AM Heavy Roadway Shaping 500 SY
0101AN Mobilization/Demobilization For Riprap Construction
1 EA
0101AO Riprap Placement 500 TON
0101AP Bedding Placement 500 TON
0102. GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
00 10 00 Page 4
0102AA Geotextile Fabric (Road Construction)
100 SY
0102AB Geotextile Fabric (Riprap Construction)
100 SY
0102AC Procure Geotextile Fabric (Road Construction)
100 SY
0102AD Procure Geotextile Fabric (Riprap Construction)
100 SY
0103. COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0103AA Mobilization/Demobilization For Cold Milling (Less than 4" Milling Depth)
1 EA
0103AB Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0103AC Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001 SY
0103AD Mobilization/Demobilization For Cold Milling (Over 4" Milling Depth)
1 EA
0103AE Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0103AF Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001 SY
0103AG Mobilization/Demobilization For Pavement Demolition/Removal
1 EA
0103AH Pavement Demolition/Removal 100 SY
0104. SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0104AA Mobilization/Demobilization For Asphalt Crack Sealing
1 EA
0104AB Asphalt Crack Sealing (1,000 FT to 2,500 FT)
1,000 FT
0104AC Asphalt Crack Sealing (Over 2,500 FT)
2,501 FT
0105. MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0105AA Procure Riprap 500 TON
0105AB Procure Spalls 500 TON
0105AC Procure Filter Rock 100 TON $_______ $_______
0105AD Procure Manufactured Sand 100 TON
00 10 00 Page 5
0105AE Procure Other Material - Subbase Course
500 TON
0105AF Procure Other Material - Gravel Cushion Course
500 TON
0105AG Procure Other Material - Aggregate Base Course
500 TON
0105AH Procure Other Material - Gravel Surfacing
500 TON
0105AI Procure Topsoil 100 TON
0105AJ Procure Composting Topsoil 100 TON
0105AK Procure Riprap (Oacoma Location) 500 TON
0105AL Procure Spalls (Oacoma Location) 500 TON
0105AM Procure Other Material – Gravel Surfacing (Oacoma Location)
500 TON
0105AN Procure Other Material – Aggregate Base Course (Oacoma Location)
500 TON
0105AO Procure Topsoil (Oacoma Location) 100 TON
0105AP Mobilization/Demobilization For Crushing & Mixing Operations
1 EA
0105AQ Concrete Crushing 250 TON $_______ $_______
0105AR Asphalt Crushing/Mixing 250 TON
0106. BITUMINOUS TACK COATS (32 12 13)
0106AA Tack Coat Asphalt 5 TON $_______ $_______
0107. HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0107AA Mobilization/Demobilization For Asphalt Concrete Composite
1 EA
0107AB Asphalt Concrete Composite 100 TON
0107AC Mobilization/Demobilization For Potholes Repair
1 EA
0107AD Pothole Repair (Deep Patch) 50 SF $_______ $_______
0108. ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0108AA Mobilization/Demobilization For Emulsified Asphalt Seal Coat
1 EA
0108AB Emulsified Asphalt: CRS-2P (For Chip Seal) (5-10 TON)
5 TON
00 10 00 Page 6
0108AC Emulsified Asphalt: CRS-2P (For Chip Seal) (Over 10 TON)
11 TON
0108AD Chip Seal Aggregate: Type 2B
(50-100 TON)
50 TON
0108AE Chip Seal Aggregate: Type 2B (Over 100 TON)
101 TON
0108AF Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (1-5
TON)
1 TON
0108AG Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (Over 5 TON)
6 TON
0108AH Flush Seal Aggregate
(10-50 TON)
10 TON
0108AI Flush Seal Aggregate (Over 50 TON)
51 TON
0108AJ Mobilization/Demobilization For Vacuum Sweep
1 EA
0108AK Vacuum Sweep 3,000 SY $_______ $_______
0108AL Mobilization/Demobilization For Power Broom
1 EA
0108AM Power Broom 3,000 SY $_______ $_______
0109. AGGREGATE BASE & SURFACE COURSE (32 15 00)
0109AA Mobilization/Demobilization For Aggregate Base & Surface Course
1 EA
0109AB Subbase Course 250 TON $_______ $_______
0109AC Gravel Cushion Course 250 TON $_______ $_______
0109AD Base Course 250 TON $_______ $_______
0109AE Gravel Surfacing Course 250 TON
0110. CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0110AA Mobilization/Demobilization Concrete Pavement & Sidewalk
(10 CY - 50 CY)
1 EA
0110AB Concrete Pavement & Sidewalk
(10 CY - 50 CY)
10 CY
0110AC Mobilization/Demobilization Concrete Pavement & Sidewalk (Over 50 CY)
1 EA
0110AD Concrete Pavement & Sidewalk (Over 50 CY)
51 CY
00 10 00 Page 7
0110AE Mobilization/Demobilization For Sidewalk Removal
1 EA
0110AF Sidewalk Removal 50 SF $_______ $_______
0110AG Mobilization/Demobilization For Curb and Gutter (Cast)
1 EA
0110AH Curb and Gutter Type B (Cast)
50 FT
0110AI Curb and Gutter Type P (Cast)
50 FT
0110AJ Curb and Gutter Valley Gutter (Cast)
50 FT
0110AK Mobilization/Demobilization For Curb and Gutter (Slip Form)
1 EA
0110AL Curb and Gutter Type B (Slip form)
