W9128F20R0039_FORT_PECK_GSU_INSTALL_BW PLANSET.pdf

PDF 31 MB Posted

Attached to
GSU Transformer Installation at Ft. Peck Powerhouse, MT
Solicitation number
W9128F20R0039
Issued by

About this file

This document provides details on a federal contract solicitation for GSU transformer installation work at Fort Peck Powerhouse in Montana. The Army Corps of Engineers Engineering District Omaha is seeking bids to remove existing GSU transformer banks and oilostatic feeders, move two government furnished equipment transformers to new locations, provide new feeders and connections for the transformers, and install new group-operated disconnect and protection/control/annunciation wiring to make the equipment fully operational. A virtual site visit was scheduled for July 21, 2020 and the solicitation will close on August 11, 2020. The estimated construction cost is between $5 million and $10 million. The primary NAICS code is 237130 for power and communication line structure construction with a $36.5 million size standard for small businesses. Interested parties can obtain the solicitation documents through the beta SAM website by searching for the solicitation number.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Omaha District of Engineers

US Army Corps

FORT PECK DAM

LOCATION

PROJECT

BY GOOGLE MAP

AREA OF WORK

THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON

THIS PROJECT WAS DESIGNED BY THE HYDROELECTRIC DESIGN CENTER OF THE U.S. ARMY CORPS OF

GSU TRANSFORMER INSTALLATION

MISSOURI RIVER

PROJECT SITE MAP

FORT PECK PROJECT - SWITCHYARD 1

JORDAN S. FINK, P.E.

CHIEF, ELECTRICAL BRANCH

STEVEN R. MILES, P.E.

DESIGN CENTER

DIRECTOR, HYDROELECTRIC

DATE

APPROVED BY:SUBMITTED BY:

JAMES D. CALNON, P.E.

CHIEF, MECHANICAL/STRUCTURAL BRANCH

DATE

SUBMITTED BY:

DATE

CONTRACT NO:

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

S

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -0

X X

X .d g n

C

G

IE

R E

K R S

H A

N K P

E

C O

V E

R S

H E

E T

A N

D V

IC

IN

IT

Y M

A P

S

F O

R T P

E C

K P

R O J E

C T L

O C

A T

IO

G-001

G

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

F P

P -1 .0

-0 -0

A /1

F O

R T P

E C

K D

A M

W

F

R

W9128F20R0039SOLICITATION NO:

JULY 06 2020ISSUE DATE:

/0

/0

LOCATION MAP

SCALE: NTS

LOCATION MAP

SCALE: NTS

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

G-001SHEET NAME:g2hdcevh Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 12:44:01 PM

OMAHA DISTRICT

K P

F

/0

/0

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

T

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -0

X X

X .d g n

C

G

IE

R E

K R S

H A

N K

IN

D

E X O

F C

O N

T R

A C

T D

R A

W

IN

G S

G-002

N .T .S

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-0 -0

A /2

F O

R T P

E C

K D

INDEX TO DRAWINGS

FILE NUMBER

NO.

SHEET

TITLE

INDEX TO DRAWINGS

GENERAL

FILE NUMBER

NO.

SHEET

TITLE

STRUCTURAL DEMOLITION

STRUCTURAL INSTALLATION

ELECTRICAL DEMOLITION

ELECTRICAL INSTALLATION

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

1 2 3 4 5 6

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

G-002SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:13:45 AM

/0

/0

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -0

X X

X .d g n

C

G

IE

R E

K R S

H A

N K

IN

E X O

F R

E F

E R

E N

C E D

R A

W

IN

G S

G-003

N .T .S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-0 -0

A /3

F O

R T P

E C

K D

A M

FILE NUMBER TITLE

REFERENCE

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

FILE NUMBER

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

REFERENCE (CONT.)

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

G-003SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:07 AM

GENERAL AREA OF WORK

EQUIPMENT (GFE) TRANSFORMER KZ2A

FOR GOVERNMENT FURNISHED

APPROXIMATE AREA OF WORK

EQUIPMENT (GFE) TRANSFORMER KY4A

FOR GOVERNMENT FURNISHED

APPROXIMATE AREA OF WORK

NOTES:

SWITCHYARD 1

050' 50'

SCALE: 1"= 50'

CABLE TUNNEL

EXISTING

EXISTING SWITCHYARD 1

TAILRACE DECK

FLOW

BANK-2 BAY

TRANSFORMER

BANK-3 BAY

TRANSFORMER

BANK-4 BAY

TRANSFORMER

RETAINING WALL

CABLE TUNNEL

EXISTING

FENCE LINE

EXISTING SWITCHYARD 1

WHATELY LINE

69 KV

COULEE LINE

RICHARDSON-

161 KV

TAILRACE DECK

FLOW

BANK-2 BAY

TRANSFORMER

BANK-3 BAY

TRANSFORMER

WOLF POINT

34.5 KV

RETAINING WALL

LINE 2

WOLF POINT

115 KV

LINE 1

WOLF POINT

115 KV

TAILRACE DECKFLOW

FLOOD TUNNEL WALL

SURGE TANK

SECOND POWER HOUSE

SECOND POWER HOUSE

TAILRACE DECKFLOW

FLOOD TUNNEL WALL

EL. 2070.0EL. 2070.0

LINE

DAWSON COUNTY

230 KV

LINE

DAWSON COUNTY

230 KV

FIRST POWERHOUSE

115 KV TIE-LINE

PARKING

SURGE TANKS

TRANSFORMER RAILS

EXISTING

FORT PECK POWERHOUSE AND SWITCHYARD - PROJECT PLAN VIEW

DRAWING NO. TITLE

REFERENCE DRAWINGS:

MFP-OPN93E165.1

EQUIPMENT ARRANGEMENT

230 KV, 161 KV, AND 115 KV STRUCTURES

SWITCHYARD 2

POSSIBLE CONTRACTOR STAGING AREA

N

STRUCTURE

161 KV SWITCHYARD

STRUCTURE

115 KV SWITCHYARD

4. SWITCHYARD 1 IS BUILT ON FILL.

3. STAGING AND ACCESS TO BE COORDINATED AS SPECIFIED.

AND INSTALLATION DRAWINGS FOR DETAILED CONTRACT SCOPE.

2. BOLD ITEMS INDICATE SIGNIFICANT AREAS OF WORK. SEE DEMOLITION

AREAS OF WORK IN SWITCHYARD 1 AND POWERHOUSE 1.

1. THIS DRAWING INDICATES GENERAL PROJECT ARRANGEMENT AND THE

/0

/0

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -0

X X

X .d g n

C

G

IE

R E

K R S

H A

N K

L A

N V

IE

W

O V

E R

A L L P

R O J E

C T A

R R

A N

G E

M E

N

G-004

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-0 -0

A /5

F O

R T P

E C

K D

A M

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

G-004SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:30 AM

EL. 2070.0

504.8939504.8939504.8939 504.8939504.8939504.8939 504.8939504.8939504.8939

EXISTING TRANSFORMER KV7A

NOTES:

CLARITY

PADS AND ARE NOT SHOWN FOR

LENGTH OF THE TRANSFORMER

EXISTING RAILS EXTEND THE

EXISTING FENCE

EL. 2068.0

APPROXIMATELY

EL. 2060.0

APPROXIMATELY

EXISTING ROAD

5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

KEY PLAN

NO SCALE

WORK AREA

FOUNDATION

EXISTING

EXISTING UNUSED TRANSFORMER FOUNDATIONS

EXISTING YARD GRADING

FOUNDATIONS

EXISTING LIGHTING

EXISTING GROUND GRID

SYSTEM

EXISTING DRAINAGE

EXISTING LAWN SPRINKLER

UNDER THIS CONTRACT

RAILS TO BE REMOVED

EXISTING TRANSFORMER

TRANSFORMER BANK 2 BAY TRANSFORMER BANK 3 BAY TRANSFORMER BANK 4 BAY

P L

A N

T N

O .1

FLOW

N

DRAWINGS

REFERENCE

VARIOUS

CONDUIT SEE

EXISTING BURIED

DRAWINGS

REFERENCE

SEE VARIOUS

FOUNDATIONS.

STRUCTURAL

EXISTING

DURING SITE WORK.

5. CONTRACTOR IS RESPONSIBLE TO REPAIR ANY UTILITY DAMAGED

4. FOR GROUND GRID REPAIRS SEE SPECIFICATION 26 05 26.00 26.

AT ALL AREAS WHICH REQUIRE EXCAVATION.

3. PERFORM A GROUND RADAR (GPR) SCAN WITHIN SWITCHYARD 1

IMPACT TO EXISTING UTILITIES.

2. ALL DEMOLITION AND SITE WORK TO BE ACCOMPLISHED WHILE MINIMIZING

REQUIREMENTS.

1. INDICATES AREA OF WORK. REFER TO SPECIFIC DETAILED DRAWINGS FOR

/0

/0

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -0

X X

X .d g n

C

G

IE

R E

K R S

H A

N K

A

N V

IE

W

S W

IT

C H

Y A

R D U

T

IL

IT

Y M

A

G-005

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-0 -0

A /6

F O

R T P

E C

K D

A M

SWITCHYARD 1 UTILITY MAP - PLAN VIEW

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

G-005SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:37 AM

IF USED

CUBICLE NO.

EQUIPMET

THE UTILIZATION

CIRCUIT NO. TO

DESIGNATION

DESTINATION EQUIP.

VOLTAGE OR USAGE CODE

CUBICLE NO. IF USED

DESIGNATION

SOURCE EQUIP.

TO PANEL

INTERNAL

LEAVES PANEL

CABLE TO SX2

EXTERNAL

SB1()-e1-SU1() u = INSTRUMENTATION t = COMMUNICATION CIRCUIT s = SPARE r = 120 OR 208VAC q = 480VAC h = 120V PREFERRED AC _/fo-MM = FIBER OPTIC MULTI MODE, _ NUMBER OF FIBER STRANDS _/fo-SM = FIBER OPTIC SINGLE MODE, _ NUMBER OF FIBER STRANDS f = 250VDC e = 125VDC c = CONTROL

INPUT - SOLID-STATE ELEMENT OR DEVICE

OUTPUT - SOLID-STATE ELEMENT OR DEVICE

K

DISCONNECT SWITCH

SWITCHYARD MOTOR OPERATED

115kV SWITCHYARD CIRCUIT BREAKER

EQUIPMENT ENCLOSURE

SURGE ARRESTER

SURGE CAPACITOR

RESISTOR

AIR CIRCUIT BREAKER

RATIO AS SHOWN

CURRENT TRANSFORMERS, NUMBER AND CURRENT

AND VOLTAGES AS SHOWN

POTENTIAL OR CONTROL TRANSFORMERS, NUMBER

CONNECTION TO GROUND BUS

CONTACTS (NORMALLY OPEN)

CONTACTS (NORMALLY CLOSED)

FUSE

TRANSFORMER (CONTROL DIAGRAM)

POWER TRANSFORMER (ONE LINE DIAGRAM)

DISCONNECT SWITCH

TEST BLOCK

AMMETER SWITCH

DISCONNECTING DEVICE, DISCONNECTING CONTACT

VOLTMETER SWITCH

SYNCHRONIZING SWITCH (I=INCOMING, R=RUNNING)

SPARE WIRE(S)

DRAWOUT CIRCUIT BREAKER

RESISTOR OR SHUNT TRIP ELEMENT

DRAWOUT CIRCUIT BREAKER WITH INTERLOCKS

A=AMBER

INDICATING LIGHT: R=RED, G=GREEN, W=WHITE,

DETAILS, ELEVATIONS)

OR TURNED AWAY FROM OBSERVER (PLANS,

NON-SEGREGATED PHASE BUS TURNED TOWARDS

INVERTER OR RECTIFIER

SWITCH

2-POSITION SELECTOR SWITCH OR TRANSFER

DIRECTION OF KEY TRANSFER

BREAKER KEYED INTERLOCK

DEVISE OPEN. (WITH KEY REMOVED)

KEY INTERLOCK USED TO LOCK

DEVISE OPEN. (WITH KEY HELD)

KEY INTERLOCK USED TO LOCK

BREAKER MECHANICAL INTERLOCK

480-120

200:5

VS

SS

I R

AS

TB

SP

OR

M

L-0

L-0

R

REQUIRED WIRE LABELING

PCC

WIRE LABEL

AS SHOWN ON DRAWING

PCC

WIRE LABEL

TERMINAL BLOCK

PCC2

PCC

WIRE LABELING

NOT INCLUDE THE PANEL IN PARENTHESIS.

NOT REQUIRED TO BE LABELED. WIRES INTERNAL TO A PANEL DO

SHORT JUMPERS WHERE THE JUMPERS ARE ENTIRELY VISIBLE ARE

FORMAT: WIRE NAME/DEVICE OR TERMINAL BLOCK-TERMINAL(PANEL).

PCC/SX2/C8

PCC/SC4/AQ-1

PCC/BB-6

BB-6

AQ-1(SC4)

FT1

RELAY I/O TEST SWITCH

GENERAL NOTES:

GRAPHIC SYMBOLS LEGEND (CONT.)GRAPHIC SYMBOLS LEGEND

WIRE NAME/DESTINATION CABINET OR DEVICE/TERMINAL BLOCK-TERMINAL#.

8. CONTRACTOR SHALL LABEL WIRES AS FOLLOWS:

7. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.

TABLE 250-122.

DRAWINGS OR IN THE CONDUIT AND CABLE SCHEDULES, SIZED PER NEC

ALL NEW FEEDERS AND BRANCH CIRCUITS WHETHER OR NOT SHOWN ON THE

CLUTTER FOR CLARITY, BUT ARE REQUIRED AND SHALL BE PROVIDED IN

6. EQUIPMENT GROUNDING CONDUCTORS MAY NOT BE SHOWN TO REDUCE DRAWING

DRAWING, THE INFORMATION ON THE INDIVIDUAL DRAWING SHALL GOVERN.

AND LEGEND APPEAR ON AN INDIVIDUAL DRAWING AND DIFFERS FROM THIS

APPLICABLE FOR ALL DRAWINGS. HOWEVER, IF SYMBOLS, DEVICE NUMBERS

5. SYMBOLS, DEVICE NUMBERS AND LEGEND SHOWN ON THIS DRAWING ARE

RESPOND ARE OF THE LOWEST VALUE.

IN THE DE-ENERGIZED POSITION OR WHEN QUANTITIES TO WHICH THEY

4. CONTROL DIAGRAMS SHOW CONTROL AND TRANSFER SWITCHES WITH CONTACTS

ON THE FOLLOWING INDIVIDUAL DRAWINGS.

3. ITEMS SHOWN ON THIS DRAWING ARE NOT ALL NECESSARILY REFERENCED

OTHERWISE NOTED.

2. CONDUITS AND BOXES ARE DIMENSIONED TO CENTERLINES UNLESS

OR AS NOTED.

WORK IS INDICATED BY HEAVIER WEIGHT LINES OR TEXT,

1. ON ALL SHEETS, REMOVAL WORK AND INSTALLATION

/0

/0

K F

L O

R E

N C

E P

E

S Y

M B

O L S A

N D L

E G

E N

D S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -0

X X

X .d g n

C

G

IE

R E

K R S

H A

N K

G-006

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-0 -0

A /7

F O

R T P

E C

K D

A M

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

G-006SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:43 AM

GSU TRANSFORMER KZ2A

TEMPORARY LOCATION OF

GSU TRANSFORMER KY4A

TEMPORARY LOCATION OF

GSU TRANSFORMER KY4A

PERMANENT LOCATION OF

SEE NOTE 5

SEE NOTE 4

GSU TRANSFORMER KZ2A

PERMANENT LOCATION OF

88'-11 7/8 "

/1

216'-5 13/16 "

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

G-100SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:49 AM

POWER PLANT 1

NOTES:

DRAWING NO. TITLE

REFERENCE DRAWINGS:

MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES

P L

A N

T N

O .1

KEY PLAN

SCALE: NTS

FLOW

WORK AREA

N

SWITCHYARD 1 - PLAN VIEW - ELECTRICAL

5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

AND OIL-FILLED.

6. MOVEMENT OF BOTH TRANSFORMERS SHALL OCCUR FULLY ASSEMBLED

PERMANENT LOCATION PER THE SPECIFICATIONS AND DRAWINGS.

5. MOVE GSU TRANSFORMER KY4A FROM CURRENT TEMPORARY LOCATION TO

PERMANENT LOCATION PER THE SPECIFICATIONS AND DRAWINGS.

4. MOVE GSU TRANSFORMER KZ2A FROM CURRENT TEMPORARY LOCATION TO

BIDDING PURPOSES ONLY.

AND PERMANENT LOCATIONS ARE APPROXIMATE AND INCLUDED FOR

3. DIMENSIONS SHOWN ON THIS DRAWING BETWEEN TEMPORARY STORAGE

2. TRANSFORMER LOCATIONS ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED.

OIL SPILL CONTAINMENT.

SWITCHYARD 1. BOTH TRANSFORMERS HAVE BEEN PROVIDED WITH TEMPORARY

1. TRANSFORMERS KY4A AND KZ2A ARE FULLY ASSEMBLED, OIL-FILLED, AND LOCATED IN

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

G -1

X X

X .d g n

C

G

IE

R E

K R S

H A

N K P

E

IN

S

T A

L L

P L

A N V

IE

W T

R A

N S

F O

R M

E R L

O C

A T

IO

N S

S W

IT

C H

Y A

R D

G-100

/1

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-6 -1

A /4

F O

R T P

E C

K D

A M

/0

/0

504.8939504.8939504.8939 504.8939504.8939504.8939

RAILWAY TIES. SEE S-901

REMOVE RAILS AND

SEE NOTE 2

NOT SHOWN

RAILWAY TIES

AND TIES

EXISTING RAILS

AND REMOVE

EXCAVATE

NOTES:

POWER PLANT 1

OMKIGDCBA F

EC

NK LJH

KV7A

G C

B

G C

B

G C

B

G C

B

G C

B

G C

B

COULEE LINE

RICHARDSON WHATELY LINE

FLOW

TRANSFORMER 3 BAY TRANSFORMER 4 BAYTRANSFORMER 2 BAY

5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

P L

A N

T N

O .1

KEY PLAN

NO SCALE

FLOW

WORK AREA

N

DRAWING NO. TITLE

REFERENCE DRAWINGS:

MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES

GCB 762

SWITCHYARD NO.1 - STRUCTURAL DEMOLITION - PLAN VIEW

/0

/0

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P

E

A N

S I F

F P F P

P -1 .0

S

D

X X

X .d g n

C

G

IE

R E

K

B S

T O

L T P

E

A

M U

E H

L E

C K P .E

R E

M O

V A

L P

L A

N V

IE

W

S W

IT

C H

Y A

R D S

T R

U C

T U

R A

L D

E M

O L

IT

IO

SD101

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-4 -0

A /1

F O

R T P

E C

K D

A M

EXCAVATION ACTIVITIES AND AS PART OF BACKFILL OPERATIONS.

IN ACCORDANCE WITH SECTION 26 05 26.00 26 ONLY AFTER COMPLETION OF

3. MINIMIZE DAMAGE TO GROUNDING GRID. REPAIR AND RETEST THE GROUNDING GRID

SURFACING ROCK.

BACKFILL ALL LOCATIONS TO MATCH THE SURROUNDING GRADE WITH SWITCHYARD

MINIMIZE ADDITIONAL REMOVAL OF THE EXISTING STRUCTURAL FOUNDATIONS AND

AT A MINIMUM, CUT FOUNDATIONS BELOW THE SWITCHYARD GRAVEL SURFACING.

SHOWN. PROVIDE CLEAN CUT LINES AND MEET THE REQUIREMENTS OF 03 60 00.01 26.

2. REMOVE EXISTING SIDEWALKS, RAIL TIES, AND FOUNDATIONS AS NECESSARY AND

CONTRACT. TRANSFORMERS ARE NOT SHOWN FOR CLARITY.

1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED UNDER THIS

SD501

A

SD501

A

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

SD101SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:57 AM

TUNNEL

EXISTING CONCRETE

8'-0"

FOUNDATION AREA

REMOVE RAILS AND TIES OVER

PAST FOUNDATION FOOTPRINT

SLOPE SIDES AS REQUIRED

(APPROXIMATELY 1'-6" BELOW GRADE)

EXISTING CONCRETE TUNNEL

TUNNEL ELEVATION. SEE SECTION C.

TRANSFORMER FOUNDATIONS TO TOP OF

APPROXIMATED. DEMO EXISTING

EXISTING TRANSFORMER FOOTING LOCATIONS

TUNNEL

EXISTING CONCRETE

EL. 2066.52

APPROXIMATE

TO CONTROL JOINT

REMOVE CONCRETE

RACEWAY

ABANDONED

RAILWAY ATTACHMENTS

REMOVE AND DISPOSE OF

ELEVATION PRIOR TO DEMOLITION.

FIELD VERIFY TOP OF TUNNEL

WITHIN 12" OF TOP OF TUNNEL.

DO NOT IMPACT CONCRETE

DO NOT BENCH

DIMENSIONS SHOWN

SLOPE TO MEET

8'-0"15'-0"

4'-6"

CONTROL JOINT

M

IN

L

IM

IT

O

F E

X C

A V

A T

IO

N F

O R K

Y

A A

N D K

Z

A F

O U

N D

A T

IO

N S

36'-0" MIN LIMIT OF EXCAVATION FOR KY4A FOUNDATION (CENTERED OVER TRANSFORMER PAD)

PER EM 385-1-1

FOOTPRINT

PAST FOUNDATION

SLOPE AS REQUIRED

F

R

U

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

OMAHA DISTRICTOMAHA DISTRICT

F

F P

P -1 .0

S

D -5

X X

X .D

G N

12" 0

"= 1'-0"2

1SCALE:

1' 2' 3' 4'

12" 0

"= 1'-0"2

1SCALE:

1' 2' 3' 4'

EL. APPROXIMATELY 2069.0

AREA OF SOIL EXCAVATION

EL. APPROXIMTELY 2069.0

TOP OF TUNNEL EL. 2067.5

CONCRETE REMOVAL LIMIT EL 2068.5

32'-8" MIN LIMIT OF EXCAVATION FOR KZ2A FOUNDATION (CENTERED OVER TRANSFORMER PAD)

F O

R T P

E C

K D

A M

M

IS

S O

U R I

R

IV

E R

S W

IT

C H

Y A

R D

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

R E

M O

V A

L S

O

IL

E

X C

A V

A T

IO

N A

N D C

O N

C R

E T

E R

E M

O V

A L

T R

A N

S F

O R

M E

R S K

Y

A K

Z

A

NOTES:

9. BOLD/GREEN INDICATES ITEMS TO BE REMOVED BY THE CONTRACTOR.

REQUIRED COMPACTION RESULTS.

THREE SEPARATE TESTS PER EACH LIFT ARE REQUIRED TO CONFIRM

EARTHWORK, PARAGRAPH 3.3, FILL PLACEMENT AND COMPACTION.

OF SUBGRADE TO FINAL GRADE ACCORDING TO SPECIFICATION 31 00 00

THE COMPACTION REQUIREMENTS, LOOSEN AND RECOMPACT TOP 12"

8. IF SUBGRADE IS DISTURBED DURING EXCAVATION OR FAILS TO MEET

COMPACTION RESULTS.

GRADE OF EXCAVATION ARE REQUIRED TO CONFIRM REQUIRED

ACCORDANCE WITH ASTM D698. THREE SEPERATE TESTS PER FINAL

PREPARED SUBGRADE MUST DEMONSTRATE 95% COMPACTION IN

DISTURBED. EXCAVATE AND PREPARE THE FINAL GRADE WITH CAUTION.

7. THE SUBGRADE AT THE BOTTOM OF SOIL EXCAVATION MUST NOT BE

DOES NOT BECOME DAMAGED.

DURING EXCAVATION ACTIVITIES TO ENSURE THE TUNNEL OR UTILITIES

GOVERNMENT REPRESENTATIVE SHALL BE PRESENT AT ALL TIMES

FOR REPAIRING ANY DAMAGES MADE DURING CONSTRUCTION. A

OF FOUNDATION INSTALLATION. THE CONTRACTOR IS RESPONSIBLE

6. EXISTING UTILITIES OR THE TUNNEL MAY NOT BE DAMAGED AS PART

STRUCTURAL FOUNDATIONS ARE NOT SHOWN ON THIS SHEET.

5. EXCAVATION FOR OIL PROCESSING VAULTS AND OTHER SWITCHYARD

WITHIN THE LIMITS OF EXCAVATION.

OF EXCAVATION. NOTIFY THE COR OF ANY IDENTIFIED UTILITIES

PENETRATING RADAR TO IDENTIFY ANY UTILITY LINES IN AREA

4. PRIOR TO EXCAVATION, THE CONTRACTOR SHALL USE GROUND

PROHIBITED DURING CONCRETE DEMOLITION.

THE USE OF JACKHAMMERS OR BLASTING MEDIA SHALL BE

CLEAN DEMOLITION LINES TO MAXIMUM PRACTICABLE EXTENT.

EXISTING CONCRETE TUNNEL. UTILIZE SAW CUTTING TO PROVIDE

AND EXCAVATION TO AVOID DAMAGING OR PLACING LOADS ON

3. CONTRACTOR SHALL TAKE CARE DURING CONCRETE DEMOLITION

VARIANCES.

PROBE PRIOR TO EXCAVATION, AND NOTIFY COR OF ANY ELEVATION

2. FIELD VERIFY TOP OF GRADE AND TOP OF TUNNEL ELEVATIONS BY

EXISTING TRANSFORMER PADS TO DEPTHS AS SHOWN ON THIS SHEET.

1. EXCAVATE SOIL FOR KY4A AND KZ2A FOUNDATIONS AND REMOVE

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

/0

/0

SD501

S T

E V

E N R

M

IL

E S P .E

A N

S I F

K W

K

K W

K

B P

S

SD-501

B

SCALE: 1/2"=1'-0"

SOIL EXCAVATION

SD-501

C

SCALE: 1/2"=1'-0"

CONCRETE DEMO

S D

B

S D

C

SD101

A

SCALE: 1/4"=1'-0"

PLAN - EXCAVATION LIMITS FOR KY4A AND KZ2A FOUNDATIONS

95% DQC REVIEWDRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

SD501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:04 AM

KY4A CONTAINMENT VAULTKZ2A CONTAINMENT VAULT

FRENCH DRAINFRENCH DRAINFRENCH DRAIN

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-101SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:12 AM

NOTES:

POWER PLANT 1

P L

A N

T N

O .1

KEY PLAN

NO SCALE

FLOW

WORK AREA

N

FLOW

DRAWING NO. TITLE

REFERENCE DRAWINGS:

MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES

5576.2-1A-11 FENCE AND GROUND MAT DETAILS

OMKIGDCB FA

NK LJH

EC

5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

SWITCHYARD NO.1 - STRUCTURAL PLAN VIEW

VAULT AS SHOWN.

5. PROVIDE A FRENCH DRAIN WHICH ROUTES WATER FROM THE OIL PROCESSING

CONTRACTOR.

4. BOLD/RED INDICATES WORK AND EQUIPMENT TO BE PERFORMED BY THE

3. GOVERNMENT SUPPLIED TRANSFORMERS NOT SHOWN FOR CLARITY.

2. SEE S-501 FOR FOUNDATION INSTALLATION REQUIREMENTS.

DETAIL DRAWINGS SHOWING EXACT FINAL LOCATION FOR APPROVAL.

1. APPROXIMATE TRANSFORMER FOUNDATION LOCATIONS ARE SHOWN. SUBMIT

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

S -1

X X

X .d g n

C

G

IE

R E

K

B S

T O

L T P

E

A

M U

E H

L E

C K P .E

IN

S

T A

L L

T R

A N

S F

O R

M E

R F

O U

N D

A T

IO

N L

A Y

O U

T

T R

A N

S F

O R

M E

R S K

Y

A K

Z

S-101

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-4 -0

A /2

F O

R T P

E C

K D

A M

/0

/0

A

S-503

S-502

SEE NOTE 2

MATERIAL,

EXPANSIVE

CONCRETE FILL NOT SHOWN FOR CLARITY

LIKE MATERIAL.

EXCAVATION WITH

COMPACT SLOPED

BACKFILL AND

PLACEMENT.

CONCRETE

REQUIRED FOR

FORM SIDE AS

1'-0"

6" MIN

BEND REBAR AT 90 DEGREES, TYP

GEOTEXTILE, SEE NOTE 3GEOTEXTILE, SEE NOTE 3

SPECIFICAITONS

IN ACCORDANCE WITH

COLD JOINT, PREP

LEAN CONCRETE

TRANSFORMER FOUNDATION

PROFILE OF EXISTING

4 INCHES BELOW GRADE

EL. 2068.66, APPROXIMATELY

PLACE CONCRETE FILL TO

4'-6"

CONCRETE

EXISTING TUNNEL

/1

M

IN

M

IN

MINIMUM EDGE DISTANCE OF 1'-0", TYP

SPACE #8 BENT REBARS @ 3'-0" MAXIMUM O.C. EW

GEOTEXTILE, SEE NOTE 3

F

R

E V

E N R

M

IL

E S P .E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

E R

F O

R T P

E C

K D

A

IT

C H

Y A

R D

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

12" 0

"= 1'-0"2

1SCALE:

1' 2' 3' 4'

F P F P

P -1 .0

S -5

X X

X .D

G N

IN

S

T A

L L

TYP

T Y

P

EL. APPROXIMATELY 2069.0

T R

A N

S F

O R

M E

R S K

Y

A K

Z

A

L E

A N C

O N

C R

E T

E F

IL

L T

Y P

IC

A L D

E T

A

IL

S

NOTES:

9. BOLD/RED INDICATES ITEMS TO BE INSTALLED BY THE CONTRACTOR.

8. REFER TO SD-501 FOR EXCAVATION DIMENSIONS FOR LEAN CONCRETE FILL.

7. ALL REBAR SHOWN SHALL BE ASTM A615, GRADE 60, #8 BARS.

6. INSTALL BENT REBAR AS SHOWN PRIOR TO SETTING OF CONCRETE.

5. FILL LEAN CONCRETE TO EL. 2068.66, APPROXIMATELY 4 INCHES BELOW GRADE.

THE NEXT LIFT.

CLEAN, SSD SURFACE IS REQUIRED IMMEDIATELY BEFORE PLACEMENT OF

AND PREPPED FOR SUBSEQUENT LIFT(S) IN ACCORDANCE WITH SPECIFICATIONS.

MAXIMUM OF 3 LIFTS. COLD JOINTS SHALL BE AS HORIZINTAL AS POSSIBLE,

MAXIMUM LEAN CONCRETE LIFT HEIGHT SHALL NOT EXCEED 3', FOR A

6". DEPOSIT LEAN CONCRETE EVENLY THROUGHOUT THE EXCAVATIONS.

BOTTOM OF PREPARED EXCAVATIONS. MAXIMUM CONCRETE DROP OF

4. DEPOSIT LEAN CONCRETE WITH A TREMIE PIPE, STARTING AT THE

LEAN CONCRETE, 1000-2000 PSI COMPRESSIVE STRENGTH AT 28 DAYS.

3. FILL IN EXCAVATED AREAS FOR KY4A AND KZ2A TRANSFORMERS WITH

MUST HAVE A COMPRESSIVE STRENGTH OF 25 PSI OR GREATER.

TOGETHER (JOINT TAPE SEALED) TO ENVELOPE CONCRETE TUNNEL. FOAM

1" THICK, 250 RIGID FOAM INSULATION SHEETS, BUTT CONNECTED

2. OVERLAY EXPOSED EXISTING TUNNEL CONCRETE SURFACES WITH

GRADE ELEVATION AND VERTICALY BEHIND TUNNEL EXPANSIVE MATERIAL.

PORTION. EXTEND GEOTEXTILE A MINIMUM OF 12" HORIZONTALLY OVER

HORIZONTAL JOINTS ARE USED, TOP PORTION MUST OVERLAY BOTTOM

ARE REQUIRED, MINIMUM OVERLAP DISTANCE OF 2 FEET IS REQUIRED. IF

(12 OZ. WEIGHT), SECURED WITH 6" STEEL PINS EVERY 12". WHERE JOINTS

1. PROTECT ALL EXCAVATED SOIL SURFACES WITH NONWOVEN GEOTEXTILE

/0

/0

S-501

A N

S I F

K W

K

B P

S K

W K

S

B

S-501

B

SCALE: 1/2"=1'-0"

LEAN CONCRETE FILL

S-501

A

SCALE: 1/4"=1'-0"

TOP OF TUNNEL PLAN - LEAN CONCRETE FILL

95% DQC REVIEWDRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:18 AM

FLOW

L

O W

F L

O W

FLOW

SEE SHEET S-504 FOR REINFORCEMENT DETAILS

TUNNEL

EXISTING CONCRETE

SEE NOTE 7

NEW ACCESS STAIRS.

CONCRETE TRANSFORMER PAD

12" CONTAINMENT WALL

SLOPE TO THE DRAIN

PROVIDE A 1.5%

FOR CLARITY

NOT SHOWN

QUENCHING STONE

TRANSFORMER OUTLINE

STONE TYP

12" QUENCHING

STAIRS

NEW ACCESS

FLOW

FLOW

FILL SURFACES, TYP

EXPOSED LEAN CONCRETE

COMPACT BACKFILL OVER

CONTROL JOINT, TYP.

CONTROL JOINT, TYP.

M

IN

TRANSFORMER FOUNDATION

FOR DETAILS.

CONTRACTOR. SEE S-506

TO BE DESIGNED BY

OIL PROCESSING VAULT

SEE SHEET S-505 FOR DETAILS

TRANSFORMER FOUNDATION

22'-6"

36'-0"

22'-0"

6'-0"

6" 1

6"

POWER PLANT 1

"= 1'-0"8

3SCALE:

12" 0 2' 4' 6'

"= 1'-0"8

3SCALE:

12" 0 2' 4' 6'

F P F P

P -1 .0

S -5

X X

X .D

G N

S W

IT

C H

Y A

R D

F O

U N

D A

T

IO

N P

L A

N S

E C

T

IO

N S

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

E R

F O

R T P

E C

K D

A

12" 0 2' 4' 6'

APPROXIMATE SOIL EL 2069.0

EL. APPROXIMATELY 2069.0 - MATCH EXISTING GRADE

T R

A N

S F

O R

M E

R K

Y

A

IN

S

T A

L L

NOTES:

S T

E V

E N R

M

IL

E S P .E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

W F

R

W F

R

PROVIDED.

VAULT ON DETAIL DRAWINGS. CHEMICALLY RESISTANT WATERSTOPS MUST BE

8. SHOW CONTROL CABLING WHICH WILL PENETRATE THE SLAB AND CONTAINMENT

GOVERNMENT.

ANCHORAGE TO CONTAINMENT WALL. COORDINATE FINAL STAIR LOCATION WITH

SPECIFICATION 05 50 04.00 26. PROVIDE NEW CONCRETE FOUNDATIONS AND DESIGN

7. CONTRACTOR TO PROVIDE NEW TRANSFORMER ACCESS STAIRS AS REQUIRED IN

APPLY WITH MANUFACTURER'S RECOMMEND METHOD.

MANUFACTURER'S RECOMMENDATION. PAINT WITH APPROVED COATING SYSTEM AND

PARTICLES, OR OTHER DEBRIS MUST BE FULLY REMOVED AND SURFACE PREPARED TO

DAMAGED LOCATIONS FOR PAINTING BY CLEANING TO BARE METAL. ALL RUST, LOOSE

SHOWN TO THE STEEL PLATE FOUNDATIONS. AFTER WELDING IS COMPLETE, PREPARE

6. AFTER THE TRANSFORMERS ARE INSTALLED, FIELD WELD THE TRANSFORMER AS

PRIMER COAT. REMOVE THIS PAINT PRIOR TO FIELD WELDING.

TO SHIPPING. IN AREAS WHERE WELDING WILL DAMAGE PAINT, ONLY PROVIDE THE

TRANSFORMER FOUNDATION. PAINT THE ASSEMBLY IN THE SHOP PRIOR

MINIMUM EMBEDMENT OF 12 INCHES. USE THESE ANCHORS TO LEVEL THE

WITH NELSON STUDS MAY BE USED TO PROVIDE SEISMIC ANCHORAGE. PROVIDE A

5. THREADED ROD AND EPOXY ANCHORS WITH GROUT OR CAST IN PLACE ANCHORS

MAY NOT BE DAMAGED AS PART OF FOUNDATION INSTALLATION.

TO SUPPORT THE NEW TRANSFORMER. EXISTING UTILITIES

4. INSTALL CONCRETE CONTAINMENT CURBING AND FOUNDATION

COATING.

3. PREPARE WELD LOCATION PER SPECIFICATIONS AND REPAIR WITH APPROVED

2. ALL METAL TO BE HOT DIP GALVANIZED IN SHOP UNLESS OTHERWISE INDICATED.

OIL FILLED COMPONENT IS 5' FROM THE EDGE OF CONTAINMENT.

1. LOCATE THE TRANSFORMER BASE AND PLATE FOUNDATION SUCH THAT ANY

/0

/0

A N

S I F

S-502

B P

S K

W K

K W

K

S-502

B

S-502

B

SCALE: 3/8"=1'-0"

SECTION

S-506

A

S-502

C

SCALE: 3/8"=1'-0"

SECTION

S

C

S-502

A

SCALE: 3/8"=1'-0"

PLAN - KY4A FOUNDATION

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:26 AM

SEE SHEET S-504 FOR REINFORCEMENT DETAILS

TUNNEL

EXISTING CONCRETE

1'-6"

FOR CLARITY

NOT SHOWN

QUENCHING STONE

CENTER THE PLATE ON THE PAD

SEE MOUNTING PLATE DETAIL

SEE NOTE 7

NEW ACCESS STAIRS.

AND BASE.

TRANSFORMER OUTLINE

SLOPE TO THE DRAIN

PROVIDE A 1.5%

12" CONTAINMENT WALL

6'-5"

6"

32'-8"

20'-0"

17'-0"

FLOW

F L

O W

FILL SURFACES, TYP

EXPOSED LEAN CONCRETE

COMPACT BACKFILL OVER

M

IN

S-506 FOR DETAILS.

CONTRACTOR. SEE

TO BE DESIGNED BY

OIL PROCESSING VAULT

CONTROL JOINT, TYP.

STONE (TYP.)

12" QUENCHING

SEE NOTE 7

NEW ACCESS STAIRS

TRANSFORMER OUTLINE NOT SHOWN FOR CLARITY.

TRANSFORMER FOUNDATION.

CONTROL JOINT, TYP.

FLOW

FLOWFLOW

F L

O W

F P

P -1 .0

S -5

X X

X .D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

E R

F O

R T P

E C

K D

A

U N

D A

T

IO

N P

L A

N S

E C

T

IO

N S

S W

IT

C H

Y A

R D

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

"= 1'-0"8

3SCALE:

12" 0 2' 4' 6'

"= 1'-0"8

3SCALE:

12" 0 2' 4' 6'

"= 1'-0"8

3SCALE:

12" 0 2' 4' 6'

APPROXIMATE SOIL EL 2069.0

MATCH EXISTING GRADE

EL. APPROXIMATELY 2069.0 -

T R

A N

S F

O R

M E

R K

Z

A

IN

S

T A

L L

NOTES:

S T

E V

E N R

M

IL

E S P .E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

W F

R

DRAWINGS. CHEMICALLY RESISTANT WATERSTOPS MUST BE PROVIDED.

8. SHOW DETAILS OF CONTROL CABLING WHICH WILL PENETRATE THE SLAB ON DETAIL

GOVERNMENT.

ANCHORAGE TO CONTAINMENT WALL. COORDINATE FINAL STAIR LOCATION WITH

SPECIFICATION 05 50 04.00 26. PROVIDE NEW CONCRETE FOUNDATIONS AND DESIGN

7. CONTRACTOR TO PROVIDE NEW TRANSFORMER ACCESS STAIRS AS REQUIRED IN

APPLY WITH MANUFACTURER'S RECOMMEND METHOD.

MANUFACTURER'S RECOMMENDATION. PAINT WITH APPROVED COATING SYSTEM AND

PARTICLES, OR OTHER DEBRIS MUST BE FULLY REMOVED AND SURFACE PREPARED TO

DAMAGED LOCATIONS FOR PAINTING BY CLEANING TO BARE METAL. ALL RUST, LOOSE

SHOWN TO THE STEEL PLATE FOUNDATIONS. AFTER WELDING IS COMPLETE, PREPARE

6. AFTER THE TRANSFORMERS ARE INSTALLED, FIELD WELD THE TRANSFORMER AS

PRIMER COAT. REMOVE THIS PAINT PRIOR TO FIELD WELDING.

TO SHIPPING. IN AREAS WHERE WELDING WILL DAMAGE PAINT, ONLY PROVIDE THE

TRANSFORMER PLATE FOUNDATION. PAINT THE PLATE ASSEMBLY IN THE SHOP PRIOR

MINIMUM EMBEDMENT OF 12 INCHES. USE THESE ANCHORS TO LEVEL THE

WITH NELSON STUDS MAY BE USED TO PROVIDE SEISMIC ANCHORAGE. PROVIDE A

5. THREADED ROD AND EPOXY ANCHORS WITH GROUT OR CAST IN PLACE ANCHORS

MAY NOT BE DAMAGED AS PART OF FOUNDATION INSTALLATION.

TO SUPPORT THE NEW TRANSFORMER. EXISTING UTILITIES

4. INSTALL CONCRETE CONTAINMENT CURBING AND PIER FOUNDATION

COATING.

3. PREPARE WELD LOCATION PER SPECIFICATIONS AND REPAIR WITH APPROVED

2. ALL METAL TO BE HOT DIP GALVANIZED IN SHOP UNLESS OTHERWISE INDICATED.

OIL FILLED COMPONENT IS 5' FROM THE EDGE OF CONTAINMENT.

1. LOCATE THE TRANSFORMER BASE AND PLATE FOUNDATION SUCH THAT ANY

/0

/0

S-503

A N

S I F

B P

S K

W K

K W

K

S-503

A

SCALE: 3/8"=1'-0"

SECTION - KZ2A FOUNDATION

S-503

B

S-503

B

PLAN - KZ2A FOUNDATION

SCALE: 3/8" = 1'-0"

S

C

SCALE: 3/8"=1'-0"

SECTION - KZ2A FOUNDATION

S-503

C

S-506

A

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-502SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:32 AM

SHEET S-510

ADD WATERSTOP PER

CONSTRUCTION JOINT, TYP

JOINT, TYP.

CONSTRUCTION

#6@ 12" O.C., TYP#6@ 12" O.C., TYP#6@ 12" O.C., TYP

6"

6"

#6 @ 12" O.C., TYP #6@ 12" O.C., TYP #6@ 12" O.C., TYP

JOINT, TYP.

CONSTRUCTION

SHEET S-510

ADD WATERSTOP PER

CONSTRUCTION JOINT, TYP

SHEET S-510

ADD WATERSTOP PER

CONSTRUCTION JOINT, TYP

VARIES

V A

R

IE

S 6"

6"

F

R

12" 0 2' 4' 6'

F P F P

P -1 .0

S -5

X X

X .D

G N

S-504

S W

IT

C H

Y A

R D

R E

IN

F O

R C

E M

E N

T P

L A

N S

E C

T

IO

N S

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

E R

F O

R T P

E C

K D

A

12" 0 2' 4' 6'

"= 1'-0"8

3SCALE:

12" 0 2' 4' 6'

IN

S

T A

L L

T R

A N

S F

O R

M E

R S K

Y

A K

Z

NOTES:

8. BOLD/RED INDICATES ITEMS TO BE REMOVED BY THE CONTRACTOR.

C. MINIMUM LAP SPLICE LENGTH = 33"

B. MINIMUM EDGE SPACING = 2"

A. MINIMUM BEND DIAMETER = 4.5"

REQUIREMENTS BELOW:

7. UNLESS OTHERWISE SHOWN, REINFORCEMENT SHALL MEET THE

WITH ACI 318.

6. REBAR STRENGTH SHALL BE ASTM A615, GRADE 60. PLACE IN ACCORDANCE

FOR WATERSTOP REQUIREMENTS

EXTERIOR CONTAINMENT SURFACE. SEE SHEET S-506 AND SPECIFICATIONS

5. INSTALL WATERSTOPS AT ALL CONSTRUCTION JOINTS THAT SERVE AS

SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS

3. MINIMUM TRANSFORMER FOUNDATION CONCRETE STRENGTH = 3000PSI

2. CONCRETE PATTERN NOT SHOWN FOR CLARITY

1. REINFORCEMENT REQUIREMENTS APPLY TO BOTH TRANSFORMER FOUNDATIONS

S T

E V

E N R

M

IL

E S P .E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

A N

S I F

/0

/0

B P

S K

W K

K W

K

S-504

B

SCALE: 3/8"=1'-0"

SECTION

S-504

B

S

C

S-504

C

SCALE: 3/8"=1'-0"

SECTION

S-504

A

SCALE: 3/8"=1'-0"

REINFORCEMENT PLAN

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:39 AM

SEE NOTE 5 ON S-503

HOLES FOR 1" THREADED ROD.

SEE NOTE 5 ON SHEET S-502

TRANSFORMER SEISMIC ANCHOR,

ON S-503

ANCHOR. SEE NOTE 5

TRANSFORMER SEISMIC

1" PLATE, TYP

1" PLATE, TYP

2'-6"1'-6"2'-6"1'-6"2'-6"1'-6"2'-6"

14'-6"

10'-6"

2'-1 1/2"1'-4"3'-7"1'-4"2'-1 1/2"

F

R

F P

P -1 .0

S -5

X X

X .D

G N

S-505

S W

IT

C H

Y A

R D

S T

E E

L P

L A

T E F

O U

N D

A T

IO

N S P

L A

N D

E T

A

IL

S

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

E R

F O

R T P

E C

K D

A

3/16

TYP

3/16

TYP

IN

S

T A

L L

T R

A N

S F

O R

M E

R S K

Y

A K

Z

A

NOTES:

3/16

TYP 3/16

TYP

S T

E V

E N R

M

IL

E S P .E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

APPLY WITH MANUFACTURER'S RECOMMEND METHOD.

MANUFACTURER'S RECOMMENDATION. PAINT WITH APPROVED COATING SYSTEM AND

PARTICLES, OR OTHER DEBRIS MUST BE FULLY REMOVED AND SURFACE PREPARED TO

DAMAGED LOCATIONS FOR PAINTING BY CLEANING TO BARE METAL. ALL RUST, LOOSE

SHOWN TO THE STEEL PLATE FOUNDATIONS. AFTER WELDING IS COMPLETE, PREPARE

3. AFTER THE TRANSFORMERS ARE INSTALLED, FIELD WELD THE TRANSFORMER AS

THESE LOCATIONS PRIOR TO WELDING.

WELDING WILL DAMAGE PAOINT, ONLY PROVIDE PRIMER COAT. REMOVE PRIMER IN

2. PAINT THE WELDED STEEL PLATE ASSEMBLY PRIOR TO SHIPPING. IN AREAS WHERE

RELIEF HOLES FOR GOVERNMENT APPROVAL.

ON SHOP DRAWINGS. SUBMIT LEVELING PLAN WITH ANCHOR DETAILS AND GROUT

FOUNDATION. SHOW FINALIZED NUMBER OF ANCHORS AND GROUT RELIEF HOLES

AS NEEDED AND GROUT RELIEF HOLES AS NEEDED TO ACHIEVE LEVELNESS IN

12" OF EMBEDMENT AS SHOWN. PROVIDE ADDITIONAL STUD ANCHORS SPACED

PROVIDE A MINIMUM OF (8) 1" DIAMETER NELSON STUD ANCHORS WITH A MINIMUM

1. PROVIDE 18"X1" STEEL PLATES IN ACCORDANCE WITH 05 50 00.00 26 AS SHOWN.

/0

/0

A N

S I F

A N

S I F

B P

S K

W K

K W

KS-505

B

SCALE: 1"=1'-0"

DETAIL - STEEL PLATE FOUNDATION FOR KZ2A TRANSFORMER

S-505

A

SCALE: 1"=1'-0"

DETAIL - STEEL PLATE FOUNDATION FOR KY4A TRANSFORMER

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:46 AM

SEE NOTE 1

STEEL GRATING,

4" MIN. ANCHOR EMBEDMENT

GALVANIZED A36 STEEL ANGLE

V A

R

IE

S

PENETRATION WATERSTOP

QUENCHING STONE

GSU PAD

3'X3' ALUMINUM HATCHES

KTR TO DESIGN WALL4" DRAIN

1" DRAINS SPACED AT 12" O.C.

WITH VALVE

CHEMICAL OIL STOP.

WATERSTOP

F

R

F P

P -1 .0

S -5

X X

X .D

G N

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

R

R T P

E C

K D

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

S T

E V

E N R

M

IL

E S P .E

S W

IT

C H

Y A

R D

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

SCALE: 3"= 1'-0"

0 3" 6" 12"

GRADE EL. APPROXIMATELY 2069.0

IN

S

T A

L L

T R

A N

S F

O R

M E

R S K

Y

A K

Z

A

O

IL

C

O N

T A

IN

M E

N T T

Y P

IC

A L D

E T

A

IL

S

/0

/0

S-506

BE MADE WATERPROOF.

SPECIFICATION SECTION 44 42 52.01 26 AND THE CONTAINMENT VAULT MUST

4. ALL WATERSTOPS MUST BE CHEMICALLY RESISTANT IN ACCORDANCE WITH

3. PROVIDE A FRENCH DRAIN FROM THE PROCESSING VAULT AS SHOWN ON S-101.

ENTRANCES AND EXITS.

4 INCHES. CONTRACTOR TO DESIGN THE FINAL FLOW LOCATIONS OF THE

USING EPOXY DOWELED REINFORCEMENT WITH A MINIMUM EMBEDMENT OF

CAST IN PLACE CONCRETE AND CONNECTED TO THE CONTAINMENT WALL

2. DESIGN AND PROVIDE THE DRAINAGE VAULTS. THE VAULTS MUST BE

QUENCHING STONE AND 200 PSF LIVE LOAD.

OR WEDGE ANCHORS. THE GRATING MUST BE ABLE TO SUPPORT THE

THE GRATING BY STEEL ANGLES TO THE CONTAINMENT WALLS WITH EPOXY

1. DESIGN AND PROVIDE GRATING TO HOLD THE QUENCHING STONE. SUPPORT

A N

S I F

K W

K

B P

S K

W K

S-506

SCALE: 3"=1'-0"

DETAIL - TYPICAL GRATING SUPPORT

S-506

S-506

A

SCALE: 1/2"=1'-0"

OIL CONTAINMENT DETAIL

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-505SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:53 AM

POWERHOUSE 1

SEE NOTE 1

EXISTING RAILS

SEE NOTE 1

EXISTING RAILS

SEE NOTE 2

EXISTING TRANSFORMER CART

EXISTING CONCRETE.

NOT REMOVE OR DAMAGE

CUT ANCHORS FLUSH. DO

ONLY REMOVE RAILS AND CLIPS.

69 KV WHATELY LINE "H" FRAME SUPPORT STRUCTURE

AND OIL DRAIN PIPING

EXISTING CONCRETE TRENCH

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-901SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:59 AM

POWER PLANT 1

SCALE: NTS

SWITCHYARD 1

SCALE: NTS

EXISTING TRANSFORMER RAILS

SCALE: NTS

EXISTING TRANSFORMER RAIL CART

SCALE: NTS

T2 EXISTING LINE SUPPORT

COORDINATE OUTAGES AS SPECIFIED.

PASSING UNDER 69 KV LINE AND IN GENERAL WITHIN THE SWITCHYARD.

3. ENSURE SAFE WORKING CLEARANCES ARE MAINTAINED AT ALL TIMES WHEN

CONTRACTOR.

2. THE EXISTING RAIL CART MAY BE USED IF DETERMINED TO BE SAFE BY THE

THE EXISTING GROUNDING GRID.

GROUND CONNECTIONS PRIOR TO REMOVAL. TAKE CARE TO NOT DAMAGE

1. REMOVE THE EXISTING RAILS AND TIES AS INDICATED ON SD-101. REMOVE THE

NOTES:

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

S -9

X X

X .d g n

C

G

IE

R E

K

B S

T O

L T P

E

A

M U

E H

L E

C K P .E

D L

IN

E S

U P

P O

R T

P H

O T

O G

R A

P H

S O

F E

X

IS

T

IN

G R

A

IL

S-901

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-4 -0

A /8

F O

R T P

E C

K D

A M

/0

/0

EXISTING PIPE SUPPORTS

SCALE: NTS

CABLE TUNNEL STAIRS

SCALE: NTS

EXISTING OILOSTATIC WALL PENETRATION - PHOTO 1

SCALE: NTS

EXISTING OILOSTATIC WALL PENETRATION - PHOTO 2

NOTES:

PLAN AS REQUIRED BY SPECIFICATION 03 60 00.01 26.

PRIOR TO CUTTING/DRILLING. SUBMIT A CONCRETE DEMOLITION

ALL NEW PENETRATIONS REQUIRE CONCRETE IMAGING

1. REUSE THE EXISTING PENETRATIONS AS PRACTICABLE.

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

S -9

X X

X .d g n

C

G

IE

R E

K

B S

T O

L T P

E

A

M U

E H

L E

C K P .E

L L P

E N

E T

R A

T

IO

N

P H

O T

O G

R A

P H

S O

F E

X

IS

T

IN

G O

IL

O S

T A

T

IC

S-902 0 0

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-4 -0

A /9

F O

R T P

E C

K D

A M

/0

/0

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

S-902SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:17 AM

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

ED101SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:34 AM

NOTES:

OMKIGDCBA F

EC

NK LJH

KV7A

GCB762

G C

B

G C

B

G C

B

G C

B

G C

B

G C

B

FLOW

DRAWING NO. TITLE

REFERENCE DRAWINGS:

MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES

P L

A N

T N

O .1

KEY PLAN

SCALE: NTS

FLOW

WORK AREA

N

SWITCHYARD 1 - ELECTRICAL DEMOLITION - PLAN VIEW

5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

TRANSFORMER BANK 2 BAY TRANSFORMER BANK 3 BAY TRANSFORMER BANK 4 BAY

TRANSFORMERS IDENTIFIED UNDER THIS CONTRACT.

DRAIN ALL OIL; AND REMOVE FOR DISPOSAL, AT CONTRACTOR'S EXPENSE, ALL

2. REMOVE ALL EXTERNAL CONNECTIONS TO THE NEAREST POINT OF ATTACHMENT;

UNDER THIS CONTRACT.

1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED

/0

/0

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

E

D

X X

X .d g n

C

G

IE

R E

K R S

H A

N K P

E

R E

M O

V A

L P

L A

N V

IE

W

S W

IT

C H

Y A

R D E

L E

C T

R

IC

A L D

E M

O L

IT

IO

ED101

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-6 -1

A /1

F O

R T P

E C

K D

A M

ED304

C

ED304

E

ED302

TRANSFORMER 3 BAYTRANSFORMER 2 BAY

TRANSFORMER 4 BAY

.5

K V

W O

L F P

O

IN

T

K V

L

IN

E N

O .2

W O

L F P

O

IN

T

K V

L

IN

E N

O .1

W O

L F P

O

IN

T

STATIC WIRE

A

C

B

C

B

A

C

B

A

ABC ABC

69KV

WHATELY LINE

161KV

COULEE LINE

RICHARDSON

BC A

A

B

C

C

B

A

B

A

C

A

B

C

NK LJH

C E

CBA D F MKIG

O

NOTES:

DRAWING NO. TITLE

REFERENCE DRAWINGS:

MFP-OPN93E104.6 SWITCHYARD 1 UPPER LEVEL BUSSES

P L

A N

T N

O .1

KEY PLAN

SCALE: NTS

FLOW

WORK AREA

N

FLOW

5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

SWITCHYARD 1 - PLAN VIEW - UPPER LEVEL BUSSES

UNDER THIS CONTRACT.

1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED

/0

/0

K F

L O

R E

N C

E P

E

U P

P E

R L

E V

E L B

U S

S E

S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

E

D

X X

X .d g n

C

G

IE

R E

K R S

H A

N K P

E

R E

M O

V A

L

S W

IT

C H

Y A

R D P

L A

N V

IE

ED102

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-6 -1

A /2

F O

R T P

E C

K D

A M

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

ED102SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:40 AM

.5

CONTROL CONDUITS

EL. 2061.0

SEE DWG. 5576.2-1A-23

OILOSTATIC FEEDERS

EL. 2069.0

EL. 2071.0

COLUMN

EL. 2089.83

EL. 2068.75

CUBICLE

FILLED PIPE FEEDERS

13.8 KV OILOSTATIC OIL

FOR TRANSFORMER KV7A FEEDERS

CABLE TUNNEL PENETRATION

SEE NOTE 3

NOTES:

SCALE: 1"= 20'

20' 0 20'

P L

A N

T N

O .1

KEY PLAN

SCALE: NTS

FLOW

N

WORK AREA

CABLE TUNNEL FROM POWERHOUSE 1 TO SWITCHYARD 1

TRANSFORMER FEEDER ROUTING

REFERENCE DRAWINGS:

CONDUIT LAYOUT AND DETAILS

CABLE TUNNEL DETAILS - SHEET NO. 3

CABLE TUNNEL DETAILS - SHEET NO. 2

CABLE TUNNEL DETAILS - SHEET NO. 1

115KV SWITCHYARD INTERMEDIATE PLAN BELOW EL 2100.0

TITLE

5576.2-1A-28

5576.2-1A-26

5576.2-1A-25

5576.2-1A-24

5576.2-1A-4

DRAWING NO.

CABLE TUNNEL BUTTERFLY VALVE CORRIDOR

TO TRANSFORMER BANK T3 AND TRANSFORMER BANK T4.

3. REMOVE 13.8 KV OILOSTATIC OIL-FILLED PIPE CABLE FEEDERS

THE NEAREST POINT OF ATTACHMENT.

HAVE ALL EXTERNAL CONNECTIONS REMOVED TO

2. TRANSFORMERS IDENTIFIED IN THIS DRAWING WILL

UNDER THIS CONTRACT.

1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED

/0

/0

K F

L O

R E

N C

E P

E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

E V

E N R

M

IL

E S P .E

A N

S I F

F P F P

P -1 .0

E

D

X X

X .d g n

C

G

IE

R E

K R S

H A

N K P

E

R E

M O

V A

L F

R O

M P

O W

E R

H O

U S

E T

O S

W

IT

C H

Y A

R D

T R

A N

S F

O R

M E

R R

O U

T

IN

G C

A B

L E T

U N

N E

ED103

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

S W

IT

C H

Y A

R D

M

IS

S O

U R I

R

IV

E R

W F

R

F P

P -1 .0

-6 -1

A /3

F O

R T P

E C

K D

A M

SECTION

SCALE: 1/8"=1'-0"

SECTION

SCALE: 1/8"=1'-0"

A

ED103

B

ED103

ED103

A

ED103

B

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

ED103SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:47 AM

GENERATOR ROOM

POWER HOUSE

C U

B

IC

L E R

O O

M

ROOM

SERVICE

TRANSFORMER

BEAM

4000 & 3000 C, B, A

1000 A, B, C & 500

800 A, B, C

DOOR.

ENTRANCE

TUNNEL

CABLE

CONDUIT NOS. LT. TO RT.

EXISTING

" OILOSTATIC PIPES8

2- 6 " OILOSTATIC PIPES2

6- 3

" OILOSTATIC PIPES8

2- 6

" OILOSTATIC PIPES2

6- 3

SYSTEM EQUIPMENT

OIL FILLED PIPE CABLE

SEE NOTE 2

F

R

F

R

E V

E N R

M

IL

E S P .E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I F

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

T

OMAHA DISTRICT

M

IS

S O

U R I

R

IV

E R

F O

R T P

E C

K D

A M

S T

E V

E N R

M

IL

E S P .E

A N

S I F

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

O M

A H

A

N E

B R

A S

K A

O M

A H

A D

IS

T R

IC

W E

R H

O U

S E

P O

W E

R H

O U

S E

R E

M O

V A

L R

E M

O V

A L

T U

R B

IN

E F

L O

O R P

L A

N E

L

.5

T U

R B

IN

E F

L O

O R P

L A

N E

L

.5

NOTES:

K F

L O

R E

N C

E P

E /0

/0

C

G

IE

R E

K C

G

IE

R E

K

G S

U T

R A

N S

F O

R M

E R I

N S

T A

L L

A T

IO

N

R S

H A

N K P

E R S

H A

N K P

E

REFERENCE DRAWINGS:

NO SCALE

KEY PLAN

PLANT NO.1

F L

O W

WORK AREA

5' 0 5' 10'

1SCALE:

POWERHOUSE 1 TURBINE FLOOR PLAN

ED104

S W

IT

C H

Y A

R D

MFP-OPN87E501.3

MFP-OPN83E2012.2

MFP-OPN83E2011.1

FP17-70-230

FP17-70-211

FP17-70-200

MFP-OPN84E104.3

DRAWING NO.

DIAGRAM - POWER PLANT 1

INSULATING OIL SYSTEM - FLOW

WIRING POWER PLANT 1

PUMPING UNIT CONTROL CABINET -

OIL FILLED PIPE CABLE SYSTEM -

ASSEMBLY - POWER PLANT 1

PUMPING UNIT CONTROL CABINET -

OIL FILLED PIPE CABLE SYSTEM -

SHEET NO. 2

MISCELLANEOUS PIPING DETAILS -

SYSTEM - PIPING DETAILS

INSULATING OIL PURIFICATION

EL. 2051.50

FLOOR & SURGE TANK STRUCTURE

PIPING PLAN & DETAILS AT TURBINE -

TURBINE FLOOR PLAN

POWER PLANT 1

TITLE

PENSTOCK GALLERY

WORK THIS DRAWING WITH:

E-904

DRAWING NO.

PENSTOCK GALLERY PHOTOS

TITLE

DESCRIPTION

OIL VOLUMES

OIL VOLUME (GALLONS)

" 8 54 - 6

OIL FILLED PIPE CABLE PIPE (OILOSTATIC SYSTEM)

F P F P

P -1 .0

E

D

X X

X .d g n

F P F P

P -1 .0

E

D

X X

X .d g n

NEAREST POINT OF TERMINATION

- ELECTRICAL PIPING AND CONDUCTORS TO THE

- ALL ASSOCIATED SUPPLY AND RETURN PIPING

- OIL STORAGE TANK

PUMPING UNIT CONTROL CABINET -

REMOVE OIL FILLED PIPE CABLE SYSTEM INCLUDING THE FOLLOWING:2.

1. BOLD ITEMS INDICATE EQUIPMENT TO BE REMOVED.

BUTTERFLY VALVE CORRIDOR

CABLE TUNNEL

(CONTROL ROOM LOCATED ABOVE)

CABLE SPREADING ROOM

DRAWING PLOT SIZE: ANSI F

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

/7 /2

BORDER VERSION UPDATE [09-2012]

c o e -n w p n v p o r.

n w p .d s .u s a c e .a rm y .m il \C

A D

D \C

A D

D

W o rk s p a c e s \N

W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e

D E

S

IG

N F

IL

E

ED104SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:53 AM

9'-0"8'-0"8'-0"9'-0"

3'-0"

4'-8"6'-7"15'-6"15'-6"15'-6"11'-3"3'-8"

34'-0"34'-0"

NOTES:

G F D

BUS SUPPORTS

1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .