Offutt AFB Lake Campus Consolidated Rec Facility Federal contract opportunity
Solicitation number
W9128F21R0022
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This notice is for a solicitation issuance for a one-step design-build project to construct a 940 square meter consolidated recreational facility and 270 square meter equipment storage facility at Offutt Air Force Base in Nebraska. The project includes site preparations, buildings, HVAC, electrical, communications, plumbing, sidewalks, pavements, demolition, lake bank stabilization, a new dock, outdoor equipment storage, fencing, retaining walls, landscaping, and ADA requirements. Sustainable practices must be integrated according to Executive Orders. The contractor must commence work within 10 days of the notice to proceed and complete the project within 540 calendar days, with liquidated damages for delays. Performance and payment bonds are required.

View the file

Other files for this federal contract opportunity

Other files attached to Offutt AFB Lake Campus Consolidated Rec Facility, newest first.
File Type Posted
W9128F21R0022 Amendment 0009.pdf PDF
W9128F21R0022 Amendment 0008.pdf PDF
W9128F21R0022 Amendment 0007.pdf PDF
Am-0006_W9128F21R0022.pdf PDF
Am-0005_W9128F21R0022.pdf PDF
Am-0004_W9128F21R0022.pdf PDF
Am-0003_W9128F21R0022.pdf PDF
SiteVisit_SignIn_W9128F21R0022_ConsRecFacility.pdf PDF
Am-0001_W9128F21R0022.pdf PDF
SPECS_W9128F-21-R-0022_Lake-Campus-CRF(of62).pdf PDF
Area Plan-Site Visit.pdf PDF
Appendix G - As-Builts - For Information Only.pdf PDF
Div 00_W9128F21R0022 SF1442 PCO Released 20210318.pdf PDF
Appendix-A-DRAWINGS_W9128F-21-R-0022_Lake-Campus-CRF(of62).PDF PDF
NDORF17G.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W9128F

LAKE CAMPUS, CONSOLIDATED RECREATION FACILITY, SGBP212908 (FY20), OFFUTT AFB, NEBRASKA

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 29 APR 2021 at 1200 hours

Government Point of Contact: Melissa Harlon, Contract Specialist, Melissa.R.Harlon@usace.army.mil

U.S.ARMY CORPS OF ENGINEERS, OMAHA DIST

Attn: CONTRACTING DIVISION (CENWO-CT-M)

1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

See Item 6

W9128F21R0022

13-Apr-2021

18-Mar-2021

13-Apr-2021

Am #0002 - 2 (Continuation SF 30)

13 April 2021 Solicitation No. W9128F 21 R 0022

Date of Issue: 18 MAR 2021 Date of Receiving Proposals: 29 APR 2021

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of LAKE CAMPUS, CONSOLIDATED RECREATION FACILITY, SGBP212908.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 01 83 00, Page 8, paragraph 1.3 “STRUCTURAL DESIGN LOADS AND CONDITIONS”, at the end of the paragraph, add the following:

“The storage building shall be designed for the design flood elevation of 972 feet.”

(2) Section 01 86 10, Page 13, paragraph 1.8.7 “Floor Drains”, delete the first sentence “Floor drains shall...and Janitor’s Closets.” and substitute the following:

“Floor drains shall be provided in the Mechanical Room, Restrooms, Shower Rooms, Catering Kitchen and Janitor's Closets.”

(3) Section 01 86 13, Page 6, paragraph 1.11.1 “Building Construction Type”, delete the first sentence “These facilities shall...in accordance with ICC IBC.” and substitute the following:

“These facilities shall comply with a minimum Construction Type V, in accordance with ICC IBC.”

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added

01 33 29AT 01 33 29AT1

** 01 33 29AT2

** 01 33 29AT3

** 01 33 29AT4

01 81 00 01 81 00 01 82 00 01 82 00 01 86 29 01 86 29 01 89 00 01 89 00

** 01 89 00AT3 – HYDRANT FLOW CALCULATIONS

APPENDIX B – ROOM DATA SHEETS APPENDIX B – ROOM DATA SHEETS

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.

1. SHEET LP101, LANDSCAPE PLAN

2. SHEET A-101, COMPOSITE FLOOR PLAN

3. SHEET A-600, ROOM FINISH SCHEDULE

4. SHEET T-101, TELECOMMUNICATION SITE PLAN - AREA 101

5. SHEET T-102, TELECOMMUNICATION SITE PLAN - AREA 102

6. SHEET T-105, TELECOMMUNICATION SITE PLAN - AREA 105

7. SHEET T-107, TELECOMMUNICATION SITE PLAN - AREA 107

8. SHEET T-108, TELECOMMUNICATION SITE PLAN - AREA 108

9. SHEET T-109, TELECOMMUNICATION SITE PLAN - AREA 109

10. SHEET T-110, TELECOMMUNICATION SITE PLAN - AREA 110

11. SHEET T-112, TELECOMMUNICATION SITE PLAN - AREA 112

12. SHEET T-113, TELECOMMUNICATION SITE PLAN - AREA 113

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 12:00 p.m., local time at place of receiving proposals, 29 APR 2021.

Attachments:

Specifications listed in 1.b., above Drawings listed in 1.c., above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

13 APR 2021

nep/2160

Am #0002 - 3 (Continuation SF 30)

This page was intentionally left blank for duplex printing.

Project Name Lake Campus ‐ Consolidated Recreation Facility PN:1080945

Project ID

Project City

Project State

Notes: Notes: Contractor shall comply with UFC 1‐200‐02 requirements for integrated design. Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v4 Integrative Process Credit

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for integrative planning. Document compliance.

Compliance Path: ‐ Step‐by‐Step LEED v4 Integrative Process Credit

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for Evaluation for Design Strategies.

Document compliance.

Compliance Path: ‐ Step‐by‐Step LEED v4 Integrative Process Credit

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for Evaluation of the Site. Document compliance.

Compliance Path: ‐ Step‐by‐Step

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for this item. Document compliance.

Compliance Path: ‐ Not applicable

Notes: Contractor shall comply with requirements of RFP section 01 86 10, 01 86 13, 01 86 26, and 01 86 29 as applicable.

Compliance Path: ‐ Step‐by‐step See sections identified above

2‐2.1 Integrated Design ‐ Design Submittal

2‐2.1.3 Evaluation of the Site ‐ Design Submittal

2‐2.1.4 Site Integration and Design of the Building ‐ Design Submittal

2‐2.2 Commissioning ‐ Construction Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation as described in the Technical Guide for Guiding Principles Assessment for DoD

‐ Streamlined LEED path as described in the Technical Guide for Guiding Principles Assessment for DoD

‐ Not applicable to project, provide written justification for missed targets as relates to mission, location, LCCA, non‐applicable to scope, or other reason specific to requirement

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

2‐2 Employ Integrated Design Principles

SGBP 21‐2908

Bellevue

NE

2‐2.1.1 Integrative Planning ‐ Design Submittal

Select 1 of the 2 compliance paths

‐ Step‐by‐Step Implementation as described in the Technical Guide for Guiding Principles Assessment for DoD

‐ Not applicable to project, provide written justification for missed targets as relates to mission, location, LCCA, non‐applicable to scope, or other reason specific to requirement

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

2‐2.1.1 Evaluation for Design Strategies ‐ Design Submittal

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 1 of 7 Am #0002 01 33 29AT1

Project City

Project State

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

SGBP 21‐2908

Bellevue

NE

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for energy performance. Document compliance.

Compliance Path: ‐ Step‐by‐Step LEED v4 Optimize Energy Performance Credit.

Notes: Project is a commercial building. As such, requirement is not applicable. No documentation required.

Compliance Path: ‐ Not applicable

Notes: Project is new construction. As such, requirement is not applicable. No documentation required.

Compliance Path: ‐ Not applicable LEED v4 Optimize Energy Performance Credit.

Notes: Per EISA 2007, acquire products that are ENERGY

STAR®‐qualified or meet FEMP‐designated efficiency requirements in all covered product categories. Document compliance

Compliance Path: ‐ Step‐by‐Step

Notes: Per EISA 2007 Section 524, provide commercially available, off‐the‐shelf products that use no more than 1 watt in their standby mode. Document compliance.

Compliance Path: ‐ Step‐by‐Step

Notes: On‐Site Renewable Energy has already undergone

Life Cycle Cost Analysis for this project and is not cost effective. No documentation required.

Compliance Path: ‐ Not applicable

2‐3.1.5 Standby Powered Device ‐ Design Submittal

2‐3.2 On‐Site Renewable Energy ‐ Design Submittal

2‐3.2.1 Solar Domestic Hot Water (SDHW) ‐ Design Submittal

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐3.1.4 Energy Efficient Products ‐ Design Submittal

2‐3.1.3 Renovations ‐ Design Submittal

2‐3.1.1 Commercial and Multi‐Family High‐Rise Residential Building ‐ Design Submittal

2‐3.1.2 Low‐Rise Residential Buildings ‐ Design Submittal

2‐3 Optimize Energy Performance

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 2 of 7

Project City

Project State

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

SGBP 21‐2908

Bellevue

NE

Notes: SDHW has already undergone Life Cycle Cost

Analysis and is not cost effective. No documentation required.

Compliance Path: ‐ Not applicable

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for utility metering. Document compliance.

Compliance Path: ‐ Step‐by‐step

2‐3.4 Metering ‐ Design Submittal

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 3 of 7

Project City

Project State

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

SGBP 21‐2908

Bellevue

NE

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for indoor water. Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v4 Water Efficiency Credit.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for utility metering. Document compliance.

Compliance Path: ‐ Step‐by‐step

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for outdoor water landscaping. Document compliance.

Compliance Path: ‐ Step‐by‐step

Notes: Project does not include existing irrigation systems, therefore requirment is not applicable. No documentation required.

Compliance Path: ‐ Not applicable

Notes: Local regulations limit harvesting rainwater.

Evaluate other alternative water sources. Document

Compliance

Compliance Path: ‐ Step‐by‐step

Notes: Contractor shall comply with UFC 3‐210‐10 for stormwater management. Document Compliance

Compliance Path: ‐ Step‐by‐step

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐4.1 Indoor Water ‐ Design Submittal

2‐4 Protect and Conserve Water

2‐4.2.1 Outdoor Water Landscaping ‐ Design Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐4.2.2 Outdoor Water Metering ‐ Design Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐4.3 Alternate Water‐ Design Submittal

2‐4.3.1 Stormwater Management ‐ Design Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐4.1.1 Indoor Water Metering ‐ Design Submittal

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 4 of 7

Project City

Project State

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

SGBP 21‐2908

Bellevue

NE

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for ventilation. Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v4 Minimum/Enhanced IAQ Credit(s).

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for thermal comfort. Document compliance.

Compliance Path: ‐ LEED streamline LEED v4 Thermal Comfort Credit.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for automated lighting controls. Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v4 Interior Lighting Credit.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for moisture control. Document compliance.

Compliance Path: ‐ Step‐by‐Step

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for low‐emitting materials (low VOC).

Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v4 Low‐Emitting Materials Credit.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for IAQ during construction. Document compliance.

Compliance Path: ‐ LEED streamline LEED v4 Construction IAQ Management Credit.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for occupant health and wellness during construction. Document compliance.

2‐5.3.1 IAQ Moisture Control ‐ Design Submittal

2‐5.3.2 Reduce VOC Low‐Emitting Materials ‐ Construction Submittal

2‐5.3.3 Protect Indoor Air Quality During Construction ‐ Construction Submittal

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 2 compliance paths:

‐ Step‐by‐Step Implementation

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐5.4 Occupant Health and Wellness ‐ Design Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐5 Enhance Indoor Environmental Quality

2‐5.1 Part 2 ‐ Thermal Comfort ‐ Design Submittal

2‐5.2 Daylighting & Lighting Controls ‐ Design Submittal

2‐5.1 Part 1 ‐ Ventilation ‐ Design Submittal

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 5 of 7

Project City

Project State

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

SGBP 21‐2908

Bellevue

NE

Compliance Path: ‐ Not applicable

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 6 of 7

Project City

Project State

PROJECT INFORMATION FORM

Guiding Principles Assessment, Department of Defense by GBCI v2.1

UFC 1‐200‐02: Chapter 2 Building Design & Construction, 01Dec16 Change 1 01Oct17 General Information

SGBP 21‐2908

Bellevue

NE

Notes: Contractor shall comply with requirements of RFP section 01 62 35 RECYCLED/RECOVERED MATERIALS.

Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v3 Recycled Content Credit.

Notes: Contractor shall comply with requirements of RFP section 01 33 29 SUSTAINABILITY REPORTING, for biologically preferred products. Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v3 Rapidly Renewable Materials Credit.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for ozone depleting substances. Document compliance.

Compliance Path: ‐ Step‐by‐step

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for storage and collection of recyclables.

Document compliance.

Compliance Path: ‐ Step‐by‐step LEED v3 or v4 Storage & Collection of Recyclables

Notes: Contractor shall comply with requirements of RFP section 01 74 19 CONSTRUCTION WASTE MANAGEMENT

AND DISPOSAL.

Compliance Path: ‐ Step‐by‐step LEED v3 or v4 Construction & Demo Waste Mngmnt.

Notes: Contractor shall comply with UFC 1‐200‐02 requirements for address climate change risk. Document compliance.

Compliance Path: ‐ Step‐by‐step

2‐6.1.2 Biologically‐Based Products ‐ Construction Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐6 Reduce Environmental Impact of Materials 2‐6.1.1 Recycled Content ‐ Construction Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

2‐7 Address Climate Change Risk 2‐7 Address Climate Change Risk ‐ Design Submittal

2‐6.1.4 Ozone Depleting Substances ‐ Construction Submittal

2‐6.2.1 Storage and Collection of Recyclables ‐ Design Submittal

2‐6.2.2 Waste Diversion‐ Construction Submittal

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Select 1 of the 3 compliance paths

‐ Step‐by‐Step Implementation

‐ Streamlined LEED path

‐ Not applicable to project

Copy of GPA DoD Project Information Form October 2017.xlsx Project Information Form 7 of 7

This page was intentionally left blank for duplex printing.

TECHNICAL GUIDE

New Construction and Renovations Guiding Principles Implemented by UFC 1-200-02 (December 2016)

Contact: GuidingPrinciplesAssessment@gbci.org

Website: GuidingPrinciples.gbci.org

Dated: January 2019

Am #0002 01 33 29AT2 mailto:GuidingPrinciplesAssessment@gbci.org GuidingPrinciples.gbci.org

UFC 1-200-02: Chapter 2 Building Design & Construction

January 2019 GuidingPrinciplesAssessment@gbci.org Page 2 of 76

Table of Contents Table of Contents

Introduction

TECHNICAL GUIDANCE

2-1. OVERVIEW

Technical Guidance Overview

Life Cycle Cost Analysis

Project Team Definitions

Projects Outside of United States

Compliance with federal requirements

Definition of Terms

2-2. EMPLOY INTEGRATED DESIGN PRINCIPLES

2-2.1 Integrated Design

2-2.1.1 Integrated Planning

2-2.1.2 Evaluation for Design Strategies

2-2.1.3 Evaluation of the Site

2-2.1.4 Site Integration and Design of the Building

2-2.2 Commissioning

2-3. OPTIMIZE ENERGY PERFORMANCE

2-3.1.1 Energy Efficiency - Commercial and Multi-Family High-Rise Residential Buildings

2-3.1.2 Energy Efficiency - Low-Rise Residential Buildings

2-3.1.3 Energy Efficiency - Renovations

2-3.1.4 Energy Efficient Products

2-3.1.5 Standby Powered Devices

2-3.2 On-Site Renewable Energy

2-3.2.1 Solar Domestic Hot Water (SDHW)

2-3.4 Metering

2-4. PROTECT AND CONSERVE WATER

2-4.1 Indoor Water

2-4.1.1 Indoor Water Metering

2-4.2.1 Outdoor Water - Landscaping

2-4.2 Outdoor Water Meter

2-4.3 Alternative Water

2-4.3.1 Stormwater Management

2-5. ENHANCE INDOOR ENVIRONMENTAL QUALITY

Am #0002 01 33 29AT2

January 2019 GuidingPrinciplesAssessment@gbci.org Page 3 of 76

2-5.1 Part 1 Ventilation

2-5.1 Part 2 Thermal Comfort

2-5.2 Daylighting and Lighting Controls

2-5.3.1 Indoor Air Quality - Moisture Control

2-5.3.2 Reduce Volatile Organic Compounds (VOC) Low-Emitting Materials

2-5.3.3 Protect Indoor Air Quality during Construction

Not applicable to project. Provide written justification for missed targets as relates to mission, location, LCCA, non-applicable to scope, or other reason specific to requirement

2-5.3.4 Environmental Tobacco Smoke Control

2-5.4 Occupant Health and Wellness

2-6. REDUCE ENVIRONMENTAL IMPACT OF MATERIALS

2-6.1 Environmentally Preferable Products

2-6.1.1 Recycled Content

2-6.1.2 Biologically-Based Products

2-6.1.3 Ozone Depleting Substances

2-6.2.1 Storage and Collection of Recyclables

2-6.2.2 Waste Diversion

2-7 ADDRESS CLIMATE CHANGE RISK

2-7 Address Climate Change Risk

Introduction For use with Guiding Principles Assessment, Department of Defense: Building Design and Construction UFC 1-

200-02

From the EPA to NASA, federal agencies work to abide by the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings1 for building, renovating, and operating optimal, efficient buildings. The Green Business Certification Inc. (GBCI) has been working with these federal agencies to offer assessments of each agency’s work to meet the Guiding Principles. GBCI can help you evaluate your success, streamline reporting, and guide your efforts toward complying with the principles, using its depth and breadth of knowledge of green building certification.

1 Guiding Principles for Sustainable Federal Buildings and Associated Instructions https://www.whitehouse.gov/sites/default/files/docs/guiding_principles_for_sustainable_federal_buildings_and_associate d_instructions_february_2016.pdf Determining Compliance with the Guiding Principles for Sustainable Federal Buildings https://www.whitehouse.gov/sites/default/files/docs/determining_compliance_with_the_guiding_principles_for_sustaina ble_federal_buildings_february_2016.pdf https://www.whitehouse.gov/sites/default/files/docs/guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf https://www.whitehouse.gov/sites/default/files/docs/guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf https://www.whitehouse.gov/sites/default/files/docs/determining_compliance_with_the_guiding_principles_for_sustainable_federal_buildings_february_2016.pdf https://www.whitehouse.gov/sites/default/files/docs/determining_compliance_with_the_guiding_principles_for_sustainable_federal_buildings_february_2016.pdf

January 2019 GuidingPrinciplesAssessment@gbci.org Page 4 of 76

The Department of Defense (DOD) initiated the Unified Facilities Criteria (UFC) program to unify all technical criteria and standards pertaining to planning, design, construction, and operation and maintenance of real property facilities2. The Guiding Principles requirements are incorporated into the

UFC 1-200-02 High Performance and Sustainable Building Requirements (UFC 1-200-02). For the DOD compliance with UFC 1-200-02 is compliance with Guiding Principles for Federal Sustainable Buildings.

Guiding Principles Assessment (GPA) assesses compliance with UFC 1-200-02.

This Technical Guide along with the Guiding Principles Assessment Handbook will take you through the steps to show your projects’ compliance with the Guiding Principles as specified in the UFC 1-200-023.

The UFC 1-200-01 DoD Building Code (General Building Requirements)4 provides clarification for projects eligible for this version of the program. Questions and requests for clarification can be directed to: GuidingPrinciplesAssessment@gbci.org

TECHNICAL GUIDANCE

2-1. OVERVIEW

These requirements apply to all New Construction, New Addition and Renovation projects. [See the

UFC 1-200-02 Appendix D for project requirements impacted by historic buildings, historic districts and those near historic facilities, view sheds and other designated cultural resources.]

Technical Guidance Overview The Requirements noted for each of the following are directly quoted from the UFC 1-200-02 dated

01Dec16 with change 01 dated 01Oct17.

There are Guiding Principle Requirements that are addressed in the UFC 1-200-02 in Chapter 3

Assessment of Existing Buildings for High Performance and Sustainable Building (HPSB) Compliance that are intentionally excluded from this Building Design and Construction assessment. For example, Benchmarking, Environmental Tobacco Smoke Control, Integrated Pest Management and Radon are requirements covered by DoD policy at later project stages.

Life Cycle Cost Analysis 1-7 LIFE-CYCLE COST ANALYSIS (LCCA). The purpose of the LCCA methodology as detailed in CFR Title

10 Part 436 Subpart A is to identify and compare life-cycle cost-effective (LCCE) building energy and water systems that will in total achieve the energy and water requirements stated in this document. An

LCCA is required for the following:

2 Department of Defense (DOD) UNIFIED FACILITIES CRITERIA PROGRAM http://www.wbdg.org/ffc/dod 3 UFC 1-200-02 dated 01Dec16 change 1 01Oct17 http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02 4 UFC 1-200-01 http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01 mailto:GuidingPrinciplesAssessment@gbci.org http://www.wbdg.org/ffc/dod http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02 http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01

January 2019 GuidingPrinciplesAssessment@gbci.org Page 5 of 76

1. Energy consuming systems (e.g.: HVAC systems)5

2. Renewable energy generating systems (ex: photovoltaic panels)

3. When LCCE is selected as the reason any requirement of this document is “Partially compliant” or “Not Applicable” (reference paragraph 4-2).

The LCCA methodology may also be used to evaluate multiple options, such as selecting the building construction type and comparing compliant materials; and is at the discretion of the project team.

1-7.1 LCCA Format. Prepare the LCCA in accordance with CFR Title 10 Part 436, Subpart A and NIST

Handbook 135 “Life-Cycle Costing Manual for the Federal Energy Management Program”. The LCCA must be prepared using the Building Life-Cycle Costing (BLCC) program, available from the National

Institute of Standards and Technology (http://energy.gov/eere/femp/building-life-cycle-cost-programs). The implied long-term inflation rate and discount rates identified in the Annual supplement to NIST Handbook 135 must be used. A link to BLCC can also be found at the Department of Energy’s building energy tools web site: http://energy.gov/eere/femp/building-life-cycle-cost-programs. When needed, refer to UFC 3-410-01 for requirements to obtain weather data.

1-7.2 LCCA Building-Level Analysis Any building-level LCCA must be calculated using a maximum of a

40-year building life and equipment lives based on accepted industry averages. Individual components or systems life expectancies must be reflected by inclusion of appropriate replacement and salvage values in the appropriate year of this analysis.

1-7.3 LCCA Individual Component or System Alternatives Analysis. LCCAs comparing at least three individual component or system alternatives must use the estimated life of the mutually exclusive alternative having the longest life, not to exceed 40 years from the beginning of beneficial use or the lowest common multiple of the expected lives of the alternatives. Include the appropriate replacement and salvage values for each of the other alternatives. A number of tools comparing energy system alternatives and evaluating specific efficiency measures may be of benefit in performing energy efficiency calculations.

Perform this analysis based on the actual conditions expected over the life of the facility including anticipated occupancies, scheduled hours of operation and process loads. Include realistic energy usage and efficiencies, maintenance cost and repairs renovations, all costs or savings associated with the utilization of recovered energy, solar heat, solar photovoltaic energy and other renewable or waste heat applications. Credit any alternative funding such as rebates in the LCCA. Use UFC 3-410-01

Appendix E.

5 In addition to the new building requirements, all existing building large capital energy investments (all projects for which the cost of the systems that impact energy consumption exceeds $250K, which constitutes a capital investment, per National Defense Authorization Act) employ the most energy efficient designs, systems, equipment, and controls that are life cycle cost effective.

January 2019 GuidingPrinciplesAssessment@gbci.org Page 6 of 76

Project Team Definitions Owner Organization: The “Owner Organization” is the building owner organization or the DOD department that will own and occupy after construction (US Army, US Air Force, US Navy or US Marine

Corps)

Owner Name: The “Owner Name” is the name of the person within the Owner Organization responsible for the project.

Primary Contact Organization: The “Primary Contact Organization” is the DOD department that is executing project for Owner Organization (US Army, US Air Force, US Navy or US Marine Corps).

Primary Contact Name: The “Primary Contact Name” is the name of the person within the Primary

Contact Organization responsible for the project.

Project Administrator Organization: “The Project Administrator Organization” is often the non-DoD organization hired to manage project execution for the Primary Contact Organization.

Project Administrator Name: The “Project Administrator” is the name of the person within the Project

Administrator Organization responsible for the project.

Projects Outside of United States If working with a project outside of the United States review excerpts from the UFC and contact GBCI with any questions or concerns:

FORWARD: All construction outside of the United States is also governed by Status of Forces

Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.

Compliance with federal requirements 4-2 COMPLIANCE WITH FEDERAL REQUIREMENTS. Not applicable – the requirement is not applicable, based on LCCE (e.g., LCCE excludes use of Alternate Water); mission exclusion (e.g., no daylighting in a theater or a SCIF); location/regional exclusion (e.g., Host Nation Agreement or no local recycling facility); or locale exclusion (e.g., there is no steam to meter), and is marked “Not Applicable” with justification.

Note, in instances where a requirement is only partially applicable, within the Project Information

Form, select the documentation path that will be used to document the applicable portions of the

Requirement. Not applicable should only be selected if the Requirement is not applicable in its entirety. If requirements are only partially applicable, (i.e. Daylighting not permitted in select secure areas of the building), it is expected that the project comply in other portions of the project and provide documentation delineating the portions of the project that are in compliance versus those that are not applicable.

January 2019 GuidingPrinciplesAssessment@gbci.org Page 7 of 76

4-3.2 SUSTAINABLE THIRD PARTY CERTIFICATION. TPC is not required for buildings being constructed by or for use by the United States under the laws, codes, rules and regulations of a Host Nation, but may need to comply with similar requirements of the Host Nation, as applicable international agreements provide.

Incorporate sustainable development strategies and features to the greatest extent practical.

Definition of Terms Life-Cycle Costing (LCC): An important economic analysis used in the selection of alternatives that impact both pending and future costs. It compares initial investment options and identifies the least cost alternatives for a 40-year period. As applied to building design energy conservations measures, the process is mandated by law and is defined in 10 CFR Part 426, Subpart A: Program Rules of the

Federal Energy Management Program (NIST Handbook 135). The National Institute of Standards and

Technology has established the Building Life-Cycle Cost (BLCC) computer program to perform LCC analyses. The program incorporates user entered data for and compares the following: Sunk Costs, First Costs, Salvage Value, Future Investment, Residual Value, Annually Recurring Fixed Costs, Annually

Recurring Escalating Costs, and Energy (Fuel Costs) Escalation Rates.

Life-Cycle Cost Analysis (LCCA): Assessment of the direct, indirect, recurring, nonrecurring, and other related costs incurred or estimated to be incurred in the design, development, production, operation, maintenance, support, and final disposition of a major system over its anticipated useful life span.

LCCA considers all costs (capital, operating, and decommissioning expenses for the duration of a project) for various alternative approaches, including inflation and discount rates.

Life-Cycle Cost Effectiveness (LCCE): A documented statement of costs to be incurred to complete all stages of a project from planning through acquisition, maintenance, operation, remediation, disposition, long-term stewardship, and disposal. The results of a LCCA.

DD Form 1391: A programming document used by the Department of Defense to submit requirements and justifications in support of funding requests for military construction to Congress.

January 2019 GuidingPrinciplesAssessment@gbci.org Page 8 of 76

2-2. EMPLOY INTEGRATED DESIGN PRINCIPLES

Integrated design is the most important requirement in achieving a high performance building. A design team must have strong, consistent representation from all stake-holders throughout the project phases to avoid missing opportunities to improve building performance and to fully realize increased savings potential.

2-2.1 Integrated Design

Requirements

Integrated Design (2-2.1): Incorporate the following planning and evaluation into the integrated design, as described in ASHRAE 189.1 Informative Appendix F (Integrated Design). Follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section F1.1.1 (Charrette Process).

The Integrated Design requirements are addressed by the Enacted DD1391 coordination from Base to

Congress, prior to delivery to project team.

Compliance Step-By-Step Implementation

Step 1. Review ASHRAE 189.1 Requirements & DD1391

• Obtain the Enacted DD1391 form to understand the owner’s project goals and any department, base or other requirements provided by the Owner

• If possible obtain the design charrette process information from the Owner that would have been created as part of the creation and approval of the “Enacted DD1391”

Step 2. Assemble team

• In addition to the owner or primary contact, core members of the integrated design team often include the architect, engineers, construction manager or general contractor, landscape architect, facilities manager, green building or sustainable design specialist, other professionals from relevant disciplines, building users, and government support staff.

• Team members with broad experience play a key role in contributing meaningfully to the major areas of focus: siting, energy, water, materials, indoor environmental quality, and other design goals.

Step 3. Document performance goals and targets

• Well-defined performance objectives serve as a road map to guide the integrated design team throughout the building process. They help keep the team on track and provide a basis for systematic decision-making. Document performance goals, such as compliance with the DD1391, the UFC 1-200-02 and/or any Owner specific goals and targets.

• If practical use natural systems for energy conservation, lighting, ventilation, and passive heating and cooling are maximized before mechanical systems are engaged, taking into account the impact of the design on the site and its larger context including the environmental impact on a life-cycle cost basis.

January 2019 GuidingPrinciplesAssessment@gbci.org Page 9 of 76

• Use building information modeling (BIM) software, design tools, and the experience of the design team if practical to help optimize the design.

Step 4. Establish and maintain an open communication process throughout design and construction

• Members of the team will communicate frequently throughout both the design and construction phases of the project. Provide opportunities for communication through coordinated meetings and workshops, document sharing, and/or collaborative software.

• Consider and ensure how project goals will be maintained should the project transition from one responsible party to another

• Collaboration is an iterative process rather than a checklist, with team members brainstorming, testing, and refining their design ideas against the performance targets.

• If possible when making design decisions solicit feedback and inform all members of the design and construction team and consider future operation and maintenance (O&M) requirements.

Documentation Requirements Design Submittal

Path One:

• Copy of Enacted DD1391 Form

• Narrative description of project teams process for distributing and incorporating the results from the DD1391 and process for ensuring owner and project goals will be met throughout the lifetime of the project including necessary transition from design to construction to project completion

• If the Owner is requiring goals more specific or beyond what is required in the UFC 1-200-02 generate a narrative document including the goals and how the team addressed them

Path Two:

• Demonstrate compliance with LEEDv4 BD+C IPc Integrative process

• Copy of Enacted DD1391 Form

• Narrative description of project teams process for distributing and incorporating the results from the DD1391 and process for ensuring owner and project goals will be met throughout the lifetime of the project including necessary transition from design to construction to project completion

• If the Owner is requiring goals more specific or beyond what is required in the UFC 1-200-02 generate a narrative document including the goals and how the team addressed them

Path Three:

• Not applicable to project. Provide written justification for missed targets as relates to mission, location, LCCA, non-applicable to scope, or other reason specific to requirement.

Am #0002 01 33 29AT2 http://www.usgbc.org/node/2613097?return=/credits/new-construction/v4

January 2019 GuidingPrinciplesAssessment@gbci.org Page 10 of 76

2-2.1.1 Integrated Planning

Requirements

Integrated Planning (2-2.1.1): Use a collaborative, integrated planning and design team, composed of user, government support staff, and appropriate professionals, to identify requirements and to establish performance goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals. Ensure incorporation of these goals throughout the design and lifecycle of the building, including deconstruction.

(The requirements noted above “to establish performance goals for siting” and “Ensure incorporation of these goals through the ……lifecycle of the building, including deconstruction” are addressed by the

1391 coordination from Base to Congress, prior to project team)

Compliance Step-By-Step Implementation

Step 1. Performance goals

• Performance goals will have been established by the Enacted DD1391 as well as the work completed to meet Integrated Design (2-2-.1) requirement as described in ASHRAE 189.1 Appendix F.

• Ensure that all stages of the building’s life cycle, including deconstruction, are considered while incorporating the performance goals into the final design and construction of the project.

Step 2. Documentation

• Maintain a log dedicated to tracking discussions and decisions related to the Integrated Planning.

Path One:

• Narrative regarding how the project team ensured that all stages of the building’s life cycle, including deconstruction, were considered while incorporating the performance goals into the final design and construction of the project.

• Copy of Integrated Planning Log

• Not applicable to project. Provide written justification for missed targets as relates to mission, location, LCCA, non-applicable to scope, or other reason specific to requirement

January 2019 GuidingPrinciplesAssessment@gbci.org Page 11 of 76

2-2.1.2 Evaluation for Design Strategies

Requirements

Evaluation for Design Strategies (2-2.1.2): Evaluate the site and building components to determine whether passive and natural design strategies and features are cost effectively incorporated before the active and mechanical systems are designed. Incorporate these features where applicable. Take into account site attributes, including climate and local and regional context, which impact the design of the building.

Compliance Step-By-Step Implementation

Step 1. Leverage Integrated Design and Integrated Planning

• While working the Integrated Design and Planning requirements and within the context of the DD1391, incorporate as many passive and natural design strategies as are cost effective prior to incorporating the active and mechanical systems.

• Evaluate the local climate, site conditions, waste treatment infrastructure, energy load distribution, water sources, transportation options, and potential building features – understanding these aspects will help inform which sustainable strategies to employ on the project.

Path One:

• For site and building attributes, highlight the documentation that demonstrates that the passive and natural design strategies and features were evaluated and incorporated where life cycle cost effective.

• Not applicable to project. Provide written justification for missed targets as relates to mission, location, LCCA, non-applicable to scope, or other reason specific to requirement.

January 2019 GuidingPrinciplesAssessment@gbci.org Page 12 of 76

2-2.1.3 Evaluation of the Site

Requirements

Evaluation of the Site (2-2.1.3): During the site selection process, meet the requirements of UFC 2-100-

01.

Compliance Step-By-Step Implementation

Step 1. Implement DD1391

• Usually the evaluation and site selection has been addressed and incorporated into the DD1391. If this is not the case utilize UFC 2-100-01.

Path One:

• Copy of DD1391 and narrative regarding items implemented.

Path Two:

• Not applicable to project. Provide written justification for missed targets as relates to mission, location, LCCA, non-applicable to scope, or other reason specific to requirement.

January 2019 GuidingPrinciplesAssessment@gbci.org Page 13 of 76

2-2.1.4 Site Integration and Design of the Building Requirements

Site Integration and Design of the Building (2-2.1.4): During the planning and design process meet the requirements of applicable UFCs, and use the following site development considerations and passive strategies:

− Site design elements that ensure safe and convenient pedestrian access.

− Meet the requirements of UFC 3-201-02 (Landscape Architecture).

− Incorporate results of site analysis into the design of the building, focusing on orientation, configuration and massing.

− Orient building to maximize energy efficiency, passive solar and daylighting potential.

− Select, design and integrate into the overall building, high performance and sustainable systems (e.g. HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, building envelope and fire protection systems).

− Promote opportunities for occupants to voluntarily increase physical activity.

Compliance Step-By-Step Implementation

Step 1. Identify site characteristics

• Determine which portions of the site have been previously developed, if any.

• Additionally, for each site that is under consideration, examine the following factors, enumerated in the requirements and summarized below:

− Site factors that are conducive to the implementation of sustainable building strategies (e.g., opportunity for daylighting and passive energy efficiency measures)

− Building orientation to maximize energy efficiency, passive solar and daylighting potential of the building

− Site design elements that provide safe and convenient pedestrian access

Step 2. Meet the Landscape Design Requirements from UFC 3-201-02

• 1-4 Critical Design Requirements: The designer shall address the following critical design issues:

− Planting and Irrigation Establishment Period

- Typical time: 1-year warranty and maintenance

- Periodic inspections: Establishment start, completion, and as directed by the designer.

Path One:

• Narrative that addresses actions and/or considerations taken when selecting project site as it relates to the following:

− How site design elements that ensure safe and convenient pedestrian access were considered and/or implemented

January 2019 GuidingPrinciplesAssessment@gbci.org Page 14 of 76

− How the project meets the requirements of UFC 3-201-02 (Landscape Architecture).

− How the results of the site analysis were incorporated into design of the building, focusing on orientation, configuration and massing.

− How the building orientation maximizes energy efficiency, passive solar and daylighting potential.

− How high performance and sustainable systems (e.g. HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, building envelope and fire protection systems) were selected, designed and integrated into the overall building.

− Opportunities for occupants to voluntarily increase physical activity are promoted within the project.

• Narrative confirming details related to meeting the Landscape Design Requirements from UFC 3- 201-02 1-4 Critical Design Requirements

• Demonstrate compliance with LEED v2009 BD+C SSc1 Site selection

• Provide narrative confirming details related to meeting the Landscape Design Requirements from UFC 3-201-02 1-4 Critical Design Requirements

OR

• Demonstrate compliance with LEED v4 BD+C SSc Site assessment

• Provide narrative confirming details related to meeting the Landscape Design Requirements from UFC 3-201-02 1-4 Critical Design Requirements

• Not applicable to project. Provide written justification for missed targets as relates to mission, https://www.usgbc.org/node/1731738?return=/credits https://www.usgbc.org/node/2758172?return=/credits/new-construction/v4/sustainable-sites

January 2019 GuidingPrinciplesAssessment@gbci.org Page 15 of 76

2-2.2 Commissioning

Requirements

To verify design and performance and ensure that the Government requirements are met, employ commissioning practices appropriate to the size and complexity of the building and its system components. This must include an experienced commissioning provider, who should be independent of the project design and construction team, and the operations team. The choice of either contracted services or Government personnel as the commissioning provider will be determined at project level.

Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:

• For buildings and systems that are less complex6, commissioning can be tailored as determined by the DoD Component AHJ7.

• “Schematic design” is the design charrette or similar conceptual design activity.

Documentation as described in ASHRAE 55 Section 6.2 is not required.

Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for commissioning requirements. /1/

Commissioning: Per DOE…