750 FT
0110AM Curb and Gutter Type P (Slip form)
750 FT
0110AN Epoxy Coated Rebar 50 LB $_______ $_______
0110AO Plain Coated Rebar 50 LB $_______ $_______
0110AP Plain Welded Wire Reinforcement (6x6-W2.1 x W2.1)
50 SF
0110AQ Plain Welded Wire Reinforcement (6x6-W2.9 x W2.9)
50 SF
0110AR Mobilization/Demobilization For Concrete Pump Truck
1 EA
0110AS Concrete Placement – Boom Pump Truck
50 CY
0110AT Mobilization/Demobilization for Concrete Buggy Placement
1 EA
0110AU Concrete Placement - Buggy 50 CY
0110AV Remove and Replace Joint Sealant (200 FT to 600 FT)
200 FT
0110AW Remove and Replace Joint Sealant (Over 600 FT)
601 FT
0111. PAVEMENT MARKING (32 17 23)
0111AA Mobilization/Demobilization For Pavement Marking (reflective, non-reflective, and painted symbols)
1 EA
0111AB Reflective Paint 3,000 FT $_______ $_______
0111AC Non-reflective paint 300 FT $_______ $_______
00 10 00 Page 8
0111AD Non-reflective Painted Symbols
1 EA
0112. SEEDING (32 92 19)
0112AA Mobilization/Demobilization For Seeding & Mulching
1 EA
0112AB Seed & Mulch 300 SY $_______ $_______
0112AC Mobilization/Demobilization For Hydroseeding
1 EA
0112AD Hydroseeding 300 SY $_______ $_______
0112AE Erosion Control Blanket 50 SY $_______ $_______
0113. STORM DRAINAGE UTILITIES (33 40 00)
0113AA Mobilization/Demobilization For Pipe Culvert Construction
1 EA
0113AB Furnish Pipe Culvert (24” RCP Arch Class 2)
20 FT
0113AC Install Pipe Culvert, 0’-5’ Deep (24” RCP Arch Class 2)
20 FT
0113AD Install Pipe Culvert, 5’-10’ Deep (24” RCP Arch Class 2)
20 FT
0113AE Furnish End Section (24” RCP Arch Flared)
1 EA
0113AF Install End Section (24” RCP Arch Flared)
1 EA
0113AG Pipe Culvert Undercut 5 CY
Total Base Year #1 (Items 0100 thru 0113) $__________
00 10 00 Page 9
NOTES:
-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.
-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee.
Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee for the material in excess of 100 CY.
00 10 00 Page 10
PRICING SCHEDULE - BASE YEAR #2
NO.
DESCRIPTION
MINIMUM
QUANTITY
UNIT OF
MEASURE
UNIT
PRICE
AMOUNT
0200. Construction Support Activities
0200AA Surveying and Field Work 1 EA
0200AB Temporary Storm Water Pollution Control
1 EA
0201. EARTHWORK (31 00 00)
0201AA Mobilization/Demobilization
1 EA
0201AB Unclassified Excavation
(25-100 CY)
25 CY
0201AC Unclassified Excavation (Over 100 CY)
101 CY
0201AD Mobilization/Demobilization For Borrow (Government Furnished)
1 EA
0201AE Borrow(Government Furnished)
(25-100 CY)
25 CY
0201AF Borrow(Government Furnished) (Over 100 CY)
101 CY
0201AG Mobilization/Demobilization For Borrow (Contractor Furnished)
1 EA
0201AH Borrow(Contractor Furnished)
(25-100 TON)
25 TON
0201AI Borrow(Contractor Furnished) (Over 100 TON)
101 TON
0201AJ Salvaging, Stockpiling, and Placing Topsoil
50 CY
0201AK Existing Surface Preparation 50 SY
0201AL Ordinary Roadway Shaping 500 SY
0201AM Heavy Roadway Shaping 500 SY
0201AN Mobilization/Demobilization For Riprap Construction
1 EA
0201AO Riprap Placement 500 TON
0201AP Bedding Placement 500 TON
0202. GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
00 10 00 Page 11
0202AA Geotextile Fabric (Road Construction)
100 SY
0202AB Geotextile Fabric (Riprap Construction)
100 SY
0202AC Procure Geotextile Fabric (Road Construction)
100 SY
0202AD Procure Geotextile Fabric (Riprap Construction)
100 SY
0203. COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0203AA Mobilization/Demobilization For Cold Milling (Less than 4" Milling Depth)
1 EA
0203AB Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0203AC Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001 SY
0203AD Mobilization/Demobilization For Cold Milling (Over 4" Milling Depth)
1 EA
0203AE Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0203AF Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001 SY
0203AG Mobilization/Demobilization For Pavement Demolition/Removal
1 EA
0203AH Pavement Demolition/Removal 100 SY
0204. SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0204AA Mobilization/Demobilization For Asphalt Crack Sealing
1 EA
0204AB Asphalt Crack Sealing (1,000 FT to 2,500 FT)
1,000 FT
0204AC Asphalt Crack Sealing (Over 2,500 FT)
2,501 FT
0205. MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0205AA Procure Riprap 500 TON
0205AB Procure Spalls 500 TON
0205AC Procure Filter Rock 100 TON $_______ $_______
0205AD Procure Manufactured Sand 100 TON
00 10 00 Page 12
0205AE Procure Other Material - Subbase Course
500 TON
0205AF Procure Other Material - Gravel Cushion Course
500 TON
0205AG Procure Other Material - Aggregate Base Course
