TGB Spare NDT Results.pdf

PDF 221 KB Posted

Attached to
Bearing Repairs at Ft. Peck Dam, MT
Solicitation number
W9128F21Q0012
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Liquid Penetrant Examination Report

410 Commerce Drive, South Point, OH 45680 - Phone: 740-523-0523 Fax: 740-523-0530 www.mistrasgroup.com

Client: American Babbitt Date: 5/31/2017 Page: 1 of 1 Address: Box 3069; RT 2, Industrial Ln. Job Number: BK1014/40366654 Huntington, WV 25704 Purchase Order: 806 Contact: Joe White Reference Number: Voith Hydro Fort Peck Unit-2 ABB Job 67045 Location: American Babbitt Shop Part No/Description: Turbine Guide Bearing A & B Spare

Code/Specification Procedure Acceptance Criteria ASME SEC. V/Article 6 100-PT-001 Rev-17 PDM ID 2GSV03-3200-01696126

Type and Method Fluorescent: Water Wash [Method A] Red Visible Dye: Water Wash [Method A]

[Type I] Solvent Removable [Method C] [Type II] Solvent Removable [Method C] Post Emulsified: Hydrophilic [D] Lipophilic [B] Post Emulsified [Method B]

Sensitivity Level: ½ 1 2 3 4 N/A Other:

Manufacturer Type Batch Number(s) Application Method Process Time (minutes)

Pre-clean Dry Time: 15

Cleaner: Magnaflux Spotcheck SKC-S 16B07K Spray Penetrant Dwell Time: 15

Penetrant: Magnaflux Spotcheck SKL-SP2 15K06K Brush Emulsifier Time:

Developer: Magnaflux Spotcheck SKD-S2 16A02K Spray Developer Time: 10

Emulsifier: Post Clean Method:

Developer Form: a. Dry Powder b. Water Soluble c. Water Suspended d. Nonaqueous Wet e. Specific Application Penetrant Removal Method & Dry Time Black Light (Model and S/N) White Light Source

Dry Cloth then Damp Cloth 10 Min Drop Light

Original Repair Material & Thickness Test Temperature

Babbitt & Steel / 1" - 4" 70 Degrees F Surface Condition

As Welded As Ground As Cast Rough Machined Final Machined Meets Code Requirements

Test Results Quantity Inspected: 1 Quantity Accepted: 1 Quantity Rejected: 0

(1) Turbine Guide Bearing (Spare) "A" and "B" halves were inspected for 100% of bonding and no unacceptable disbonded areas noted.

See Following Pages for Pictures

The content of this document may be defense article/service related as described and controlled by International Traffic in Arms Regulations (ITAR)(22 CFR 120-130). Distribute only to entities meeting ITAR requirements.

Discard by shredding. At no time during testing did these parts or material come into contact with mercury.

Technician Name, Level & Date Customer (if applicable):

Reviewed By (if applicable):

Ray Stricklin/Level II; 5/31/2017

Certification of Inspection, Liquid Penetrant [Basic Report Form] 100-PTFORM-002 | Rev 1

Fort Peck Turbine Guide Bearing In-Service and Spare

Page 28 of 42 PDM Doc No. 01811549 RevB

Ultrasonic Examination Report

410 Commerce Drive, South Point, OH 45680 - Phone: 740-523-0523 Fax: 740-523-0530 www.mistrasgroup.com

Client: American Babbitt Date: 5/31/2017 Page: 1 of 1 Address: Box 3069; RT 2, Industrial Ln. Job Number: BK1014/40366654

Huntington, WV 25704 Purchase Order: 806 Contact: Joe White Reference Number: Voith Hydro Fort Peck Unit-2 ABB Job 67045 Location: American Babbitt Shop Part No/Description: Turbine Guide Bearing A & B

Spare

Code/Specification Procedure Acceptance Criteria ASME Sec. V Article 5 PDM ID 2GSV03-3200-01696126 PDM ID 2GSV03-3200-01696126

Inspection Method Immersion Contact Thru-Transmission Thickness Measure Longitudinal Shear-wave (Angle: ) C-scan A-scan B-scan Other:

Instrument Transducer Model Serial No. Cal. Due Date Frequency Size Serial No.

KB-USN50R 00BHT5 6/14/17 5mhz .500" 1043068

Setup Data Reflector Location Amplitude Gate Level .25"-10" Backwall 80% 25% Cal. Standard: Babbitt Wedge Standard

Scan Equipment: Krautkramer Couplant: 30 Weight Oil

Additional Information:

Test Results Quantity Inspected: 1 Quantity Accepted: 1 Quantity Rejected: 0

(1) Turbine Guide Bearing (Spare) "A" and "B" halves were inspected for 100% of bonding and no unacceptable disbonded areas noted

See Following Pages for Pictures

The content of this document may be defense article/service related as described and controlled by International Traffic in Arms Regulations (ITAR)(22 CFR 120-130).

Distribute only to entities meeting ITAR requirements. Discard by shredding. At no time during testing did these parts or material come into contact with mercury.

Technician, Level & Date: Customer Sign (if applicable): Reviewed By (if applicable):

Ray Stricklin; Level II; 5/31/2017

Certificate of Inspection, Ultrasonic Testing [Basic Report Form] 100-UTFORM-001 | Rev 1

Fort Peck Turbine Guide Bearing In-Service and Spare

Page 30 of 42 PDM Doc No. 01811549 RevB

File details come from the government source that posted it. Updated .