This document contains bidder inquiries and responses for a federal contract opportunity for bank stabilization work. The U.S. Army Corps of Engineers - Omaha District issued an Invitation for Bid for the Jenny Graner Bank Stabilization project in Morton County, North Dakota, requiring bank stabilization measures including peaked stone revetments, fill placement, geo-textile fabric placement, and minor grading. The work will stabilize approximately 1,450 linear feet of bank and involves placing around 9,480 tons of riprap. The bid closing date was July 8, 2021 and the opportunity is restricted to small businesses. The estimated construction value is between $250,000 and $500,000. Inquiries addressed topics such as permissible work areas, tree removal requirements, current water and bank elevations, soil stability issues, maintenance responsibilities, and debris removal obligations. Responses to the seven bidder questions provided clarifying details on these aspects of the opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7/8/2021 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 1/2

Controlled Unclassified Information (CUI) Only

Bid Inquiry Technical Evaluators Report Unresolved Inquiries

Project: Oahe Jenny Graner Bank Stabilization Review: Oahe Jenny Graner Bank Stabilizaiton (00001) (sorted by CommentID ) Displaying 7 inquiries.

Id Discipline Sheet Detail Spec 9303503 Other Typical X-Section Comment Classification: UNCLASSIFIED (U)

There is a work platform shown in the drawings, but a note on the typical cross section sheet indicates that all work must be conducted below the bank. Can you clarify?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. Site Visit Response:

Work may be conducted above the high bank. However, any work performed above the high bank shall be restricted to the access roads, access ramps, stockpile area, and work platform as shown in the drawings. By: Phillip Schroeder; Oahe Dam; (6059453406) On: Jun 29 2021

Current Request Status: Request Working Information for this report is procurement sensitive.

9303504 Other Project Overview Comment Classification: Controlled Unclassified Information (CUI)

Will trees need to be cut?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. Site Visit Response:

Some trees will require removal to construct the access roads, ramps, and placement of riprap protection. Trees in the cut bank shall be cut flush. Trees requiring removal for the construction access roads and ramps may be pulled. By: Phillip Schroeder; Oahe Dam; (6059453406) On: Jun 29 2021

Current Request Status: Request Working Information for this report is procurement sensitive.

9303505 Other Typical X-Section Comment Classification: Controlled Unclassified Information (CUI)

What is the current water elevation and top of bank elevation?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. USGS Stream Gauge "06349700 MISSOURI RIVER NR SCHMIDT, ND" shows the water elevation at 1614.48

The top of bank elevation is at approximately 1640. By: Phillip Schroeder; Oahe Dam; (6059453406) On: Jun 29 2021 Current Request Status: Request Working

Information for this report is procurement sensitive.

9303506 Other Typical X-Section Comment Classification: Controlled Unclassified Information (CUI) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=SpecText https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303503 mailto:phillip.p.schroeder@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303504 mailto:phillip.p.schroeder@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303505 mailto:phillip.p.schroeder@usace.army.mil

7/8/2021 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 2/2

Are there issues with soils sliding in the area?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. There is a potential for sloughing of the cut bank material due to undercutting erosion. By: Phillip Schroeder; Oahe Dam;

(6059453406) On: Jun 29 2021 Current Request Status: Request Working

Information for this report is procurement sensitive.

9303507 Other Project Overview Comment Classification: Controlled Unclassified Information (CUI)

Is the Contractor responsible for the maintenance of approaches?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. Yes. By: Phillip Schroeder; Oahe Dam; (6059453406) On: Jun 29 2021

Current Request Status: Request Working Information for this report is procurement sensitive.

9303508 Other Work Platform Comment Classification: Controlled Unclassified Information (CUI)

Is the Contractor required to use the work platform or can all work be conducted below the high bank?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. Work may be conducted from below the high bank. However, any work that is conducted above the high bank shall be restricted to the access roads, ramps, stockpile area, and work platform as shown in the drawings. By: Phillip Schroeder; Oahe Dam; (6059453406) On: Jun 29 2021

Current Request Status: Request Working Information for this report is procurement sensitive.

9303509 Other Project Overview Comment Classification: Controlled Unclassified Information (CUI)

Do debris and removed trees need to be hauled off site?

On: Jun 29 2021. Forward request by email.

1-0 Evaluation For Information Only. Yes. The contractor shall be responsible for the hauling and offsite disposal of debris and removed trees. By: Phillip

Schroeder; Oahe Dam; (6059453406) On: Jun 29 2021 Current Request Status: Request Working

Information for this report is procurement sensitive.

Report Complete

Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303506 mailto:phillip.p.schroeder@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303507 mailto:phillip.p.schroeder@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303508 mailto:phillip.p.schroeder@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9303509 mailto:phillip.p.schroeder@usace.army.mil http://projnet.com/index.php