500 TON
0205AH Procure Other Material - Gravel Surfacing
500 TON
0205AI Procure Topsoil 100 TON
0205AJ Procure Composting Topsoil 100 TON
0205AK Procure Riprap (Oacoma Location) 500 TON
0205AL Procure Spalls (Oacoma Location) 500 TON
0205AM Procure Other Material – Gravel Surfacing (Oacoma Location)
500 TON
0205AN Procure Other Material – Aggregate Base Course (Oacoma Location)
500 TON
0205AO Procure Topsoil (Oacoma Location) 100 TON
0205AP Mobilization/Demobilization For Crushing & Mixing Operations
1 EA
0205AQ Concrete Crushing 250 TON $_______ $_______
0205AR Asphalt Crushing/Mixing 250 TON
0206. BITUMINOUS TACK COATS (32 12 13)
0206AA Tack Coat Asphalt 5 TON $_______ $_______
0207. HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0207AA Mobilization/Demobilization
1 EA
0207AB Asphalt Concrete Composite 100 TON
0207AC Mobilization/Demobilization For Potholes Repair
1 EA
0207AD Pothole Repair (Deep Patch) 50 SF $_______ $_______
0208. ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0208AA Mobilization/Demobilization
1 EA
0208AB Emulsified Asphalt: CRS-2P (For Chip Seal) (5-10 TON)
5 TON
0208AC Emulsified Asphalt: CRS-2P (For Chip Seal) (Over 10 TON)
11 TON
00 10 00 Page 13
0208AD Chip Seal Aggregate: Type 2B
(50-100 TON)
50 TON
0208AE Chip Seal Aggregate: Type 2B (Over 100 TON)
101 TON
0208AF Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (1-5
TON)
1 TON
0208AG Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (Over 5 TON)
6 TON
0208AH Flush Seal Aggregate
(10-50 TON)
10 TON
0208AI Flush Seal Aggregate (Over 50 TON)
51 TON
0208AJ Mobilization/Demobilization For Vacuum Sweep
1 EA
0208AK Vacuum Sweep 3,000 SY $_______ $_______
0208AL Mobilization/Demobilization For Power Broom
1 EA
0208AM Power Broom 3,000 SY $_______ $_______
0209. AGGREGATE BASE & SURFACE COURSE (32 15 00)
0209AA Mobilization/Demobilization For Aggregate Base & Surface Course
1 EA
0209AB Subbase Course 250 TON $_______ $_______
0209AC Gravel Cushion Course 250 TON $_______ $_______
0209AD Base Course 250 TON $_______ $_______
0209AE Gravel Surfacing Course 250 TON
0210. CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0210AA Mobilization/Demobilization Concrete Pavement & Sidewalk
(10 CY - 50 CY)
1 EA
0210AB Concrete Pavement & Sidewalk
(10 CY - 50 CY)
10 CY
0210AC Mobilization/Demobilization Concrete Pavement & Sidewalk (Over 50 CY)
1 EA
0210AD Concrete Pavement & Sidewalk (Over 50 CY)
51 CY
0210AE Mobilization/Demobilization For Sidewalk Removal
1 EA
00 10 00 Page 14
0210AF Sidewalk Removal 50 SF
0210AG Mobilization/Demobilization For Curb and Gutter (Cast)
1 EA
0210AH Curb and Gutter Type B (Cast)
50 FT
0210AI Curb and Gutter Type P (Cast)
50 FT
0210AJ Curb and Gutter Valley Gutter (Cast)
50 FT
0210AK Mobilization/Demobilization For Curb and Gutter (Slip Form)
1 EA
0210AL Curb and Gutter Type B (Slip form)
750 FT
0210AM Curb and Gutter Type P (Slip form)
750 FT
0210AN Epoxy Coated Rebar 50 LB $_______ $_______
0210AO Plain Coated Rebar 50 LB $_______ $_______
0210AP Plain Welded Wire Reinforcement (6x6-W2.1 x W2.1)
50 SF
0210AQ Plain Welded Wire Reinforcement (6x6-W2.9 x W2.9)
50 SF
0210AR Mobilization/Demobilization For Concrete Pump Truck
1 EA
0210AS Concrete Placement – Boom Pump Truck
50 CY
0210AT Mobilization/Demobilization for Concrete Buggy Placement
1 EA
0210AU Concrete Placement - Buggy 50 CY
0210AV Remove and Replace Joint Sealant (200 FT to 600 FT)
200 FT
0210AW Remove and Replace Joint Sealant (Over 600 FT)
601 FT
0211. PAVEMENT MARKING (32 17 23)
0211AA Mobilization/Demobilization non-reflective, and painted symbols)
1 EA
0211AB Reflective Paint 3,000 FT $_______ $_______
0211AC Non-reflective paint 300 FT $_______ $_______
0211AD Non-reflective Painted Symbols
1 EA
00 10 00 Page 15
0212. SEEDING (32 92 19)
0212AA Mobilization/Demobilization For Seeding & Mulching
1 EA
0212AB Seed & Mulch 300 SY $_______ $_______
0212AC Mobilization/Demobilization For Hydroseeding
1 EA
0212AD Hydroseeding 300 SY $_______ $_______
0212AE Erosion Control Blanket 50 SY $_______ $_______
0213. STORM DRAINAGE UTILITIES (33 40 00)
0213AA Mobilization/Demobilization For Pipe Culvert Construction
1 EA
0213AB Furnish Pipe Culverts (24” RCP Arch Class 2)
20 FT
0213AC Install Pipe Culverts, 0’-5’ Deep (24” RCP Arch Class 2)
20 FT
0213AD Install Pipe Culverts, 5’-10’ Deep (24” RCP Arch Class 2)
20 FT
0213AE Furnish End Sections (24” RCP Arch Flared)
1 EA
0213AF Install End Sections (24” RCP Arch Flared)
1 EA
0213AG Pipe Culvert Undercut 5 CY
Total Base Year #2 (Items 0200 thru 0213) $__________
-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.
