Q_and_A_Scott_IGL_21R0035_21 JAN 2021_Second Set.pdf
PDF 44 KB Posted
- Solicitation number
- W9128F21R0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_and_A_Scott_ILG_21R0035_29 JAN 2021.pdf | ||
| Modification_Copy_1449_PWS_Edit.pdf | ||
| Conformed_Copy_1449_PWS_Edit.pdf | ||
| TG30 ILG Fac. 5042 Tank1 API 653 OOS Report.pdf | ||
| Q_and_A_Scott_IGL_21R0035_21 JAN 2021_First Set(002).pdf | ||
| Q_and_A_21R0035_ILG_20 JAN 2021.pdf | ||
| Attachment E (API In-Service Template).docx | DOCX document | |
| ATT C-Fuel Storage Excel Document.xlsx | XLSX spreadsheet | |
| ATT D-Monthly Contractors Progress Management and Status Reports.xlsx | XLSX spreadsheet | |
| Attch B_ILG_Tank Info.xlsx | XLSX spreadsheet | |
| ATT A-General Installation Security Requirements.docx | DOCX document | |
| W9128F21R0035 SCOTT ANGB_ IL.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9128F21R0035 Scott ILG Question and Answer Second Set of Questions for 21 Jan 2021
The description in the advertisement on beta.sam.gov and in Part 1.1 of the Performance Work Statement indicate API 653 out of service inspections. However, the title of the Proposal as well as Part
5.1 Basic Services of the PWS, indicate API 653 External inspections with hydrostatic testing of the drain lines and valves.
Could you please confirm the scope of the work?
Answer: Error on PWS, Hydrostatic testing not required. Both tanks are to be inspected externally.
File details come from the government source that posted it. Updated .