This abstract of offers is for a bank stabilization project in Morton County, North Dakota issued by the US Army Corps of Engineers Omaha District. The solicitation seeks bids for bank and slope stabilization along approximately 1,450 linear feet of shoreline along Lake Oahe, including placement of approximately 9,480 tons of riprap, 4,530 square yards of geotextile fabric, and 2,400 cubic yards of embankment fill. The work also includes access ramp construction and site work. The pre-bid site visit was held on June 22, 2021 and bids were due by July 8, 2021 as reflected in Solicitation W9128F21B0007. Five offers were received ranging from $809,750 to $2,556,950 including two base options to extend the stabilization by 300 linear feet. Offerors included construction companies from North Dakota, Nebraska and Oklahoma.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20210708 Jenny Graner Bidder Inquiry and responses ProjNet_ Logged In User.pdf | ||
| Project Overview_Revised6.23.2021.pdf | ||
| Am0001 - W9128F21B0007 Jenny Graner.pdf | ||
| W9128F21B0007 - Jenny Graner Plans - Specs - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
15-Jul-21
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
15-Jul-21
Jenny Graner Bank Stabilization Oahe Dam, ND
C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
Basic Item - 850 LF of Bank Stone Protection
All work complete to supply and install Riprap as specified in the specifications and drawings.
5,800 Ton $58.36 $338,488.00 $172.58 $1,000,964.00 $165.00 $957,000.00 $63.00 $365,400.00 $72.00 $417,600.00
0002 All work complete to supply and install Geotextile Fabric as specified. 4,530 SY $2.96 $13,408.80 $4.08 $18,482.40 $5.00 $22,650.00 $3.00 $13,590.00 $36.00 $163,080.00
All work complete to supply, haul, place, and compact embankment (Cut/Fill) for bank stabilization as specified.
2,400 CY $21.16 $50,784.00 $13.00 $31,200.00 $28.25 $67,800.00 $14.00 $33,600.00 $56.00 $134,400.00
All work to construct and restore access ramps at pre-determined location shown on drawings.
1 Job $13,010.00 $13,010.00 $18,482.46 $18,482.46 $70,000.00 $70,000.00 $95,000.00 $95,000.00 $96,000.00 $96,000.00
All remaining work including but not limited to: mobilization, demobilization, access road, shaping, seeding, and maintenance, and all other work except the work listed in the items above and below.
1 Job $87,600.00 $87,600.00 $23,553.58 $23,553.58 $325,000.00 $325,000.00 $130,000.00 $130,000.00 $147,000.00 $147,000.00
Total Amount Basic Items (Items 0001 - 0005) $503,290.80 $1,092,682.44 $1,442,450.00 $637,590.00 $958,080.00
Option #1 - 300 Linear Feet of Bank Stone Protection
All work complete to supply and install Riprap as specified in the specifications and drawings.
1,840 Ton $58.36 $107,382.40 $172.58 $317,547.20 165.00$ $303,600.00 $63.00 $115,920.00 $66.00 $121,440.00
0007 All work complete to supply and install Geotextile Fabric as specified. 1,270 SY $2.96 $3,759.20 $3.86 $4,902.20 5.00$ $6,350.00 $3.00 $3,810.00 $36.00 $45,720.00
All work complete to supply, haul, place, and compact embankment (Cut/Fill) for bank stabilization as specified.
800 CY $21.16 $16,928.00 $13.00 $10,400.00 28.25$ $22,600.00 $13.00 $10,400.00 $52.00 $41,600.00
All work complete to supply, haul, place, maintain and remove a work platform as per drawings.
1 Job $50,320.00 $50,320.00 $0.00 $0.00 385,000.00$ $385,000.00 $10.00 $10.00 $96,000.00 $96,000.00
Total Amount Option #1 Items (Items 0006 - 0009) $178,389.60 $332,849.40 $717,550.00 $130,140.00 $304,760.00
Option #2 - 300 Linear Feet of Bank Stone Protection
All work complete to supply and install Riprap as specified in the specifications and drawings. 1,840 Ton
$58.36 $107,382.40 172.58$ $317,547.20 200.00$ $368,000.00 $63.00 $115,920.00 $66.00 $121,440.00
0011 All work complete to supply and install Geotextile Fabric as specified.
1,270 SY
$2.96 $3,759.20 3.86$ $4,902.20 5.00$ $6,350.00 $3.00 $3,810.00 $36.00 $45,720.00
All work complete to supply, haul, place, and compact embankment (Cut/Fill) for bank stabilization as specified. 800 CY
$21.16 $16,928.00 13.00$ $10,400.00 28.25$ $22,600.00 $13.00 $10,400.00 $52.00 $41,600.00
Total Amount Option #2 Items (Items 0010 - 0012) $128,069.60 $332,849.40 $396,950.00 $130,130.00 $208,760.00
TOTAL $809,750.00 $1,758,381.24 $2,556,950.00 $897,860.00 $1,471,600.00
Bid Security 20% C. AMENDMENTS ACKNOWLEDGED : Yes
NO. 3
A. OFFEROR
RTS Shearing, LLC 2511 17th St. SE, PO Box 1177 Jamestown, ND 58402
Bid Security 20% C. AMENDMENTS ACKNOWLEDGED : Yes
Bid Security 20% C. AMENDMENTS ACKNOWLEDGED : Yes
(Without Profit)
(Including Profit)
Fargo, ND 58102 Fargo, ND 58103
B. REASONABLE CONTRACT
6. NUMBER OF AMENDMENTS ISSUED
A. OFFEROR A. OFFEROR
3950 25th Street North 827 28th St S, Suite B
A. HIRED LABOR
IGE Tunheim Construction, LLC Greenstone Construction Inc.
NO. 1 NO. 2
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F21B0007
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE 9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
DANIEL D MONAHAN - CONTRACTING OFFICER
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
Bid Security 20% C. AMENDMENTS ACKNOWLEDGED : Yes
NO. 4
A. OFFEROR
TIMCO
200 N Main St Bristow, OK 74010 g6ct9ddm Monahan