Am-0003_W9128F-20-R-0066.pdf
PDF 3 MB Posted
- Solicitation number
- W9128F-20-R-0066
About this file
This document provides specifications for a large vehicle inspection point facility project at Buckley Air Force Base in Colorado. The solicitation notice seeks proposals for the design and construction of crash rated active vehicle barriers, a control system, traffic signals, signs, pavement markings, sensors, and related infrastructure. Proposals are due by 2:00 pm on August 21, 2020. The selected contractor will be responsible for installation, testing, training, maintenance, and warranties. The project includes two fixed-width crash rated active vehicle barriers to protect roadway lanes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am-0004_W9128F-20-R-0066.pdf | ||
| Am-0002_W9128F-20-R-0066.pdf | ||
| Am-0001_W9128F-20-R-0066.pdf | ||
| SPECS_W9128F-20-R-0066.pdf | ||
| Site Photos.pdf | ||
| DRAWINGS_W9128F-20-R-0066.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0003 - 1
Am #0003 - 2 (Continuation SF 30)
10 August 2020 Solicitation No. W9128F 20 R 0066
Date of Issue: 15 JUL 2020 New Date of Receiving Proposals: 21 AUG 2020
SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for Construction of LARGE VEHICLE INSPECTION POINT (LVIP).
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Standard Form 1442 (SF1442), Page 00 10 00-1, item 13.A., delete the time and date for proposal receipt and substitute “1400” and “21 AUG 2020”.
(2) Section 00 21 00, Page 18, paragraph 1.19.1 “BIDDER INQUIRY”, delete the first sentence “Technical inquiries and...receipt of offers.” and substitute the following:
“Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/ No Later Than 4 AUG 2020 in order that they may be given consideration or actions taken prior to receipt of offers.”
(3) Section 00 21 00, Page 19, delete item “c.” in its entirety and substitute the following:
“c. The Bidder Inquiry System will be unavailable for new inquires after the date stated above in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.”
(4) Section 05 50 13, Page 6, delete paragraph 2.1.4 in its entirety and substitute the following:
“2.1.4 Not Used”
(5) Section 06 61 16, Page 8, add paragraph 2.2.8 as follows:
“2.2.8 Counter Support Brackets
Provide factory-painted steel counter support brackets at not less than 4 feet on center (max) at all unsupported countertop spans. Brackets shall be designed and mounted to support a 300 PLF load at forward edge of countertop. Provide supplemental blocking, bridging, framing, and/or fasteners for support of the specified loading.”
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted
Am #0003 - 3 (Continuation SF 30) pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added 28 10 05 28 10 05 34 71 13.19 34 71 13.19
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.
VOLUME 1 OF 2 – SITE FACILITIES PACKAGE
1. SHEET CS800, VEHICLE BARRIER PLAN
2. SHEET ES101B, ELECTRICAL SITE PLAN B
3. SHEET ES507, EXTERIOR SECURITY DETAILS (CCTV)
4. SHEET A-410, WALL TYPES
5. SHEET TN601, COMMUNICATION RISER DIAGRAM
6. SHEET TY101, SECURITY PLAN
7. SHEET TY501, CCTV RISER DIAGRAM
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 21 AUG 2020.
Attachments:
Section 00 10 00 – SF1442 and CLIN Pricing Schedule Specifications listed in 1.b., above Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
10 AUG 2020
nep/2160
This page was intentionally left blank for duplex printing.
Am #0003 00 10 00 - 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-20-R-0066
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
15 JUL 2020
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 7
9. FOR INFORMATION
CALL:
A. NAME
Brian Finerty
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) Use Email: Brian.C.Finerty@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
LARGE VEHICLE INSPECTION POINT (LVIP)
PN CRWU173001 (FY20)
BUCKLEY AFB, COLORADO
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442) AND SECTION 00 45 00.
THIS SOLICITATION IS RESTRICTED 100% TO SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS INTERESTS
11. The Contractor shall begin performance within 10 calendar days and complete it within 425 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 21 AUG 2020. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ___90_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(d)
Am #0003 00 10 00 - 2
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due.
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
CLIN SCHEDULE 00 10 00 - 3 W9128F-20-R-0066
Am #0003
CONTRACT LINE ITEM PRICING SCHEDULE
ITEM
NO.
DESCRIPTION QTY UNIT UNIT
PRICE
ESTIMATED AMOUNT
BASIC ITEMS
Entire work complete to construct Two Bay Large Vehicle Inspection Bay and Administration Building excluding other items listed separately below
Job
XXX
Entire work complete to construct sitework to the limits shown on the plans. Includes pavements, utilities, site improvements, and passive barriers
Entire work complete for demolition of existing concrete slab and partial berm
Entire work complete for procurement and installation of active barriers
Entire work complete for procurement and installation of fiber communication line
Entire work complete for Cybersecurity
TOTAL BASIC AMOUNT $_____________________________
OPTION ITEMS
[Option]
Entire work complete to procure and install DOT LED Blank-Out sign
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
NOTES:
1. See 00 21 00, INSTRUCTIONS TO OFFERORS (IFB) for evaluation of options. The Government reserves the right to exercise the Option Item No. 0007 within 90 days after issuance of Notice to Proceed.
CLIN SCHEDULE 00 10 00 - 4 W9128F-20-R-0066
Am #0003
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted. In case of variation between the unit prices and the extensions, the unit prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective lump sum price and unit price affected.
Large Vehicle Inspection Point (LVIP) - Buckley AFB, CO BU78
SECTION TABLE OF CONTENTS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 28 10 05
ELECTRONIC SECURITY SYSTEMS (ESS)
05/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Standard Products
1.3.1.1 Material and Equipment Manufacturing Date
1.3.1.2 Product Safety
1.4 Environmental Conditions
1.4.1 Interior Conditions
1.4.1.1 Temperature
1.4.1.2 Pressure
1.4.1.3 Relative Humidity
1.4.1.4 Fungus
1.4.1.5 Acoustical Noise
1.4.2 Exterior Conditions
1.4.2.1 Temperature
1.4.2.2 Pressure
1.4.2.3 Solar Radiation
1.4.2.4 Sand and Dust
1.4.2.5 Rain
1.4.2.6 Humidity
1.4.2.7 Salt Fog
1.4.2.8 Snow
1.4.2.9 Ice Accretion
1.4.2.10 Wind
1.4.2.11 Acoustical Noise
1.5 AS-BUILT DRAWINGS
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 CLOSED-CIRCUIT TELEVISION (CCTV) SYSTEM
2.2.1 Camera Mounting Structures
2.3 EQUIPMENT RACK
2.4 LOCKS AND KEY LOCK
2.4.1 Lock
2.4.2 Key-Lock Operated Switches
2.4.3 Construction Locks
2.5 FIELD FABRICATED NAMEPLATES
2.5.1 Manufacturer's Nameplate
2.6 FACTORY APPLIED FINISH
PART 3 EXECUTION
3.1 INSTALLATION
SECTION 28 10 05 Page 1Am #0003
3.1.1 Enclosure Penetrations
3.1.2 Conduits
3.1.3 Camera Housings, Mounts, and Poles
3.1.4 Field Applied Painting
-- End of Section Table of Contents --
SECTION 28 10 05 Page 2Am #0003
SECTION 28 10 05
ELECTRONIC SECURITY SYSTEMS (ESS)
05/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 (2010) Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-222 (2005G; Add 1 2007; Add 2 2009; Add 3 2014; Add 4 2014; R 2014; R 2016) Structural Standards for Steel Antenna Towers and Antenna Supporting Structures
UNDERWRITERS LABORATORIES (UL)
UL 1037 (2016; Reprint Sep 2017) UL Standard for Safety Antitheft Alarms and Devices
UL 1076 (2018) UL Standard for Safety Proprietary Burglar Alarm Units and Systems
SECTION 28 10 05 Page 3Am #0003
UL 437 (2013; Reprint Oct 2017) UL Standard for Safety Key Locks
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 681 (2014) Installation and Classification of Burglar and Holdup Alarm Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Equipment Rack; G , RO
SD-11 Closeout Submittals
As-Built Drawings; G , RO
1.3 QUALITY ASSURANCE
1.3.1 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening, and have been utilized in applications of equipment and materials under similar circumstances and of similar size.
b. Have been available on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer.
d. Provide commercial off-the-shelf (COTS) products in which the manufacturer allows a network of qualified distributors to sell, install, integrate, maintain, and repair the hardware and software products that make up the system.
1.3.1.1 Material and Equipment Manufacturing Date
Products manufactured more than one year prior to date of delivery to the site are not acceptable.
SECTION 28 10 05 Page 4Am #0003
1.3.1.2 Product Safety
System components are to conform to applicable rules and requirements of NFPA 70 . Equip system components with instruction stickers including warnings and cautions describing physical safety, and special or important procedures to be followed in operating and servicing system equipment.
1.4 Environmental Conditions
1.4.1 Interior Conditions
Equipment installed in environmentally protected interior areas must meet performance requirements specified for the following ambient conditions:
1.4.1.1 Temperature
32 to 120 degrees F. Components installed in unheated security protected areas must meet performance requirements for temperatures as low as 0 degrees F
1.4.1.2 Pressure
Sea level to 15,000 feet above sea level
1.4.1.3 Relative Humidity
5 to 95 percent
1.4.1.4 Fungus
Components must be constructed of nonfungus nutrient materials or be treated to inhibit fungus growth
1.4.1.5 Acoustical Noise
Components must be suitable for use in high noise areas above 100 dB, without adversely affecting their performance
1.4.2 Exterior Conditions
Components in enclosures must meet performance requirements when exposed to the following ambient conditions:
1.4.2.1 Temperature
Minus 25 to 140 degrees F
1.4.2.2 Pressure
Sea level to 15,000 feet above sea level
1.4.2.3 Solar Radiation
Six hours of solar radiation per day at dry bulb temperature of 120 degrees F including 4 hours of solar radiation at 104 watts per square foot
SECTION 28 10 05 Page 5Am #0003
1.4.2.4 Sand and Dust
Wind driven for up to 6 miles per hour (mph)
1.4.2.5 Rain
2 inches per hour and 5 inches per hour cyclic with wind plus one period of 12 inches per hour
1.4.2.6 Humidity
5 to 95 percent
1.4.2.7 Salt Fog
Salt atmosphere with 5 percent salinity
1.4.2.8 Snow
Snow loading of 48 (psf) per hour; blowing snow of 4.6 psf per hour
1.4.2.9 Ice Accretion
Up to 1/2 inches of radial ice
1.4.2.10 Wind
Continual velocity up to 50 mph with gusts to 66 mph, except that fence sensors must detect intrusions up to 35 mph
1.4.2.11 Acoustical Noise
Components must be suitable for use in high noise areas above 110 dB without adversely affecting their performance. Examples areas include flight lines, runup pads, and generator sites.
1.5 AS-BUILT DRAWINGS
Maintain a separate set of drawings, elementary diagrams, and wiring diagrams of the system to be used for as-built drawings. Keep this set accurately and neatly up-to-date with all changes and additions. This set is not to be used for installation purposes.
Finish the final drawings submitted with the endurance test report in accordance with Section 01 78 00 CLOSEOUT SUBMITTALS for as-built requirements.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete pathway system consisting of conduit, junciton boxes, handholes, poles, racks and other equipment to allow a future contract to install the systems indicated below.
c. Closed-circuit Television System (CCTV)
SECTION 28 10 05 Page 6Am #0003
2.2 CLOSED-CIRCUIT TELEVISION (CCTV) SYSTEM
CCTV system components are to be installed in the future. Provide the pathways, poles, mounting hardware, racks per the contract.
2.2.1 Camera Mounting Structures
Provide camera mounting structures designed specifically for CCTV cameras. The structure is to accommodate appropriate wiring pathways for power and communication as well as proper grounding and surge protection.
Design loads for the camera mounting structure must conform to TIA-222 and all applicable addendums of the TIA standard. Allowable pole deflection is determined from the point of the camera mount and must not exceed 0.5 percent of the pole height under adjusted maximum wind load conditions.
Adjusted maximum wind load conditions for deflection calcualtions must be 30 miles per hour (mph) or 35 percent of the basic wind speed as determined by TIA-222 , whichever is greater. Confirm compliance to TIA standards by structure manufacturer data or by analysis. Provide additional measures as required to stabilize the camera if placed in an environment that is subject to induced vibrations such as heavy winds or excessive traffic.
[] 2.3 EQUIPMENT RACK
Provide standard 19 inch electronic rack cabinets conforming to UL 50 for the ESS system at the SCC and remote control and monitoring sites as shown on the drawings. Equipment rack must be in accordance with Section
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.
2.4 LOCKS AND KEY LOCK
2.4.1 Lock
Provide locks on system enclosures for maintenance purposes that meet UL 437 and are [round-key type, with three dual, one mushroom, and three plain pin tumblers] [or] [conventional key type lock having a five cylinder pin and five-point three position side bar combination]. Keys must be stamped "U.S. GOVT. DO NOT DUP.". Keys are only to be withdrawn when in the locked position. Key all maintenance locks alike and furnish only two keys for all of these locks.
2.4.2 Key-Lock Operated Switches
All key-lock-operated switches required to be installed on system components are to be UL 437 , [with three dual, one mushroom, and three plain pin tumblers,] [or] [conventional key type lock having a five cylinder pin and five-point three position side bar combination]. Keys must be stamped "U.S. GOVT. DO NOT DUP.". Key-lock-operated switches are to have two positions, with the key removable in either position. Key all key-lock-operated switches differently and furnish only two keys for each key-lock-operated-switch.
2.4.3 Construction Locks
Use a set of temporary locks during installation and construction. Do not include any of the temporary locks in the final set of locks installed and delivered to the Government.
SECTION 28 10 05 Page 7Am #0003
2.5 FIELD FABRICATED NAMEPLATES
Nameplates must comply with ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified or as indicated on the drawings. Each nameplate inscription is to identify the function and, when applicable, the position.
Nameplates are to be melamine plastic, 0.125 inch thick, white with black center core. Surface is to be matte finish. Corners are to be square.
Accurately align lettering and engrave into the core. Minimum size of nameplates must be 1 by 2.5 inches. Provide lettering a minimum of 0.25 inch high normal block style. Nameplates are not be required for devices smaller than 1 x 3 inches.
2.5.1 Manufacturer's Nameplate
Each item of equipment is to have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
2.6 FACTORY APPLIED FINISH
Electrical equipment is to have factory-applied painting systems which meetsthe requirements of the NEMA 250 corrosion-resistance test as a minimum.
PART 3 EXECUTION
3.1 INSTALLATION
Install the system in accordance with safety and technical standards NFPA 70 , UL 681 , UL 1037 , and UL 1076 . Configure components within the system with appropriate service points to pinpoint system trouble in less than 20 minutes.
Install all system components, including any equipment that is furnished by the Government, and appurtenances in accordance with the manufacturer's instructions, IEEE C2 and as shown on the drawings, and furnish all necessary connectors, terminators, interconnections, services, and adjustments required for a complete and operable system.
3.1.1 Enclosure Penetrations
Enclosures are to be penetrated from the bottom unless shown otherwise.
Penetrations of interior enclosures having transitions of conduit from interior to exterior, and penetrations of exterior enclosures are to be sealed with rubber silicone sealant to preclude the entry of water.
Terminate conduit risers in a hot-dipped galvanized metal cable terminator that is filled with a sealant as recommended by the cable manufacturer, and in a manner that does not damage the cable.
3.1.2 Conduits
Install interior conduits in accordance with NFPA 70 , Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM and ICS 705-1 . Install exterior conduits in accordance with NFPA 70 , Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION and ICS 705-1 .
SECTION 28 10 05 Page 8Am #0003
3.1.3 Camera Housings, Mounts, and Poles
a. Provide a foundation for each camera pole as specified and designed.
b. Provide a ground rod for each camera pole and connect the camera pole to the ground rod.
3.1.4 Field Applied Painting
Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria. Painting must be as specified in Section 09 90 00 PAINTS AND COATINGS.
-- End of Section --
SECTION 28 10 05 Page 9Am #0003
This page was intentionally left blank for duplex printing.
SECTION TABLE OF CONTENTS
DIVISION 34 - TRANSPORTATION
SECTION 34 71 13.19
CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
02/20
PART 1 GENERAL
1.1 REFERENCES
1.2 ABBREVIATIONS & DEFINITIONS
1.2.1 Abbreviations
1.2.2 Definitions
1.3 SUBMITTALS
1.4 INSTALLATION PACKAGE
1.4.1 Overall System Drawings
1.4.2 Point to Point Wiring Information
1.4.3 Major Components
1.4.4 Data Package
1.4.4.1 Delivery
1.4.4.2 Technical Data and Software
1.4.4.3 Active Vehicle Barrier Controls
1.5 TRAFFIC CONTROL PLANS
1.5.1 Traffic Control Plan for the maintenance of traffic during construction
1.5.2 Traffic Control Plan During Crash Rated Active Vehicle Barrier
Maintenance
1.6 COMPONENT CERTIFICATION
1.7 CYBERSECURITY EQUIPMENT CERTIFICATION
1.8 OPERATION AND MAINTENANCE MANUALS
1.8.1 Software Manual
1.8.2 Hardware Manual
1.8.3 Functional Design Manual
1.8.4 Maintenance Manual
1.8.5 Application Software
1.8.6 Final System Drawings
1.9 CRASH RESISTANCE: DEMONSTRATION OF COMPLIANCE
1.9.1 DOD Letter of Certification
1.9.2 Crash Test Report
1.9.3 Different Length
1.9.4 Engineering Analysis
1.9.5 Retrofitted Barrier Systems
1.10 QUALITY CONTROL
1.10.1 Project Manager Qualifications
1.10.2 Installation Superintendent Qualifications
1.11 TECHNICAL SPECIALISTS QUALIFICATIONS
1.12 KEY CONTROL PLAN
1.13 DELIVERY, STORAGE, AND HANDLING
1.14 PROJECT/SITE CONDITIONS
1.14.1 Environmental Conditions
1.14.2 Exterior Conditions
1.14.3 Interior Conditions
1.14.4 Site Power Supply
SECTION 34 71 13.19 Page 1Am #0003
1.14.5 Current Site Conditions
1.14.6 Generic Design and Contract Revisions
1.15 MAINTENANCE AND SERVICE
1.15.1 Description of Work
1.15.2 Service Personnel
1.15.3 Schedule of Work
1.15.3.1 Minor Inspections
1.15.3.2 Major Inspections
1.15.3.3 Scheduled Work
1.15.4 Operation
1.15.5 Records and Logs
1.15.6 System Modifications
1.15.7 Software
1.16 WARRANTY
1.16.1 Warranty Service
1.16.2 Service Call Requests
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 CRASH RATED ACTIVE VEHICLE BARRIER SAFETY SCHEME
2.3 CRASH RATED ACTIVE VEHICLE BARRIER FEATURES
2.3.1 Impact Conditions
2.3.2 Penetration Rating
2.3.3 Operators
2.3.4 Vehicle Loads
2.3.5 Bicycle Safety
2.3.6 Roadway Obstruction
2.3.7 Dimension Requirements
2.3.8 Operation Speeds Excluding Crash Gates
2.3.9 Failure Modes of Operation
2.3.10 Manual (Non-Powered) Barrier Operation
2.3.11 Crash Rated Active Vehicle Barrier Foundations
2.3.12 Lane Coverage
2.3.13 SAFETY EQUIPMENT
2.4 CRASH RATED ACTIVE VEHICLE BARRIER(S)
2.4.1 [Enter Appropriate Subpart Title Here]
2.4.2 CRASH BEAM
2.4.2.1 Vertical Pivot Crash Beam (Drop Arm)
2.4.2.2 Powered Crash Beam
2.5 POWER UNIT
2.5.1 HYDRAULIC POWER UNIT ENCLOSURE
2.6 HEATER
2.7 FINISH AND MARKINGS
2.8 SIGNAGE
2.9 ACTIVE VEHICLE BARRIER CONTROL SYSTEM (AVBCS)
2.9.1 General Requirements
2.9.2 System Integration
2.9.3 AVBCS Processor
2.9.4 PROGRAMMABLE LOGIC CONTROLLER (PLC)
2.9.4.1 PLC General Requirements
2.9.4.2 Modular PLC
2.9.4.2.1 Central Processing Unit (CPU) Module
2.9.4.2.2 Communications Module
2.9.4.2.3 Power Supply Module
2.9.4.2.4 Input/Output (I/O) Modules
2.9.4.3 Program Storage/Memory Requirements
2.9.4.4 Input/Output Characteristics
2.9.4.5 Wiring Connections
SECTION 34 71 13.19 Page 2Am #0003
2.9.4.6 On-Off Switch
2.9.4.7 Diagnostics
2.9.4.8 Accuracy
2.9.5 PLC SOFTWARE
2.9.5.1 Operating System
2.9.5.1.1 Startup
2.9.5.1.2 Failure Mode
2.9.5.2 Functions
2.9.5.2.1 Analog Monitoring
2.9.5.2.2 Logic (Virtual)
2.9.5.2.3 State Variables
2.9.5.2.4 Analog Totalization
2.9.5.3 Alarm Processing
2.9.6 AVB Control System Processing and Control Software
2.9.6.1 General
2.9.6.2 Resident Application Software
2.9.6.3 Display Information
2.9.6.4 Graphical Object Oriented Programming
2.9.6.5 Command Software
2.9.6.6 Command Input and Errors
2.9.6.7 Special Functions
2.9.6.8 Alarms
2.9.6.9 Report Generator
2.9.6.10 Periodic Automatic Report
2.9.6.11 Historical Data Storage and Retrieval
2.9.6.12 System Access Control
2.9.6.13 Convenience Outlet
2.9.7 CONTROL PANEL(S)
2.9.8 VOLTAGE
2.9.9 SEQUENCE OF EVENTS RECORDER
2.9.10 Control Panel Components and Construction
2.9.10.1 Enclosures
2.9.10.2 Controllers
2.9.10.3 Standard Indicator Light
2.9.10.4 Selector Switches
2.9.10.5 Push Buttons
2.9.10.6 Relays
2.9.10.7 Terminal Blocks
2.9.10.8 Alarm Buzzer
2.9.10.9 Touchscreen
2.9.10.10 Wiring
2.10 SEQUENCE OF OPERATION
2.11 AVB LIGHTING
2.12 WARNING BEACONS
2.13 TRAFFIC SIGNALS/HYBRID BEACON TRAFFIC SIGNALS
2.14 TRAFFIC SIGNAL SUPPORTS
2.15 UNINTERRUPTIBLE POWER SUPPLIES (UPS)
2.16 SURGE PROTECTION
2.16.1 Power Line Surge Protection
2.16.2 Sensor Device Wiring and Communication Circuit Surge
Protection
2.17 CCTV SYSTEM
2.17.1 CCTV System
2.18 MATERIALS AND COMPONENTS
2.18.1 Materials and Equipment
2.18.2 Single Manufacturer Active Vehicle Barriers
2.18.3 Field Enclosures
2.18.3.1 Interior Sensors
2.18.3.2 Exterior Sensors
SECTION 34 71 13.19 Page 3Am #0003
2.18.3.3 Interior Electronics
2.18.3.4 Exterior Electronics
2.18.3.5 Corrosion Resistant
2.18.4 Above Ground Components
2.18.5 Below Ground Components
2.18.6 Nameplates
2.18.6.1 Components
2.18.6.1.1 AVB Nameplate
2.18.7 Tamper Switches
2.18.8 Locks and Key-Lock Switches
2.18.8.1 Locks
2.18.8.2 Key-Lock-Operated Switches
2.18.8.3 Construction Locks
2.18.9 System Components
2.18.9.1 Modularity
2.18.9.2 Maintainability
2.18.9.3 Interchangeability
2.18.9.4 Product Safety
2.19 LINE SUPERVISION
2.20 ELECTRICAL WORK
2.21 WIRE AND CABLE
2.21.1 Above Ground Sensor Wiring
2.21.2 Cable Construction
2.22 DATA TRANSMISSION SYSTEM (DTS)
2.23 CONCRETE
2.24 WELDING
2.25 ACCESSORIES
2.26 FABRICATION
2.27 TEST, INSPECTIONS AND VERIFICATIONS
2.28 FACTORY ACCEPTANCE TEST
2.28.1 General
2.28.2 Factory Acceptance Test Plan
2.28.3 Factory Acceptance Test Report
PART 3 EXECUTION
3.1 EXAMINATION
3.2 INSTALLATION
3.2.1 Oversight
3.2.1.1 Observation and Inspection
3.2.1.2 Installer Training/Certification
3.2.2 Installation Schedule
3.2.3 Crash Rated Active Vehicle Barrier Installation
3.2.3.1 Vertical Alignment
3.2.3.2 Horizontal Alignment
3.2.3.3 Field Welding
3.2.3.4 Field Cutting and Drilling
3.2.4 Hydraulic Lines
3.2.5 Incidental Infrastructure
3.2.6 Concrete Placement
3.2.7 Reinforcing Steel Inspection
3.3 CYBERSECURITY INSTALLATION CERTIFICATION
3.4 DRAINAGE
3.4.1 Pit Drainage
3.4.2 Surface Drainage
3.5 ELECTRICAL
3.5.1 Wiring
3.5.2 Grounding
3.5.3 Enclosure Penetrations
SECTION 34 71 13.19 Page 4Am #0003
3.5.4 Exterior Components
3.5.5 Other Requirements
3.6 OPERATING AND MAINTENANCE INSTRUCTIONS
3.7 REPAIR
3.8 TEST PLANS
3.9 CONTRACTOR VERIFICATION TEST
3.10 FINAL SYSTEM ACCEPTANCE
3.10.1 General
3.10.2 Team Leader
3.10.3 Commissioning Team
3.10.4 Training
3.10.4.1 General Requirements
3.10.4.2 Guard's Training
3.10.4.3 Maintenance Personnel Training
3.10.4.4 System Manager Training
3.10.5 Performance Verification Test (PVT)
3.10.5.1 Test Plan
3.10.5.2 Test Equipment and Personnel
3.10.5.3 Commissioning
3.10.5.4 Test Report
3.10.6 Endurance Test
3.10.6.1 General
3.10.6.2 Phase I Testing
3.10.6.3 Phase II Assessment
3.10.7 Final Report
3.10.8 Post Commissioning PVT
3.10.9 APPENDICES
ATTACHMENTS:
Appendix A
-- End of Section Table of Contents --
SECTION 34 71 13.19 Page 5Am #0003
SECTION 34 71 13.19
CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
02/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO GDHS-5 (2011, Errata 2012) A Policy on Geometric Design of Highways and Streets
AASHTO LTS (2013; Errata 2013) Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals
AASHTO RSDG-4 (2011; Errata 1 2012; Errata 2 2015) Roadside Design Guide
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2020) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A106/A106M (2019a) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM D4956 (2013) Standard Specification for Retroreflective Sheeting for Traffic Control
ASTM F2656/F2656M (2018) Standard Test Method for Crash Testing of Vehicle Security Barriers
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 142 (2007; Errata 2014) Recommended Practice for Grounding of Industrial and Commercial Power Systems - IEEE Green Book
IEEE C37.90 (2005; R 2011) Standard for Relays and Relay Systems Associated With Electric Power Apparatus
IEEE C37.90.1 (2013) Standard for Surge Withstand Capability (SWC) Tests for Relays and
SECTION 34 71 13.19 Page 6Am #0003
Relay Systems Associated with Electric Power Apparatus
IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 61131-3 (2013) Programmable Controllers - Part 3:
Programming Languages
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO ISO/IEC 17025 (2017) General Requirements for the Competence of Testing and Calibration Laboratories
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2005; Errata 2008) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 4 (2015) Application Guideline for Terminal Blocks
NEMA MG 1 (2018) Motors and Generators
NEMA TC 2 (2013) Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA
19-4; ERTA 1 2019) National Electrical Code
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J517 (2017) Hydraulic Hose
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 8500.01 (2014; Change 1-2019) Cybersecurity
SECTION 34 71 13.19 Page 7Am #0003
DOD 8510.01 (2014; Change 1-2016; Change 2-2017) Risk Management Framework (RMF) for DoD Information Technology (IT)
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD (2015) Manual on Uniform Traffic Control Devices
NCHRP 350 (1993) Recommended Procedures for the Safety Performance Evaluation of Highway Features
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
47 CFR 15 Radio Frequency Devices
UNDERWRITERS LABORATORIES (UL)
UL 486A-486B (2018) UL Standard for Safety Wire Connectors
UL 508 (2018) UL Standard for Safety Industrial Control Equipment
UL 651 (2011; Reprint Nov 2018) UL Standard for Safety Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings
UL 796 (2016) UL Standard for Safety Printed-Wiring Boards
UL 1059 (2019) UL Standard for Safety Terminal Blocks
UL 1076 (2018) UL Standard for Safety Proprietary Burglar Alarm Units and Systems
1.2 ABBREVIATIONS & DEFINITIONS
1.2.1 Abbreviations
a. ACP - Access Control Point
b. AIE - Automated Installation Entry
c. AVB - Active Vehicle Barrier
d. AVBCS - Active Vehicle Barrier Control System
e. BMS - Balanced Magnetic Switch
f. CCTV - Closed Circuit Television System
g. CPU - Central Processing Unit (Computer)
h. CSMS - Central Security Monitoring Station (e.g., Installation Police
Station)
i. CVT - Contractor Verification Test
j. DTS - Data Transmission System
k. ECF - Entry Control Facility
l. EFO - Emergency Fast Operate (active barrier emergency fast close control)
SECTION 34 71 13.19 Page 8Am #0003
m. FAT - Factory Acceptance Test
o. IDS - Intrusion Detection System
p. PLC - Programmable Logic Controller
q. PVT - Performance Verification Test
r. RSM - Remote Status Monitor
s. SDC - Standard Design/Criteria
t. SDDC - Surface Development and Distribution Command
u. SDDCTEA - Surface Development and Distribution Command Traffic
Engineering Agency
v. TCU - Traffic Controller Unit
w. UPS - Uninterruptible Power Supply
x. VCC - Visitors Control Center
y. VPD - Vehicle Presence Detector
1.2.2 Definitions
Command & Control. Command & Control function refers to location the main guard will be located to oversee the activity at the ECF/ACP. This is typically the Gatehouse, but not in all cases.
Crash-rated active vehicle barrier. Crash-rated active vehicle barrier and active vehicle barrier in this specification refer to a vehicle barrier that has been tested to impede or stop a vehicle of a specific weight and speed. The barrier is operable either manually or through electrical controls.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Overall System Drawings; G, DO
Point to Point Wiring Information; G, DO
TRAFFIC CONTROL PLANS; G, DO
crash rated active vehicle barrier system; G, DO
Installation; G, DO
Electrical Work; G, DO
SD-03 Product Data
Major Components; G, DO
Data Package; G, DO
CRASH RESISTANCE: DEMONSTRATION OF COMPLIANCE; G, DO
Hydraulic Fluid manufacturer's data; G, DO
SECTION 34 71 13.19 Page 9Am #0003
SD-05 Design Data traffic signal support design calculations; G, DO
UPS Calculations; G, DO
Generic Design and Contract Revisions; G, DO
SD-06 Test Reports
Crash Test Reports; G, DO
Current Site Conditions; G, DO
KEY CONTROL PLAN; G, DO
Factory Acceptance Test; G, DO
Factory Acceptance Test Report; G, DO
Contractor Verification Test; G, DO
Contractor Verification Test Report; G, DO
Performance Verification Test (PVT); G, DO
Performance Verification Test Report; G, DO
Endurance Test; G, DO
Final Report; G, DO
SD-07 Certificates
COMPONENT CERTIFICATION; G, DO
Cybersecurity Equipment Certification; G, DO
Cybersecurity Installation Certification; G, DO
Installation Superintendent Qualifications; G, DO
Project Manager Qualifications; G, DO
TECHNICAL SPECIALISTS QUALIFICATIONS; G, DO
SD-08 Manufacturer's Instructions
Manufacturer Repair of Coatings Instructions; G, DO
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G, DO
OPERATING AND MAINTENANCE INSTRUCTIONS; G, DO
Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, Controls O&M Data Package
SECTION 34 71 13.19 Page 10Am #0003 and the requirements herein.
1.4 INSTALLATION PACKAGE
Submit Installation package 120 days after receipt of the Notice to Proceed. The installation package consists of the overall system drawings, major components and data package.
1.4.1 Overall System Drawings
Include the following in overall system drawing package:
a. Functional System Block Diagram, identifying all major equipment including interconnection between components specified herein and those furnished under other sections and communications protocols.
(1) Indicate control/signal and data communication paths and identify PLCs, control interface devices, and media to be used
(2) Describe characteristics of network and other data communication lines.
(3) Describe methods used to protect against power outages and transient voltages including types and ratings of isolation and surge suppression devices used in data, communication, signal, control, and ac and dc power circuits.
b. Block and Wiring Diagrams of each subsystem.
c. Drawing showing equipment layout in the Command & Control including the Master control panel, UPS, and other hardware intended to be located in the Command & Control.
d. Drawing showing equipment layout around the crash rated active vehicle barriers including the crash rated active vehicle barriers, active vehicle barrier control box(es), vehicle presence detectors, stop lines, traffic signals, warning beacons (wig-wag warning signals) (if applicable), and actuated traffic arms (if applicable).
e. A signing and pavement marking plan.
f. Drawing showing layout and dimensions of the each individual active vehicle barrier operating panels.
g. Touchscreen Audible Tones and Visual Indications if used. Include the following material for use at touchscreen video control panels:
(1) Audible indication, notification, and alarm tones.
(2) Visual materials for touchscreen video control panel display screens, complete with proposed shapes, colors, scale, and textual content.
Provide the following: graphics, including maps; icons; dialog boxes;
and help messages, prompts and instructions. Provide material in color.
h. Tamper switch locations for AVBCS related cabinets and operating panels.
i. Vehicle presence detector locations, set-points, and sensor
SECTION 34 71 13.19 Page 11Am #0003 detection patterns. Include descriptions of the security strategy for the coverage and operation of the sensors located at the AVB.
j. Details of connections to power sources, including power supplies and grounding.
k. Preliminary point-to-point wiring database. Preliminary submittals is to provide sufficient detail to ensure the final database has all the appropriate information. Provide details such as the legend to be used for the different wiring types, alphanumeric numbering scheme, abbreviations to be used, and the layout of the database. Provide an example of a small section of the system showing the point-to-point wiring.
1.4.2 Point to Point Wiring Information
Final point-to-point wiring diagram of complete interconnected system including database listing of wire numbers, to and from designations, and wire characteristics.
1.4.3 Major Components
Submit the following for approval:
a. Active Vehicle Barrier Controls to include pushbuttons, indicating lights, switches and panels.
b. Programmable Logic Controller.
c. Traffic Signs: powered and unpowered.
d. Traffic signals and traffic signal supports.
e. Warning Beacons (wig-wags).
g. Alarm display panels.
h. Sequence of Events Recorder.
i. Cable and wiring used for the data transmission.
j. Surge protection device.
k. Cabinets and other main components needed to make a complete system.
l. Tamper switches.
m. Actuated traffic arms.
n. Touch screens, if allowed.
1.4.4 Data Package
1.4.4.1 Delivery
Deliver all items of computer software and technical data (including technical data which relates to computer software), which is specifically
SECTION 34 71 13.19 Page 12Am #0003 identified in this specification in accordance with the CONTRACT CLAUSES, SPECIAL CONTRACT REQUIREMENTS, and in accordance with the Contract Data Requirements List (CDRL), DD FORM 1423, which is attached to and thereby made a part of this contract. Identify all data delivered by reference to the particular specification paragraph against which it is furnished.
1.4.4.2 Technical Data and Software
Include the following in the data package:
a. Communications speeds and protocol descriptions.
b. Operator commands.
c. Alarm and system messages and printing formats.
d. Start-up and shut-down operations including system and database backup operations.
e. Expansion capability and method of implementation.
f. Sample copy of sequence of events report.
g. Color print of the graphical user interface (GUI) screens (when used) on 8-1/2 by 11 inch paper.
h. System data entry requirements.
i. User enrollment.
j. System and application software descriptions.
k. Recovery and restart procedures.
l. Use of report generator and generation of reports.
1.4.4.3 Active Vehicle Barrier Controls
Describe operation of the different barrier control operating modes to include normal and emergency operation, barrier control switches, actuated traffic arms, traffic signals, warning beacons, and vehicle presence detectors. Include description of security strategy for defeating a threat vehicle and the SDDC approved barrier safety scheme for protecting innocent vehicles from barrier operations.
1.5 TRAFFIC CONTROL PLANS
1.5.1 Traffic Control Plan for the maintenance of traffic during construction
Provide a Traffic Control Plan for maintenance of traffic during construction per Section 08C of EM 385-1-1 .
1.5.2 Traffic Control Plan During Crash Rated Active Vehicle Barrier Maintenance
Describe plans for taking one or more active barriers out of service for maintenance or testing purposes, while other barriers at the ACP/ECF remain in service. As a minimum, include requirements for traffic signal
SECTION 34 71 13.19 Page 13Am #0003 indications, for bagging signal heads, and for temporary passive barriers and signage, e.g., Type 3 passive barriers, per MUTCD. Include both short term (less than an hour) and long term plans.
1.6 COMPONENT CERTIFICATION
Provide certifications from the manufacturers of the following equipment as part of the data package: crash rated active vehicle Barrier, programmable logic controller (PLC), warning signal, annunciator, sequence of events recorder, and all sensors.
1.7 CYBERSECURITY EQUIPMENT CERTIFICATION
Furnish a certification that control systems are designed and tested in accordance with DOD 8500.01 , DOD 8510.01 , Section 25 05 11 CYBERSECURITY OF FACILITY RELATED CONTROL SYSTEMS, and as required by individual Service Implementation Policy.
1.8 OPERATION AND MAINTENANCE MANUALS
Submit finalized manuals bound in hardback, loose-leaf binders within 30 days after completing the Endurance test. Update the draft copy used during site testing with any changes required prior to final delivery of the manuals. Identify each manual's contents on the cover. Include in each manual the names, addresses, and telephone numbers of each subcontractor installing equipment and systems, and the nearest service representative for each item of equipment. Provide each manual with a table of contents and tab sheets. Place tab sheets at the beginning of each chapter or section and at the beginning of each appendix. Include modifications made during installation, checkout, and acceptance in the final copies delivered after completion of the endurance test. Provide the number of copies of each manual to be delivered per DD FORM 1423.
1.8.1 Software Manual
In the software manual describe the functions of all software and include all other information necessary to enable proper loading, testing, and operation. As a minimum, include in the manual the following:
a. Definition of terms and functions.
b. Use of system and application software.
c. Procedures for system initialization, start-up and shutdown.
d. Alarm reports.
e. Reports generation.
f. Database format and date entry requirements.
g. Directory of all disk files.
h. Description of all communication protocols, including data formats, command characters, and a sample of each type of data transfer.
1.8.2 Hardware Manual
As a minimum, describe all equipment furnished in the hardware manual and
SECTION 34 71 13.19 Page 14Am #0003 include the following:
a. General description and specifications.
b. Installation and checkout procedures.
c. Equipment electrical schematics and layout drawings.
d. System schematics and layout drawings.
e. Alignment and calibration procedures.
f. Manufacturer's repair parts list indicating sources of supply.
1.8.3 Functional Design Manual
Identify the operational requirements for the system and explain the theory of operation, design philosophy, and specific functions within the functional design manual. Include a description of hardware and software functions, interfaces, and requirements for all system operating modes.
1.8.4 Maintenance Manual
Include descriptions of maintenance for all equipment including inspection, periodic prevention maintenance (include specific time intervals for each recommended preventative maintenance tasks), fault diagnosis, and repair or replacement of defective components in the maintenance manual.
1.8.5 Application Software
Provide a copy of the software installation package on optical disk that runs the control program. Provide on optical disk, separate from the operating system software, the complete program or image of the installed software, with all custom changes and configuration data specific for the installed system. At the end of project, after the endurance test is complete, provide complete sets of optical discs. [Provide one set of discs to the USACE Protective Design Center.Provide one to be turned over to the User.]
1.8.6 Final System Drawings
Maintain a separate set of drawings (including site, civil, electrical, mechanical, structural, and architectural plans, elevations, and details), elementary diagrams, wiring diagrams, and control diagrams of the system to be used for final system drawings. This set is to be accurately kept up-to-date with all changes and additions to the AVBCS and to be delivered to the Government with the final endurance test report. In addition to being complete and accurate, this set of drawings is to be kept neat and not be used for installation purposes. Furnish final drawings with the endurance test report on optical disk in Microstation latest Version or AutoCAD latest version format.
1.9 CRASH RESISTANCE: DEMONSTRATION OF COMPLIANCE
Submit the following as demonstration of compliance with the specified crash resistance requirements for each crash rated active vehicle barrier proposed for this project.
SECTION 34 71 13.19 Page 15Am #0003
1.9.1 DOD Letter of Certification
Submit a DOD Letter of Certification for crash-rated active vehicle barrier with a configuration identical to the as tested crash rated active vehicle barrier being provided. DOS Letter of Certification is allowed;
however, the crash-rated active vehicle barrier must be on the DOD anti-ram vehicle barrier list.
1.9.2 Crash Test Report
Submit a crash test report for crash-rated active vehicle barrier with a configuration identical to the as tested crash rated active vehicle barrier being provided, from a DOS approved testing laboratory or a testing laboratory accredited by a nationally recognized testing agency in accordance with ISO ISO/IEC 17025 . This report is only required for crash-rated active vehicle barriers that are not on the DOD list. The information is to be submitted with the barrier submittal and is to show an approved crash test per ASTM F2656/F2656M .
1.9.3 Different Length
The only exception to the requirement that the tested crash rated active vehicle barrier be identical to the as tested crash rated active vehicle barrier being provided is the barrier's length.
This is the start of the file's text. The full file is on GovTribe.