Am-0004_W9128F21R0022.pdf
PDF 2 MB Posted
- Attached to
- Offutt AFB Lake Campus Consolidated Rec Facility Federal contract opportunity
- Solicitation number
- W9128F21R0022
About this file
This document provides details for a solicitation for the construction of a consolidated recreational facility at Offutt Air Force Base in Nebraska. The solicitation is open only to small businesses and seeks design-build services for a 940 square meter facility including a reception hall, equipment rental areas, offices, restrooms, showers, a catering kitchen, storage, and a mechanical room. The project also includes construction of a 270 square meter equipment storage facility as well as site work and landscaping. Contractors must be registered in the System for Award Management and have the NAICS code 236220. The contractor will be required to commence work within 10 days of notice to proceed and complete construction within 540 calendar days, with liquidated damages for delays. Performance and payment bonds will be required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F21R0022 Amendment 0009.pdf | ||
| W9128F21R0022 Amendment 0008.pdf | ||
| W9128F21R0022 Amendment 0007.pdf | ||
| Am-0006_W9128F21R0022.pdf | ||
| Am-0005_W9128F21R0022.pdf | ||
| Am-0003_W9128F21R0022.pdf | ||
| Am-0002_W9128F21R0022.pdf | ||
| SiteVisit_SignIn_W9128F21R0022_ConsRecFacility.pdf | ||
| Am-0001_W9128F21R0022.pdf | ||
| SPECS_W9128F-21-R-0022_Lake-Campus-CRF(of62).pdf | ||
| Area Plan-Site Visit.pdf | ||
| Appendix G - As-Builts - For Information Only.pdf | ||
| Div 00_W9128F21R0022 SF1442 PCO Released 20210318.pdf | ||
| Appendix-A-DRAWINGS_W9128F-21-R-0022_Lake-Campus-CRF(of62).PDF | ||
| NDORF17G.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
W9128F
LAKE CAMPUS, CONSOLIDATED RECREATION FACILITY, SGBP212908 (FY20), OFFUTT AFB, NEBRASKA
See attached documentation for content of the amendment revisions to solicitation
New date for receipt of proposals is 03 MAY 2021 at 1400 hours CDT
Government Point of Contact: Melissa Harlon, Contract Specialist, Melissa.R.Harlon@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA DIST
Attn: CONTRACTING DIVISION (CENWO-CT-M)
1616 CAPITOL AVENUE
OMAHA, NE 68102-4901
See Item 6
W9128F21R0022
21-Apr-2021
18-Mar-2021
21-Apr-2021
Am #0004 - 1
Am #0004 - 2 (Continuation SF 30)
21 April 2021 Solicitation No. W9128F 21 R 0022
Date of Issue: 18 MAR 2021 New Date of Receiving Proposals: 03 MAY 2021
SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of LAKE CAMPUS, CONSOLIDATED RECREATION FACILITY, SGBP212908.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 00 10 00, SF1442, Page 1 of 135, block 13.A., delete date and time of receiving proposals shown and substitute "03 May 2021" at "2:00 PM".
(2) Section 00 21 00, Page 29 of 135, paragraph 1.23.1 “BIDDER INQUIRY” delete the first sentence and substitute the following:
“Technical inquiries and questions relating to technical requirements, proposal procedures or bonds were to be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/ prior to 19 APR 2021; bidder inquiries are currently closed and will not be reopened.”
b. Specifications (New and/or Revised and Reissued). NONE
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.
1. SHEET A-101, COMPOSITE FLOOR PLAN
2. SHEET A-201, ELEVATIONS
3. SHEET A-600, ROOM FINISH SCHEDULE
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 03 MAY 2021.
Attachments:
Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
21 APR 2021
nep/2160
Tectonic Copyright 2007
DNDN
DN
DN
DN
DN
A-201
A-201
A-201
A-201
A-301
A-301
VESTIBULE
ALCOVE
MENS RESTROOM
WOMENS
RESTROOM
JANITOR -
PLUMBING CHASE
LACTATION ROOM
CORRIDOR
SEATING-SALES
CUSTOMER
SERVICE
OFFICE
STORAGE
DINING - EVENTS
STORAGE
CATERING
VESTIBULE
LAUNDRY
SHOWER
SHOWER
SHOWER
ACCESSIBLE
SHOWER
TELECOMMUNICATIONS
MECHANICAL
PATIO
94' - 5"
91' - 9"
4' - 0"
5' - 4"
4'
0" 5'
0"
5' - 0"
9'
4"
1' - 3"
9' - 4"
4'
6" 4'
1/ 2"
3' - 0" 3' - 0"
5'
0"
2' - 0"
1' - 3"
2'
0"
10' - 0"
30' - 6"
5' - 0"20
ELECTRICAL
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A-101
C O
M P
O S
IT
E
F
LO
O R
P
LA
N
O
FF
U
TT
A
FB
, N E
B R
A S
K A
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
A
VE
O
M A
H A, N E
K . H
A H
N
B . G
O R
U P
B . G
O R
U P
B . N
O H
R
/1
5/
W
F2
1R
W
8-
XX
-X
-X
XX
X
FI
LE
N
U M
B E
R
FI
LE
N A
M E
FL
O
O D
R E
C O
V E
R Y
-L A
K E
C A
M P
U S
R E
C R
E A
TI
O
N F
A C
IL
TY
O F6
2_ B
LB
H
E C
F_ D
M _A
.rv t
1/8" = 1'-0"1 COMPOSITE FLOOR PLAN
PLAN NORTH
WOOD STUD FRAMING WITH GYPSUM
WALLBOARD AND SOUND BATT INSULATION
0 8'4' 16'
HANDRAIL - TYP
CONTINUOUS
GUARDRAIL - TYP .
SEE ELEVATIONS
HANDRAIL - TYP
CONTINUOUS
GUARDRAIL - TYP .
SEE ELEVATIONS
CONTINUOUS
GUARDRAIL - TYP .
SEE ELEVATIONS
R A
M P
SL
O P
E
RAMP - SLOPE
RAMP - SLOPE
R A
M P
SL
O P
E
G
EN
ER
AL
R
EV
IS
IO
N
S
/0 9/
G
EN
ER
AL
R
EV
IS
IO
N S
/2
0/
CONTINUOUS CONCRETE
RETAINING WALL BELOW
- SEE ELEVATIONS
CONTINUOUS INTEGRALLY
COLORED SEGMENTED
BLOCK RETAINING WALL
BELOW - TYP .SEE ELEVATIONS
CONTINUOUS INTEGRALLY
COLORED CONCRETE
FOUNDATION WALL BELOW
- SEE ELEVATIONS
FOLD UP BENCHES - TYP.
REMOVEABLE
GUARDRAIL SECTION
FOR MECH ACCESS
COILING
COUNTER DOOR
ELECTRIC
HAND
DRYER -TYP.
LAVATORY
RAMP - SLOPE LANDING
LANDING
3-SIDED ATFP COMPLIANT
EQUIPMENT SCREEN WALL TO
MATCH THE EXTERIOR BUILDING
WALL MATERIAL
SIDEWALK - TYP. - WIDTH AS
REQURED TO MEET ALL
EGRESS REQUIREMENTS
FINISH FIRST FLOOR
0' - 0"
8'
0"
FINISH FIRST FLOOR
0' - 0"
A-301
2'
3"
2'
2'
0'
6"
6'
0"
FINISH FIRST FLOOR
0' - 0"
A-301
FINISH FIRST FLOOR
0' - 0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A-201
E
LE
V A
TI
O
N S
O
FF
U
TT
A
FB
, N E
B R
A S
K A
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
A
VE
O
M A
H A, N E
K . H
A H
N
B . G
O R
U P
B . G
O R
U P
B . N
O H
R
/1
5/
W
F2
1R
W
8-
XX
-X
-X
XX
X
FI
LE
N
U M
B E
R
FI
LE
N A
M E
FL
O
O D
R E
C O
V E
R Y
-L A
K E
C A
M P
U S
R E
C R
E A
TI
O
N F
A C
IL
TY
O F6
2_ B
LB
H
E C
F_ D
M _A
.rv t
1/8" = 1'-0"1 East Elevation
1/8" = 1'-0"2 North Elevation
1/8" = 1'-0"3 South Elevation
1/8" = 1'-0"4 West Elevation
HORIZONTAL CEMENTITIOUS
SIDING ON WOOD FRAMED
EXTERIOR. WALLS - TYP.
EXPOSED CONCRETE
FOUNDATION WALLS - TYP
HIP-SLOPED/GABLE TRUSS-FRAMED
STANDING SEAM METAL ROOF SYSTEM
0 8'4' 16'
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 6/
G
EN
ER
AL
R
EV
IS
IO
N S
/2
0/
CONCRETE RETAINING
WALL BELOW PERIMETER - TYP
INTEGRALLY COLORED
SEGMENTED BLOCK
RETAINING WALL - TYP.
REMOVABLE GUARDRAIL
SECTION IN FRONT OF
MECHANCIAL ROOM DOORS
STANDING SEAM METAL
ROOF W/ GUTTERS
AND DOWNSPOUTS - TYP.
METAL WALL
PANELS TO MATCH STANDING
SEAM METAL - TYP.
ENTRY CANOPY
METAL HANDRAILS
AND GUARDRAILS - TYP
METAL STAIRS
BUILDING ID SIGN
BUILDING ID SIGN
MONOLITHIC CONCRETE STAIR - TYP
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A-600
R O
O M
F
IN
IS
H
S C
H E
D U
LE
O
FF
U
TT
A
FB
, N E
B R
A S
K A
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
A
VE
O
M A
H A, N E
K . H
A H
N
B . G
O R
U P
B . G
O R
U P
B . N
O H
R
/1
5/
W
F2
1R
W
8-
XX
-X
-X
XX
X
FI
LE
N
U M
B E
R
FI
LE
N A
M E
FL
O
O D
R E
C O
V E
R Y
-L A
K E
C A
M P
U S
R E
C R
E A
TI
O
N F
A C
IL
TY
O F6
2_ B
LB
H
E C
F_ D
M _A
.rv t
G
EN
ER
AL
R
EV
IS
IO
N
S
/0 9/
G
EN
ER
AL
R
EV
IS
IO
N S
/2
0/
ROOM FINISH SCHEDULE
ROOM NO. ROOM NAME
MATERIAL / FINISHES
NET AREA REMARKS
WALL FINISH BASE
FINISH
FLOOR
FINISH
CEILING
FINISHNORTH EAST SOUTH WEST
101 VESTIBULE GWB/PNT GWB/PNT GWB/PNT GWB/PNT SSB WOM/CT GWB 133 SF
102 ALCOVE GWB/PNT GWB/PNT GWB/PNT/PWC GWB/PNT PT PT ACT 84 SF
103 MENS RESTROOM GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT GWB 270 SF
104 WOMENS RESTROOM GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT GWB 293 SF
105 JANITOR - PLUMBING CHASE GWB GWB GWB GWB - CONCRETE GWB 123 SF
106 LACTATION ROOM GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT ACT 104 SF
107 CORRIDOR GWB/PNT GWB/PNT GWB/PNT GWB/PNT PT PT ACT 455 SF
108 SEATING-SALES GWB/PNT GWB/PNT/DWP GWB/PNT GWB/PNT PT PT ACT 712 SF
109 CUSTOMER SERVICE GWB/PNT GWB/PNT GWB/PNT/PWC GWB/PNT RB LVT ACT 286 SF
110 OFFICE GWB/PNT GWB/PNT GWB/PNT GWB/PNT RB LVT ACT 141 SF
111 STORAGE GWB/PNT GWB/PNT GWB/PNT GWB/PNT RB LVT ACT 141 SF
112 DINING - EVENTS GWB GWB/PNT GWB/PNT GWB/VWC RB CPT ACT/GWB 2884 SF
113 STORAGE GWB/PNT GWB/PNT GWB/PNT GWB/PNT/PT RB LVT ACT 314 SF
114 CATERING GWB/PNT/PT GWB/PNT GWB/PNT/PT GWB/PNT/PT RB LVT GWB 360 SF
115 VESTIBULE GWB/PNT GWB/PNT GWB/PNT GWB/PNT SSB WOM/PT GWB 85 SF
116 LAUNDRY GWB/PNT GWB/PNT GWB/PNT GWB/PNT - CONCRETE GWB 105 SF
117 SHOWER GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT GWB 59 SF
118 SHOWER GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT GWB 60 SF
119 SHOWER GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT GWB 60 SF
120 ACCESSIBLE SHOWER GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT GWB/PNT/PT SSB PT GWB 90 SF
121 TELECOMMUNICATIONS GWB/PNT GWB/PNT GWB/PT GWB/PNT - CONCRETE GWB 107 SF
122 MECHANICAL GWB/PNT GWB/PNT GWB/PT GWB/PNT - CONCRETE ES 561 SF
123 PATIO - CONCRETE ES Not Enclosed
124 ELECTRICAL GWB/PNT GWB/PNT GWB/PT GWB/PNT - CONCRETE ES 158 SF
ACT ACOUTIC CEILING TILE
PT PORCELAIN TILE
DWP DECORATIVE WALL PANEL
ES EXPOSED STRUCTURE
GWB GYPSUM WALL BOARD
LVT LUXURY VINYL TILE
PNT PAINT
RB RUBBER BASE
SSB STAINLESS STEEL BASE
VWC VINYL WALLCOVERING
WOM WALK-OFF MAT
PWC PROTECTIVE WALL COVERING
FINISH TYPES
1. ALL NEW, EXPOSED GWB IN SPACES OTHER THAN UTILITY SPACES SHALL BE PAINTED.
2. WHEN A CEILING OR WALL IS CALLED FOR "PAINT" IN ROOM FINISH SCHEDULE, ALL STEEL FRAMING, SUPPORTS, DECKING, DUCTWORK, CONDUIT, AND GYPSUM BOARD SHALL BE PAINTED
UNLESS APPROVED OTHERWISE.
3. PROVIDE ABA-COMPLIANT EXTRUDED ALUMINUM TRANSITION STRIPS WHERE CHANGES IN FINISH FLOORING. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4. PROVIDE TRANSITION STRIPS AT THE CENTERLINE OF DOOR JAMBS WHERE FLOOR MATERIAL TRANSITIONS BETWEEN SPACES OCCUR. FLOORING AND TRANSITION STRIP CHANGE IN ELEVATION
SHALL NOT BE GREATER THAN 1/4."
NOTES, TYP ALL ROOMS
| Standard_Form_30 | |
| Am-0004_W9128F-21-R-0022_Narrative | |
| Attachments | |
| Drawings (Reissued) | |
| ARCHITECTURAL | |
| A-101 | COMPOSITE FLOOR PLAN (1) |
| A-201 | ELEVATIONS (1) |
| A-600 | ROOM FINISH SCHEDULE (1) |
File details come from the government source that posted it. Updated .