-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee.
Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for
00 10 00 Page 16
PRICING SCHEDULE - BASE YEAR #3
NO.
DESCRIPTION
MINIMUM
QUANTITY
UNIT OF
MEASURE
UNIT
PRICE
AMOUNT
0300. Construction Support Activities
0300AA Surveying and Field Work 1 EA
0300AB Temporary Storm Water Pollution Control
1 EA
0301. EARTHWORK (31 00 00)
0301AA Mobilization/Demobilization
1 EA
0301AB Unclassified Excavation
(25-100 CY)
25 CY
0301AC Unclassified Excavation (Over 100 CY)
101 CY
0301AD Mobilization/Demobilization For Borrow (Government Furnished)
1 EA
0301AE Borrow(Government Furnished)
(25-100 CY)
25 CY
0301AF Borrow(Government Furnished) (Over 100 CY)
101 CY
0301AG Mobilization/Demobilization For Borrow (Contractor Furnished)
1 EA
0301AH Borrow(Contractor Furnished)
(25-100 TON)
25 TON
0301AI Borrow(Contractor Furnished) (Over 100 TON)
101 TON
0301AJ Salvaging, Stockpiling, and Placing Topsoil
50 CY
0301AK Existing Surface Preparation 50 SY
0301AL Ordinary Roadway Shaping 500 SY
0301AM Heavy Roadway Shaping 500 SY
0301AN Mobilization/Demobilization For Riprap Construction
1 EA
0301AO Riprap Placement 500 TON
0301AP Bedding Placement 500 TON
0302. GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
00 10 00 Page 17
0302AA Geotextile Fabric (Road Construction)
100 SY
0302AB Geotextile Fabric (Riprap Construction)
100 SY
0302AC Procure Geotextile Fabric (Road Construction)
100 SY
0302AD Procure Geotextile Fabric (Riprap Construction)
100 SY
0303. COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0303AA Mobilization/Demobilization For Cold Milling (Less than 4" Milling Depth)
1 EA
0303AB Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0303AC Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001 SY
0303AD Mobilization/Demobilization For Cold Milling (Over 4" Milling Depth)
1 EA
0303AE Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0303AF Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001 SY
0303AG Mobilization/Demobilization For Pavement Demolition/Removal
1 EA
0303AH Pavement Demolition/Removal 100 SY
0304. SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0304AA Mobilization/Demobilization For Asphalt Crack Sealing
1 EA
0304AB Asphalt Crack Sealing (1,000 FT to 2,500 FT)
1,000 FT
0304AC Asphalt Crack Sealing (Over 2,500 FT)
2,501 FT
0305. MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0305AA Procure Riprap 500 TON
0305AB Procure Spalls 500 TON
0305AC Procure Filter Rock 100 TON $_______ $_______
0305AD Procure Manufactured Sand 100 TON
00 10 00 Page 18
0305AE Procure Other Material - Subbase Course
500 TON
0305AF Procure Other Material - Gravel Cushion Course
500 TON
0305AG Procure Other Material - Aggregate Base Course
500 TON
0305AH Procure Other Material - Gravel Surfacing
500 TON
0305AI Procure Topsoil 100 TON
0305AJ Procure Composting Topsoil 100 TON
0305AK Procure Riprap (Oacoma Location) 500 TON
0305AL Procure Spalls (Oacoma Location) 500 TON
0305AM Procure Other Material – Gravel Surfacing (Oacoma Location)
500 TON
0305AN Procure Other Material – Aggregate Base Course (Oacoma Location)
500 TON
0305AO Procure Topsoil (Oacoma Location) 100 TON
0305AP Mobilization/Demobilization For Crushing & Mixing Operations
1 EA
0305AQ Concrete Crushing 250 TON $_______ $_______
0305AR Asphalt Crushing/Mixing 250 TON
0306. BITUMINOUS TACK COATS (32 12 13)
0306AA Tack Coat Asphalt 5 TON $_______ $_______
0307. HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0307AA Mobilization/Demobilization
1 EA
0307AB Asphalt Concrete Composite 100 TON
0307AC Mobilization/Demobilization For Potholes Repair
1 EA
0307AD Pothole Repair (Deep Patch) 50 SF
0308. ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0308AA Mobilization/Demobilization
1 EA
0308AB Emulsified Asphalt: CRS-2P (For Chip Seal) (5-10 TON)
00 10 00 Page 19
0308AC Emulsified Asphalt: CRS-2P (For Chip Seal) (Over 10 TON)
11 TON
0308AD Chip Seal Aggregate: Type 2B
(50-100 TON)
50 TON
0308AE Chip Seal Aggregate: Type 2B (Over 100 TON)
101 TON
0308AF Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (1-5
TON)
1 TON
0308AG Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (Over 5 TON)
6 TON
0308AH Flush Seal Aggregate
(10-50 TON)
10 TON
0308AI Flush Seal Aggregate (Over 50 TON)
51 TON
0308AJ Mobilization/Demobilization For Vacuum Sweep
1 EA
0308AK Vacuum Sweep 3,000 SY $_______ $_______
0308AL Mobilization/Demobilization For Power Broom
1 EA
0308AM Power Broom 3,000 SY $_______ $_______
0309. AGGREGATE BASE & SURFACE COURSE (32 15 00)
0309AA Mobilization/Demobilization For Aggregate Base & Surface Course
1 EA
0309AB Subbase Course 250 TON $_______ $_______
0309AC Gravel Cushion Course 250 TON $_______ $_______
0309AD Base Course 250 TON $_______ $_______
0309AE Gravel Surfacing Course 250 TON
0310. CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0310AA Mobilization/Demobilization Concrete Pavement & Sidewalk
(10 CY - 50 CY)
1 EA
0310AB Concrete Pavement & Sidewalk
(10 CY - 50 CY)
10 CY
0310AC Mobilization/Demobilization Concrete Pavement & Sidewalk (Over 50 CY)
1 EA
0310AD Concrete Pavement & Sidewalk (Over 50 CY)
00 10 00 Page 20
0310AE Mobilization/Demobilization For Sidewalk Removal
1 EA
0310AF Sidewalk Removal 50 SF
0310AG Mobilization/Demobilization For Curb and Gutter (Cast)
1 EA
0310AH Curb and Gutter Type B (Cast)
50 FT
0310AI Curb and Gutter Type P (Cast)
50 FT
0310AJ Curb and Gutter Valley Gutter (Cast)
50 FT
0310AK Mobilization/Demobilization For Curb and Gutter (Slip Form)
1 EA
0310AL Curb and Gutter Type B (Slip form)
750 FT
0310AM Curb and Gutter Type P (Slip form)
750 FT
0310AN Epoxy Coated Rebar 50 LB $_______ $_______
0310AO Plain Coated Rebar 50 LB $_______ $_______
0310AP Plain Welded Wire Reinforcement (6x6-W2.1 x W2.1)
50 SF
0310AQ Plain Welded Wire Reinforcement (6x6-W2.9 x W2.9)
50 SF
0310AR Mobilization/Demobilization For Concrete Pump Truck
1 EA
0310AS Concrete Placement – Boom Pump Truck
50 CY
0310AT Mobilization/Demobilization for Concrete Buggy Placement
1 EA
0310AU Concrete Placement - Buggy 50 CY
0310AV Remove and Replace Joint Sealant (200 FT to 600 FT)
200 FT
0310AW Remove and Replace Joint Sealant (Over 600 FT)
601 FT
0311. PAVEMENT MARKING (32 17 23)
0311AA Mobilization/Demobilization non-reflective, and painted symbols)
1 EA
0311AB Reflective Paint 3,000 FT $_______ $_______
0311AC Non-reflective paint 300 FT $_______ $_______
00 10 00 Page 21
0311AD Non-reflective Painted Symbols
1 EA
0312. SEEDING (32 92 19)
0312AA Mobilization/Demobilization For Seeding & Mulching
1 EA
0312AB Seed & Mulch 300 SY $_______ $_______
0312AC Mobilization/Demobilization For Hydroseeding
1 EA
0312AD Hydroseeding 300 SY $_______ $_______
0312AE Erosion Control Blanket 50 SY $_______ $_______
0313. STORM DRAINAGE UTILITIES (33 40 00)
0313AA Mobilization/Demobilization For Pipe Culvert Construction
1 EA
0313AB Furnish Pipe Culverts (24” RCP Arch Class 2)
20 FT
0313AC Install Pipe Culverts, 0’-5’ Deep (24” RCP Arch Class 2)
20 FT
0313AD Install Pipe Culverts, 5’-10’ Deep (24” RCP Arch Class 2)
20 FT
0313AE Furnish End Sections (24” RCP Arch Flared)
1 EA
0313AF Install End Sections (24” RCP Arch Flared)
1 EA
0313AG Pipe Culvert Undercut 5 CY
Total Base Year #3 (Items 0300 thru 0313) $__________
00 10 00 Page 22
-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.
-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee.
Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for
00 10 00 Page 23
PRICING SCHEDULE - BASE YEAR #4
NO.
DESCRIPTION
MINIMUM
QUANTITY
UNIT OF
MEASURE
UNIT
PRICE
AMOUNT
0400. Construction Support Activities
0400AA Surveying and Field Work 1 EA
0400AB Temporary Storm Water Pollution Control
1 EA
0401. EARTHWORK (31 00 00)
0401AA Mobilization/Demobilization
1 EA
0401AB Unclassified Excavation
(25-100 CY)
25 CY
0401AC Unclassified Excavation (Over 100 CY)
101 CY
0401AD Mobilization/Demobilization For Borrow (Government Furnished)
1 EA
0401AE Borrow(Government Furnished)
(25-100 CY)
25 CY
0401AF Borrow(Government Furnished) (Over 100 CY)
101 CY
0401AG Mobilization/Demobilization For Borrow (Contractor Furnished)
1 EA
0401AH Borrow(Contractor Furnished)
(25-100 TON)
25 TON
0401AI Borrow(Contractor Furnished) (Over 100 TON)
101 TON
0401AJ Salvaging, Stockpiling, and Placing Topsoil
50 CY
0401AK Existing Surface Preparation 50 SY
0401AL Ordinary Roadway Shaping 500 SY
0401AM Heavy Roadway Shaping 500 SY
0401AN Mobilization/Demobilization For Riprap Construction
1 EA
0401AO Riprap Placement 500 TON
0401AP Bedding Placement 500 TON
0402. GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
00 10 00 Page 24
0402AA Geotextile Fabric (Road Construction)
100 SY
0402AB Geotextile Fabric (Riprap Construction)
100 SY
0402AC Procure Geotextile Fabric (Road Construction)
100 SY
0402AD Procure Geotextile Fabric (Riprap Construction)
100 SY
0403. COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0403AA Mobilization/Demobilization For Cold Milling (Less than 4" Milling Depth)
1 EA
0403AB Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0403AC Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001 SY
0403AD Mobilization/Demobilization For Cold Milling (Over 4" Milling Depth)
1 EA
0403AE Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0403AF Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001 SY
0403AG Mobilization/Demobilization For Pavement Demolition/Removal
1 EA
0403AH Pavement Demolition/Removal 100 SY
0404. SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0404AA Mobilization/Demobilization For Asphalt Crack Sealing
1 EA
0404AB Asphalt Crack Sealing (1,000 FT to 2,500 FT)
1,000 FT
0404AC Asphalt Crack Sealing (Over 2,500 FT)
2,501 FT
0405. MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0405AA Procure Riprap 500 TON
0405AB Procure Spalls 500 TON
0405AC Procure Filter Rock 100 TON $_______ $_______
0405AD Procure Manufactured Sand 100 TON
00 10 00 Page 25
0405AE Procure Other Material - Subbase Course
500 TON
0405AF Procure Other Material - Gravel Cushion Course
500 TON
0405AG Procure Other Material - Aggregate Base Course
500 TON
0405AH Procure Other Material - Gravel Surfacing
500 TON
0405AI Procure Topsoil 100 TON
0405AJ Procure Composting Topsoil 100 TON
0405AK Procure Riprap (Oacoma Location) 500 TON
0405AL Procure Spalls (Oacoma Location) 500 TON
0405AM Procure Other Material – Gravel Surfacing (Oacoma Location)
500 TON
0405AN Procure Other Material – Aggregate Base Course (Oacoma Location)
500 TON
0405AO Procure Topsoil (Oacoma Location) 100 TON
0405AP Mobilization/Demobilization For Crushing & Mixing Operations
1 EA
0405AQ Concrete Crushing 250 TON $_______ $_______
0405AR Asphalt Crushing/Mixing 250 TON
0406. BITUMINOUS TACK COATS (32 12 13)
0406AA Tack Coat Asphalt 5 TON $_______ $_______
0407. HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0407AA Mobilization/Demobilization
1 EA
0407AB Asphalt Concrete Composite 100 TON
0407AC Mobilization/Demobilization For Potholes Repair
1 EA
0407AD Pothole Repair (Deep Patch) 50 SF
0408. ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0408AA Mobilization/Demobilization
1 EA
0408AB Emulsified Asphalt: CRS-2P (For Chip Seal) (5-10 TON)
00 10 00 Page 26
0408AC Emulsified Asphalt: CRS-2P (For Chip Seal) (Over 10 TON)
11 TON
0408AD Chip Seal Aggregate: Type 2B
(50-100 TON)
50 TON
0408AE Chip Seal Aggregate: Type 2B (Over 100 TON)
101 TON
0408AF Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (1-5
TON)
1 TON
0408AG Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (Over 5 TON)
6 TON
0408AH Flush Seal Aggregate
(10-50 TON)
10 TON
0408AI Flush Seal Aggregate (Over 50 TON)
51 TON
0408AJ Mobilization/Demobilization For Vacuum Sweep
1 EA
0408AK Vacuum Sweep 3,000 SY $_______ $_______
0408AL Mobilization/Demobilization For Power Broom
1 EA
0408AM Power Broom 3,000 SY $_______ $_______
0409. AGGREGATE BASE & SURFACE COURSE (32 15 00)
0409AA Mobilization/Demobilization For Aggregate Base & Surface Course
1 EA
0409AB Subbase Course 250 TON $_______ $_______
0409AC Gravel Cushion Course 250 TON $_______ $_______
0409AD Base Course 250 TON $_______ $_______
0409AE Gravel Surfacing Course 250 TON
0410. CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0410AA Mobilization/Demobilization Concrete Pavement & Sidewalk
(10 CY - 50 CY)
1 EA
0410AB Concrete Pavement & Sidewalk
(10 CY - 50 CY)
10 CY
0410AC Mobilization/Demobilization Concrete Pavement & Sidewalk (Over 50 CY)
1 EA
0410AD Concrete Pavement & Sidewalk (Over 50 CY)
00 10 00 Page 27
0410AE Mobilization/Demobilization For Sidewalk Removal
1 EA
0410AF Sidewalk Removal 50 SF
0410AG Mobilization/Demobilization For Curb and Gutter (Cast)
1 EA
0410AH Curb and Gutter Type B (Cast)
50 FT
0410AI Curb and Gutter Type P (Cast)
50 FT
0410AJ Curb and Gutter Valley Gutter (Cast)
50 FT
0410AK Mobilization/Demobilization For Curb and Gutter (Slip Form)
1 EA
0410AL Curb and Gutter Type B (Slip form)
750 FT
0410AM Curb and Gutter Type P (Slip form)
750 FT
0410AN Epoxy Coated Rebar 50 LB $_______ $_______
0410AO Plain Coated Rebar 50 LB $_______ $_______
0410AP Plain Welded Wire Reinforcement (6x6-W2.1 x W2.1)
50 SF
0410AQ Plain Welded Wire Reinforcement (6x6-W2.9 x W2.9)
50 SF
0410AR Mobilization/Demobilization For Concrete Pump Truck
1 EA
0410AS Concrete Placement – Boom Pump Truck
50 CY
0410AT Mobilization/Demobilization for Concrete Buggy Placement
1 EA
0410AU Concrete Placement - Buggy 50 CY
0410AV Remove and Replace Joint Sealant (200 FT to 600 FT)
200 FT
0410AW Remove and Replace Joint Sealant (Over 600 FT)
601 FT
0411. PAVEMENT MARKING (32 17 23)
0411AA Mobilization/Demobilization non-reflective, and painted symbols)
1 EA
0411AB Reflective Paint 3,000 FT $_______ $_______
0411AC Non-reflective paint 300 FT $_______ $_______
00 10 00 Page 28
0411AD Non-reflective Painted Symbols
1 EA
0412. SEEDING (32 92 19)
0412AA Mobilization/Demobilization For Seeding & Mulching
1 EA
0412AB Seed & Mulch 300 SY $_______ $_______
0412AC Mobilization/Demobilization For Hydroseeding
1 EA
0412AD Hydroseeding 300 SY $_______ $_______
0412AE Erosion Control Blanket 50 SY $_______ $_______
0413. STORM DRAINAGE UTILITIES (33 40 00)
0413AA Mobilization/Demobilization For Pipe Culvert Construction
1 EA
0413AB Furnish Pipe Culverts (24” RCP Arch Class 2)
20 FT
0413AC Install Pipe Culverts, 0’-5’ Deep (24” RCP Arch Class 2)
20 FT
0413AD Install Pipe Culverts, 5’-10’ Deep (24” RCP Arch Class 2)
20 FT
0413AE Furnish End Sections (24” RCP Arch Flared)
1 EA
0413AF Install End Sections (24” RCP Arch Flared)
1 EA
0413AG Pipe Culvert Undercut 5 CY
Total Base Year #4 (Items 0400 thru 0413) $__________
00 10 00 Page 29
-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.
-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee.
Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for
00 10 00 Page 30
PRICING SCHEDULE - BASE YEAR #5
NO.
DESCRIPTION
MINIMUM
QUANTITY
UNIT OF
MEASURE
UNIT
PRICE
AMOUNT
0500. Construction Support Activities
0500AA Surveying and Field Work 1 EA
0500AB Temporary Storm Water Pollution Control
1 EA
0501. EARTHWORK (31 00 00)
0501AA Mobilization/Demobilization
1 EA
0501AB Unclassified Excavation
(25-100 CY)
25 CY
0501AC Unclassified Excavation (Over 100 CY)
101 CY
0501AD Mobilization/Demobilization For Borrow (Government Furnished)
1 EA
0501AE Borrow(Government Furnished)
(25-100 CY)
25 CY
0501AF Borrow(Government Furnished) (Over 100 CY)
101 CY
0501AG Mobilization/Demobilization For Borrow (Contractor Furnished)
1 EA
0501AH Borrow(Contractor Furnished)
(25-100 TON)
25 TON
0501AI Borrow(Contractor Furnished) (Over 100 TON)
101 TON
0501AJ Salvaging, Stockpiling, and Placing Topsoil
50 CY
0501AK Existing Surface Preparation 50 SY
0501AL Ordinary Roadway Shaping 500 SY
0501AM Heavy Roadway Shaping 500 SY
0501AN Mobilization/Demobilization For Riprap Construction
1 EA
0501AO Riprap Placement 500 TON
0501AP Bedding Placement 500 TON
0502. GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
00 10 00 Page 31
0502AA Geotextile Fabric (Road Construction)
100 SY
0502AB Geotextile Fabric (Riprap Construction)
100 SY
0502AC Procure Geotextile Fabric (Road Construction)
100 SY
0502AD Procure Geotextile Fabric (Riprap Construction)
100 SY
0503. COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0503AA Mobilization/Demobilization For Cold Milling (Less than 4" Milling Depth)
1 EA
0503AB Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0503AC Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001 SY
0503AD Mobilization/Demobilization For Cold Milling (Over 4" Milling Depth)
1 EA
0503AE Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000 SY
0503AF Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001 SY
0503AG Mobilization/Demobilization For Pavement Demolition/Removal
1 EA
0503AH Pavement Demolition/Removal 100 SY
0504. SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0504AA Mobilization/Demobilization For Asphalt Crack Sealing
1 EA
0504AB Asphalt Crack Sealing (1,000 FT to 2,500 FT)
1,000 FT
0504AC Asphalt Crack Sealing (Over 2,500 FT)
2,501 FT
0505. MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0505AA Procure Riprap 500 TON
0505AB Procure Spalls 500 TON
0505AC Procure Filter Rock 100 TON $_______ $_______
0505AD Procure Manufactured Sand 100 TON
00 10 00 Page 32
0505AE Procure Other Material - Subbase Course
500 TON
0505AF Procure Other Material - Gravel Cushion Course
500 TON
0505AG Procure Other Material - Aggregate Base Course
500 TON
0505AH Procure Other Material - Gravel Surfacing
500 TON
0505AI Procure Topsoil 100 TON
0505AJ Procure Composting Topsoil 100 TON
0505AK Procure Riprap (Oacoma Location) 500 TON
0505AL Procure Spalls (Oacoma Location) 500 TON
0505AM Procure Other Material – Gravel Surfacing (Oacoma Location)
500 TON
0505AN Procure Other Material – Aggregate Base Course (Oacoma Location)
500 TON
0505AO Procure Topsoil (Oacoma Location) 100 TON
0505AP Mobilization/Demobilization For Crushing & Mixing Operations
1 EA
0505AQ Concrete Crushing 250 TON $_______ $_______
0505AR Asphalt Crushing/Mixing 250 TON
0506. BITUMINOUS TACK COATS (32 12 13)
0506AA Tack Coat Asphalt 5 TON $_______ $_______
0507. HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0507AA Mobilization/Demobilization
1 EA
0507AB Asphalt Concrete Composite 100 TON
0507AC Mobilization/Demobilization For Potholes Repair
1 EA
0507AD Pothole Repair (Deep Patch) 50 SF
0508. ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0508AA Mobilization/Demobilization
1 EA
0508AB Emulsified Asphalt: CRS-2P (For Chip Seal) (5-10 TON)
00 10 00 Page 33
0508AC Emulsified Asphalt: CRS-2P (For Chip Seal) (Over 10 TON)
11 TON
0508AD Chip Seal Aggregate: Type 2B
(50-100 TON)
50 TON
0508AE Chip Seal Aggregate: Type 2B (Over 100 TON)
101 TON
0508AF Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (1-5
TON)
1 TON
0508AG Emulsified Asphalt: CSS-1h (For Flush Seal and Fog Seal) (Over 5 TON)
6 TON
0508AH Flush Seal Aggregate
(10-50 TON)
10 TON
0508AI Flush Seal Aggregate (Over 50 TON)
51 TON
0508AJ Mobilization/Demobilization For Vacuum Sweep
1 EA
0508AK Vacuum Sweep 3,000 SY $_______ $_______
0508AL Mobilization/Demobilization For Power Broom
1 EA
0508AM Power Broom 3,000 SY $_______ $_______
0509. AGGREGATE BASE & SURFACE COURSE (32 15 00)
0509AA Mobilization/Demobilization For Aggregate Base & Surface Course
1 EA
0509AB Subbase Course 250 TON $_______ $_______
0509AC Gravel Cushion Course 250 TON $_______ $_______
0509AD Base Course 250 TON $_______ $_______
0509AE Gravel Surfacing Course 250 TON
0510. CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0510AA Mobilization/Demobilization Concrete Pavement & Sidewalk
(10 CY - 50 CY)
1 EA
0510AB Concrete Pavement & Sidewalk
(10 CY - 50 CY)
10 CY
0510AC Mobilization/Demobilization Concrete Pavement & Sidewalk (Over 50 CY)
1 EA
0510AD Concrete Pavement & Sidewalk (Over 50 CY)
00 10 00 Page 34
0510AE Mobilization/Demobilization For Sidewalk Removal
1 EA
0510AF Sidewalk Removal 50 SF
0510AG Mobilization/Demobilization For Curb and Gutter (Cast)
1 EA
0510AH Curb and Gutter Type B (Cast)
50 FT
0510AI Curb and Gutter Type P (Cast)
50 FT
0510AJ Curb and Gutter Valley Gutter (Cast)
50 FT
0510AK Mobilization/Demobilization For Curb and Gutter (Slip Form)
1 EA
0510AL Curb and Gutter Type B (Slip form)
750 FT
0510AM Curb and Gutter Type P (Slip form)
750 FT
0510AN Epoxy Coated Rebar 50 LB $_______ $_______
0510AO Plain Coated Rebar 50 LB $_______ $_______
0210AP Plain Welded Wire Reinforcement (6x6-W2.1 x W2.1)
50 SF
0510AQ Plain Welded Wire Reinforcement (6x6-W2.9 x W2.9)
50 SF
0510AR Mobilization/Demobilization For Concrete Pump Truck
1 EA
0510AS Concrete Placement – Boom Pump Truck
50 CY
0510AT Mobilization/Demobilization for Concrete Buggy Placement
1 EA
0510AU Concrete Placement - Buggy 50 CY
0510AV Remove and Replace Joint Sealant (200 FT to 600 FT)
200 FT
0510AW Remove and Replace Joint Sealant (Over 600 FT)
601 FT
0511. PAVEMENT MARKING (32 17 23)
0511AA Mobilization/Demobilization non-reflective, and painted symbols)
1 EA
0511AB Reflective Paint 3,000 FT $_______ $_______
0511AC Non-reflective paint 300 FT $_______ $_______
00 10 00 Page 35
0511AD Non-reflective Painted Symbols
1 EA
0512. SEEDING (32 92 19)
0512AA Mobilization/Demobilization For Seeding & Mulching
1 EA
0512AB Seed & Mulch 300 SY $_______ $_______
0512AC Mobilization/Demobilization For Hydroseeding
1 EA
0512AD Hydroseeding 300 SY $_______ $_______
0512AE Erosion Control Blanket 50 SY $_______ $_______
0513. STORM DRAINAGE UTILITIES (33 40 00)
0513AA Mobilization/Demobilization For Pipe Culvert Construction
1 EA
0513AB Furnish Pipe Culverts (24” RCP Arch Class 2)
20 FT
0513AC Install Pipe Culverts, 0’-5’ Deep (24” RCP Arch Class 2)
20 FT
0513AD Install Pipe Culverts, 5’-10’ Deep (24” RCP Arch Class 2)
20 FT
0513AE Furnish End Sections (24” RCP Arch Flared)
1 EA
0513AF Install End Sections (24” RCP Arch Flared)
1 EA
0513AG Pipe Culvert Undercut 5 CY
Total Base Year #5 (Items 0500 thru 0513) $__________
00 10 00 Page 36
-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.
-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee.
Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee
Total Years 1 thru 5 (Items 0100 thru 0513) $_____________________
Notes:
1. Quantities for unit priced items are estimated only and the representative unit price will prevail in the event of an overrun or underrun subject to Contract Clauses (Section 00 72 00) Clause “Variation in Estimated Quantities.”
2. Prices must be entered for all items of the schedule. Total amount submitted without prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government.
In case of variation between the unit price and the extension, the unit price will be considered the price. In case of variation between the individual item prices and the total amount, the individual prices will be considered the price.
3. A modification to a price which provides for a single adjustment to the total amount should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the amount of the adjustment will be divided by the number of items in the Basic Year Pricing Schedule, whichever one applies, and distributed equally among each Item.