Q_and_A_21R0035_ILG_20 JAN 2021.pdf
PDF 90 KB Posted
- Solicitation number
- W9128F21R0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_and_A_Scott_ILG_21R0035_29 JAN 2021.pdf | ||
| Modification_Copy_1449_PWS_Edit.pdf | ||
| Conformed_Copy_1449_PWS_Edit.pdf | ||
| TG30 ILG Fac. 5042 Tank1 API 653 OOS Report.pdf | ||
| Q_and_A_Scott_IGL_21R0035_21 JAN 2021_First Set(002).pdf | ||
| Q_and_A_Scott_IGL_21R0035_21 JAN 2021_Second Set.pdf | ||
| Attachment E (API In-Service Template).docx | DOCX document | |
| ATT C-Fuel Storage Excel Document.xlsx | XLSX spreadsheet | |
| ATT D-Monthly Contractors Progress Management and Status Reports.xlsx | XLSX spreadsheet | |
| Attch B_ILG_Tank Info.xlsx | XLSX spreadsheet | |
| ATT A-General Installation Security Requirements.docx | DOCX document | |
| W9128F21R0035 SCOTT ANGB_ IL.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21R0035 Questions and Answers Scott ILG
20 Jan 2021
1) Under the Performance Work Statement, item 5.1, ¶3 on page 24 of 55, the contractor is required to perform a hydrostatic test of the drain line and release valve. What size is the drain line and release valve?
Answer: The Issue line is 12” piping and the valve is a 12 “ Double block bleed, (DBB).
2) Under the Performance Work Statement, item 5.1, ¶4 on page 24 of 55, the contractor is required to perform a hydrostatic test of the containment drain inlet sump. What size are the containment sumps if the tanks are not within a combined containment area with a single sump?
Answer: The oil water separator holds up to 5000 gals.
3) Is water available on site for use, and if so, what is the anticipated utility rate.
Answer: There is water on site, but I do not know the anticipated utility rate, as that would change month to month depending on the season.