21R0035 Questions and Answers Scott ILG

20 Jan 2021

1) Under the Performance Work Statement, item 5.1, ¶3 on page 24 of 55, the contractor is required to perform a hydrostatic test of the drain line and release valve. What size is the drain line and release valve?

Answer: The Issue line is 12” piping and the valve is a 12 “ Double block bleed, (DBB).

2) Under the Performance Work Statement, item 5.1, ¶4 on page 24 of 55, the contractor is required to perform a hydrostatic test of the containment drain inlet sump. What size are the containment sumps if the tanks are not within a combined containment area with a single sump?

Answer: The oil water separator holds up to 5000 gals.

3) Is water available on site for use, and if so, what is the anticipated utility rate.

Answer: There is water on site, but I do not know the anticipated utility rate, as that would change month to month depending on the season.