PRICING SCHEDULE – BASE YEAR #1

ITEM NO.
DESCRIPTION
MINIMUM

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE

AMOUNT

0100.
Construction Support Activities
0100AA
Surveying and Field Work
1
EA
$_______
$_______
0100AB
Temporary Storm Water Pollution Control
1
EA
$_______
$_______
0101.
EARTHWORK (31 00 00)
0101AA
Mobilization/Demobilization

For Unclassified Excavation

1
EA
$_______
$_______
0101AB
Unclassified Excavation

(25-100 CY)

25
CY
$_______
$_______
0101AC
Unclassified Excavation

(Over 100 CY)

101
CY
$_______
$_______
0101AD
Mobilization/Demobilization

For Borrow (Government Furnished)

1
EA
$_______
$_______
0101AE
Borrow (Government Furnished)

(25-100 CY)

25
CY
$_______
$_______
0101AF
Borrow (Government Furnished)

(Over 100 CY)

101
CY
$_______
$_______
0101AG
Mobilization/Demobilization

For Borrow (Contractor Furnished)

1
EA
$_______
$_______
0101AH
Borrow (Contractor Furnished)

(25-100 TON)

25
TON
$_______
$_______
0101AI
Borrow (Contractor Furnished)

(Over 100 TON)

101
TON
$_______
$_______
0101AJ
Salvaging, Stockpiling, and Placing Topsoil
50
CY
$_______
$_______
0101AK
Existing Surface Preparation
50
SY
$_______
$_______
0101AL
Ordinary Roadway Shaping
500
SY
$_______
$_______
0101AM
Heavy Roadway Shaping
500
SY
$_______
$_______
0101AN
Mobilization/Demobilization For Riprap Construction
1
EA
$_______
$_______
0101AO
Riprap Placement
500
TON
$_______
$_______
0101AP
Bedding Placement
500
TON
$_______
$_______
0102.
GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
0102AA
Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0102AB
Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0102AC
Procure Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0102AD
Procure Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0103.
COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0103AA
Mobilization/Demobilization

For Cold Milling (Less than 4" Milling Depth)

1
EA
$_______
$_______
0103AB
Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0103AC
Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001
SY
$_______
$_______
0103AD
Mobilization/Demobilization

For Cold Milling (Over 4" Milling Depth)

1
EA
$_______
$_______
0103AE
Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0103AF
Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001
SY
$_______
$_______
0103AG
Mobilization/Demobilization

For Pavement Demolition/Removal

1
EA
$_______
$_______
0103AH
Pavement Demolition/Removal
100
SY
$_______
$_______
0104.
SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0104AA
Mobilization/Demobilization

For Asphalt Crack Sealing

1
EA
$_______
$_______
0104AB
Asphalt Crack Sealing

(1,000 FT to 2,500 FT)

1,000
FT
$_______
$_______
0104AC
Asphalt Crack Sealing

(Over 2,500 FT)

2,501
FT
$_______
$_______
0105.
MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0105AA
Procure Riprap
500
TON
$_______
$_______
0105AB
Procure Spalls
500
TON
$_______
$_______
0105AC
Procure Filter Rock
100
TON
$_______
$_______
0105AD
Procure Manufactured Sand
100
TON
$_______
$_______
0105AE
Procure Other Material - Subbase Course
500
TON
$_______
$_______
0105AF
Procure Other Material - Gravel Cushion Course
500
TON
$_______
$_______
0105AG
Procure Other Material - Aggregate Base Course
500
TON
$_______
$_______
0105AH
Procure Other Material - Gravel Surfacing
500
TON
$_______
$_______
0105AI
Procure Topsoil
100
TON
$_______
$_______
0105AJ
Procure Composting Topsoil
100
TON
$_______
$_______
0105AK
Procure Riprap (Oacoma Location)
500
TON
$_______
$_______
0105AL
Procure Spalls (Oacoma Location)
500
TON
$_______
$_______
0105AM
Procure Other Material – Gravel Surfacing (Oacoma Location)
500
TON
$_______
$_______
0105AN
Procure Other Material – Aggregate Base Course (Oacoma Location)
500
TON
$_______
$_______
0105AO
Procure Topsoil (Oacoma Location)
100
TON
$_______
$_______
0105AP
Mobilization/Demobilization

For Crushing & Mixing Operations

1
EA
$_______
$_______
0105AQ
Concrete Crushing
250
TON
$_______
$_______
0105AR
Asphalt Crushing/Mixing
250
TON
$_______
$_______
0106.
BITUMINOUS TACK COATS (32 12 13)
0106AA
Tack Coat Asphalt
5
TON
$_______
$_______
0107.
HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0107AA
Mobilization/Demobilization

For Asphalt Concrete Composite

1
EA
$_______
$_______
0107AB
Asphalt Concrete Composite
100
TON
$_______
$_______
0107AC
Mobilization/Demobilization

For Potholes Repair

1
EA
$_______
$_______
0107AD
Pothole Repair (Deep Patch)
50
SF
$_______
$_______
0108.
ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0108AA
Mobilization/Demobilization

For Emulsified Asphalt Seal Coat

1
EA
$_______
$_______
0108AB
Emulsified Asphalt: CRS-2P

(For Chip Seal) (5-10 TON)

5
TON
$_______
$_______
0108AC
Emulsified Asphalt: CRS-2P

(For Chip Seal) (Over 10 TON)

11
TON
$_______
$_______
0108AD
Chip Seal Aggregate: Type 2B

(50-100 TON)

50
TON
$_______
$_______
0108AE
Chip Seal Aggregate: Type 2B

(Over 100 TON)

101
TON
$_______
$_______
0108AF
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (1-5 TON)

1
TON
$_______
$_______
0108AG
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (Over 5 TON)

6
TON
$_______
$_______
0108AH
Flush Seal Aggregate

(10-50 TON)

10
TON
$_______
$_______
0108AI
Flush Seal Aggregate

(Over 50 TON)

51
TON
$_______
$_______
0108AJ
Mobilization/Demobilization

For Vacuum Sweep

1
EA
$_______
$_______
0108AK
Vacuum Sweep
3,000
SY
$_______
$_______
0108AL
Mobilization/Demobilization

For Power Broom

1
EA
$_______
$_______
0108AM
Power Broom
3,000
SY
$_______
$_______
0109.
AGGREGATE BASE & SURFACE COURSE (32 15 00)
0109AA
Mobilization/Demobilization

For Aggregate Base & Surface Course

1
EA
$_______
$_______
0109AB
Subbase Course
250
TON
$_______
$_______
0109AC
Gravel Cushion Course
250
TON
$_______
$_______
0109AD
Base Course
250
TON
$_______
$_______
0109AE
Gravel Surfacing Course
250
TON
$_______
$_______
0110.
CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0110AA
Mobilization/Demobilization

Concrete Pavement & Sidewalk

(10 CY - 50 CY)

1
EA
$_______
$_______
0110AB
Concrete Pavement & Sidewalk

(10 CY - 50 CY)

10
CY
$_______
$_______
0110AC
Mobilization/Demobilization

Concrete Pavement & Sidewalk (Over 50 CY)

1
EA
$_______
$_______
0110AD
Concrete Pavement & Sidewalk

(Over 50 CY)

51
CY
$_______
$_______
0110AE
Mobilization/Demobilization

For Sidewalk Removal

1
EA
$_______
$_______
0110AF
Sidewalk Removal
50
SF
$_______
$_______
0110AG
Mobilization/Demobilization

For Curb and Gutter (Cast)

1
EA
$_______
$_______
0110AH
Curb and Gutter

Type B (Cast)

50
FT
$_______
$_______
0110AI
Curb and Gutter

Type P (Cast)

50
FT
$_______
$_______
0110AJ
Curb and Gutter

Valley Gutter (Cast)

50
FT
$_______
$_______
0110AK
Mobilization/Demobilization

For Curb and Gutter (Slip Form)

1
EA
$_______
$_______
0110AL
Curb and Gutter

Type B (Slip form)

750
FT
$_______
$_______
0110AM
Curb and Gutter

Type P (Slip form)

750
FT
$_______
$_______
0110AN
Epoxy Coated Rebar
50
LB
$_______
$_______
0110AO
Plain Coated Rebar
50
LB
$_______
$_______
0110AP
Plain Welded Wire Reinforcement

(6x6-W2.1 x W2.1)

50
SF
$_______
$_______
0110AQ
Plain Welded Wire Reinforcement

(6x6-W2.9 x W2.9)

50
SF
$_______
$_______
0110AR
Mobilization/Demobilization For Concrete Pump Truck
1
EA
$_______
$_______
0110AS
Concrete Placement – Boom Pump Truck
50
CY
$_______
$_______
0110AT
Mobilization/Demobilization for Concrete Buggy Placement
1
EA
$_______
$_______
0110AU
Concrete Placement - Buggy
50
CY
$_______
$_______
0110AV
Remove and Replace Joint Sealant

(200 FT to 600 FT)

200
FT
$_______
$_______
0110AW
Remove and Replace Joint Sealant

(Over 600 FT)

601
FT
$_______
$_______
0111.
PAVEMENT MARKING (32 17 23)
0111AA
Mobilization/Demobilization

For Pavement Marking (reflective, non-reflective, and painted symbols)

1
EA
$_______
$_______
0111AB
Reflective Paint
3,000
FT
$_______
$_______
0111AC
Non-reflective paint
300
FT
$_______
$_______
0111AD
Non-reflective

Painted Symbols

1
EA
$_______
$_______
0112.
SEEDING (32 92 19)
0112AA
Mobilization/Demobilization

For Seeding & Mulching

1
EA
$_______
$_______
0112AB
Seed & Mulch
300
SY
$_______
$_______
0112AC
Mobilization/Demobilization

For Hydroseeding

1
EA
$_______
$_______
0112AD
Hydroseeding
300
SY
$_______
$_______
0112AE
Erosion Control Blanket
50
SY
$_______
$_______
0113.
STORM DRAINAGE UTILITIES (33 40 00)
0113AA
Mobilization/Demobilization For Pipe Culvert Construction
1
EA
$_______
$_______
0113AB
Furnish Pipe Culvert

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0113AC
Install Pipe Culvert, 0’-5’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0113AD
Install Pipe Culvert, 5’-10’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0113AE
Furnish End Section

(24” RCP Arch Flared)

1
EA
$_______
$_______
0113AF
Install End Section

(24” RCP Arch Flared)

1
EA
$_______
$_______
0113AG
Pipe Culvert Undercut
5
CY
$_______
$_______

Total Base Year #1 (Items 0100 thru 0113) $__________

NOTES:

-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.

-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee. Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee for the material in excess of 100 CY.

PRICING SCHEDULE - BASE YEAR #2

ITEM NO.
DESCRIPTION
MINIMUM

QUANTITY

UNIT OF

MEASURE

UNIT PRICE
AMOUNT
0200.
Construction Support Activities
0200AA
Surveying and Field Work
1
EA
$_______
$_______
0200AB
Temporary Storm Water Pollution Control
1
EA
$_______
$_______
0201.
EARTHWORK (31 00 00)
0201AA
Mobilization/Demobilization

For Unclassified Excavation

1
EA
$_______
$_______
0201AB
Unclassified Excavation

(25-100 CY)

25
CY
$_______
$_______
0201AC
Unclassified Excavation

(Over 100 CY)

101
CY
$_______
$_______
0201AD
Mobilization/Demobilization

For Borrow (Government Furnished)

1
EA
$_______
$_______
0201AE
Borrow(Government Furnished)

(25-100 CY)

25
CY
$_______
$_______
0201AF
Borrow(Government Furnished)

(Over 100 CY)

101
CY
$_______
$_______
0201AG
Mobilization/Demobilization

For Borrow (Contractor Furnished)

1
EA
$_______
$_______
0201AH
Borrow(Contractor Furnished)

(25-100 TON)

25
TON
$_______
$_______
0201AI
Borrow(Contractor Furnished)

(Over 100 TON)

101
TON
$_______
$_______
0201AJ
Salvaging, Stockpiling, and Placing Topsoil
50
CY
$_______
$_______
0201AK
Existing Surface Preparation
50
SY
$_______
$_______
0201AL
Ordinary Roadway Shaping
500
SY
$_______
$_______
0201AM
Heavy Roadway Shaping
500
SY
$_______
$_______
0201AN
Mobilization/Demobilization For Riprap Construction
1
EA
$_______
$_______
0201AO
Riprap Placement
500
TON
$_______
$_______
0201AP
Bedding Placement
500
TON
$_______
$_______
0202.
GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
0202AA
Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0202AB
Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0202AC
Procure Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0202AD
Procure Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0203.
COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0203AA
Mobilization/Demobilization

For Cold Milling (Less than 4" Milling Depth)

1
EA
$_______
$_______
0203AB
Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0203AC
Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001
SY
$_______
$_______
0203AD
Mobilization/Demobilization

For Cold Milling (Over 4" Milling Depth)

1
EA
$_______
$_______
0203AE
Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0203AF
Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001
SY
$_______
$_______
0203AG
Mobilization/Demobilization

For Pavement Demolition/Removal

1
EA
$_______
$_______
0203AH
Pavement Demolition/Removal
100
SY
$_______
$_______
0204.
SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0204AA
Mobilization/Demobilization

For Asphalt Crack Sealing

1
EA
$_______
$_______
0204AB
Asphalt Crack Sealing

(1,000 FT to 2,500 FT)

1,000
FT
$_______
$_______
0204AC
Asphalt Crack Sealing

(Over 2,500 FT)

2,501
FT
$_______
$_______
0205.
MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0205AA
Procure Riprap
500
TON
$_______
$_______
0205AB
Procure Spalls
500
TON
$_______
$_______
0205AC
Procure Filter Rock
100
TON
$_______
$_______
0205AD
Procure Manufactured Sand
100
TON
$_______
$_______
0205AE
Procure Other Material - Subbase Course
500
TON
$_______
$_______
0205AF
Procure Other Material - Gravel Cushion Course
500
TON
$_______
$_______
0205AG
Procure Other Material - Aggregate Base Course
500
TON
$_______
$_______
0205AH
Procure Other Material - Gravel Surfacing
500
TON
$_______
$_______
0205AI
Procure Topsoil
100
TON
$_______
$_______
0205AJ
Procure Composting Topsoil
100
TON
$_______
$_______
0205AK
Procure Riprap (Oacoma Location)
500
TON
$_______
$_______
0205AL
Procure Spalls (Oacoma Location)
500
TON
$_______
$_______
0205AM
Procure Other Material – Gravel Surfacing (Oacoma Location)
500
TON
$_______
$_______
0205AN
Procure Other Material – Aggregate Base Course (Oacoma Location)
500
TON
$_______
$_______
0205AO
Procure Topsoil (Oacoma Location)
100
TON
$_______
$_______
0205AP
Mobilization/Demobilization

For Crushing & Mixing Operations

1
EA
$_______
$_______
0205AQ
Concrete Crushing
250
TON
$_______
$_______
0205AR
Asphalt Crushing/Mixing
250
TON
$_______
$_______
0206.
BITUMINOUS TACK COATS (32 12 13)
0206AA
Tack Coat Asphalt
5
TON
$_______
$_______
0207.
HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0207AA
Mobilization/Demobilization

For Asphalt Concrete Composite

1
EA
$_______
$_______
0207AB
Asphalt Concrete Composite
100
TON
$_______
$_______
0207AC
Mobilization/Demobilization

For Potholes Repair

1
EA
$_______
$_______
0207AD
Pothole Repair (Deep Patch)
50
SF
$_______
$_______
0208.
ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0208AA
Mobilization/Demobilization

For Emulsified Asphalt Seal Coat

1
EA
$_______
$_______
0208AB
Emulsified Asphalt: CRS-2P

(For Chip Seal) (5-10 TON)

5
TON
$_______
$_______
0208AC
Emulsified Asphalt: CRS-2P

(For Chip Seal) (Over 10 TON)

11
TON
$_______
$_______
0208AD
Chip Seal Aggregate: Type 2B

(50-100 TON)

50
TON
$_______
$_______
0208AE
Chip Seal Aggregate: Type 2B

(Over 100 TON)

101
TON
$_______
$_______
0208AF
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (1-5 TON)

1
TON
$_______
$_______
0208AG
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (Over 5 TON)

6
TON
$_______
$_______
0208AH
Flush Seal Aggregate

(10-50 TON)

10
TON
$_______
$_______
0208AI
Flush Seal Aggregate

(Over 50 TON)

51
TON
$_______
$_______
0208AJ
Mobilization/Demobilization

For Vacuum Sweep

1
EA
$_______
$_______
0208AK
Vacuum Sweep
3,000
SY
$_______
$_______
0208AL
Mobilization/Demobilization

For Power Broom

1
EA
$_______
$_______
0208AM
Power Broom
3,000
SY
$_______
$_______
0209.
AGGREGATE BASE & SURFACE COURSE (32 15 00)
0209AA
Mobilization/Demobilization

For Aggregate Base & Surface Course

1
EA
$_______
$_______
0209AB
Subbase Course
250
TON
$_______
$_______
0209AC
Gravel Cushion Course
250
TON
$_______
$_______
0209AD
Base Course
250
TON
$_______
$_______
0209AE
Gravel Surfacing Course
250
TON
$_______
$_______
0210.
CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0210AA
Mobilization/Demobilization

Concrete Pavement & Sidewalk

(10 CY - 50 CY)

1
EA
$_______
$_______
0210AB
Concrete Pavement & Sidewalk

(10 CY - 50 CY)

10
CY
$_______
$_______
0210AC
Mobilization/Demobilization

Concrete Pavement & Sidewalk (Over 50 CY)

1
EA
$_______
$_______
0210AD
Concrete Pavement & Sidewalk

(Over 50 CY)

51
CY
$_______
$_______
0210AE
Mobilization/Demobilization

For Sidewalk Removal

1
EA
$_______
$_______
0210AF
Sidewalk Removal
50
SF
$_______
$_______
0210AG
Mobilization/Demobilization

For Curb and Gutter (Cast)

1
EA
$_______
$_______
0210AH
Curb and Gutter

Type B (Cast)

50
FT
$_______
$_______
0210AI
Curb and Gutter

Type P (Cast)

50
FT
$_______
$_______
0210AJ
Curb and Gutter

Valley Gutter (Cast)

50
FT
$_______
$_______
0210AK
Mobilization/Demobilization

For Curb and Gutter (Slip Form)

1
EA
$_______
$_______
0210AL
Curb and Gutter

Type B (Slip form)

750
FT
$_______
$_______
0210AM
Curb and Gutter

Type P (Slip form)

750
FT
$_______
$_______
0210AN
Epoxy Coated Rebar
50
LB
$_______
$_______
0210AO
Plain Coated Rebar
50
LB
$_______
$_______
0210AP
Plain Welded Wire Reinforcement

(6x6-W2.1 x W2.1)

50
SF
$_______
$_______
0210AQ
Plain Welded Wire Reinforcement

(6x6-W2.9 x W2.9)

50
SF
$_______
$_______
0210AR
Mobilization/Demobilization For Concrete Pump Truck
1
EA
$_______
$_______
0210AS
Concrete Placement – Boom Pump Truck
50
CY
$_______
$_______
0210AT
Mobilization/Demobilization for Concrete Buggy Placement
1
EA
$_______
$_______
0210AU
Concrete Placement - Buggy
50
CY
$_______
$_______
0210AV
Remove and Replace Joint Sealant

(200 FT to 600 FT)

200
FT
$_______
$_______
0210AW
Remove and Replace Joint Sealant

(Over 600 FT)

601
FT
$_______
$_______
0211.
PAVEMENT MARKING (32 17 23)
0211AA
Mobilization/Demobilization

For Pavement Marking (reflective, non-reflective, and painted symbols)

1
EA
$_______
$_______
0211AB
Reflective Paint
3,000
FT
$_______
$_______
0211AC
Non-reflective paint
300
FT
$_______
$_______
0211AD
Non-reflective

Painted Symbols

1
EA
$_______
$_______
0212.
SEEDING (32 92 19)
0212AA
Mobilization/Demobilization

For Seeding & Mulching

1
EA
$_______
$_______
0212AB
Seed & Mulch
300
SY
$_______
$_______
0212AC
Mobilization/Demobilization

For Hydroseeding

1
EA
$_______
$_______
0212AD
Hydroseeding
300
SY
$_______
$_______
0212AE
Erosion Control Blanket
50
SY
$_______
$_______
0213.
STORM DRAINAGE UTILITIES (33 40 00)
0213AA
Mobilization/Demobilization For Pipe Culvert Construction
1
EA
$_______
$_______
0213AB
Furnish Pipe Culverts

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0213AC
Install Pipe Culverts, 0’-5’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0213AD
Install Pipe Culverts, 5’-10’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0213AE
Furnish End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0213AF
Install End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0213AG
Pipe Culvert Undercut
5
CY
$_______
$_______

Total Base Year #2 (Items 0200 thru 0213) $__________

NOTES:

-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.

-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee. Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee for the material in excess of 100 CY.

PRICING SCHEDULE - BASE YEAR #3

ITEM NO.
DESCRIPTION
MINIMUM

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE

AMOUNT

0300.
Construction Support Activities
0300AA
Surveying and Field Work
1
EA
$_______
$_______
0300AB
Temporary Storm Water Pollution Control
1
EA
$_______
$_______
0301.
EARTHWORK (31 00 00)
0301AA
Mobilization/Demobilization

For Unclassified Excavation

1
EA
$_______
$_______
0301AB
Unclassified Excavation

(25-100 CY)

25
CY
$_______
$_______
0301AC
Unclassified Excavation

(Over 100 CY)

101
CY
$_______
$_______
0301AD
Mobilization/Demobilization

For Borrow (Government Furnished)

1
EA
$_______
$_______
0301AE
Borrow(Government Furnished)

(25-100 CY)

25
CY
$_______
$_______
0301AF
Borrow(Government Furnished)

(Over 100 CY)

101
CY
$_______
$_______
0301AG
Mobilization/Demobilization

For Borrow (Contractor Furnished)

1
EA
$_______
$_______
0301AH
Borrow(Contractor Furnished)

(25-100 TON)

25
TON
$_______
$_______
0301AI
Borrow(Contractor Furnished)

(Over 100 TON)

101
TON
$_______
$_______
0301AJ
Salvaging, Stockpiling, and Placing Topsoil
50
CY
$_______
$_______
0301AK
Existing Surface Preparation
50
SY
$_______
$_______
0301AL
Ordinary Roadway Shaping
500
SY
$_______
$_______
0301AM
Heavy Roadway Shaping
500
SY
$_______
$_______
0301AN
Mobilization/Demobilization For Riprap Construction
1
EA
$_______
$_______
0301AO
Riprap Placement
500
TON
$_______
$_______
0301AP
Bedding Placement
500
TON
$_______
$_______
0302.
GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
0302AA
Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0302AB
Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0302AC
Procure Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0302AD
Procure Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0303.
COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0303AA
Mobilization/Demobilization

For Cold Milling (Less than 4" Milling Depth)

1
EA
$_______
$_______
0303AB
Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0303AC
Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001
SY
$_______
$_______
0303AD
Mobilization/Demobilization

For Cold Milling (Over 4" Milling Depth)

1
EA
$_______
$_______
0303AE
Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0303AF
Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001
SY
$_______
$_______
0303AG
Mobilization/Demobilization

For Pavement Demolition/Removal

1
EA
$_______
$_______
0303AH
Pavement Demolition/Removal
100
SY
$_______
$_______
0304.
SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0304AA
Mobilization/Demobilization

For Asphalt Crack Sealing

1
EA
$_______
$_______
0304AB
Asphalt Crack Sealing

(1,000 FT to 2,500 FT)

1,000
FT
$_______
$_______
0304AC
Asphalt Crack Sealing

(Over 2,500 FT)

2,501
FT
$_______
$_______
0305.
MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0305AA
Procure Riprap
500
TON
$_______
$_______
0305AB
Procure Spalls
500
TON
$_______
$_______
0305AC
Procure Filter Rock
100
TON
$_______
$_______
0305AD
Procure Manufactured Sand
100
TON
$_______
$_______
0305AE
Procure Other Material - Subbase Course
500
TON
$_______
$_______
0305AF
Procure Other Material - Gravel Cushion Course
500
TON
$_______
$_______
0305AG
Procure Other Material - Aggregate Base Course
500
TON
$_______
$_______
0305AH
Procure Other Material - Gravel Surfacing
500
TON
$_______
$_______
0305AI
Procure Topsoil
100
TON
$_______
$_______
0305AJ
Procure Composting Topsoil
100
TON
$_______
$_______
0305AK
Procure Riprap (Oacoma Location)
500
TON
$_______
$_______
0305AL
Procure Spalls (Oacoma Location)
500
TON
$_______
$_______
0305AM
Procure Other Material – Gravel Surfacing (Oacoma Location)
500
TON
$_______
$_______
0305AN
Procure Other Material – Aggregate Base Course (Oacoma Location)
500
TON
$_______
$_______
0305AO
Procure Topsoil (Oacoma Location)
100
TON
$_______
$_______
0305AP
Mobilization/Demobilization

For Crushing & Mixing Operations

1
EA
$_______
$_______
0305AQ
Concrete Crushing
250
TON
$_______
$_______
0305AR
Asphalt Crushing/Mixing
250
TON
$_______
$_______
0306.
BITUMINOUS TACK COATS (32 12 13)
0306AA
Tack Coat Asphalt
5
TON
$_______
$_______
0307.
HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0307AA
Mobilization/Demobilization

For Asphalt Concrete Composite

1
EA
$_______
$_______
0307AB
Asphalt Concrete Composite
100
TON
$_______
$_______
0307AC
Mobilization/Demobilization

For Potholes Repair

1
EA
$_______
$_______
0307AD
Pothole Repair (Deep Patch)
50
SF
$_______
$_______
0308.
ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0308AA
Mobilization/Demobilization

For Emulsified Asphalt Seal Coat

1
EA
$_______
$_______
0308AB
Emulsified Asphalt: CRS-2P

(For Chip Seal) (5-10 TON)

5
TON
$_______
$_______
0308AC
Emulsified Asphalt: CRS-2P

(For Chip Seal) (Over 10 TON)

11
TON
$_______
$_______
0308AD
Chip Seal Aggregate: Type 2B

(50-100 TON)

50
TON
$_______
$_______
0308AE
Chip Seal Aggregate: Type 2B

(Over 100 TON)

101
TON
$_______
$_______
0308AF
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (1-5 TON)

1
TON
$_______
$_______
0308AG
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (Over 5 TON)

6
TON
$_______
$_______
0308AH
Flush Seal Aggregate

(10-50 TON)

10
TON
$_______
$_______
0308AI
Flush Seal Aggregate

(Over 50 TON)

51
TON
$_______
$_______
0308AJ
Mobilization/Demobilization

For Vacuum Sweep

1
EA
$_______
$_______
0308AK
Vacuum Sweep
3,000
SY
$_______
$_______
0308AL
Mobilization/Demobilization

For Power Broom

1
EA
$_______
$_______
0308AM
Power Broom
3,000
SY
$_______
$_______
0309.
AGGREGATE BASE & SURFACE COURSE (32 15 00)
0309AA
Mobilization/Demobilization

For Aggregate Base & Surface Course

1
EA
$_______
$_______
0309AB
Subbase Course
250
TON
$_______
$_______
0309AC
Gravel Cushion Course
250
TON
$_______
$_______
0309AD
Base Course
250
TON
$_______
$_______
0309AE
Gravel Surfacing Course
250
TON
$_______
$_______
0310.
CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0310AA
Mobilization/Demobilization

Concrete Pavement & Sidewalk

(10 CY - 50 CY)

1
EA
$_______
$_______
0310AB
Concrete Pavement & Sidewalk

(10 CY - 50 CY)

10
CY
$_______
$_______
0310AC
Mobilization/Demobilization

Concrete Pavement & Sidewalk (Over 50 CY)

1
EA
$_______
$_______
0310AD
Concrete Pavement & Sidewalk

(Over 50 CY)

51
CY
$_______
$_______
0310AE
Mobilization/Demobilization

For Sidewalk Removal

1
EA
$_______
$_______
0310AF
Sidewalk Removal
50
SF
$_______
$_______
0310AG
Mobilization/Demobilization

For Curb and Gutter (Cast)

1
EA
$_______
$_______
0310AH
Curb and Gutter

Type B (Cast)

50
FT
$_______
$_______
0310AI
Curb and Gutter

Type P (Cast)

50
FT
$_______
$_______
0310AJ
Curb and Gutter

Valley Gutter (Cast)

50
FT
$_______
$_______
0310AK
Mobilization/Demobilization

For Curb and Gutter (Slip Form)

1
EA
$_______
$_______
0310AL
Curb and Gutter

Type B (Slip form)

750
FT
$_______
$_______
0310AM
Curb and Gutter

Type P (Slip form)

750
FT
$_______
$_______
0310AN
Epoxy Coated Rebar
50
LB
$_______
$_______
0310AO
Plain Coated Rebar
50
LB
$_______
$_______
0310AP
Plain Welded Wire Reinforcement

(6x6-W2.1 x W2.1)

50
SF
$_______
$_______
0310AQ
Plain Welded Wire Reinforcement

(6x6-W2.9 x W2.9)

50
SF
$_______
$_______
0310AR
Mobilization/Demobilization For Concrete Pump Truck
1
EA
$_______
$_______
0310AS
Concrete Placement – Boom Pump Truck
50
CY
$_______
$_______
0310AT
Mobilization/Demobilization for Concrete Buggy Placement
1
EA
$_______
$_______
0310AU
Concrete Placement - Buggy
50
CY
$_______
$_______
0310AV
Remove and Replace Joint Sealant

(200 FT to 600 FT)

200
FT
$_______
$_______
0310AW
Remove and Replace Joint Sealant

(Over 600 FT)

601
FT
$_______
$_______
0311.
PAVEMENT MARKING (32 17 23)
0311AA
Mobilization/Demobilization

For Pavement Marking (reflective, non-reflective, and painted symbols)

1
EA
$_______
$_______
0311AB
Reflective Paint
3,000
FT
$_______
$_______
0311AC
Non-reflective paint
300
FT
$_______
$_______
0311AD
Non-reflective

Painted Symbols

1
EA
$_______
$_______
0312.
SEEDING (32 92 19)
0312AA
Mobilization/Demobilization

For Seeding & Mulching

1
EA
$_______
$_______
0312AB
Seed & Mulch
300
SY
$_______
$_______
0312AC
Mobilization/Demobilization

For Hydroseeding

1
EA
$_______
$_______
0312AD
Hydroseeding
300
SY
$_______
$_______
0312AE
Erosion Control Blanket
50
SY
$_______
$_______
0313.
STORM DRAINAGE UTILITIES (33 40 00)
0313AA
Mobilization/Demobilization For Pipe Culvert Construction
1
EA
$_______
$_______
0313AB
Furnish Pipe Culverts

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0313AC
Install Pipe Culverts, 0’-5’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0313AD
Install Pipe Culverts, 5’-10’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0313AE
Furnish End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0313AF
Install End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0313AG
Pipe Culvert Undercut
5
CY
$_______
$_______

Total Base Year #3 (Items 0300 thru 0313) $__________

NOTES:

-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.

-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee. Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee for the material in excess of 100 CY.

PRICING SCHEDULE - BASE YEAR #4

ITEM NO.
DESCRIPTION
MINIMUM

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE

AMOUNT

0400.
Construction Support Activities
0400AA
Surveying and Field Work
1
EA
$_______
$_______
0400AB
Temporary Storm Water Pollution Control
1
EA
$_______
$_______
0401.
EARTHWORK (31 00 00)
0401AA
Mobilization/Demobilization

For Unclassified Excavation

1
EA
$_______
$_______
0401AB
Unclassified Excavation

(25-100 CY)

25
CY
$_______
$_______
0401AC
Unclassified Excavation

(Over 100 CY)

101
CY
$_______
$_______
0401AD
Mobilization/Demobilization

For Borrow (Government Furnished)

1
EA
$_______
$_______
0401AE
Borrow(Government Furnished)

(25-100 CY)

25
CY
$_______
$_______
0401AF
Borrow(Government Furnished)

(Over 100 CY)

101
CY
$_______
$_______
0401AG
Mobilization/Demobilization

For Borrow (Contractor Furnished)

1
EA
$_______
$_______
0401AH
Borrow(Contractor Furnished)

(25-100 TON)

25
TON
$_______
$_______
0401AI
Borrow(Contractor Furnished)

(Over 100 TON)

101
TON
$_______
$_______
0401AJ
Salvaging, Stockpiling, and Placing Topsoil
50
CY
$_______
$_______
0401AK
Existing Surface Preparation
50
SY
$_______
$_______
0401AL
Ordinary Roadway Shaping
500
SY
$_______
$_______
0401AM
Heavy Roadway Shaping
500
SY
$_______
$_______
0401AN
Mobilization/Demobilization For Riprap Construction
1
EA
$_______
$_______
0401AO
Riprap Placement
500
TON
$_______
$_______
0401AP
Bedding Placement
500
TON
$_______
$_______
0402.
GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
0402AA
Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0402AB
Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0402AC
Procure Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0402AD
Procure Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0403.
COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0403AA
Mobilization/Demobilization

For Cold Milling (Less than 4" Milling Depth)

1
EA
$_______
$_______
0403AB
Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0403AC
Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001
SY
$_______
$_______
0403AD
Mobilization/Demobilization

For Cold Milling (Over 4" Milling Depth)

1
EA
$_______
$_______
0403AE
Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0403AF
Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001
SY
$_______
$_______
0403AG
Mobilization/Demobilization

For Pavement Demolition/Removal

1
EA
$_______
$_______
0403AH
Pavement Demolition/Removal
100
SY
$_______
$_______
0404.
SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0404AA
Mobilization/Demobilization

For Asphalt Crack Sealing

1
EA
$_______
$_______
0404AB
Asphalt Crack Sealing

(1,000 FT to 2,500 FT)

1,000
FT
$_______
$_______
0404AC
Asphalt Crack Sealing

(Over 2,500 FT)

2,501
FT
$_______
$_______
0405.
MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0405AA
Procure Riprap
500
TON
$_______
$_______
0405AB
Procure Spalls
500
TON
$_______
$_______
0405AC
Procure Filter Rock
100
TON
$_______
$_______
0405AD
Procure Manufactured Sand
100
TON
$_______
$_______
0405AE
Procure Other Material - Subbase Course
500
TON
$_______
$_______
0405AF
Procure Other Material - Gravel Cushion Course
500
TON
$_______
$_______
0405AG
Procure Other Material - Aggregate Base Course
500
TON
$_______
$_______
0405AH
Procure Other Material - Gravel Surfacing
500
TON
$_______
$_______
0405AI
Procure Topsoil
100
TON
$_______
$_______
0405AJ
Procure Composting Topsoil
100
TON
$_______
$_______
0405AK
Procure Riprap (Oacoma Location)
500
TON
$_______
$_______
0405AL
Procure Spalls (Oacoma Location)
500
TON
$_______
$_______
0405AM
Procure Other Material – Gravel Surfacing (Oacoma Location)
500
TON
$_______
$_______
0405AN
Procure Other Material – Aggregate Base Course (Oacoma Location)
500
TON
$_______
$_______
0405AO
Procure Topsoil (Oacoma Location)
100
TON
$_______
$_______
0405AP
Mobilization/Demobilization

For Crushing & Mixing Operations

1
EA
$_______
$_______
0405AQ
Concrete Crushing
250
TON
$_______
$_______
0405AR
Asphalt Crushing/Mixing
250
TON
$_______
$_______
0406.
BITUMINOUS TACK COATS (32 12 13)
0406AA
Tack Coat Asphalt
5
TON
$_______
$_______
0407.
HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0407AA
Mobilization/Demobilization

For Asphalt Concrete Composite

1
EA
$_______
$_______
0407AB
Asphalt Concrete Composite
100
TON
$_______
$_______
0407AC
Mobilization/Demobilization

For Potholes Repair

1
EA
$_______
$_______
0407AD
Pothole Repair (Deep Patch)
50
SF
$_______
$_______
0408.
ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0408AA
Mobilization/Demobilization

For Emulsified Asphalt Seal Coat

1
EA
$_______
$_______
0408AB
Emulsified Asphalt: CRS-2P

(For Chip Seal) (5-10 TON)

5
TON
$_______
$_______
0408AC
Emulsified Asphalt: CRS-2P

(For Chip Seal) (Over 10 TON)

11
TON
$_______
$_______
0408AD
Chip Seal Aggregate: Type 2B

(50-100 TON)

50
TON
$_______
$_______
0408AE
Chip Seal Aggregate: Type 2B

(Over 100 TON)

101
TON
$_______
$_______
0408AF
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (1-5 TON)

1
TON
$_______
$_______
0408AG
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (Over 5 TON)

6
TON
$_______
$_______
0408AH
Flush Seal Aggregate

(10-50 TON)

10
TON
$_______
$_______
0408AI
Flush Seal Aggregate

(Over 50 TON)

51
TON
$_______
$_______
0408AJ
Mobilization/Demobilization

For Vacuum Sweep

1
EA
$_______
$_______
0408AK
Vacuum Sweep
3,000
SY
$_______
$_______
0408AL
Mobilization/Demobilization

For Power Broom

1
EA
$_______
$_______
0408AM
Power Broom
3,000
SY
$_______
$_______
0409.
AGGREGATE BASE & SURFACE COURSE (32 15 00)
0409AA
Mobilization/Demobilization

For Aggregate Base & Surface Course

1
EA
$_______
$_______
0409AB
Subbase Course
250
TON
$_______
$_______
0409AC
Gravel Cushion Course
250
TON
$_______
$_______
0409AD
Base Course
250
TON
$_______
$_______
0409AE
Gravel Surfacing Course
250
TON
$_______
$_______
0410.
CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0410AA
Mobilization/Demobilization

Concrete Pavement & Sidewalk

(10 CY - 50 CY)

1
EA
$_______
$_______
0410AB
Concrete Pavement & Sidewalk

(10 CY - 50 CY)

10
CY
$_______
$_______
0410AC
Mobilization/Demobilization

Concrete Pavement & Sidewalk (Over 50 CY)

1
EA
$_______
$_______
0410AD
Concrete Pavement & Sidewalk

(Over 50 CY)

51
CY
$_______
$_______
0410AE
Mobilization/Demobilization

For Sidewalk Removal

1
EA
$_______
$_______
0410AF
Sidewalk Removal
50
SF
$_______
$_______
0410AG
Mobilization/Demobilization

For Curb and Gutter (Cast)

1
EA
$_______
$_______
0410AH
Curb and Gutter

Type B (Cast)

50
FT
$_______
$_______
0410AI
Curb and Gutter

Type P (Cast)

50
FT
$_______
$_______
0410AJ
Curb and Gutter

Valley Gutter (Cast)

50
FT
$_______
$_______
0410AK
Mobilization/Demobilization

For Curb and Gutter (Slip Form)

1
EA
$_______
$_______
0410AL
Curb and Gutter

Type B (Slip form)

750
FT
$_______
$_______
0410AM
Curb and Gutter

Type P (Slip form)

750
FT
$_______
$_______
0410AN
Epoxy Coated Rebar
50
LB
$_______
$_______
0410AO
Plain Coated Rebar
50
LB
$_______
$_______
0410AP
Plain Welded Wire Reinforcement

(6x6-W2.1 x W2.1)

50
SF
$_______
$_______
0410AQ
Plain Welded Wire Reinforcement

(6x6-W2.9 x W2.9)

50
SF
$_______
$_______
0410AR
Mobilization/Demobilization For Concrete Pump Truck
1
EA
$_______
$_______
0410AS
Concrete Placement – Boom Pump Truck
50
CY
$_______
$_______
0410AT
Mobilization/Demobilization for Concrete Buggy Placement
1
EA
$_______
$_______
0410AU
Concrete Placement - Buggy
50
CY
$_______
$_______
0410AV
Remove and Replace Joint Sealant

(200 FT to 600 FT)

200
FT
$_______
$_______
0410AW
Remove and Replace Joint Sealant

(Over 600 FT)

601
FT
$_______
$_______
0411.
PAVEMENT MARKING (32 17 23)
0411AA
Mobilization/Demobilization

For Pavement Marking (reflective, non-reflective, and painted symbols)

1
EA
$_______
$_______
0411AB
Reflective Paint
3,000
FT
$_______
$_______
0411AC
Non-reflective paint
300
FT
$_______
$_______
0411AD
Non-reflective

Painted Symbols

1
EA
$_______
$_______
0412.
SEEDING (32 92 19)
0412AA
Mobilization/Demobilization

For Seeding & Mulching

1
EA
$_______
$_______
0412AB
Seed & Mulch
300
SY
$_______
$_______
0412AC
Mobilization/Demobilization

For Hydroseeding

1
EA
$_______
$_______
0412AD
Hydroseeding
300
SY
$_______
$_______
0412AE
Erosion Control Blanket
50
SY
$_______
$_______
0413.
STORM DRAINAGE UTILITIES (33 40 00)
0413AA
Mobilization/Demobilization For Pipe Culvert Construction
1
EA
$_______
$_______
0413AB
Furnish Pipe Culverts

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0413AC
Install Pipe Culverts, 0’-5’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0413AD
Install Pipe Culverts, 5’-10’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0413AE
Furnish End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0413AF
Install End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0413AG
Pipe Culvert Undercut
5
CY
$_______
$_______

Total Base Year #4 (Items 0400 thru 0413) $__________

NOTES:

-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.

-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee. Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee for the material in excess of 100 CY.

PRICING SCHEDULE - BASE YEAR #5

ITEM NO.
DESCRIPTION
MINIMUM

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE

AMOUNT

0500.
Construction Support Activities
0500AA
Surveying and Field Work
1
EA
$_______
$_______
0500AB
Temporary Storm Water Pollution Control
1
EA
$_______
$_______
0501.
EARTHWORK (31 00 00)
0501AA
Mobilization/Demobilization

For Unclassified Excavation

1
EA
$_______
$_______
0501AB
Unclassified Excavation

(25-100 CY)

25
CY
$_______
$_______
0501AC
Unclassified Excavation

(Over 100 CY)

101
CY
$_______
$_______
0501AD
Mobilization/Demobilization

For Borrow (Government Furnished)

1
EA
$_______
$_______
0501AE
Borrow(Government Furnished)

(25-100 CY)

25
CY
$_______
$_______
0501AF
Borrow(Government Furnished)

(Over 100 CY)

101
CY
$_______
$_______
0501AG
Mobilization/Demobilization

For Borrow (Contractor Furnished)

1
EA
$_______
$_______
0501AH
Borrow(Contractor Furnished)

(25-100 TON)

25
TON
$_______
$_______
0501AI
Borrow(Contractor Furnished)

(Over 100 TON)

101
TON
$_______
$_______
0501AJ
Salvaging, Stockpiling, and Placing Topsoil
50
CY
$_______
$_______
0501AK
Existing Surface Preparation
50
SY
$_______
$_______
0501AL
Ordinary Roadway Shaping
500
SY
$_______
$_______
0501AM
Heavy Roadway Shaping
500
SY
$_______
$_______
0501AN
Mobilization/Demobilization For Riprap Construction
1
EA
$_______
$_______
0501AO
Riprap Placement
500
TON
$_______
$_______
0501AP
Bedding Placement
500
TON
$_______
$_______
0502.
GEOTEXTILES USED FOR FILTERS AND ROAD CONSTRUCTION (31 05 22)
0502AA
Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0502AB
Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0502AC
Procure Geotextile Fabric (Road Construction)
100
SY
$_______
$_______
0502AD
Procure Geotextile Fabric (Riprap Construction)
100
SY
$_______
$_______
0503.
COLD MILLING/PAVEMENT DEMOLITION (32 01 16.71)
0503AA
Mobilization/Demobilization

For Cold Milling (Less than 4" Milling Depth)

1
EA
$_______
$_______
0503AB
Cold Milling (Less than 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0503AC
Cold Milling (Less than 4" Milling Depth -Over 3000 SY)
3,001
SY
$_______
$_______
0503AD
Mobilization/Demobilization

For Cold Milling (Over 4" Milling Depth)

1
EA
$_______
$_______
0503AE
Cold Milling (Over 4" Milling Depth - 2000 SY to 3000 SY)
2,000
SY
$_______
$_______
0503AF
Cold Milling (Over 4" Milling Depth - Over 3000 SY)
3,001
SY
$_______
$_______
0503AG
Mobilization/Demobilization

For Pavement Demolition/Removal

1
EA
$_______
$_______
0503AH
Pavement Demolition/Removal
100
SY
$_______
$_______
0504.
SEALING CRACKS IN ASPHALT PAVEMENTS (32 01 17.61)
0504AA
Mobilization/Demobilization

For Asphalt Crack Sealing

1
EA
$_______
$_______
0504AB
Asphalt Crack Sealing

(1,000 FT to 2,500 FT)

1,000
FT
$_______
$_______
0504AC
Asphalt Crack Sealing

(Over 2,500 FT)

2,501
FT
$_______
$_______
0505.
MATERIAL STOCKPILING & CONCRETE & ASPHALT CRUSHING/MIXING (32 11 23)
0505AA
Procure Riprap
500
TON
$_______
$_______
0505AB
Procure Spalls
500
TON
$_______
$_______
0505AC
Procure Filter Rock
100
TON
$_______
$_______
0505AD
Procure Manufactured Sand
100
TON
$_______
$_______
0505AE
Procure Other Material - Subbase Course
500
TON
$_______
$_______
0505AF
Procure Other Material - Gravel Cushion Course
500
TON
$_______
$_______
0505AG
Procure Other Material - Aggregate Base Course
500
TON
$_______
$_______
0505AH
Procure Other Material - Gravel Surfacing
500
TON
$_______
$_______
0505AI
Procure Topsoil
100
TON
$_______
$_______
0505AJ
Procure Composting Topsoil
100
TON
$_______
$_______
0505AK
Procure Riprap (Oacoma Location)
500
TON
$_______
$_______
0505AL
Procure Spalls (Oacoma Location)
500
TON
$_______
$_______
0505AM
Procure Other Material – Gravel Surfacing (Oacoma Location)
500
TON
$_______
$_______
0505AN
Procure Other Material – Aggregate Base Course (Oacoma Location)
500
TON
$_______
$_______
0505AO
Procure Topsoil (Oacoma Location)
100
TON
$_______
$_______
0505AP
Mobilization/Demobilization

For Crushing & Mixing Operations

1
EA
$_______
$_______
0505AQ
Concrete Crushing
250
TON
$_______
$_______
0505AR
Asphalt Crushing/Mixing
250
TON
$_______
$_______
0506.
BITUMINOUS TACK COATS (32 12 13)
0506AA
Tack Coat Asphalt
5
TON
$_______
$_______
0507.
HOT-MIX ASPHALT (HMA) FOR ROADS (32 12 16)
0507AA
Mobilization/Demobilization

For Asphalt Concrete Composite

1
EA
$_______
$_______
0507AB
Asphalt Concrete Composite
100
TON
$_______
$_______
0507AC
Mobilization/Demobilization

For Potholes Repair

1
EA
$_______
$_______
0507AD
Pothole Repair (Deep Patch)
50
SF
$_______
$_______
0508.
ASPHALTIC SEAL AND FOG COAT (32 12 36.13)
0508AA
Mobilization/Demobilization

For Emulsified Asphalt Seal Coat

1
EA
$_______
$_______
0508AB
Emulsified Asphalt: CRS-2P

(For Chip Seal) (5-10 TON)

5
TON
$_______
$_______
0508AC
Emulsified Asphalt: CRS-2P

(For Chip Seal) (Over 10 TON)

11
TON
$_______
$_______
0508AD
Chip Seal Aggregate: Type 2B

(50-100 TON)

50
TON
$_______
$_______
0508AE
Chip Seal Aggregate: Type 2B

(Over 100 TON)

101
TON
$_______
$_______
0508AF
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (1-5 TON)

1
TON
$_______
$_______
0508AG
Emulsified Asphalt: CSS-1h

(For Flush Seal and Fog Seal) (Over 5 TON)

6
TON
$_______
$_______
0508AH
Flush Seal Aggregate

(10-50 TON)

10
TON
$_______
$_______
0508AI
Flush Seal Aggregate

(Over 50 TON)

51
TON
$_______
$_______
0508AJ
Mobilization/Demobilization

For Vacuum Sweep

1
EA
$_______
$_______
0508AK
Vacuum Sweep
3,000
SY
$_______
$_______
0508AL
Mobilization/Demobilization

For Power Broom

1
EA
$_______
$_______
0508AM
Power Broom
3,000
SY
$_______
$_______
0509.
AGGREGATE BASE & SURFACE COURSE (32 15 00)
0509AA
Mobilization/Demobilization

For Aggregate Base & Surface Course

1
EA
$_______
$_______
0509AB
Subbase Course
250
TON
$_______
$_______
0509AC
Gravel Cushion Course
250
TON
$_______
$_______
0509AD
Base Course
250
TON
$_______
$_______
0509AE
Gravel Surfacing Course
250
TON
$_______
$_______
0510.
CONCRETE PAVEMENTS, SIDEWALKS, AND CURBS AND GUTTERS (32 16 19)
0510AA
Mobilization/Demobilization

Concrete Pavement & Sidewalk

(10 CY - 50 CY)

1
EA
$_______
$_______
0510AB
Concrete Pavement & Sidewalk

(10 CY - 50 CY)

10
CY
$_______
$_______
0510AC
Mobilization/Demobilization

Concrete Pavement & Sidewalk (Over 50 CY)

1
EA
$_______
$_______
0510AD
Concrete Pavement & Sidewalk

(Over 50 CY)

51
CY
$_______
$_______
0510AE
Mobilization/Demobilization

For Sidewalk Removal

1
EA
$_______
$_______
0510AF
Sidewalk Removal
50
SF
$_______
$_______
0510AG
Mobilization/Demobilization

For Curb and Gutter (Cast)

1
EA
$_______
$_______
0510AH
Curb and Gutter

Type B (Cast)

50
FT
$_______
$_______
0510AI
Curb and Gutter

Type P (Cast)

50
FT
$_______
$_______
0510AJ
Curb and Gutter

Valley Gutter (Cast)

50
FT
$_______
$_______
0510AK
Mobilization/Demobilization

For Curb and Gutter (Slip Form)

1
EA
$_______
$_______
0510AL
Curb and Gutter

Type B (Slip form)

750
FT
$_______
$_______
0510AM
Curb and Gutter

Type P (Slip form)

750
FT
$_______
$_______
0510AN
Epoxy Coated Rebar
50
LB
$_______
$_______
0510AO
Plain Coated Rebar
50
LB
$_______
$_______
0210AP
Plain Welded Wire Reinforcement

(6x6-W2.1 x W2.1)

50
SF
$_______
$_______
0510AQ
Plain Welded Wire Reinforcement

(6x6-W2.9 x W2.9)

50
SF
$_______
$_______
0510AR
Mobilization/Demobilization For Concrete Pump Truck
1
EA
$_______
$_______
0510AS
Concrete Placement – Boom Pump Truck
50
CY
$_______
$_______
0510AT
Mobilization/Demobilization for Concrete Buggy Placement
1
EA
$_______
$_______
0510AU
Concrete Placement - Buggy
50
CY
$_______
$_______
0510AV
Remove and Replace Joint Sealant

(200 FT to 600 FT)

200
FT
$_______
$_______
0510AW
Remove and Replace Joint Sealant

(Over 600 FT)

601
FT
$_______
$_______
0511.
PAVEMENT MARKING (32 17 23)
0511AA
Mobilization/Demobilization

For Pavement Marking (reflective, non-reflective, and painted symbols)

1
EA
$_______
$_______
0511AB
Reflective Paint
3,000
FT
$_______
$_______
0511AC
Non-reflective paint
300
FT
$_______
$_______
0511AD
Non-reflective

Painted Symbols

1
EA
$_______
$_______
0512.
SEEDING (32 92 19)
0512AA
Mobilization/Demobilization

For Seeding & Mulching

1
EA
$_______
$_______
0512AB
Seed & Mulch
300
SY
$_______
$_______
0512AC
Mobilization/Demobilization

For Hydroseeding

1
EA
$_______
$_______
0512AD
Hydroseeding
300
SY
$_______
$_______
0512AE
Erosion Control Blanket
50
SY
$_______
$_______
0513.
STORM DRAINAGE UTILITIES (33 40 00)
0513AA
Mobilization/Demobilization For Pipe Culvert Construction
1
EA
$_______
$_______
0513AB
Furnish Pipe Culverts

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0513AC
Install Pipe Culverts, 0’-5’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0513AD
Install Pipe Culverts, 5’-10’ Deep

(24” RCP Arch Class 2)

20
FT
$_______
$_______
0513AE
Furnish End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0513AF
Install End Sections

(24” RCP Arch Flared)

1
EA
$_______
$_______
0513AG
Pipe Culvert Undercut
5
CY
$_______
$_______

Total Base Year #5 (Items 0500 thru 0513) $__________

NOTES:

-Contractor shall be aware that pricing items "Chip Seal Aggregate" and "Flush Seal Aggregate" require the Contractor to vacuum sweep and power broom as part of the application of the seal coat. Costs associated with vacuum sweeping and power brooming in accordance with application of a seal coat shall be included in these pricing items. Pricing items "Vacuum Sweep" and "Power Broom" are separate, standalone pricing items.

-Mobilization/Demobilization prices will cover all costs associated with hauling, transporting, and moving any equipment and/or materials to and from the project site. The Contractor is specifically cautioned that he will only receive one (1) mobilization/demobilization payment for similar pricing items on the same task order. For example, if the Contractor is directed to provide non-reflective pavement striping, reflective pavement striping, and non-reflective painted pavement symbols on the same task order, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee. Similarly, if the Contractor is directed to place Government Furnished Borrow material in excess of 100 CY, he will only be allowed to charge the Government for one (1) Mobilization/Demobilization fee, instead of charging a fee for both the first 100 CY of Government Furnished Borrow Material and then a fee for the material in excess of 100 CY.

Total Years 1 thru 5 (Items 0100 thru 0513) $_____________________

Notes:

1. Quantities for unit priced items are estimated only and the representative unit price will prevail in the event of an overrun or underrun subject to Contract Clauses (Section 00 72 00) Clause “Variation in Estimated Quantities.”

2. Prices must be entered for all items of the schedule. Total amount submitted without prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered the price. In case of variation between the individual item prices and the total amount, the individual prices will be considered the price.

3. A modification to a price which provides for a single adjustment to the total amount should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the amount of the adjustment will be divided by the number of items in the Basic Year Pricing Schedule, whichever one applies, and distributed equally among each Item.

4. * Refers to the number of the specification section for referencing technical and measurement and payment information for the various items.

5. Calendar duration is a five-year period starting with the effective date of the contract award.

6. If a line item is used, then the minimum quantity stated on the pricing sheet is the smallest quantity that may be ordered. The Contractor has the right to turn down any task order if done in writing in accordance with (Section 00 73 00) within 7 days of the task order being issued. In this case the Government may open task order items for other contractors to propose pricing.

7. Funds are not presently available for this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .