This document is a solicitation notice for the Air Force CyberWorx project located at the U.S. Air Force Academy in Colorado Springs, Colorado. The solicitation will close on June 11, 2020 at 2:00PM MDT. This is an unrestricted solicitation open to both large and small businesses for a one-step design-build training facility project including administrative support, offices, labs, classrooms, and support spaces. Evaluation criteria are outlined for technical elements including specialized experience, technical approach, key personnel, past performance, and contract schedule. Price will be evaluated separately for reasonableness and realism, with a best value selection made after reviewing price and technical factors. The project description, codes and standards to be followed, and site requirements are provided.

View the file

Other files

File Type Posted
Am-0006_W9128F-20-R-0052.pdf PDF
Am-0004_W9128F-20-R-0052.pdf PDF
Am-0003_W9128F-20-R-0052.pdf PDF
Am-0002_W9128F-20-R-0052.pdf PDF
BIM-4of4.zip ZIP file
BIM-2of4.zip ZIP file
BIM- 1of4.zip.docx DOCX document
BIM-3of4.zip ZIP file
Bldg2413 As-Builts.zip ZIP file
Plinth Wall As-Builts.zip ZIP file
Am-0001_W9128F-20-R-0052.pdf PDF
DRAWINGS_W9218F-20-R-0052_CyberWorx_USAFA.pdf PDF
SPECS_W9218F-20-R-0052_CyberWorx_USAFA-1.pdf PDF
Site Photos (2).pdf PDF
Site Photos (1).pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0005 W9128F

AIR FORCE CYBERWORX, XQPZ 164001, USAF ACADEMY, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 11 JUN 2020 at 1400 hours

Government Point of Contact: Brian Finerty, Contract Specialist, Brian.C.Finerty@usace.army.mil

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-20-R-0052

06/02/2020

04/16/2020

06/02/2020

Am #0005 - 1

Am #0005 - 2 (Continuation SF 30)

2 JUN 2020

Solicitation No. W9128F 20 R 0052

Date of Issue: 16 APR 2020 Date of Receiving Proposals: 11 JUN 2020

SUBJECT: Amendment No. 0005 to Request for Proposal Solicitation Package for Construction of AIR FORCE CYBERWORX, XQPZ 164001.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.) NONE

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 01 78 39.00 24 01 78 39.00 24 01 81 00 01 81 00 01 82 00 01 82 00 01 83 00 01 83 00 01 86 10 01 86 10 01 86 26 01 86 26

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.

1. SHEET G-003, GENERAL NOTES AND ABBREVIATIONS

2. SHEET G-102, CODE ANALYSIS – SECOND AND THIRD LEVEL

3. SHEET G-102.1, CODE ANALYSIS – SECOND AND THIRD LEVEL – OPTION ITEMS

4. SHEET C-030, EXTERIOR DEMOLTION

5. SHEET A-101.1, LEVEL 01 - FLOOR PLAN – OPTION ITEMS

6. SHEET A-103, LEVEL 03 – FLOOR PLAN

7. SHEET A-103.1, LEVEL 03 – FLOOR PLAN – OPTION ITEMS

8. SHEET A-104.1, LEVEL 03.5 – FLOOR PLAN – OPTION ITEMS

9. SHEET A-203, LEVEL 03 – REFLECTED CEILING PLAN

10. SHEET A-203.1, LEVEL 03 – REFLECTED CEILING PLAN – OPTION ITEMS

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

Am #0005 - 3 (Continuation SF 30)

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 11 JUN 2020.

Attachments:

Specifications listed in 1.b., above Drawings listed in 1.c., above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

2 JUN 2020

nep/2160

This page was intentionally left blank for duplex printing.

CyberWorx (FY20) - USAFA, CO AA63

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 78 39.00 24

AS-BUILT DRAWINGS

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Red-Line Drawings

1.1.2 As-Built Drawings

1.1.3 Advanced Modeling

1.1.4 Record Model

1.1.5 USACE CAD/BIM Technology Center

1.1.6 Working Construction Model

1.1.7 Record Drawings

1.1.8 Black-Line Drawings

1.1.9 Full-Size Drawings

1.1.10 Modification Circle

1.1.11 Electronic CAD Files

1.1.12 Accepted Design Drawings

1.1.13 Building Information Modeling (BIM) Files

1.1.14 Geodetic Datum

1.1.15 State Plane Coordinate System (SPCS)

1.2 REFERENCES

1.3 SUBMITTALS

1.4 GENERAL REQUIREMENTS

1.4.1 As-built Drawings

1.4.2 Red-Line Drawings

1.4.2.1 Electronic Option

1.4.3 GeoDataBase

1.5 PAYMENT

1.6 CONTRACTOR PERFORMANCE RATING

1.7 TRANSMITTAL OF AS-BUILT DRAWINGS

1.7.1 Optional As-built Drawings Sample

1.7.2 50 Percent Preliminary As-Built Drawings

1.7.3 100 Percent Preliminary As-Built Drawings

1.7.4 Final As-Built Drawings

1.8 AS-BUILT DRAWINGS FORMAT REQUIREMENTS

1.8.1 General Formatting

1.8.2 Title Block

1.8.3 Modification Changes

1.8.4 Legends

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL

3.1.1 Redline Content

3.2 SITE WORK

3.2.1 Utilities

3.2.2 Structures

SECTION 01 78 39.00 24 Page 1Am #0005

3.2.3 Grades

3.3 STRUCTURAL

3.3.1 Steel/Concrete

3.4 MECHANICAL

3.4.1 Ductwork

3.4.2 Plumbing

3.5 ELECTRICAL

3.5.1 PANELS

3.5.2 Controls

3.6 CONTRACTOR SHOP DRAWINGS

-- End of Section Table of Contents --

SECTION 01 78 39.00 24 Page 2Am #0005

SECTION 01 78 39.00 24

AS-BUILT DRAWINGS

03/17

PART 1 GENERAL

Attachments:

Modifications and Title Block Examples

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards. All as-built deliverables shall be delivered in compliance with the requirements and standards referenced in 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD)

REQUIREMENTS.

1.1 DEFINITIONS

The definitions listed below form a part of this specification.

1.1.1 Red-Line Drawings

Accepted design drawings marked-up during construction to show actual work performed to include necessary sketches, modification drawings, shop drawings and notes.

1.1.2 As-Built Drawings

As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to Contractor submitted Requests for Information; direction from the Contracting Officer; designs which are the responsibility of the Contractor, and differing site conditions. Maintain the as-builts throughout construction as. These files serve as the basis for the creation of the record drawings.

1.1.3 Advanced Modeling

A subset of geospatial technologies as defined in EM 1110-1-2909 to include BIM, CIM, GIS, and CAD. Advanced Modeling is comprised of models and drawings that form a digital representation of the project, or part thereof, that are comprised of model elements with facility data.

1.1.4 Record Model

A model reflecting all approved changes during construction including red-lines, requests for information (RFIs), and contract modifications.

Includes updated construction phase facility/site data for all components.

1.1.5 USACE CAD/BIM Technology Center

The USACE CAD/BIM Technology Center hosts all standard content for USACE.

This content can be accessed through the CAD/BIM Technology Center website, https://cadbimcenter.erdc.dren.mil/ .

SECTION 01 78 39.00 24 Page 3Am #0005

1.1.6 Working Construction Model

Working model created and updated during construction which incorporate the changes received during construction to including red-lines, requests for information (RFIs), and contract modifications at intervals during the construction process. These include updated construction phase facility/site data for installed components.

1.1.7 Record Drawings

The record drawings are the final compilation of actual conditions reflected in the as-built drawings.

1.1.8 Black-Line Drawings

Paper drawings reproduced from electronic files or high quality reproducible drawings.

1.1.9 Full-Size Drawings

24 inches x 36 inches nominal size drawings with all details visually readable so that half-size plot will fit on 11 inches x 17 inches cut sheets.

1.1.10 Modification Circle

A circle with a horizontal line through the center to identify modification changes on the drawings. The top half will contain the letter "R" with the bottom half containing the Modification number, unless directed otherwise. The lettering standard will be 1/8-inch Arial.ttf.

1.1.11 Electronic CAD Files

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards.

1.1.12 Accepted Design Drawings

Design drawings created by the design-build contractor for the construction phase of the contract that have been reviewed and accepted by the Government.

[*Am-2] <text deleted> [**Am-2]

1.1.13 Building Information Modeling (BIM) Files

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards.

1.1.14 Geodetic Datum

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards.

1.1.15 State Plane Coordinate System (SPCS)

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards.

SECTION 01 78 39.00 24 Page 4Am #0005

1.2 REFERENCES

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-1-2909 (2012) Geospatial Data and Systems

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

50 Percent Preliminary As-Built Drawings; G-DO

100 Percent Preliminary As-Built Drawings; G-DO

SD-11 Closeout Submittals

Final As-Built Drawings; G-DO

[*Am-2] <text deleted> [**Am-2]

1.4 GENERAL REQUIREMENTS

1.4.1 As-built Drawings

[*Am-5] The as-built Building BIM model shall be provided in compliance with USACE Minimum Modeling Matrix (M3) "LOD" and "Grade" requirements for "Record Models" as referenced by 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS. [**Am-5]

The Contractor shall be responsible for obtaining the required CAD software and BIM sotware for their own use. The transmittal requirements for the As-built Drawings shall be shown as activities on the Contractor prepared project schedule.

All changes from the accepted design drawings shall be shown on the as-builts. All changes shall be accurately and neatly recorded on the As-built drawings using the same symbols, terminology, and general quality as the original set of accepted design drawings. All changes shall be shown on all drawings that are affected by the change. Changes include:

actual work performed, deviations resulting from Government responses to Requests for Information or Serial letters, surveys, shop drawings, descriptive changes, sketch changes, and modifications to the contract.

Systems designed or enhanced by the Contractor such as HVAC control system, fire alarm system fire sprinkler system, and irrigation sprinkler system, shall shown on the As-built drawings. Where accepted design drawings or specifications allow for options, only the option selected and actually constructed shall be shown on the As-Built Drawings.

