Am-0002_W9128F-21-R-0006.pdf
PDF 1 MB Posted
- Solicitation number
- W9128F-21-R-0006
About this file
This solicitation requests proposals for the construction of Repair Mass Parking Apron Section IV located at Minot Air Force Base in North Dakota. Offerors must provide pricing for the base project and optional items on the provided pricing schedule by January 21, 2021 at 2:00 PM. The scope of work includes all labor, materials, equipment, and supervision to complete airfield pavement demolition and construction in accordance with the specifications, including 15 inches or thicker of Portland cement concrete pavement over 10,000 square yards. The U.S. Army Corps of Engineers Omaha District will evaluate proposals based on construction experience and qualifications, technical approach, key personnel qualifications, past performance, and small business participation. The agency intends to make one award to the responsible offeror providing the best value to the government considering all technical and price factors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am-0001_W9128F-21-R-0006.pdf | ||
| SPECS_W9128F21R0006.pdf | ||
| DWGS_W9128F-21-R-0006 - REPAIR MASS PARKING APRON - SECTION IV.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0002 W9128F
REPAIR MASS PARKING APRON – SECTION IV, QJVF 1007861, MINOT AFB, NORTH DAKOTA
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of proposals is 21 JAN 2021 at 1400 hours
Government Point of Contact: Booker L. Jordan, Jr., Contract Specialist, Booker.L.Jordan@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 6
W9128F-21-R-0006
01/13/2021
12/09/2020
01/13/2021
Am #0002 - 1
Am #0002 - 2 (Continuation SF 30)
13 January 2021 Solicitation No. W9128F 21 R 0006
Date of Issue: 9 DEC 2020 Date of Receiving Proposals: 21 JAN 2021
SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of REPAIR MASS PARKING APRON – SECTION IV, QJVF 1007861, MINOT
AFB, NORTH DAKOTA.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.) NONE
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added
00 10 00-CLIN 00 10 00-CLIN
00 22 00 00 22 00 01 30 00.24 01 30 00.24 02 61 13 02 61 13
02 61 13AT3 02 61 13AT3
32 13 14.13 32 13 14.13
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 21 JAN 2021.
Attachments:
Section 00 10 00 – SF1442 and CLIN Pricing Schedule Specifications listed in 1.b., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
13 JAN 2021
nep/2160
Am #0002 00 10 00 - 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F21R0006
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
9 DEC 2020
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Block 7
9. FOR INFORMATION
CALL:
A. NAME
Booker L. Jordan, Jr.
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) Use Email: Booker.L.Jordan@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
REPAIR MASS PARKING APRON – SECTION IV
QJVF 1007861
MINOT AFB, NORTH DAKOTA
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTIONS 00 22 00 AND 00 45 00.
REFER TO BLOCK 13A FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.
THIS SOLICITATION IS UNRESTRICTED AND IS OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION
11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (** See Section 00 73 00____________)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 21 JAN 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ___60_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(d)
Am #0002 00 10 00 - 2
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
CLIN SCHEDULE 00 10 00 - 3 W9128F-21-R-0006
Am #0002
CONTRACT LINE ITEM PRICING SCHEDULE
ITEM
NO.
DESCRIPTION QTY UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
All work complete for construction of Repair Mass Parking Apron – Section IV, PN QJVF1007861, FY21, Minot AFB, North Dakota, excluding all CLIN’s listed separately below.
1 Job XXX $ ________________________
All work complete for the Concrete Pavement in accordance with the drawings and Section 32 13 14.13 CONCRETE
PAVEMENT FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS.
1 Job XXX $ ________________________
All work complete for the Hot-Mix Asphalt in accordance with the drawings and Section
32 12 15.13 HOT-MIX ASPHALT
AIRFIELD PAVING.
1 Job XXX $ ________________________
TOTAL AMOUNT BASIC ITEMS
OPTION ITEMS
[Option]
Additional cost of all work complete for airfield pavement marking using Type III retroreflective beads in accordance with the drawings and Section 32 17 23 PAVEMENT MARKINGS in lieu of Type I retroreflective beads.
1 Job XXX $ ________________________
[Option]
Contaminated Soil Disposal – Includes all work and all associated costs to dispose of fuel contaminated soil found to be above North Dakota action levels requiring offsite disposal during construction and any offsite clean soil to replace contaminated soil volume. See Note 6 below.
8,000 Cubic Yards
Per Cubic
Yard
[Option]
Contaminated Groundwater – Includes all work to containerize, and properly dispose of contaminated petroleum-contaminated groundwater and provide notification to regulatory agencies for petroleum contaminated groundwater that cannot be discharged to the sewer.
500 Gallons
Per Gallon
[Option]
Access delays during concrete production placement. Estimated quantities are 25 hours. See Note 5 below.
1 Job XXX $ ________________________
[Option]
Access delays other than during concrete production placement. Estimated quantities are 75 hours. See Note 5 below.
1 Job XXX $ ________________________
CLIN SCHEDULE 00 10 00 - 4 W9128F-21-R-0006
Am #0002
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS (RFP) for evaluation of options. The Government reserves the right to exercise Option 0004 within 60 calendar days after issuance of Notice to Proceed, Options 0005 & 0006 anytime during required excavations for the contract, and remaining Options any time during construction.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted. In case of variation between the unit prices and the extensions, the unit prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price and unit price affected.
4. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or under-run subject to General Conditions (Contract Clauses) clause “Variation in Estimated Quantities”
5. Access Delays. Access Delays under Items 0007 and 0008 - Measure and pay for each half hour that the entire workforce is delayed, or prevented from accessing the project site. The Contractor’s superintendent shall notify the Contracting Officer’s on-site representative within twenty-four hours (24) of any delay restricting access to the jobsite. This item will be paid based on a half-hour of work basis. All partial half hours for a notified delay will be rounded up to the next half-hour increment. These access delays apply to Items 0001, 0002, 0003, 0005, and 0006.
6. Include the following costs under Item 0005: Removal/remediation plan and technical memorandum outlining removal/remediation of any contaminated soil and/or contaminated dewatering water and confirmation activities for any contamination that remains. Include contamination investigation under Item 0001. Include containerization and disposal of contaminated dewatering water under Item 0006.
TOTAL AMOUNT (ALL BASIC PLUS OPTION ITEMS)
Am #0002 00 22 00, Page 1
SECTION 00 22 00
PROPOSAL INSTRUCTIONS,
SUBMISSION REQUIREMENTS AND EVALUATION
INDEX
1. WHO MAY SUBMIT
2. GENERAL REQUIREMENTS
3. FORMAT OF SUBMISSIONS
4. HOW TO SUBMIT
5. EVALUATION OF PROPOSALS
6. EVALUATION FACTORS FOR AWARD
7. PROPOSAL REQUIREMENTS AND SUBMISSION FORMAT
7.1. PREFACE
7.2. FACTOR 1 - CONSTRUCTION EXPERIENCE AND QUALIFICATIONS
7.3. FACTOR 2 TECHNICAL APPROACH
7.4. FACTOR 3 - OFFEROR’S KEY PERSONNEL
7.5. FACTOR 4 - PAST PERFORMANCE, CONSTRUCTION
7.6. FACTOR 5 – SMALL BUSINESS PARTICIPATION
8. PRICE AND PRO FORMA INFORMATION
8.1. SUBMISSION REQUIREMENTS
8.2. EVALUATION OF PRICE
9. COMPETITIVE RANGE
10. CLARIFICATIONS AND DISCUSSIONS
11. FINAL PROPOSAL REVISIONS
12. SMALL BUSINESS SUPPLEMENTAL INFORMATION
13. AWARD OF CONTRACT
14. DEBRIEFING
Attachments:
Attachment A - NAVFAC USACE PPQ Form Sep 2011 SF294 - Subcontracting Report For Individual Contracts Attachment B - Individual Subcontract Form
Am #0002 00 22 00, Page 2
SECTION 00 22 00
PROPOSAL INSTRUCTIONS,
SUBMISSION REQUIREMENTS AND EVALUATION
1. WHO MAY SUBMIT
This solicitation is unrestricted and open to both large and small business participation.
All offerors, including joint ventures, must be registered in the System for Award Management (SAM) and have completed their Representations and Certification through SAM.
There will be no public opening. All proposals submitted will become, upon receipt, the property of the U.S. Government and will not be returned. After evaluation of proposals, the proposals will be retained for the official contract file.
2. GENERAL REQUIREMENTS
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate compliance with the proposal submission requirements.
3. FORMAT OF SUBMISSIONS
All written portions (other than the organization chart and bar chart schedule, which can be 11” x 17”) shall be in 8-1/2" x 11" format, unless indicated otherwise. The proposal shall be submitted in two separate volumes: Volume 1 (Technical) and Volume 2 (Price) as separate Adobe PDF files with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. Volume 1 shall have bookmarks, at a minimum, corresponding to each factor and sub-factor. See Section 8.1 for additional information related to submission of Volume 2, Price.
4. HOW TO SUBMIT
Proposals shall be submitted by the time and date as specified. Due to heightened security at Government installations, the proposal shall be emailed to the following. If the proposal is too large for email, Offers may be submitted electronically via DOD Safe Access File Exchange (SAFE) at https://safe.apps.mil/ to the following recipients:
1. Booker L. Jordan, Jr., Booker.L.Jordan@usace.army.mil
2. Christine Wilson, Christine.L.Wilson@usace.army.mil
**Offerors accessing the DOD SAFE site as a GUEST (a “Guest” is defined as a user who is not assigned a CAC) must request a package invitation from the Contract Specialist listed in Section 00 22 00 a minimum of 48-business hours prior to the close of the RFP.**
For the purposes of determining whether the proposal was received "late" in accordance with FAR 15.208, the date and time the file(s) are received by the USACE Outlook Server or uploaded into
Am #0002 00 22 00, Page 3 the DOD SAFE website as identified in the DOD SAFE notification e-mail sent to the Contract Specialist(s)/ Contracting Officer will be the time and date the Government received the proposal.
Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal.
Coordinate directly with the Contract Specialist for any questions related to submission requirements or format.
Volume I: Technical Volume II: Price and Pro Forma Information
Title the single files in the following format:
Title the single files in the following format:
W9128F21R0006_Company Name_Volume_1_Technical W9128F21R0006_Company Name_Volume_2_Price_and_Pro_Forma_Information (Note: Company name may be abbreviated)
5. EVALUATION OF PROPOSALS
a. All proposals and documentation which have been properly submitted will be evaluated. Proposals will be evaluated on the basis of the factors stated in the solicitation to select the responsible offeror whose proposal is most advantageous to the Government. Uniformity of all proposals is essential to assure fair and accurate evaluation. All proposals must comply with the instructions in the solicitation. If a proposal is suspected of having a deficiency, it will be brought to the immediate attention of the appropriate authority who will determine if there is a deficiency. If the determination is made that a deficiency exists, the proposal will not be evaluated further and will be eliminated from further consideration. The affected offeror shall be promptly notified of the decision. Properly conforming proposals will be forwarded to the Source Selection Evaluation Board (SSEB) for evaluation. If, after award, the contractor wishes to replace key personnel or sub-contractors identified in the proposal, a formal request for substitution shall be presented to the Contracting Officer for approval. The Contracting Officer’s written consent shall be obtained before making any substitutions for these designated personnel or sub-contractors. The request shall clearly show the qualifications of the replacement personnel or sub-contractors and shall illustrate that the replacements have skills, experience, and capacity to accomplish the work equal to or better than those personnel or sub-contractors identified in the proposal.
b. Information obtained from owners, contract administrators, or other points of contact provided by the offeror may affect the evaluation rating given for the factors being evaluated by those discussions.
c. Evaluations will be conducted in accordance with the Best Value Tradeoff Process, FAR 15.101-1. This process allows for a tradeoff between non-cost factors and cost/price and allows the Government to accept other than the lowest-priced proposal or other than the highest technically-rated proposal to achieve a best–value contract award. Proposal evaluation is an assessment of the proposal and the offeror's ability to perform the resultant contract successfully.
Proposals will be evaluated to determine ratings, supported by narratives, and to identify
Am #0002 00 22 00, Page 4 strengths, weaknesses, and deficiencies of the proposed approach in each proposal.
d. Evaluation Definitions.
(1) Strength is an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
(2) Weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
(3) Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
(4) Clarifications are limited exchanges between the Government and offerors that may occur when award without discussion is contemplated. See FAR 15.306(a)(1).
(5) Communications are exchanges, between the Government and offerors, after receipt of proposals, leading to establishment of the competitive range. See FAR 15.306(b).
(6) Discussions are exchanges (i.e., negotiations) in a competitive environment that are undertaken with the intent of allowing the offeror to revise its proposal. Discussions take place after establishment of the competitive range. See FAR 15.306(d).
e. Technical Rating Evaluation Process.
(1) For purposes of this solicitation, technical and risk ratings for non-cost Evaluation Factors other than Past Performance and Small Business Participation will utilize a scale of colors and words used in conjunction with narrative to evaluate the quality of the offeror’s technical solution for meeting the Government’s requirement and the associated degree of risk.
Ratings will be applied at the factor and sub-factor level. If at any level of evaluation an Offeror’s proposal is evaluated as not meeting a minimum requirement (that is, below the level of yellow (marginal)), this fact must be included in the rating and narrative assessment at that level and each higher level of indentation. Therefore, a red - unacceptable rating at any level must be carried to the factor level. The following ratings will be used to evaluate Factors 1 through 3. See paragraph 6 for Evaluation Factors:
Color Rating Description Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and
Am #0002 00 22 00, Page 5 risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
(2) Factor 4 Past Performance Evaluation. The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered.
The Government will first assess and rate the relevancy of recent projects accomplished by the offeror to the scope of this contract for overall application to the Performance Confidence Assessment ratings described hereinafter. Relevancy shall be determined utilizing the similarity definition found in Paragraph 7.2.1, based on size, relevance, and complexity of the projects and the similarity of those projects to the project in this solicitation.
The following relevancy ratings will be used to evaluate the past performance information:
Very Relevant. Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant. Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant. Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant. Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The Government will next consider how well the offeror performed on the contracts. Past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance. Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and contractor; as well as level of support for such items as as-built documentation, O&M manuals, training, correcting construction errors, warranty work, etc. (see Attachment A). The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, cost control, and customer satisfaction; as
Am #0002 00 22 00, Page 6 well as level of support for such items as as-built documentation, O&M manuals, training, problem resolution for construction errors, warranty work, and safety. The Government also places a higher value on projects which document successful outcomes and are supported by outside source confirmation; for example, but not limited to, telephone interviews with points of contact identified in the proposal, CPARS/CCASS or other agency performance databases, offeror furnished references, or personal knowledge. The Government also places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. This rating is not a separate proposal rating but is only used in developing an overall past performance confidence assessment rating assigned to the Past Performance Factor.
The following ratings will be used for the Performance Confidence Assessment:
Substantial Confidence. Based on the offeror’s recent/relevant performance record, the Government has high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence. Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence. No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence. Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence. Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
For Volume 1, Factor 4, Past Performance, Construction, a neutral rating will be awarded when no past performance records are provided or are otherwise unavailable. Per Federal Acquisition Regulation (FAR) 15.305(a)(2)(iv), “In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated either favorably or unfavorably on past performance."
(3) Factor 5 Small Business Participation Evaluation. See paragraph 7.6.2.
6. EVALUATION FACTORS FOR AWARD
Offerors will be evaluated based on the Evaluation Factors shown below. The requirements specified in the solicitation are considered to be minimum requirements. A more favorable evaluation rating may be given for exceeding the minimum requirements. Note: The relative importance of Evaluation Factors 1-5 is described below. All Evaluation Factors, other than
Am #0002 00 22 00, Page 7 cost or price, when combined, are approximately equal to cost or price.
EVALUATION FACTORS
Volume 1
Factor Order of Importance Factor 1 – Construction Experience and Qualifications
Most important Factor, more important than Factors 2, 3, 4, and 5 individually.
Factor 2 – Technical Approach 2nd most important
Factor, less important than Factor 1, equal to Factors 3 and 4, more important than Factor
Factor 3 – Offeror’s Key Personnel Equal importance to
Factors 2 and 4. Less important than Factor 1, more important than Factor 5
Factor 4 – Past Performance, Construction Equal importance to
Factors 2 and 3. Less important than Factor 1, more important than Factor 5
Factor 5 – Small Business Participation Least important technical Factor
Volume 2
Price and Pro Forma Information - All Evaluation Factors, other than cost or price, when combined, are approximately equal to cost or price
Note: A poor evaluation rating for any Factor, or combination of different Factors, may cause the proposal to be evaluated as “Red - Unacceptable”. Volume 2, Price will be evaluated in accordance with requirements listed in paragraph 8.2, EVALUATION OF PRICE.
7. PROPOSAL REQUIREMENTS AND SUBMISSION FORMAT
All proposals shall contain the information stated herein. Proposal clarity, organization (as defined in this solicitation) and cross-referencing is mandatory. No material (information not part of
Am #0002 00 22 00, Page 8 proposal) shall be incorporated by reference. Material not specifically identified below will not be evaluated. If offerors do not want the data contained in the proposal disclosed by the Government, the offeror shall follow the procedure specified in Section 00 21 00 INSTRUCTIONS TO OFFERORS, paragraph: RESTRICTION ON DISCLOSURE AND USE OF DATA. However, portions of the winning proposal will be incorporated into the contract and are subject to disclosure notwithstanding restrictive markings.
a. Volume 1 shall consist of Factors 1 through 5 and be divided as follows:
Factor Factor 1 - Construction Experience and Qualifications
Factor 2 - Technical Approach
Factor 3 - Offeror’s Key Personnel
Factor 4 - Past Performance, Construction
Factor 5 - Small Business Participation
b. Volume 2 - Shall be a separate PDF file containing the information shown below. This volume shall include the following information, in the order identified herein.
Additional information on the content of this volume is shown in Section 8.1 below.
SF 1442 (Reference Section 00 10 00)
Pricing Schedule (Reference Section 00 10 00)
Representations and Certifications (Reference Section 00 45 00)
Pre-Award Survey Information, as defined in Section 8.1
c. Teaming Arrangements - For purposes of this RFP, an “Offeror” may include a group of two (2) or more entities that have formed a “contractor team arrangement,” as defined in the Federal Acquisition Regulation (FAR), Section 9.601. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently-proposed contractor team arrangement, will be considered as a part of the evaluation of the Offeror’s proposal. In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least 50 percent of the total number of projects submitted for Factor 1 – Runway Construction Experience (refer to paragraph 7.2.1) for consideration in response to the experience requirements of this RFP. In the case of subcontractor submissions, the subcontractor must submit the final cost of their portion of the project. An Offeror that relies upon the experience and performance history of a member or members of a proposed contractor team arrangement will be expected to maintain that arrangement during performance of any contract awarded to that Offeror under this RFP. As a part of their proposal, the Offeror must provide a contractor team agreement signed by all parties, identifying the legal name(s) of all
Am #0002 00 22 00, Page 9 entities and describing the nature of each entity’s relationship (teaming/partnering, joint venture, mentor/protégé, etc.) and their role on this project. This documentation shall be provided at the beginning of the Offeror's technical proposal, prior to any Factors.
7.1. PREFACE
The Preface to Volume 1 should consist of a brief explanation of the offeror, the organization of the proposed construction team, and key sub-contractors that will be utilized on this project. If a teaming arrangement or Joint Venture (JV) of prime contractors will be utilized, the JV will be identified in this preface and the management of the JV will be provided. This preface shall not exceed four (4) pages.
7.2. FACTOR 1 - CONSTRUCTION EXPERIENCE AND QUALIFICATIONS
7.2.1. Runway Construction Experience
7.2.1.1 Submission Requirements
The Offeror shall submit three (3) examples of construction projects which best illustrate the experience of the construction contractor on projects of similar function, scope, size, and complexity to the Repair Mass Parking Apron Section IV, Minot AFB, as described in this solicitation. Any of the three project examples may also be used by the Offeror to meet the specialized experience requirements described in paragraphs 7.2.2.1 a through e below and provide the necessary cross-reference as described in paragraph 7.2.2.1. No more than three (3) projects should be submitted with a three (3) page limit per project. Each project example should provide a narrative of the example project, discussing the project and providing specifics as noted herein. If a Joint Venture (JV) is proposing, provide examples for each prime contractor in the JV within the three project examples allowed.
Each project cited should have a construction dollar value equal to or greater than $4,000,000 and should have been completed within six (6) years from the date that the proposal for this project is due. A single Task Order dollar value equal to or greater than $4,000,000 and completed within six (6) years from the date that the proposal for this project is due is acceptable. Indefinite- Delivery, Indefinite Quantity (IDIQ) Contracts, where numerous Task Orders are summed to meet the minimum construction dollar value identified herein, are not acceptable.
Narratives for each project should include a brief overview of the project, discussing major features of the project and each project’s relevance and similarities to this project. The government preference is that project examples submitted be of completed projects (i.e. construction complete).
Each construction project example narrative should include the following information:
Project title and location
Detailed scope of the project including area of paving in square yards (SY)
Original contract award amount and final construction cost
Original contract finish date and actual finish date. All time growth and construction cost growth shall be explained in each project example narrative.
Am #0002 00 22 00, Page 10
Role of the Offeror on the project, including a clear designation of whether or not the Offeror was the prime contractor
Sub-contractors utilized on the project and if they are proposed to be utilized for the Minot AFB Project
Prime Contractor Personnel on the project and if they are proposed to be utilized for the Minot AFB Project
All project examples shall contain a Point of Contact (POC) as well as one alternate Point of Contact, to include the name, job title, address, telephone, and e-mail address. The POC and alternate shall be familiar with the construction performance of the offeror and be a representative of the owner/customer, not affiliated with the offeror. The POC and alternate shall be able to verify the experience cited.
7.2.2. Specialized Experience
7.2.2.1. Submission Requirements
The Offeror should demonstrate experience in each of the following areas of specialized experience. If the Offeror proposes subcontractors, then a letter of commitment shall be required from each subcontractor and must be provided as part of the Offeror’s proposal in this factor.
After award of the contract, the Contractor shall obtain the Contracting Officer's written consent before making any substitutions for the subcontractors identified in this factor.
Areas of specialized experience below are listed in descending order of importance. Offerors shall not submit more than two (2) projects per area of specialized experience in paragraphs a through c below. Each project should contain no more than two (2) pages. Each project narrative should include a description of the experience noted in paragraphs a through c below, the role of the offeror on the project including whether prime or subcontractor; subcontractors used on the project and if they are proposed to be utilized on this project; and total dollar value of the overall project and the dollar value of the specialized work. The offeror may utilize project experience submitted under paragraph 7.2.1 for any specialized areas noted in paragraphs a through c below, by providing a cross-reference to the appropriate project in paragraph 7.2.1.
a. Airfield Pavement. Show experience constructing Portland Cement Concrete (PCC) pavement with a thickness of 15 inches or greater. Projects submitted for evaluation should each consist of at least 10,000 square yards (SY) of total paving area. The Contractor should demonstrate experience with slip-form paving, to include installation of dowel bars in hardened concrete. In addition, experience installing PCC airfield pavement joint seals (both field molded and preformed compression); grooving of PCC airfield pavements; and installing pavement markings on PCC airfield pavements should be demonstrated.
b. Contractor Quality Control (CQC) Geotechnical Laboratory. Show experience in the following: Experience in casting and breaking concrete cylinders and beams for compressive and flexural strength testing for airfield pavement consistent with requirements in ASTM C31, ASTM C39 and ASTM C78. Experience with concrete mix design for airfield pavement meeting
Am #0002 00 22 00, Page 11 requirements of ACI 211 and ASTM C1077. Experience with aggregate testing and deleterious materials in accordance with requirements in Section 32 13 14.13 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS. Ability to identify and resolve airfield pavement issues during construction. Submit current USACE laboratory certification for all testing required by Section 32 13 14.13 CONCRETE PAVEMENT FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS.
c. Demolition. Show experience in demolition of Portland Cement Concrete (PCC) pavement with a thickness of 12 inches or greater. The Contractor shall demonstrate experience using the double saw cut method to initiate the removal of pavement slabs adjacent to other slabs that are to remain in place without damaging the existing slabs to remain.
7.2.3. Evaluation
The Offeror's experience in construction of facilities similar to this project will be evaluated. No more than the previously stated allotted projects may be submitted in this factor. If the number of project examples in this factor exceeds the maximum allowed, only the first indicated number of projects listed in the RFP will be evaluated. Evaluation will be based on the project examples provided in the offeror’s proposal. Any additional material inserted into this factor will not be evaluated.
Evaluation will be based on the project example narratives and other requested information provided in the offeror’s proposal. Higher evaluation ratings will be given for project examples which are similar in function, scope, size, and complexity to this project and clearly demonstrate a contractor’s capabilities to construct a project of this nature, and execute the project successfully while containing costs and maintaining schedule. Projects submitted which demonstrate experience in construction of Portland Cement Concrete (PCC) airfield pavement 15-inch thick or greater will be rated more favorably. Projects meeting or exceeding the $4 million criteria in Paragraph 7.2.1 will be rated higher than those not meeting the minimum.
Projects meeting the similarity criteria identified in Paragraph 7.2.1 will be rated higher than those projects that do not meet the similarity criteria. Projects still under construction or projects not completed within the last six (6) years will be evaluated, though less favorably than projects completed in the last six (6) years. Military construction project examples will be rated more favorably than commercial projects. Submission of fewer projects than allowed above may reduce the offeror’s rating in this Factor. Omission of requested information will result in lower ratings.
Specialized experience in construction of facilities similar to this project will be evaluated.
Lower evaluation ratings will be given for those project examples not meeting the minimum SY of Airfield Pavement for PCC identified above. Higher evaluation ratings will be given for those project examples which are similar in function, scope, size, and complexity to this project and clearly demonstrate subcontractor capabilities to construct a project of this nature, and execute the project successfully while containing costs and maintaining schedule. Any specialized experience performed by the Prime will be evaluated more favorably. Subcontractors that have previously worked with the proposed prime contractor(s) will be evaluated more favorably.
Projects which are relevant and similar and utilize personnel that will be used on the Repair Mass Parking Apron Section IV, Minot AFB project will be evaluated more favorably. Those subcontractors that include military construction projects will be rated more favorably.
Am #0002 00 22 00, Page 12
7.3. FACTOR 2 TECHNICAL APPROACH
7.3.1. Submission Requirements
[*Am-2] Based on your understanding of the RFP requirements, describe the technical approach you will take to address the unique challenges, opportunities, and constraints inherent to this project (i.e.
work delays, scheduling, working on an active runway, equipment height restrictions, etc.). The submission for this factor may not exceed ten (10) pages, including explanatory drawings, excluding bar chart schedule. Provide a bar chart schedule (may not exceed four pages) on your plan for completing the work based on an arbitrary estimated, non-binding Contract Notice to Proceed date of 22 Feb 2021 and Contract Completion date of 1 October 2021. This schedule shall be considered the preliminary project schedule per specification Section 01 32 01.00 10 PROJECT SCHEDULE. Note: Per Section 01 32 01.00 10 PROJECT SCHEDULE, the initial project schedule shall be submitted for approval the day Construction Notice to Proceed is issued which shall be assumed to be 1 June 2021. Include major work milestones and scheduled activities (i.e. Non-Work Periods, Pavement Workshop, Order of Work restrictions and any other activity that will affect schedule as identified on the Construction drawings and Section 01 30 00 .24 OTHER ADMINSTRATIVE AND SPECIAL REQUIREMENTS.) Present a narrative to describe your technical solution for this project, specifically citing the process and major equipment used for construction of airfield pavement, discussion of the batch plant required to produce concrete for the project, how subcontractors will be managed, how supplies and materials will be managed (i.e. source and location of all aggregates for concrete and asphalt proposed for use in this project), and your schedule development and methods to be utilized and to keep the project on schedule, including responsibilities for schedule development and updates.
This portion of the factor shall also address mitigation of delays due to unforeseen conditions or events and methods to recover time to complete the scheduled work with the contract duration.
Proposed equipment shall be consistent with requirements of Section 32 13 14.13 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS of the specifications.
7.3.2. Evaluation
The Government will evaluate the offeror’s understanding of the unique requirements of airfield paving as portrayed in your discussion of construction intent for this project. Requirements to be evaluated include project schedule, the process and type of major equipment proposed for construction of airfield paving for this project. Submissions which demonstrate a complete, logical and well defined construction methodology, understanding and presentation of a realistic schedule that includes major work items and all phasing requirements shown on construction drawings and specifications will be evaluated more favorably. Material submitted that exceeds the ten (10) page limit (excluding bar chart schedule) shall not be evaluated. Omission of requested information will result in lower ratings.
7.4. FACTOR 3 - OFFEROR’S KEY PERSONNEL
7.4.1. Submission Requirements
In this factor, the offeror shall provide resumes for key construction personnel that will be assigned to this project. Resumes should be submitted for the personnel roles shown in this
Am #0002 00 22 00, Page 13 paragraph.
The first page of this factor shall include a one-page listing of the names of the construction personnel that will be assigned to each of the positions listed below. Provide primary name and resume for each key construction person identified below.
Following this page, provide a summary of the duties and responsibilities of these individuals that clearly indicate separate duties and responsibilities for each individual. Note: The Superintendent, CQC, and Site Safety and Health Officer (SSHO) may not share duties and must all be separate individuals in accordance with SECTION 01 45 00.00 10 paragraph 3.4.4.
Following this summary, the offeror shall submit the resumes for key construction personnel that will be assigned to this project. This factor shall include resumes on the following personnel:
Project Manager
Project Superintendent
Contractor Quality Control System Manager
ACI Concrete Transportation Inspector
The resumes in this factor should clearly present the credentials of each person and show that each meets the requirements listed below. Each resume should be limited to two pages. Each resume should include the following information:
Name, assignment for this project, and company employing the person
Education and degree
Past project experience (including what role or capacity the individual served on each project), as well as the durations (including month/year started and ended) employed on each project in that capacity, the monetary size of each project cited as experience, and a point of contact familiar with each project. Resumes should list enough projects to clearly show the requisite years of experience shown for personnel in the paragraph below. A brief description of each project cited in the resume should be provided, showing the monetary size of each project, and identifying any relevant features of each project. Resumes shall be listed in reverse chronological order, with the latest experience listed first, and all time gaps on each resume fully explained.
Any pertinent training, registration, or certifications applicable to the position
The proposal should clearly present the credentials of each person, and should show that each possesses the following qualifications:
Project Manager: The proposed Construction Project Manager should possess a Bachelor’s Degree in Engineering or Construction Management, with a minimum of five years of experience (within the last ten years) performing as a Construction Project Manager on construction projects similar in monetary size and/or scope to this project. A minimum of two of those five years should indicate experience as a Construction Project Manager for Military and/or commercial airfield pavement construction consisting of runway; parking apron; or taxiway pavement for fixed-wing aircraft.
Am #0002 00 22 00, Page 14
Project Superintendent: The proposed On-Site…
This is the start of the file's text. The full file is on GovTribe.