TGB Spare NDT Results.pdf
PDF 221 KB Posted
- Attached to
- Bearing Repairs at Ft. Peck Dam, MT
- Solicitation number
- W9128F21Q0012
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Liquid Penetrant Examination Report
410 Commerce Drive, South Point, OH 45680 - Phone: 740-523-0523 Fax: 740-523-0530 www.mistrasgroup.com
Client: American Babbitt Date: 5/31/2017 Page: 1 of 1 Address: Box 3069; RT 2, Industrial Ln. Job Number: BK1014/40366654 Huntington, WV 25704 Purchase Order: 806 Contact: Joe White Reference Number: Voith Hydro Fort Peck Unit-2 ABB Job 67045 Location: American Babbitt Shop Part No/Description: Turbine Guide Bearing A & B Spare
Code/Specification Procedure Acceptance Criteria ASME SEC. V/Article 6 100-PT-001 Rev-17 PDM ID 2GSV03-3200-01696126
Type and Method Fluorescent: Water Wash [Method A] Red Visible Dye: Water Wash [Method A]
[Type I] Solvent Removable [Method C] [Type II] Solvent Removable [Method C] Post Emulsified: Hydrophilic [D] Lipophilic [B] Post Emulsified [Method B]
Sensitivity Level: ½ 1 2 3 4 N/A Other:
Manufacturer Type Batch Number(s) Application Method Process Time (minutes)
Pre-clean Dry Time: 15
Cleaner: Magnaflux Spotcheck SKC-S 16B07K Spray Penetrant Dwell Time: 15
Penetrant: Magnaflux Spotcheck SKL-SP2 15K06K Brush Emulsifier Time:
Developer: Magnaflux Spotcheck SKD-S2 16A02K Spray Developer Time: 10
Emulsifier: Post Clean Method:
Developer Form: a. Dry Powder b. Water Soluble c. Water Suspended d. Nonaqueous Wet e. Specific Application Penetrant Removal Method & Dry Time Black Light (Model and S/N) White Light Source
Dry Cloth then Damp Cloth 10 Min Drop Light
Original Repair Material & Thickness Test Temperature
Babbitt & Steel / 1" - 4" 70 Degrees F Surface Condition
As Welded As Ground As Cast Rough Machined Final Machined Meets Code Requirements
Test Results Quantity Inspected: 1 Quantity Accepted: 1 Quantity Rejected: 0
(1) Turbine Guide Bearing (Spare) "A" and "B" halves were inspected for 100% of bonding and no unacceptable disbonded areas noted.
See Following Pages for Pictures
The content of this document may be defense article/service related as described and controlled by International Traffic in Arms Regulations (ITAR)(22 CFR 120-130). Distribute only to entities meeting ITAR requirements.
Discard by shredding. At no time during testing did these parts or material come into contact with mercury.
Technician Name, Level & Date Customer (if applicable):
Reviewed By (if applicable):
Ray Stricklin/Level II; 5/31/2017
Certification of Inspection, Liquid Penetrant [Basic Report Form] 100-PTFORM-002 | Rev 1
Fort Peck Turbine Guide Bearing In-Service and Spare
Page 28 of 42 PDM Doc No. 01811549 RevB
Ultrasonic Examination Report
410 Commerce Drive, South Point, OH 45680 - Phone: 740-523-0523 Fax: 740-523-0530 www.mistrasgroup.com
Client: American Babbitt Date: 5/31/2017 Page: 1 of 1 Address: Box 3069; RT 2, Industrial Ln. Job Number: BK1014/40366654
Huntington, WV 25704 Purchase Order: 806 Contact: Joe White Reference Number: Voith Hydro Fort Peck Unit-2 ABB Job 67045 Location: American Babbitt Shop Part No/Description: Turbine Guide Bearing A & B
Spare
Code/Specification Procedure Acceptance Criteria ASME Sec. V Article 5 PDM ID 2GSV03-3200-01696126 PDM ID 2GSV03-3200-01696126
Inspection Method Immersion Contact Thru-Transmission Thickness Measure Longitudinal Shear-wave (Angle: ) C-scan A-scan B-scan Other:
Instrument Transducer Model Serial No. Cal. Due Date Frequency Size Serial No.
KB-USN50R 00BHT5 6/14/17 5mhz .500" 1043068
Setup Data Reflector Location Amplitude Gate Level .25"-10" Backwall 80% 25% Cal. Standard: Babbitt Wedge Standard
Scan Equipment: Krautkramer Couplant: 30 Weight Oil
Additional Information:
Test Results Quantity Inspected: 1 Quantity Accepted: 1 Quantity Rejected: 0
(1) Turbine Guide Bearing (Spare) "A" and "B" halves were inspected for 100% of bonding and no unacceptable disbonded areas noted
See Following Pages for Pictures
The content of this document may be defense article/service related as described and controlled by International Traffic in Arms Regulations (ITAR)(22 CFR 120-130).
Distribute only to entities meeting ITAR requirements. Discard by shredding. At no time during testing did these parts or material come into contact with mercury.
Technician, Level & Date: Customer Sign (if applicable): Reviewed By (if applicable):
Ray Stricklin; Level II; 5/31/2017
Certificate of Inspection, Ultrasonic Testing [Basic Report Form] 100-UTFORM-001 | Rev 1
Fort Peck Turbine Guide Bearing In-Service and Spare
Page 30 of 42 PDM Doc No. 01811549 RevB
File details come from the government source that posted it. Updated .