SECTION 01 78 39.00 24 Page 5Am #0005 g6edxnep Highlight

1.4.2 Red-Line Drawings

Red-Line Drawings shall be updated throughout the construction phase of a contract showing all changes that will be shown on the final as-builts.

All as-built conditions shall be on the Red-Line Drawings within 1 week after the work activity is completed or shall be entered on the deficiency tracking system (see Section 01 45 00.00 10, QUALITY CONTROL). If the red-line drawings are not being updated, incomplete, or inaccurate, the Contractor shall be considered to not be making satisfactory progress and funds will be withheld from the progress payments.

The Contractor shall have the option to do red-line drawings in either a hardcopy format or an electronic format unless the COR does not wish to do the As-Built drawings electronically, in whcih case the Contractor shall do the hardcopy option for the completion of Red-line Drawings.

1.4.2.1 Electronic Option

The Contractor shall make electronic drawings available to the COR at all times through a Local Area Network (LAN) or Internet connection. The connection shall have a download transfer rate not less than 10 Megabit/second (~1.250 Megabytes/second) and an upload transfer rate of not less than 1 Megabit/second (~124 kilobytes/second) in order to facilitate the timely access of drawing files. The Contractor shall make backups of all the electronic drawings at the close of business on the final day of work each week on a durable digital media such as removable hard-drive, tape drive, or optical disk. Each weekly file system backup shall be preserved over the course of the project and not overwritten;

with file folders or individual media labeled with the date of backup.

The weekly backup media shall be stored in a fireproof and waterproof safe in a locked room of the Contractor's trailer. The Contractor must also provide the COR with a DVD containing updated PDF drawings on a monthly basis. All changes to the electronic drawings shall be shown with clouding and in accordance with standards and requirements in

01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS.

1.4.3 GeoDataBase

The Contractor shall provide a DVD containing a SDSFIE/FGDC GeoReferenced personal GeoDataBase, in accordance with the requirements of this section and EM 1110-1-2909 , unless otherwise directed by the Contracting Officer.

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards.

[*Am-2] <text deleted> [**Am-2]

1.5 PAYMENT

In accordance with the clause "Payment Under Fixed - Price Construction Contracts", cost load closeout activities amounts in accordance with Section 01 32 01.00 10 PROJECT SCHEDULE will be withheld from payment for the creation of As-Built Drawings until Final As-Built Drawings and GeoDatabase Files are delivered to and accepted by the COR.

1.6 CONTRACTOR PERFORMANCE RATING

The Government will evaluate the Contractor's performance in CPARS (Contractor Performance Assessment Reporting System) at intervals of no

SECTION 01 78 39.00 24 Page 6Am #0005 more than 365 days during the period of performance and complete the final evaluation within 120 days of completion of the project. The timeliness and quality of As-Built drawings submittals, Final As-built Drawings, Red-line drawings , [*Am-2] <text deleted> [**Am-2] and GeoDataBase Files will be an important factor in determining the assigned rating for the Schedule evaluation area. If the Contractor fails to submit complete and accurate Final As-Built Drawings and GeoDataBase Files within sixty (60) calendar days of turning the completed project over to the Using Service, this failure will be noted in the comments under the Schedule evaluation area and may result in a lower rating for this area. Repeated failure to submit correct and accurate As-Built drawings submittals, Final As-built Drawings, Red-line drawings , [*Am-2] <text deleted> [**Am-2] and GeoDataBase Files may also result in lower ratings for the Quality and Management evaluation areas. [*Am-2] <text deleted> [**Am-2]

1.7 TRANSMITTAL OF AS-BUILT DRAWINGS

1.7.1 Optional As-built Drawings Sample

The Contractor has the option to submit a sample of preliminary as-built drawings to the Omaha District Office that will be reviewed for formatting purposes. This submittal shall include five (5) distinct sheets from the project set of drawings. This optional submittal shall be sent to the Omaha District Office (ATTN: Russell Matthews CENWO-CDS-T) and contain the following:

1. One (1) DVD containing the following for each sheet:

a. Electronic CAD Files

b. Individual full-size PDF Drawings

c. One (1) Combined Set of full-size PDF Drawings with bookmarks for each sheet

1.7.2 50 Percent Preliminary As-Built Drawings

The 50 Percent Preliminary As-Built Drawings are to be submitted within ten (10) days after 50% physical completion unless otherwise directed by the COR. These drawings will be reviewed by the government for technical content and formatting requirements. The Electronic Files shall include all changes up to the time 50 Percent Preliminary As-Built Drawings are furnished with "clouding" around the changes. All drawings contained in the complete project set of drawings plus any additional drawings shall be submitted with the 50 Percent Preliminary As-Built Drawings. The 50 Percent Preliminary As-Built Drawings shall be submitted within ten days after unless otherwise directed by the COR. 50 Percent Preliminary As-Built Drawings shall include the following:

1. All electronic deliverables on electronic media as identified in "DELIVERY, STORAGE, AND HANDLING" paragraph of 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS, in the quantities indicated therein. Send one (1) set of media to the Omaha District Office (ATTN:

Russell Matthews CENWO-CDS-T).

2. One set of half-size black-line drawings to the COR.

If a resubmittal is required, the contractor shall resubmit within fifteen days after receiving comments back from the government. If the contractor fails to submit the 50 Percent Preliminary As-Built Drawings by the specified time, the contractor shall be considered to not be making satisfactory progress on the project and funds will be withheld from the

SECTION 01 78 39.00 24 Page 7Am #0005 progress payments.

1.7.3 100 Percent Preliminary As-Built Drawings

The 100 Percent Preliminary As-Built Drawings include all changes to the drawings as specified. The 100 Percent Preliminary As-Built Drawings will be reviewed for technical content and formatting requirements. Within thirty (30) days after the final inspection, the Contractor shall submit 100 Percent Preliminary As-Built Drawings indicating all as-built changes with "clouding" on all of the project drawings. All drawings contained in the complete project set of drawings plus any additional drawings shall be submitted with the 100 Percent Preliminary As-Built Drawings. The COR may grant the Contractor additional time if the Contractor is making reasonable progress on the as-builts, in the sole judgement of the COR.

The Contractor shall not submit the Final As-Built Drawings until the 100 Percent Preliminary As-Built Drawings are approved. 100 Percent Preliminary As-Built Drawings shall include the following:

1. All electronic deliverables on electronic media as identified in "DELIVERY, STORAGE, AND HANDLING" paragraph of 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS, in the quantities indicated therein. Send one (1) set of media to the Omaha District Office (ATTN:

Russell Matthews CENWO-CDS-T).

2. One (1) set of full-size black-line drawings to the COR.

1.7.4 Final As-Built Drawings

The Contractor shall produce Final As-Built Drawings without "clouding".

The Final As-Built Drawings shall include all changes shown on the 100 Percent Preliminary As-Built Drawings including any additional required changes. All drawings contained in the complete project set of drawings plus any additional drawings shall be submitted with the Final As-Built Drawings. The Final Drawings shall be submitted no later than ten days after the 100 Percent Preliminary As-Built Drawing submittal is approved.

The COR may grant the Contractor additional time if the Contractor is making reasonable progress on the as-builts. The Contractor shall send the following documents to the COR:

1. All electronic deliverables on electronic media as identified in "DELIVERY, STORAGE, AND HANDLING" paragraph of 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS, in the quantities indicated therein. Send one (1) set of media to the Omaha District Office (ATTN:

Russell Matthews CENWO-CDS-T).

2. One full-size of As-built drawings.

All GeoDatabase files shall be under a folder titled "GeoDatabase".

1.8 AS-BUILT DRAWINGS FORMAT REQUIREMENTS

1.8.1 General Formatting

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for detailed CAD/BIM formatting requirements and standards. The drawings shall include all of the requirements below:

a. The drawing index shall be updated when drawings are added.

b. When opened, the view shall be zoomed to fit the border.

SECTION 01 78 39.00 24 Page 8Am #0005

c. All files shall reference a border supplied by the US Air Force Academy in the USAFA CAD/BIM standards.

d. All unnecessary information outside the border shall be deleted.

e. All files shall be purged/compressed.

f. All reference files shall comply with their applicable formatting and content standards.

l. The file name shall be the project code followed by the sheet identification number. The file name shall be included in the border on every sheet and shall match the name of the file on the DVD. The project code is AA63.

m. NOT USED

n. The cover sheet will have "Contract Award Set" changed to "As-Built Record Set" with month & year completed.

o. All preliminary as-builts and redlines shall show drawing changes by "clouding" the affected area in the drawing file.

p. All submitted Electronic Files and PDF drawings shall be under a folder labeled "As-Built" on the submitted DVD.

q. Both the DVD case and DVD shall contain the name of the project, location, project code, solicitation number, contract number, and words detailing which submittal it is. The Final As-builts Drawings should be titled "As-Built Record Set".

r. Do not use zipped or compressed folders on any of the As-built submittals.

s. On the cover sheet add or revise text to read "This folio includes all reissued and descriptive amendments, RFIs, and modifications."

t. The Electronic working files and PDF drawings shall be in separate folders on each DVD.

1.8.2 Title Block

All information in the title block shall be filled in and correct. The title block shall also include all of the requirements below.

a. "RECORD DRAWING" text shall be added below the title block on the right side of the drawing on all sheets.

b. The date to be added in the revision box for modifications is found in Block 3 of Form SF-30.

c. The top line of the revision box shall state "REVISED TO SHOW AS-BUILT CONDITIONS" and dated. Use a "-" for the "Mark".

d. The date box shall have the month and year as-builts were completed.

f. The approved box shall have the initials indicated at the direction of the COR.

e. The contract number and the solicitation number (if available) shall be shown on all sheets.

f. Additional word abbreviations, not found on the abbreviation sheet but necessary to describe the work, shall be properly identified and incorporated with the other standard word abbreviations.

g. Modifications should be properly noted in the title block in accordance with paragraph "Modification Changes" below.

1.8.3 Modification Changes

All modification changes shall be included on the as-built drawings.

Modification changes at a minimum shall include all revised and reissued sheets, descriptive changes, sketches, etc. Any modification change that also affects other sheets other than the one referenced with the modification shall also be changed as appropriate. Typically, modification changes can be done by following the descriptive change included with the modification, but may require additional effort

SECTION 01 78 39.00 24 Page 9Am #0005 depending on the change and level of detail of the modification change.

Modifications shall be posted in accordance with the following.

a. Follow directions in the modification for posting all changes.

b. All modifications to the contract shall be posted in chronological order.

c. The last modification number completed on the sheet should be shown with the modification circle in the top right corner of the "Project Title" and "Project Location" box.

d. All modifications to all plans, sections, or details, shall have a modification number placed in the revision box over column entitled "Mark". The statement "GENERAL REVISIONS" may be used when applicable.

e. The Modification Circle size shall be 1/2-inch diameter unless the area where circle is to be placed is crowded. Use smaller size circle for crowded areas.

f. A Modification Circle shall be place at the location of each deletion.

g. For all new details or sections that are added to a drawing, place a Modification Circle by the detail or section title.

h. For changes to a drawing, place a Modification Circle by the title of the affected plan, section or detail titles (each location).

i. For changes to schedules on drawings, a Modification Circle shall be placed either by the schedule heading or by the change in the schedule.

1.8.4 Legends

Symbols, which conflict with those on the original accepted design legend sheet, shall not be used. Additional symbols, necessary to depict any additional work items, shall be properly identified and added to the legend sheet or supplemental legend. Those projects that do not have legend sheets may use supplemental legends on each sheet where symbol is shown.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL

Maintain detailed and organized contract document redlines and make them available to the Government for review. Redlines shall be maintained as electronic PDF files. At minimum, redlined files shall be kept current on a weekly basis and shall be available at the jobsite at all times.

Redlines shall document, describe, and reference all revisions to the contract documents (RFIs, Modifications, Changes, etc.) to reflect accurate as-constructed conditions.

3.1.1 Redline Content

Redlines shall include, but are not limited to, the following information:

a. The actual location, kinds and sizes of all sub-surface utility lines. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered over or obscured. Update the locations in the record files and show by offset dimensions to two permanently fixed surface features the end of each run including each change in direction on the record drawings. Locate valves, splice boxes and similar

SECTION 01 78 39.00 24 Page 10Am #0005 appurtenances by dimensioning along the utility run from a reference point. Also record the average depth below the surface of each run.

b. The location and dimensions of any changes within the building structure.

c. Layout and schematic drawings of electrical circuits and piping.

d. Correct grade, elevations, cross section, or alignment of roads, earthwork, structures or utilities if any changes were made from contract plans.

e. Changes in details of design or additional information obtained from working drawings specified to be prepared; including but not limited to shop drawings, fabrication, erection, installation plans and placing details, pipe sizes, insulation material, and dimensions of equipment foundations.

f. The topography, invert elevations and grades of drainage installed or affected as part of the project construction.

g. Changes or Revisions which result from the final inspection.

h. Where contract drawings or specifications present options, show only the option selected for construction on the working as-built markup drawings.

i. If borrow material for this project is from sources on Government property, or if Government property is used as a spoil area, furnish a contour map of the final borrow pit/spoil area elevations.

j. Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler, and irrigation systems.

k. Changes in location of equipment and architectural features.

j. Modifications (include within change order price the cost to change working as-built markup drawings to reflect modifications).

l. Actual location of anchors, construction and control joints, and penetrations in concrete.

m. Unusual or uncharted obstructions that are encountered in the contract work area during construction.

n. Location, extent, thickness, and size of stone protection particularly where it will be normally submerged by water.

3.2 SITE WORK

3.2.1 Utilities

The as-built drawings shall show all utilities whether active or abandoned, and will include all those shown on the original accepted design drawings or found on-site. The type of utility, location, general direction, size, material make-up and depth shall be shown. The location and description of any utility line or other installations of any kind known to exist within the construction area shall be shown. The location shall include dimensions to permanent features. All new underground

SECTION 01 78 39.00 24 Page 11Am #0005 utility lines (including electrical power and communications, gas, water, sanitary sewer, storm drains, roof drains and culverts) shall be located during installation. The Contractor shall survey pipe invert of gas, water, sanitary sewer, storm drains, roof drains and culverts and top of duct bank of electrical power and communications lines and associated fixtures (valves, manholes, test points, meters, cathodic protection points, tanks, ground points, and all point features along the new utility lines). Storm drains and sanitary sewer lines shall be surveyed where pipes enter manholes and inlets and at 100-foot maximum intervals along the line. The inverts of all cleanouts and tees shall be surveyed.

Inverts at each end of culverts shall be surveyed. Electrical power, communications, gas and water lines shall be surveyed at all manholes, tees, valves, corners, changes in direction and at intervals along the line which will accurately depict the location of the line in both horizontal and vertical directions (50-foot maximum interval). The horizontal and vertical accuracy shall be as indicated in the GIS requirements in 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS. New underground utility lines shall be shown as 3-dimensional elements in both the electronic as-built files as well as the required GIS files as indicated in 01 33 39.00 10 ADVANCED MODELING

(BIM/CIM/GIS/CAD) REQUIREMENTS.

3.2.2 Structures

Structures above and below ground shall be shown. The size, material make-up, location, height, and/or depth shall be shown. Manholes shall show rim elevation and invert elevations as applicable. Power poles shall show electrical equipment, guy wires, and voltage rating.

3.2.3 Grades

Grade or alignment of roads, structures, or utilities shall be corrected if any changes were made from the contract drawings. Elevations shall be corrected if changes were made in site grading. If any grades are finalized outside of the respective grades tolerances, that new grade shall be shown on the as-builts.

3.3 STRUCTURAL

3.3.1 Steel/Concrete

Shop drawings that deviate from the accepted design drawings shall be incorporated in the As-Built Drawings.

3.4 MECHANICAL

3.4.1 Ductwork

Ductwork shall be shown to reflect actual installation and duct size.

Ductwork routing changes shall be shown.

3.4.2 Plumbing

Piping and fixtures shall be shown to reflect the type of material, size and the route or location.

SECTION 01 78 39.00 24 Page 12Am #0005

3.5 ELECTRICAL

3.5.1 PANELS

All accepted design drawing panel schedules shall be revised to show as-built conditions. Home-run circuit designation on electrical drawings shall accurately correspond to the as-built panel schedules.

3.5.2 Controls

All control diagrams in accepted design drawings shall be revised to reflect as-built conditions, and setpoints.

3.6 CONTRACTOR SHOP DRAWINGS

Contractor shop drawings, which supersede data on the accepted design plans and/or additional drawings, prepared by the Contractor, shall be incorporated into the As-Built Drawings. Design plans prepared by the Contractor shall include the designer's name on the As-Built Drawings.

-- End of Section --

SECTION 01 78 39.00 24 Page 13Am #0005

Air Force CyberWorx US Army Corps of Engineers US Air Force Academy, CO XQPZ164001

Section 01 81 00 Page 1

SECTION 01 81 00

SUMMARY OF THE WORK

PART 1 SUMMARY OF WORK

1.1 PROJECT DESCRIPTION

1.1.1 Function of Facility

The Air Force CyberWorx is to support training of cadet candidates, permanent party, other governmental partners and business partners. The goal is to achieve the unity of effort required to prevent malicious, covert attempts to interrupt and compromise the functional capacity of the DoD networks and Cyber Domain. The process of monitoring, identifying, and countering these attacks will require a collaborative environment within which elements of all cyber activities can be represented, in a collocated manner while executing passive, active, and defensive network operations.

This facility will incorporate new technologies and processes that will generate beneficial synergies through integration and collaboration.

Through an open work environment that incorporates scalable, reconfigurable work spaces, cyber assets will be able to achieve both actual and virtual collaboration while maintaining their functional discipline

1.1.2 Building Arrangement

CyberWorx will use the USAFA IFS as the basis for the design. However, the scale of the building will not allow a copy of adjacent buildings. USAFA desires a facility that will look like a logical extension of the original design of the Cadet Area. The building should be considered as a 'pavilion' on a raised plinth above the parade field. Additionally, the building exterior design shall project an exciting image commensurate with the creative work being done in the facility. Likewise, the interior shall encourage creativity and collaboration through its design similar to creative environments at Google or Walt Disney Imagineering as examples. The building must ultimately be reviewed by both the Colorado Historical Society (Colorado SHPO) and the National Park Service, therefore the building must be compatible with the Cadet Area and Design Standards.

See RFP Section 01 82 00 ARCHITECTURAL BUILDING REQUIREMENTS for additional canopy requirements pertaining to free spans and proportions.

1.1.3 Demolition (OBI # 5)

Demolish existing building 2413 in accordance with Environmental Assessment.

1.2 GOALS, OBJECTIVES AND REQUIREMENTS

1.2.1 Requirements During Construction

It shall be required that construction of the CyberWorx be constructed in a manner that meets the constraints described below. At the end of each

Am #0005

Section 01 81 00 Page 2 work night, the job site will be cleaned up and left in a presentable manner, clear of debris and material stacked in an orderly fashion.

The Contractor shall maintain traffic safety at all times. Traffic control shall be in accordance with all requirements of the Manual on Uniform Traffic Control Devices (MUTCD)and EM 385-1-1.

1.2.1.1 Non-Overhead Construction

Not Used.

1.2.1.2 Overhead Structural Construction

Not Used.

1.2.2 Codes

All pertinent building codes and Life Safety codes shall be met or exceeded.

The more stringent code requirement shall be followed when apparent conflict exists among codes. Questions involving any conflicting code criteria which cannot be resolved by following the most stringent requirement will be presented, with recommendations for resolution, to the Government. Any building code or standard refers to the authority having "jurisdiction" or "governmental authority", this reference shall be interpreted as referring to the Contracting Officer.

1.2.3 Building Durability

Materials and equipment incorporated in the project must have a documented historical performance record for long term durability, with minimal or no maintenance requirements. The canopy design shall conserve natural and manmade resources, and energy usage.

1.2.4 Changes to RFP Criteria Requirements

This Request for Proposal provides requirements expected of the design-build Contractor during the design and construction of this project.

The RFP drawings present an overall design concept of the project, provide useful project information, establish some definition of the systems to be used, and incorporate requirements expected by the Using Service.

It shall be the responsibility of the design-build Contractor to assemble the best-valued-priced construction systems for this project that meet or exceed the design criteria set forth herein.

Offerors should not consider changes to RFP criteria requirements during proposal preparation. After contract award, any changes to the RFP criteria requirements require approval by the Contracting Officer.

See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.

1.2.5 Sustainable Design

Section 01 81 00 Page 3

LEED certification is not required.

Comply with Air Force sustainable design and development (SDD) criteria as follows:

Comply with all the Federal sustainability requirements as detailed in UFC 1-200-02, High Performance and Sustainable Building Requirements.

Design Build Contractor is responsible for all costs and activities required to successfully third-party validate that all of the Federal/UFC requirements have been met using the DoD version of either the US Green Building Council (USGBC)/Green Business Certification Inc. (GBCI) Guiding Principles Assessment or Green Building Initiative (GBI) Guiding Principle Compliance (GPC) system.

(See specification section 01 33 29.05 20) [*Am-5] Use the AF Sustainability Requirements Scoresheet (attached – provided checklist is for information only) to track and report project compliance status at all design/construction submittals; and submit the Microsoft Excel scoresheet, along with the design analysis to AFCEC.CF.SustainableRpt@us.af.mil in conjunction with each design submission and when construction is complete.

If energy net-zero is not achieved with this project, energy goals beyond the minimum 30% energy consumption reduction to be considered so that when renewable energy generation is added to the facility the long-term goal can be achieved. Reference NREL/DOE RPF developed for Fort Carson army barracks at:

Https://www1.eere.energy.gov/buildings/publications/pdfs/rsf/annotated_r fp_ftcarson.pdf

The building to be renewable energy ready.

1.2.5.1 LIFE-CYCLE COST ANALYSIS (LCCA).

The purpose of the LCCA methodology as detailed in CFR Title 10 Part 436 Subpart A is to identify and compare life-cycle cost-effective (LCCE) building energy and water systems that will in total achieve the energy and water requirements stated in this document. An LCCA is required for the following:

1. Energy consuming systems (ex: HVAC systems)

2. Renewable energy generating systems (ex: photovoltaic panels)

3. When LCCE is selected as the reason any requirement of the AF

Sustainability Requirements Scoresheet is "Partially compliant" or "Not Applicable" (reference paragraph 4-2). The LCCA methodology may also be used to evaluate multiple options, such as selecting the building construction type and comparing compliant materials; and is at the discretion of the project team.

1.2.5.2 LCCA Format.

Prepare the LCCA in accordance with CFR Title 10 Part 436, Subpart A and NIST Handbook 135 "Life-Cycle Costing Manual for the Federal Energy Management Program". The LCCA must be prepared using the Building Life- Cycle Costing (BLCC) program, available from the National Institute of

Section 01 81 00 Page 4

Standards and Technology (http://energy.gov/eere/femp/building-life-cycle-cost-programs). The implied long-term inflation rate and discount rates identified in the Annual supplement to NIST Handbook 135 must be used. A link to BLCC can also be found at the Department of Energy's building energy tools web site: http://energy.gov/eere/femp/building-life-cycle-cost-programs.

1.2.5.3 LCCA Building-Level Analysis.

Any building-level LCCA must be calculated using a maximum of a 40-year building life and equipment lives based on accepted industry averages.

Individual components or systems life expectancies must be reflected by inclusion of appropriate replacement and salvage values in the appropriate year of this analysis.

1.2.5.4 LCCA Individual Component or System Alternatives Analysis.

LCCAs comparing at least three individual component or system alternatives must use the estimated life of the mutually exclusive alternative having the longest life, not to exceed 40 years from the beginning of beneficial use or the lowest common multiple of the expected lives of the alternatives. Include the appropriate replacement and salvage values for each of the other alternatives. A number of tools comparing energy system alternatives and evaluating specific efficiency measures may be of benefit in performing energy efficiency calculations. Perform this analysis based on the actual conditions expected over the life of the facility including anticipated occupancies, scheduled hours of operation and process loads. Use UFC 3- 410-01 Appendix E.

1.2.5.5 Energy Consumption Reduction Requirement:

Meet the requirements of ASHRAE 90.1-2013.

Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1-2013 baseline.

If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.

Determine energy consumption levels for both the ASHRAE Baseline Building and proposed building alternatives by using the Performance Rating Method found in UFC 1-200-02.

1.2.5.6 Energy Compliance Analysis (ECA).

In the design analysis, include an ECA which demonstrates compliance with all energy related requirements in UFC 1-200-02. Identify the specific energy efficiency criteria that apply to the project, the software used to prepare the necessary calculations, a summary of all input to and output from the calculations, and the calculated baseline and as-designed building energy consumption of the proposed design.

Include in the ECA a completed "Performance Rating Report" as shown in Appendix G of the ASHRAE 90.1 "User's Manual." Building-level energy consumption calculations must be performed using a computer program or programs that integrate architectural features such as windows for daylighting, air-conditioning, heating, lighting, and other energy

Section 01 81 00 Page 5 producing or consuming systems. These programs must be capable of simulating the features, systems, and thermal loads used in the design.

Include the energy savings and any parasitic energy loads associated with the utilization of recovered energy, solar heat, solar photovoltaic energy and other renewable or waste heat applications. The program must be capable of performing 8,760 hourly calculations. The Department of Energy (DoE) maintains a list of building energy tools for design (such as eQuest).

1.2.5.7 ECA Narrative Requirements.

ECA LCCA narratives must be prepared by each of the following individuals: the Lead Project Architect, Lead Project Mechanical Engineer, and the Lead Project Electrical Engineer. List in each of the three narratives the conservation features considered for that discipline; conservation measures adopted in the design; and any supporting LCCA calculations.

1.3 FACILITY TYPE AND SIZE

1.3.1 Facility Type

Air Force CyberWorx includes administrative support, offices, Innovation Think Tank, air/Unmanned Aerial Vehicle (UAV) operations & connectivity to air/UAV, Conference & Breakout Rooms, Student Lounge, Classrooms, Secured Area, Digital Forensics & Reverse Engineering Lab, Autonomous & Embedded Systems Lab, Cyber Security Lab, Telecommunications Lab, Industrial Control Systems/Supervisory Control & Data Acquisition Lab, Policy/Strategy/Law Lab, air/UAV Lab & support space requirements.

The Optional Bid Items include an addition for Classrooms, Cyber Training, Breakout Rooms, Collaboration Areas, Third Floor Mezzanine & support space requirements. It also relocates the second floor vestibule.

1.3.2 Facility Size

The CyberWorx project is programmed at 33,024 sqft. (3,068 SM). The building cannot exceed the programmed area.

The Addition Bid Option (OBI# 13 & 14) includes an additional 14,705 sqft

(1,366 SM).

1.4 DRAWINGS

Drawings of the site area and the floor plan are included for use in developing this design.

The Addition Bid Option (OBI# 13 & 14) drawings are included. The drawing index identifies the drawings to be used for the MILCON funded project and the Addition Bid Option. The Addition Bid Option drawings also includes other Bid Option items listed on the CLIN Schedule.

1.5 OPERATION AND MAINTENANCE REQUIREMENTS

Section 01 81 00 Page 6

1.5.1 Operation and Maintenance Manuals

The intent of the O&M Manuals is to document the operations and maintenance requirements of the products incorporated into the construction of the project. These manuals promote and maximize the efficiency, economy, safety, and effectiveness of the life cycle operation, maintenance, and repair of the facility. Operation and maintenance manuals shall be required and specified within the Technical specification provided by the D/B Team during completion of the design.

1.6 OVERVIEW OF DESIGN-BUILD PROCESS

1.6.1 Overview

Since the early 1980s Congress has urged the military services to explore alternative construction methods, such as "Design-Build," which includes both design and construction under a single contract. This process is similar to "one-step turnkey selection procedures" and is defined in Title 10 of the United States Codes, Section 2862.

1.6.2 Process

The design-build process uses a Request for Proposal (RFP) to solicit for design and construction of a facility by a single contractual entity, such as a design-build firm, or joint venture between architect-engineer (A-E) and construction firm, or a construction management (CM) firm joint venture with an A-E and a construction firm. A design-build RFP states the project functional requirements, design and engineering criteria, technical performance specifications, and proposal evaluation factors.

Potential contractors develop their proposals for the government to evaluate competitively, with the contract award based on a combination of technical merit and price.

In general, the RFP is a conceptual design document and the Contractor is responsible for completing the design and constructing the project.

The plans provided in this Request for Proposal (RFP) shows the User's intent and expectations. The RFP has developed the site plan and building design and establishes the architectural character and proportions required by the USAFA.

The Contractor will be required to coordinate and adjust final dimensioning, detailing, furniture arrangements and other items necessary to make this a usable facility in accordance with the furnished RFP drawings. The design, with permitted flexibility for detailing and constructability, must be carried through to construction. The design-build contractor is responsible for all design on the project.

The RFP furnished design drawings may be used by the Contractor. However, the Contractor agrees to hold the Government harmless in acceptance of these drawings. It shall be the design-build Contractor's responsibility to verify all dimensions, AutoCAD drafting, BIM Modeling and accuracy for the design drawings prepared by the design-build Contractor.

After award of the contract, the design-build contractor will prepare a series of design submittals for review by the Government, so that design and criteria compliance can be effectively monitored for compliance.

Section 01 81 00 Page 7

After approval of the final design, construction can…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .