This document provides details on a federal contract solicitation for GSU transformer installation work at Fort Peck Powerhouse in Montana. The Army Corps of Engineers Engineering District Omaha is seeking bids to remove existing GSU transformer banks and oilostatic feeders, move two government furnished equipment transformers to new locations, provide new feeders and connections for the transformers, and install new group-operated disconnect and protection/control/annunciation wiring to make the equipment fully operational. A virtual site visit was scheduled for July 21, 2020 and the solicitation will close on August 11, 2020. The estimated construction cost is between $5 million and $10 million. The primary NAICS code is 237130 for power and communication line structure construction with a $36.5 million size standard for small businesses. Interested parties can obtain the solicitation documents through the beta SAM website by searching for the solicitation number.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Omaha District of Engineers
US Army Corps
FORT PECK DAM
LOCATION
PROJECT
BY GOOGLE MAP
AREA OF WORK
THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON
THIS PROJECT WAS DESIGNED BY THE HYDROELECTRIC DESIGN CENTER OF THE U.S. ARMY CORPS OF
GSU TRANSFORMER INSTALLATION
MISSOURI RIVER
PROJECT SITE MAP
FORT PECK PROJECT - SWITCHYARD 1
JORDAN S. FINK, P.E.
CHIEF, ELECTRICAL BRANCH
STEVEN R. MILES, P.E.
DESIGN CENTER
DIRECTOR, HYDROELECTRIC
DATE
APPROVED BY:SUBMITTED BY:
JAMES D. CALNON, P.E.
CHIEF, MECHANICAL/STRUCTURAL BRANCH
DATE
SUBMITTED BY:
DATE
CONTRACT NO:
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
S
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -0
X X
X .d g n
C
G
IE
R E
K R S
H A
N K P
E
C O
V E
R S
H E
E T
A N
D V
IC
IN
IT
Y M
A P
S
F O
R T P
E C
K P
R O J E
C T L
O C
A T
IO
G-001
G
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
F P
P -1 .0
-0 -0
A /1
F O
R T P
E C
K D
A M
W
F
R
W9128F20R0039SOLICITATION NO:
JULY 06 2020ISSUE DATE:
/0
/0
LOCATION MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
G-001SHEET NAME:g2hdcevh Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 12:44:01 PM
OMAHA DISTRICT
K P
F
/0
/0
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
T
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -0
X X
X .d g n
C
G
IE
R E
K R S
H A
N K
IN
D
E X O
F C
O N
T R
A C
T D
R A
W
IN
G S
G-002
N .T .S
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-0 -0
A /2
F O
R T P
E C
K D
INDEX TO DRAWINGS
FILE NUMBER
NO.
SHEET
TITLE
INDEX TO DRAWINGS
GENERAL
FILE NUMBER
NO.
SHEET
TITLE
STRUCTURAL DEMOLITION
STRUCTURAL INSTALLATION
ELECTRICAL DEMOLITION
ELECTRICAL INSTALLATION
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
G-002SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:13:45 AM
/0
/0
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -0
X X
X .d g n
C
G
IE
R E
K R S
H A
N K
IN
E X O
F R
E F
E R
E N
C E D
R A
W
IN
G S
G-003
N .T .S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-0 -0
A /3
F O
R T P
E C
K D
A M
FILE NUMBER TITLE
REFERENCE
REQ'D
AS-BUILT
INDEX TO REFERENCE DRAWINGS
FILE NUMBER
REQ'D
AS-BUILT
INDEX TO REFERENCE DRAWINGS
REFERENCE (CONT.)
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
G-003SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:07 AM
GENERAL AREA OF WORK
EQUIPMENT (GFE) TRANSFORMER KZ2A
FOR GOVERNMENT FURNISHED
APPROXIMATE AREA OF WORK
EQUIPMENT (GFE) TRANSFORMER KY4A
FOR GOVERNMENT FURNISHED
APPROXIMATE AREA OF WORK
NOTES:
SWITCHYARD 1
050' 50'
SCALE: 1"= 50'
CABLE TUNNEL
EXISTING
EXISTING SWITCHYARD 1
TAILRACE DECK
FLOW
BANK-2 BAY
TRANSFORMER
BANK-3 BAY
TRANSFORMER
BANK-4 BAY
TRANSFORMER
RETAINING WALL
CABLE TUNNEL
EXISTING
FENCE LINE
EXISTING SWITCHYARD 1
WHATELY LINE
69 KV
COULEE LINE
RICHARDSON-
161 KV
TAILRACE DECK
FLOW
BANK-2 BAY
TRANSFORMER
BANK-3 BAY
TRANSFORMER
WOLF POINT
34.5 KV
RETAINING WALL
LINE 2
WOLF POINT
115 KV
LINE 1
WOLF POINT
115 KV
TAILRACE DECKFLOW
FLOOD TUNNEL WALL
SURGE TANK
SECOND POWER HOUSE
SECOND POWER HOUSE
TAILRACE DECKFLOW
FLOOD TUNNEL WALL
EL. 2070.0EL. 2070.0
LINE
DAWSON COUNTY
230 KV
LINE
DAWSON COUNTY
230 KV
FIRST POWERHOUSE
115 KV TIE-LINE
PARKING
SURGE TANKS
TRANSFORMER RAILS
EXISTING
FORT PECK POWERHOUSE AND SWITCHYARD - PROJECT PLAN VIEW
DRAWING NO. TITLE
REFERENCE DRAWINGS:
MFP-OPN93E165.1
EQUIPMENT ARRANGEMENT
230 KV, 161 KV, AND 115 KV STRUCTURES
SWITCHYARD 2
POSSIBLE CONTRACTOR STAGING AREA
N
STRUCTURE
161 KV SWITCHYARD
STRUCTURE
115 KV SWITCHYARD
4. SWITCHYARD 1 IS BUILT ON FILL.
3. STAGING AND ACCESS TO BE COORDINATED AS SPECIFIED.
AND INSTALLATION DRAWINGS FOR DETAILED CONTRACT SCOPE.
2. BOLD ITEMS INDICATE SIGNIFICANT AREAS OF WORK. SEE DEMOLITION
AREAS OF WORK IN SWITCHYARD 1 AND POWERHOUSE 1.
1. THIS DRAWING INDICATES GENERAL PROJECT ARRANGEMENT AND THE
/0
/0
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -0
X X
X .d g n
C
G
IE
R E
K R S
H A
N K
L A
N V
IE
W
O V
E R
A L L P
R O J E
C T A
R R
A N
G E
M E
N
G-004
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-0 -0
A /5
F O
R T P
E C
K D
A M
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
G-004SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:30 AM
EL. 2070.0
504.8939504.8939504.8939 504.8939504.8939504.8939 504.8939504.8939504.8939
EXISTING TRANSFORMER KV7A
NOTES:
CLARITY
PADS AND ARE NOT SHOWN FOR
LENGTH OF THE TRANSFORMER
EXISTING RAILS EXTEND THE
EXISTING FENCE
EL. 2068.0
APPROXIMATELY
EL. 2060.0
APPROXIMATELY
EXISTING ROAD
5' 0 10' 20' 30'
"= 1'-0"16
1SCALE:
KEY PLAN
NO SCALE
WORK AREA
FOUNDATION
EXISTING
EXISTING UNUSED TRANSFORMER FOUNDATIONS
EXISTING YARD GRADING
FOUNDATIONS
EXISTING LIGHTING
EXISTING GROUND GRID
SYSTEM
EXISTING DRAINAGE
EXISTING LAWN SPRINKLER
UNDER THIS CONTRACT
RAILS TO BE REMOVED
EXISTING TRANSFORMER
TRANSFORMER BANK 2 BAY TRANSFORMER BANK 3 BAY TRANSFORMER BANK 4 BAY
P L
A N
T N
O .1
FLOW
N
DRAWINGS
REFERENCE
VARIOUS
CONDUIT SEE
EXISTING BURIED
DRAWINGS
REFERENCE
SEE VARIOUS
FOUNDATIONS.
STRUCTURAL
EXISTING
DURING SITE WORK.
5. CONTRACTOR IS RESPONSIBLE TO REPAIR ANY UTILITY DAMAGED
4. FOR GROUND GRID REPAIRS SEE SPECIFICATION 26 05 26.00 26.
AT ALL AREAS WHICH REQUIRE EXCAVATION.
3. PERFORM A GROUND RADAR (GPR) SCAN WITHIN SWITCHYARD 1
IMPACT TO EXISTING UTILITIES.
2. ALL DEMOLITION AND SITE WORK TO BE ACCOMPLISHED WHILE MINIMIZING
REQUIREMENTS.
1. INDICATES AREA OF WORK. REFER TO SPECIFIC DETAILED DRAWINGS FOR
/0
/0
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -0
X X
X .d g n
C
G
IE
R E
K R S
H A
N K
A
N V
IE
W
S W
IT
C H
Y A
R D U
T
IL
IT
Y M
A
G-005
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-0 -0
A /6
F O
R T P
E C
K D
A M
SWITCHYARD 1 UTILITY MAP - PLAN VIEW
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
G-005SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:37 AM
IF USED
CUBICLE NO.
EQUIPMET
THE UTILIZATION
CIRCUIT NO. TO
DESIGNATION
DESTINATION EQUIP.
VOLTAGE OR USAGE CODE
CUBICLE NO. IF USED
DESIGNATION
SOURCE EQUIP.
TO PANEL
INTERNAL
LEAVES PANEL
CABLE TO SX2
EXTERNAL
SB1()-e1-SU1() u = INSTRUMENTATION t = COMMUNICATION CIRCUIT s = SPARE r = 120 OR 208VAC q = 480VAC h = 120V PREFERRED AC _/fo-MM = FIBER OPTIC MULTI MODE, _ NUMBER OF FIBER STRANDS _/fo-SM = FIBER OPTIC SINGLE MODE, _ NUMBER OF FIBER STRANDS f = 250VDC e = 125VDC c = CONTROL
INPUT - SOLID-STATE ELEMENT OR DEVICE
OUTPUT - SOLID-STATE ELEMENT OR DEVICE
K
DISCONNECT SWITCH
SWITCHYARD MOTOR OPERATED
115kV SWITCHYARD CIRCUIT BREAKER
EQUIPMENT ENCLOSURE
SURGE ARRESTER
SURGE CAPACITOR
RESISTOR
AIR CIRCUIT BREAKER
RATIO AS SHOWN
CURRENT TRANSFORMERS, NUMBER AND CURRENT
AND VOLTAGES AS SHOWN
POTENTIAL OR CONTROL TRANSFORMERS, NUMBER
CONNECTION TO GROUND BUS
CONTACTS (NORMALLY OPEN)
CONTACTS (NORMALLY CLOSED)
FUSE
TRANSFORMER (CONTROL DIAGRAM)
POWER TRANSFORMER (ONE LINE DIAGRAM)
DISCONNECT SWITCH
TEST BLOCK
AMMETER SWITCH
DISCONNECTING DEVICE, DISCONNECTING CONTACT
VOLTMETER SWITCH
SYNCHRONIZING SWITCH (I=INCOMING, R=RUNNING)
SPARE WIRE(S)
DRAWOUT CIRCUIT BREAKER
RESISTOR OR SHUNT TRIP ELEMENT
DRAWOUT CIRCUIT BREAKER WITH INTERLOCKS
A=AMBER
INDICATING LIGHT: R=RED, G=GREEN, W=WHITE,
DETAILS, ELEVATIONS)
OR TURNED AWAY FROM OBSERVER (PLANS,
NON-SEGREGATED PHASE BUS TURNED TOWARDS
INVERTER OR RECTIFIER
SWITCH
2-POSITION SELECTOR SWITCH OR TRANSFER
DIRECTION OF KEY TRANSFER
BREAKER KEYED INTERLOCK
DEVISE OPEN. (WITH KEY REMOVED)
KEY INTERLOCK USED TO LOCK
DEVISE OPEN. (WITH KEY HELD)
KEY INTERLOCK USED TO LOCK
BREAKER MECHANICAL INTERLOCK
480-120
200:5
VS
SS
I R
AS
TB
SP
OR
M
L-0
L-0
R
REQUIRED WIRE LABELING
PCC
WIRE LABEL
AS SHOWN ON DRAWING
PCC
WIRE LABEL
TERMINAL BLOCK
PCC2
PCC
WIRE LABELING
NOT INCLUDE THE PANEL IN PARENTHESIS.
NOT REQUIRED TO BE LABELED. WIRES INTERNAL TO A PANEL DO
SHORT JUMPERS WHERE THE JUMPERS ARE ENTIRELY VISIBLE ARE
FORMAT: WIRE NAME/DEVICE OR TERMINAL BLOCK-TERMINAL(PANEL).
PCC/SX2/C8
PCC/SC4/AQ-1
PCC/BB-6
BB-6
AQ-1(SC4)
FT1
RELAY I/O TEST SWITCH
GENERAL NOTES:
GRAPHIC SYMBOLS LEGEND (CONT.)GRAPHIC SYMBOLS LEGEND
WIRE NAME/DESTINATION CABINET OR DEVICE/TERMINAL BLOCK-TERMINAL#.
8. CONTRACTOR SHALL LABEL WIRES AS FOLLOWS:
7. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.
TABLE 250-122.
DRAWINGS OR IN THE CONDUIT AND CABLE SCHEDULES, SIZED PER NEC
ALL NEW FEEDERS AND BRANCH CIRCUITS WHETHER OR NOT SHOWN ON THE
CLUTTER FOR CLARITY, BUT ARE REQUIRED AND SHALL BE PROVIDED IN
6. EQUIPMENT GROUNDING CONDUCTORS MAY NOT BE SHOWN TO REDUCE DRAWING
DRAWING, THE INFORMATION ON THE INDIVIDUAL DRAWING SHALL GOVERN.
AND LEGEND APPEAR ON AN INDIVIDUAL DRAWING AND DIFFERS FROM THIS
APPLICABLE FOR ALL DRAWINGS. HOWEVER, IF SYMBOLS, DEVICE NUMBERS
5. SYMBOLS, DEVICE NUMBERS AND LEGEND SHOWN ON THIS DRAWING ARE
RESPOND ARE OF THE LOWEST VALUE.
IN THE DE-ENERGIZED POSITION OR WHEN QUANTITIES TO WHICH THEY
4. CONTROL DIAGRAMS SHOW CONTROL AND TRANSFER SWITCHES WITH CONTACTS
ON THE FOLLOWING INDIVIDUAL DRAWINGS.
3. ITEMS SHOWN ON THIS DRAWING ARE NOT ALL NECESSARILY REFERENCED
OTHERWISE NOTED.
2. CONDUITS AND BOXES ARE DIMENSIONED TO CENTERLINES UNLESS
OR AS NOTED.
WORK IS INDICATED BY HEAVIER WEIGHT LINES OR TEXT,
1. ON ALL SHEETS, REMOVAL WORK AND INSTALLATION
/0
/0
K F
L O
R E
N C
E P
E
S Y
M B
O L S A
N D L
E G
E N
D S
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -0
X X
X .d g n
C
G
IE
R E
K R S
H A
N K
G-006
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-0 -0
A /7
F O
R T P
E C
K D
A M
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
G-006SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:43 AM
GSU TRANSFORMER KZ2A
TEMPORARY LOCATION OF
GSU TRANSFORMER KY4A
TEMPORARY LOCATION OF
GSU TRANSFORMER KY4A
PERMANENT LOCATION OF
SEE NOTE 5
SEE NOTE 4
GSU TRANSFORMER KZ2A
PERMANENT LOCATION OF
88'-11 7/8 "
/1
216'-5 13/16 "
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
G-100SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:49 AM
POWER PLANT 1
NOTES:
DRAWING NO. TITLE
REFERENCE DRAWINGS:
MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES
P L
A N
T N
O .1
KEY PLAN
SCALE: NTS
FLOW
WORK AREA
N
SWITCHYARD 1 - PLAN VIEW - ELECTRICAL
5' 0 10' 20' 30'
"= 1'-0"16
1SCALE:
AND OIL-FILLED.
6. MOVEMENT OF BOTH TRANSFORMERS SHALL OCCUR FULLY ASSEMBLED
PERMANENT LOCATION PER THE SPECIFICATIONS AND DRAWINGS.
5. MOVE GSU TRANSFORMER KY4A FROM CURRENT TEMPORARY LOCATION TO
PERMANENT LOCATION PER THE SPECIFICATIONS AND DRAWINGS.
4. MOVE GSU TRANSFORMER KZ2A FROM CURRENT TEMPORARY LOCATION TO
BIDDING PURPOSES ONLY.
AND PERMANENT LOCATIONS ARE APPROXIMATE AND INCLUDED FOR
3. DIMENSIONS SHOWN ON THIS DRAWING BETWEEN TEMPORARY STORAGE
2. TRANSFORMER LOCATIONS ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED.
OIL SPILL CONTAINMENT.
SWITCHYARD 1. BOTH TRANSFORMERS HAVE BEEN PROVIDED WITH TEMPORARY
1. TRANSFORMERS KY4A AND KZ2A ARE FULLY ASSEMBLED, OIL-FILLED, AND LOCATED IN
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
G -1
X X
X .d g n
C
G
IE
R E
K R S
H A
N K P
E
IN
S
T A
L L
P L
A N V
IE
W T
R A
N S
F O
R M
E R L
O C
A T
IO
N S
S W
IT
C H
Y A
R D
G-100
/1
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-6 -1
A /4
F O
R T P
E C
K D
A M
/0
/0
504.8939504.8939504.8939 504.8939504.8939504.8939
RAILWAY TIES. SEE S-901
REMOVE RAILS AND
SEE NOTE 2
NOT SHOWN
RAILWAY TIES
AND TIES
EXISTING RAILS
AND REMOVE
EXCAVATE
NOTES:
POWER PLANT 1
OMKIGDCBA F
EC
NK LJH
KV7A
G C
B
G C
B
G C
B
G C
B
G C
B
G C
B
COULEE LINE
RICHARDSON WHATELY LINE
FLOW
TRANSFORMER 3 BAY TRANSFORMER 4 BAYTRANSFORMER 2 BAY
5' 0 10' 20' 30'
"= 1'-0"16
1SCALE:
P L
A N
T N
O .1
KEY PLAN
NO SCALE
FLOW
WORK AREA
N
DRAWING NO. TITLE
REFERENCE DRAWINGS:
MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES
GCB 762
SWITCHYARD NO.1 - STRUCTURAL DEMOLITION - PLAN VIEW
/0
/0
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P
E
A N
S I F
F P F P
P -1 .0
S
D
X X
X .d g n
C
G
IE
R E
K
B S
T O
L T P
E
A
M U
E H
L E
C K P .E
R E
M O
V A
L P
L A
N V
IE
W
S W
IT
C H
Y A
R D S
T R
U C
T U
R A
L D
E M
O L
IT
IO
SD101
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-4 -0
A /1
F O
R T P
E C
K D
A M
EXCAVATION ACTIVITIES AND AS PART OF BACKFILL OPERATIONS.
IN ACCORDANCE WITH SECTION 26 05 26.00 26 ONLY AFTER COMPLETION OF
3. MINIMIZE DAMAGE TO GROUNDING GRID. REPAIR AND RETEST THE GROUNDING GRID
SURFACING ROCK.
BACKFILL ALL LOCATIONS TO MATCH THE SURROUNDING GRADE WITH SWITCHYARD
MINIMIZE ADDITIONAL REMOVAL OF THE EXISTING STRUCTURAL FOUNDATIONS AND
AT A MINIMUM, CUT FOUNDATIONS BELOW THE SWITCHYARD GRAVEL SURFACING.
SHOWN. PROVIDE CLEAN CUT LINES AND MEET THE REQUIREMENTS OF 03 60 00.01 26.
2. REMOVE EXISTING SIDEWALKS, RAIL TIES, AND FOUNDATIONS AS NECESSARY AND
CONTRACT. TRANSFORMERS ARE NOT SHOWN FOR CLARITY.
1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED UNDER THIS
SD501
A
SD501
A
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
SD101SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:14:57 AM
TUNNEL
EXISTING CONCRETE
8'-0"
FOUNDATION AREA
REMOVE RAILS AND TIES OVER
PAST FOUNDATION FOOTPRINT
SLOPE SIDES AS REQUIRED
(APPROXIMATELY 1'-6" BELOW GRADE)
EXISTING CONCRETE TUNNEL
TUNNEL ELEVATION. SEE SECTION C.
TRANSFORMER FOUNDATIONS TO TOP OF
APPROXIMATED. DEMO EXISTING
EXISTING TRANSFORMER FOOTING LOCATIONS
TUNNEL
EXISTING CONCRETE
EL. 2066.52
APPROXIMATE
TO CONTROL JOINT
REMOVE CONCRETE
RACEWAY
ABANDONED
RAILWAY ATTACHMENTS
REMOVE AND DISPOSE OF
ELEVATION PRIOR TO DEMOLITION.
FIELD VERIFY TOP OF TUNNEL
WITHIN 12" OF TOP OF TUNNEL.
DO NOT IMPACT CONCRETE
DO NOT BENCH
DIMENSIONS SHOWN
SLOPE TO MEET
8'-0"15'-0"
4'-6"
CONTROL JOINT
M
IN
L
IM
IT
O
F E
X C
A V
A T
IO
N F
O R K
Y
A A
N D K
Z
A F
O U
N D
A T
IO
N S
36'-0" MIN LIMIT OF EXCAVATION FOR KY4A FOUNDATION (CENTERED OVER TRANSFORMER PAD)
PER EM 385-1-1
FOOTPRINT
PAST FOUNDATION
SLOPE AS REQUIRED
F
R
U
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
OMAHA DISTRICTOMAHA DISTRICT
F
F P
P -1 .0
S
D -5
X X
X .D
G N
12" 0
"= 1'-0"2
1SCALE:
1' 2' 3' 4'
12" 0
"= 1'-0"2
1SCALE:
1' 2' 3' 4'
EL. APPROXIMATELY 2069.0
AREA OF SOIL EXCAVATION
EL. APPROXIMTELY 2069.0
TOP OF TUNNEL EL. 2067.5
CONCRETE REMOVAL LIMIT EL 2068.5
32'-8" MIN LIMIT OF EXCAVATION FOR KZ2A FOUNDATION (CENTERED OVER TRANSFORMER PAD)
F O
R T P
E C
K D
A M
M
IS
S O
U R I
R
IV
E R
S W
IT
C H
Y A
R D
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
R E
M O
V A
L S
O
IL
E
X C
A V
A T
IO
N A
N D C
O N
C R
E T
E R
E M
O V
A L
T R
A N
S F
O R
M E
R S K
Y
A K
Z
A
NOTES:
9. BOLD/GREEN INDICATES ITEMS TO BE REMOVED BY THE CONTRACTOR.
REQUIRED COMPACTION RESULTS.
THREE SEPARATE TESTS PER EACH LIFT ARE REQUIRED TO CONFIRM
EARTHWORK, PARAGRAPH 3.3, FILL PLACEMENT AND COMPACTION.
OF SUBGRADE TO FINAL GRADE ACCORDING TO SPECIFICATION 31 00 00
THE COMPACTION REQUIREMENTS, LOOSEN AND RECOMPACT TOP 12"
8. IF SUBGRADE IS DISTURBED DURING EXCAVATION OR FAILS TO MEET
COMPACTION RESULTS.
GRADE OF EXCAVATION ARE REQUIRED TO CONFIRM REQUIRED
ACCORDANCE WITH ASTM D698. THREE SEPERATE TESTS PER FINAL
PREPARED SUBGRADE MUST DEMONSTRATE 95% COMPACTION IN
DISTURBED. EXCAVATE AND PREPARE THE FINAL GRADE WITH CAUTION.
7. THE SUBGRADE AT THE BOTTOM OF SOIL EXCAVATION MUST NOT BE
DOES NOT BECOME DAMAGED.
DURING EXCAVATION ACTIVITIES TO ENSURE THE TUNNEL OR UTILITIES
GOVERNMENT REPRESENTATIVE SHALL BE PRESENT AT ALL TIMES
FOR REPAIRING ANY DAMAGES MADE DURING CONSTRUCTION. A
OF FOUNDATION INSTALLATION. THE CONTRACTOR IS RESPONSIBLE
6. EXISTING UTILITIES OR THE TUNNEL MAY NOT BE DAMAGED AS PART
STRUCTURAL FOUNDATIONS ARE NOT SHOWN ON THIS SHEET.
5. EXCAVATION FOR OIL PROCESSING VAULTS AND OTHER SWITCHYARD
WITHIN THE LIMITS OF EXCAVATION.
OF EXCAVATION. NOTIFY THE COR OF ANY IDENTIFIED UTILITIES
PENETRATING RADAR TO IDENTIFY ANY UTILITY LINES IN AREA
4. PRIOR TO EXCAVATION, THE CONTRACTOR SHALL USE GROUND
PROHIBITED DURING CONCRETE DEMOLITION.
THE USE OF JACKHAMMERS OR BLASTING MEDIA SHALL BE
CLEAN DEMOLITION LINES TO MAXIMUM PRACTICABLE EXTENT.
EXISTING CONCRETE TUNNEL. UTILIZE SAW CUTTING TO PROVIDE
AND EXCAVATION TO AVOID DAMAGING OR PLACING LOADS ON
3. CONTRACTOR SHALL TAKE CARE DURING CONCRETE DEMOLITION
VARIANCES.
PROBE PRIOR TO EXCAVATION, AND NOTIFY COR OF ANY ELEVATION
2. FIELD VERIFY TOP OF GRADE AND TOP OF TUNNEL ELEVATIONS BY
EXISTING TRANSFORMER PADS TO DEPTHS AS SHOWN ON THIS SHEET.
1. EXCAVATE SOIL FOR KY4A AND KZ2A FOUNDATIONS AND REMOVE
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
/0
/0
SD501
S T
E V
E N R
M
IL
E S P .E
A N
S I F
K W
K
K W
K
B P
S
SD-501
B
SCALE: 1/2"=1'-0"
SOIL EXCAVATION
SD-501
C
SCALE: 1/2"=1'-0"
CONCRETE DEMO
S D
B
S D
C
SD101
A
SCALE: 1/4"=1'-0"
PLAN - EXCAVATION LIMITS FOR KY4A AND KZ2A FOUNDATIONS
95% DQC REVIEWDRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
SD501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:04 AM
KY4A CONTAINMENT VAULTKZ2A CONTAINMENT VAULT
FRENCH DRAINFRENCH DRAINFRENCH DRAIN
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-101SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:12 AM
NOTES:
POWER PLANT 1
P L
A N
T N
O .1
KEY PLAN
NO SCALE
FLOW
WORK AREA
N
FLOW
DRAWING NO. TITLE
REFERENCE DRAWINGS:
MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES
5576.2-1A-11 FENCE AND GROUND MAT DETAILS
OMKIGDCB FA
NK LJH
EC
5' 0 10' 20' 30'
"= 1'-0"16
1SCALE:
SWITCHYARD NO.1 - STRUCTURAL PLAN VIEW
VAULT AS SHOWN.
5. PROVIDE A FRENCH DRAIN WHICH ROUTES WATER FROM THE OIL PROCESSING
CONTRACTOR.
4. BOLD/RED INDICATES WORK AND EQUIPMENT TO BE PERFORMED BY THE
3. GOVERNMENT SUPPLIED TRANSFORMERS NOT SHOWN FOR CLARITY.
2. SEE S-501 FOR FOUNDATION INSTALLATION REQUIREMENTS.
DETAIL DRAWINGS SHOWING EXACT FINAL LOCATION FOR APPROVAL.
1. APPROXIMATE TRANSFORMER FOUNDATION LOCATIONS ARE SHOWN. SUBMIT
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
S -1
X X
X .d g n
C
G
IE
R E
K
B S
T O
L T P
E
A
M U
E H
L E
C K P .E
IN
S
T A
L L
T R
A N
S F
O R
M E
R F
O U
N D
A T
IO
N L
A Y
O U
T
T R
A N
S F
O R
M E
R S K
Y
A K
Z
S-101
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-4 -0
A /2
F O
R T P
E C
K D
A M
/0
/0
A
S-503
S-502
SEE NOTE 2
MATERIAL,
EXPANSIVE
CONCRETE FILL NOT SHOWN FOR CLARITY
LIKE MATERIAL.
EXCAVATION WITH
COMPACT SLOPED
BACKFILL AND
PLACEMENT.
CONCRETE
REQUIRED FOR
FORM SIDE AS
1'-0"
6" MIN
BEND REBAR AT 90 DEGREES, TYP
GEOTEXTILE, SEE NOTE 3GEOTEXTILE, SEE NOTE 3
SPECIFICAITONS
IN ACCORDANCE WITH
COLD JOINT, PREP
LEAN CONCRETE
TRANSFORMER FOUNDATION
PROFILE OF EXISTING
4 INCHES BELOW GRADE
EL. 2068.66, APPROXIMATELY
PLACE CONCRETE FILL TO
4'-6"
CONCRETE
EXISTING TUNNEL
/1
M
IN
M
IN
MINIMUM EDGE DISTANCE OF 1'-0", TYP
SPACE #8 BENT REBARS @ 3'-0" MAXIMUM O.C. EW
GEOTEXTILE, SEE NOTE 3
F
R
E V
E N R
M
IL
E S P .E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
E R
F O
R T P
E C
K D
A
IT
C H
Y A
R D
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
12" 0
"= 1'-0"2
1SCALE:
1' 2' 3' 4'
F P F P
P -1 .0
S -5
X X
X .D
G N
IN
S
T A
L L
TYP
T Y
P
EL. APPROXIMATELY 2069.0
T R
A N
S F
O R
M E
R S K
Y
A K
Z
A
L E
A N C
O N
C R
E T
E F
IL
L T
Y P
IC
A L D
E T
A
IL
S
NOTES:
9. BOLD/RED INDICATES ITEMS TO BE INSTALLED BY THE CONTRACTOR.
8. REFER TO SD-501 FOR EXCAVATION DIMENSIONS FOR LEAN CONCRETE FILL.
7. ALL REBAR SHOWN SHALL BE ASTM A615, GRADE 60, #8 BARS.
6. INSTALL BENT REBAR AS SHOWN PRIOR TO SETTING OF CONCRETE.
5. FILL LEAN CONCRETE TO EL. 2068.66, APPROXIMATELY 4 INCHES BELOW GRADE.
THE NEXT LIFT.
CLEAN, SSD SURFACE IS REQUIRED IMMEDIATELY BEFORE PLACEMENT OF
AND PREPPED FOR SUBSEQUENT LIFT(S) IN ACCORDANCE WITH SPECIFICATIONS.
MAXIMUM OF 3 LIFTS. COLD JOINTS SHALL BE AS HORIZINTAL AS POSSIBLE,
MAXIMUM LEAN CONCRETE LIFT HEIGHT SHALL NOT EXCEED 3', FOR A
6". DEPOSIT LEAN CONCRETE EVENLY THROUGHOUT THE EXCAVATIONS.
BOTTOM OF PREPARED EXCAVATIONS. MAXIMUM CONCRETE DROP OF
4. DEPOSIT LEAN CONCRETE WITH A TREMIE PIPE, STARTING AT THE
LEAN CONCRETE, 1000-2000 PSI COMPRESSIVE STRENGTH AT 28 DAYS.
3. FILL IN EXCAVATED AREAS FOR KY4A AND KZ2A TRANSFORMERS WITH
MUST HAVE A COMPRESSIVE STRENGTH OF 25 PSI OR GREATER.
TOGETHER (JOINT TAPE SEALED) TO ENVELOPE CONCRETE TUNNEL. FOAM
1" THICK, 250 RIGID FOAM INSULATION SHEETS, BUTT CONNECTED
2. OVERLAY EXPOSED EXISTING TUNNEL CONCRETE SURFACES WITH
GRADE ELEVATION AND VERTICALY BEHIND TUNNEL EXPANSIVE MATERIAL.
PORTION. EXTEND GEOTEXTILE A MINIMUM OF 12" HORIZONTALLY OVER
HORIZONTAL JOINTS ARE USED, TOP PORTION MUST OVERLAY BOTTOM
ARE REQUIRED, MINIMUM OVERLAP DISTANCE OF 2 FEET IS REQUIRED. IF
(12 OZ. WEIGHT), SECURED WITH 6" STEEL PINS EVERY 12". WHERE JOINTS
1. PROTECT ALL EXCAVATED SOIL SURFACES WITH NONWOVEN GEOTEXTILE
/0
/0
S-501
A N
S I F
K W
K
B P
S K
W K
S
B
S-501
B
SCALE: 1/2"=1'-0"
LEAN CONCRETE FILL
S-501
A
SCALE: 1/4"=1'-0"
TOP OF TUNNEL PLAN - LEAN CONCRETE FILL
95% DQC REVIEWDRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:18 AM
FLOW
L
O W
F L
O W
FLOW
SEE SHEET S-504 FOR REINFORCEMENT DETAILS
TUNNEL
EXISTING CONCRETE
SEE NOTE 7
NEW ACCESS STAIRS.
CONCRETE TRANSFORMER PAD
12" CONTAINMENT WALL
SLOPE TO THE DRAIN
PROVIDE A 1.5%
FOR CLARITY
NOT SHOWN
QUENCHING STONE
TRANSFORMER OUTLINE
STONE TYP
12" QUENCHING
STAIRS
NEW ACCESS
FLOW
FLOW
FILL SURFACES, TYP
EXPOSED LEAN CONCRETE
COMPACT BACKFILL OVER
CONTROL JOINT, TYP.
CONTROL JOINT, TYP.
M
IN
TRANSFORMER FOUNDATION
FOR DETAILS.
CONTRACTOR. SEE S-506
TO BE DESIGNED BY
OIL PROCESSING VAULT
SEE SHEET S-505 FOR DETAILS
TRANSFORMER FOUNDATION
22'-6"
36'-0"
22'-0"
6'-0"
6" 1
6"
POWER PLANT 1
"= 1'-0"8
3SCALE:
12" 0 2' 4' 6'
"= 1'-0"8
3SCALE:
12" 0 2' 4' 6'
F P F P
P -1 .0
S -5
X X
X .D
G N
S W
IT
C H
Y A
R D
F O
U N
D A
T
IO
N P
L A
N S
E C
T
IO
N S
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
E R
F O
R T P
E C
K D
A
12" 0 2' 4' 6'
APPROXIMATE SOIL EL 2069.0
EL. APPROXIMATELY 2069.0 - MATCH EXISTING GRADE
T R
A N
S F
O R
M E
R K
Y
A
IN
S
T A
L L
NOTES:
S T
E V
E N R
M
IL
E S P .E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
W F
R
W F
R
PROVIDED.
VAULT ON DETAIL DRAWINGS. CHEMICALLY RESISTANT WATERSTOPS MUST BE
8. SHOW CONTROL CABLING WHICH WILL PENETRATE THE SLAB AND CONTAINMENT
GOVERNMENT.
ANCHORAGE TO CONTAINMENT WALL. COORDINATE FINAL STAIR LOCATION WITH
SPECIFICATION 05 50 04.00 26. PROVIDE NEW CONCRETE FOUNDATIONS AND DESIGN
7. CONTRACTOR TO PROVIDE NEW TRANSFORMER ACCESS STAIRS AS REQUIRED IN
APPLY WITH MANUFACTURER'S RECOMMEND METHOD.
MANUFACTURER'S RECOMMENDATION. PAINT WITH APPROVED COATING SYSTEM AND
PARTICLES, OR OTHER DEBRIS MUST BE FULLY REMOVED AND SURFACE PREPARED TO
DAMAGED LOCATIONS FOR PAINTING BY CLEANING TO BARE METAL. ALL RUST, LOOSE
SHOWN TO THE STEEL PLATE FOUNDATIONS. AFTER WELDING IS COMPLETE, PREPARE
6. AFTER THE TRANSFORMERS ARE INSTALLED, FIELD WELD THE TRANSFORMER AS
PRIMER COAT. REMOVE THIS PAINT PRIOR TO FIELD WELDING.
TO SHIPPING. IN AREAS WHERE WELDING WILL DAMAGE PAINT, ONLY PROVIDE THE
TRANSFORMER FOUNDATION. PAINT THE ASSEMBLY IN THE SHOP PRIOR
MINIMUM EMBEDMENT OF 12 INCHES. USE THESE ANCHORS TO LEVEL THE
WITH NELSON STUDS MAY BE USED TO PROVIDE SEISMIC ANCHORAGE. PROVIDE A
5. THREADED ROD AND EPOXY ANCHORS WITH GROUT OR CAST IN PLACE ANCHORS
MAY NOT BE DAMAGED AS PART OF FOUNDATION INSTALLATION.
TO SUPPORT THE NEW TRANSFORMER. EXISTING UTILITIES
4. INSTALL CONCRETE CONTAINMENT CURBING AND FOUNDATION
COATING.
3. PREPARE WELD LOCATION PER SPECIFICATIONS AND REPAIR WITH APPROVED
2. ALL METAL TO BE HOT DIP GALVANIZED IN SHOP UNLESS OTHERWISE INDICATED.
OIL FILLED COMPONENT IS 5' FROM THE EDGE OF CONTAINMENT.
1. LOCATE THE TRANSFORMER BASE AND PLATE FOUNDATION SUCH THAT ANY
/0
/0
A N
S I F
S-502
B P
S K
W K
K W
K
S-502
B
S-502
B
SCALE: 3/8"=1'-0"
SECTION
S-506
A
S-502
C
SCALE: 3/8"=1'-0"
SECTION
S
C
S-502
A
SCALE: 3/8"=1'-0"
PLAN - KY4A FOUNDATION
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:26 AM
SEE SHEET S-504 FOR REINFORCEMENT DETAILS
TUNNEL
EXISTING CONCRETE
1'-6"
FOR CLARITY
NOT SHOWN
QUENCHING STONE
CENTER THE PLATE ON THE PAD
SEE MOUNTING PLATE DETAIL
SEE NOTE 7
NEW ACCESS STAIRS.
AND BASE.
TRANSFORMER OUTLINE
SLOPE TO THE DRAIN
PROVIDE A 1.5%
12" CONTAINMENT WALL
6'-5"
6"
32'-8"
20'-0"
17'-0"
FLOW
F L
O W
FILL SURFACES, TYP
EXPOSED LEAN CONCRETE
COMPACT BACKFILL OVER
M
IN
S-506 FOR DETAILS.
CONTRACTOR. SEE
TO BE DESIGNED BY
OIL PROCESSING VAULT
CONTROL JOINT, TYP.
STONE (TYP.)
12" QUENCHING
SEE NOTE 7
NEW ACCESS STAIRS
TRANSFORMER OUTLINE NOT SHOWN FOR CLARITY.
TRANSFORMER FOUNDATION.
CONTROL JOINT, TYP.
FLOW
FLOWFLOW
F L
O W
F P
P -1 .0
S -5
X X
X .D
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
E R
F O
R T P
E C
K D
A
U N
D A
T
IO
N P
L A
N S
E C
T
IO
N S
S W
IT
C H
Y A
R D
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
"= 1'-0"8
3SCALE:
12" 0 2' 4' 6'
"= 1'-0"8
3SCALE:
12" 0 2' 4' 6'
"= 1'-0"8
3SCALE:
12" 0 2' 4' 6'
APPROXIMATE SOIL EL 2069.0
MATCH EXISTING GRADE
EL. APPROXIMATELY 2069.0 -
T R
A N
S F
O R
M E
R K
Z
A
IN
S
T A
L L
NOTES:
S T
E V
E N R
M
IL
E S P .E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
W F
R
DRAWINGS. CHEMICALLY RESISTANT WATERSTOPS MUST BE PROVIDED.
8. SHOW DETAILS OF CONTROL CABLING WHICH WILL PENETRATE THE SLAB ON DETAIL
GOVERNMENT.
ANCHORAGE TO CONTAINMENT WALL. COORDINATE FINAL STAIR LOCATION WITH
SPECIFICATION 05 50 04.00 26. PROVIDE NEW CONCRETE FOUNDATIONS AND DESIGN
7. CONTRACTOR TO PROVIDE NEW TRANSFORMER ACCESS STAIRS AS REQUIRED IN
APPLY WITH MANUFACTURER'S RECOMMEND METHOD.
MANUFACTURER'S RECOMMENDATION. PAINT WITH APPROVED COATING SYSTEM AND
PARTICLES, OR OTHER DEBRIS MUST BE FULLY REMOVED AND SURFACE PREPARED TO
DAMAGED LOCATIONS FOR PAINTING BY CLEANING TO BARE METAL. ALL RUST, LOOSE
SHOWN TO THE STEEL PLATE FOUNDATIONS. AFTER WELDING IS COMPLETE, PREPARE
6. AFTER THE TRANSFORMERS ARE INSTALLED, FIELD WELD THE TRANSFORMER AS
PRIMER COAT. REMOVE THIS PAINT PRIOR TO FIELD WELDING.
TO SHIPPING. IN AREAS WHERE WELDING WILL DAMAGE PAINT, ONLY PROVIDE THE
TRANSFORMER PLATE FOUNDATION. PAINT THE PLATE ASSEMBLY IN THE SHOP PRIOR
MINIMUM EMBEDMENT OF 12 INCHES. USE THESE ANCHORS TO LEVEL THE
WITH NELSON STUDS MAY BE USED TO PROVIDE SEISMIC ANCHORAGE. PROVIDE A
5. THREADED ROD AND EPOXY ANCHORS WITH GROUT OR CAST IN PLACE ANCHORS
MAY NOT BE DAMAGED AS PART OF FOUNDATION INSTALLATION.
TO SUPPORT THE NEW TRANSFORMER. EXISTING UTILITIES
4. INSTALL CONCRETE CONTAINMENT CURBING AND PIER FOUNDATION
COATING.
3. PREPARE WELD LOCATION PER SPECIFICATIONS AND REPAIR WITH APPROVED
2. ALL METAL TO BE HOT DIP GALVANIZED IN SHOP UNLESS OTHERWISE INDICATED.
OIL FILLED COMPONENT IS 5' FROM THE EDGE OF CONTAINMENT.
1. LOCATE THE TRANSFORMER BASE AND PLATE FOUNDATION SUCH THAT ANY
/0
/0
S-503
A N
S I F
B P
S K
W K
K W
K
S-503
A
SCALE: 3/8"=1'-0"
SECTION - KZ2A FOUNDATION
S-503
B
S-503
B
PLAN - KZ2A FOUNDATION
SCALE: 3/8" = 1'-0"
S
C
SCALE: 3/8"=1'-0"
SECTION - KZ2A FOUNDATION
S-503
C
S-506
A
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-502SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:32 AM
SHEET S-510
ADD WATERSTOP PER
CONSTRUCTION JOINT, TYP
JOINT, TYP.
CONSTRUCTION
#6@ 12" O.C., TYP#6@ 12" O.C., TYP#6@ 12" O.C., TYP
6"
6"
#6 @ 12" O.C., TYP #6@ 12" O.C., TYP #6@ 12" O.C., TYP
JOINT, TYP.
CONSTRUCTION
SHEET S-510
ADD WATERSTOP PER
CONSTRUCTION JOINT, TYP
SHEET S-510
ADD WATERSTOP PER
CONSTRUCTION JOINT, TYP
VARIES
V A
R
IE
S 6"
6"
F
R
12" 0 2' 4' 6'
F P F P
P -1 .0
S -5
X X
X .D
G N
S-504
S W
IT
C H
Y A
R D
R E
IN
F O
R C
E M
E N
T P
L A
N S
E C
T
IO
N S
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
E R
F O
R T P
E C
K D
A
12" 0 2' 4' 6'
"= 1'-0"8
3SCALE:
12" 0 2' 4' 6'
IN
S
T A
L L
T R
A N
S F
O R
M E
R S K
Y
A K
Z
NOTES:
8. BOLD/RED INDICATES ITEMS TO BE REMOVED BY THE CONTRACTOR.
C. MINIMUM LAP SPLICE LENGTH = 33"
B. MINIMUM EDGE SPACING = 2"
A. MINIMUM BEND DIAMETER = 4.5"
REQUIREMENTS BELOW:
7. UNLESS OTHERWISE SHOWN, REINFORCEMENT SHALL MEET THE
WITH ACI 318.
6. REBAR STRENGTH SHALL BE ASTM A615, GRADE 60. PLACE IN ACCORDANCE
FOR WATERSTOP REQUIREMENTS
EXTERIOR CONTAINMENT SURFACE. SEE SHEET S-506 AND SPECIFICATIONS
5. INSTALL WATERSTOPS AT ALL CONSTRUCTION JOINTS THAT SERVE AS
SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS
3. MINIMUM TRANSFORMER FOUNDATION CONCRETE STRENGTH = 3000PSI
2. CONCRETE PATTERN NOT SHOWN FOR CLARITY
1. REINFORCEMENT REQUIREMENTS APPLY TO BOTH TRANSFORMER FOUNDATIONS
S T
E V
E N R
M
IL
E S P .E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
A N
S I F
/0
/0
B P
S K
W K
K W
K
S-504
B
SCALE: 3/8"=1'-0"
SECTION
S-504
B
S
C
S-504
C
SCALE: 3/8"=1'-0"
SECTION
S-504
A
SCALE: 3/8"=1'-0"
REINFORCEMENT PLAN
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:39 AM
SEE NOTE 5 ON S-503
HOLES FOR 1" THREADED ROD.
SEE NOTE 5 ON SHEET S-502
TRANSFORMER SEISMIC ANCHOR,
ON S-503
ANCHOR. SEE NOTE 5
TRANSFORMER SEISMIC
1" PLATE, TYP
1" PLATE, TYP
2'-6"1'-6"2'-6"1'-6"2'-6"1'-6"2'-6"
14'-6"
10'-6"
2'-1 1/2"1'-4"3'-7"1'-4"2'-1 1/2"
F
R
F P
P -1 .0
S -5
X X
X .D
G N
S-505
S W
IT
C H
Y A
R D
S T
E E
L P
L A
T E F
O U
N D
A T
IO
N S P
L A
N D
E T
A
IL
S
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
E R
F O
R T P
E C
K D
A
3/16
TYP
3/16
TYP
IN
S
T A
L L
T R
A N
S F
O R
M E
R S K
Y
A K
Z
A
NOTES:
3/16
TYP 3/16
TYP
S T
E V
E N R
M
IL
E S P .E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
APPLY WITH MANUFACTURER'S RECOMMEND METHOD.
MANUFACTURER'S RECOMMENDATION. PAINT WITH APPROVED COATING SYSTEM AND
PARTICLES, OR OTHER DEBRIS MUST BE FULLY REMOVED AND SURFACE PREPARED TO
DAMAGED LOCATIONS FOR PAINTING BY CLEANING TO BARE METAL. ALL RUST, LOOSE
SHOWN TO THE STEEL PLATE FOUNDATIONS. AFTER WELDING IS COMPLETE, PREPARE
3. AFTER THE TRANSFORMERS ARE INSTALLED, FIELD WELD THE TRANSFORMER AS
THESE LOCATIONS PRIOR TO WELDING.
WELDING WILL DAMAGE PAOINT, ONLY PROVIDE PRIMER COAT. REMOVE PRIMER IN
2. PAINT THE WELDED STEEL PLATE ASSEMBLY PRIOR TO SHIPPING. IN AREAS WHERE
RELIEF HOLES FOR GOVERNMENT APPROVAL.
ON SHOP DRAWINGS. SUBMIT LEVELING PLAN WITH ANCHOR DETAILS AND GROUT
FOUNDATION. SHOW FINALIZED NUMBER OF ANCHORS AND GROUT RELIEF HOLES
AS NEEDED AND GROUT RELIEF HOLES AS NEEDED TO ACHIEVE LEVELNESS IN
12" OF EMBEDMENT AS SHOWN. PROVIDE ADDITIONAL STUD ANCHORS SPACED
PROVIDE A MINIMUM OF (8) 1" DIAMETER NELSON STUD ANCHORS WITH A MINIMUM
1. PROVIDE 18"X1" STEEL PLATES IN ACCORDANCE WITH 05 50 00.00 26 AS SHOWN.
/0
/0
A N
S I F
A N
S I F
B P
S K
W K
K W
KS-505
B
SCALE: 1"=1'-0"
DETAIL - STEEL PLATE FOUNDATION FOR KZ2A TRANSFORMER
S-505
A
SCALE: 1"=1'-0"
DETAIL - STEEL PLATE FOUNDATION FOR KY4A TRANSFORMER
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-501SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:46 AM
SEE NOTE 1
STEEL GRATING,
4" MIN. ANCHOR EMBEDMENT
GALVANIZED A36 STEEL ANGLE
V A
R
IE
S
PENETRATION WATERSTOP
QUENCHING STONE
GSU PAD
3'X3' ALUMINUM HATCHES
KTR TO DESIGN WALL4" DRAIN
1" DRAINS SPACED AT 12" O.C.
WITH VALVE
CHEMICAL OIL STOP.
WATERSTOP
F
R
F P
P -1 .0
S -5
X X
X .D
G N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
R
R T P
E C
K D
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
S T
E V
E N R
M
IL
E S P .E
S W
IT
C H
Y A
R D
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
SCALE: 3"= 1'-0"
0 3" 6" 12"
GRADE EL. APPROXIMATELY 2069.0
IN
S
T A
L L
T R
A N
S F
O R
M E
R S K
Y
A K
Z
A
O
IL
C
O N
T A
IN
M E
N T T
Y P
IC
A L D
E T
A
IL
S
/0
/0
S-506
BE MADE WATERPROOF.
SPECIFICATION SECTION 44 42 52.01 26 AND THE CONTAINMENT VAULT MUST
4. ALL WATERSTOPS MUST BE CHEMICALLY RESISTANT IN ACCORDANCE WITH
3. PROVIDE A FRENCH DRAIN FROM THE PROCESSING VAULT AS SHOWN ON S-101.
ENTRANCES AND EXITS.
4 INCHES. CONTRACTOR TO DESIGN THE FINAL FLOW LOCATIONS OF THE
USING EPOXY DOWELED REINFORCEMENT WITH A MINIMUM EMBEDMENT OF
CAST IN PLACE CONCRETE AND CONNECTED TO THE CONTAINMENT WALL
2. DESIGN AND PROVIDE THE DRAINAGE VAULTS. THE VAULTS MUST BE
QUENCHING STONE AND 200 PSF LIVE LOAD.
OR WEDGE ANCHORS. THE GRATING MUST BE ABLE TO SUPPORT THE
THE GRATING BY STEEL ANGLES TO THE CONTAINMENT WALLS WITH EPOXY
1. DESIGN AND PROVIDE GRATING TO HOLD THE QUENCHING STONE. SUPPORT
A N
S I F
K W
K
B P
S K
W K
S-506
SCALE: 3"=1'-0"
DETAIL - TYPICAL GRATING SUPPORT
S-506
S-506
A
SCALE: 1/2"=1'-0"
OIL CONTAINMENT DETAIL
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-505SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:53 AM
POWERHOUSE 1
SEE NOTE 1
EXISTING RAILS
SEE NOTE 1
EXISTING RAILS
SEE NOTE 2
EXISTING TRANSFORMER CART
EXISTING CONCRETE.
NOT REMOVE OR DAMAGE
CUT ANCHORS FLUSH. DO
ONLY REMOVE RAILS AND CLIPS.
69 KV WHATELY LINE "H" FRAME SUPPORT STRUCTURE
AND OIL DRAIN PIPING
EXISTING CONCRETE TRENCH
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-901SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:15:59 AM
POWER PLANT 1
SCALE: NTS
SWITCHYARD 1
SCALE: NTS
EXISTING TRANSFORMER RAILS
SCALE: NTS
EXISTING TRANSFORMER RAIL CART
SCALE: NTS
T2 EXISTING LINE SUPPORT
COORDINATE OUTAGES AS SPECIFIED.
PASSING UNDER 69 KV LINE AND IN GENERAL WITHIN THE SWITCHYARD.
3. ENSURE SAFE WORKING CLEARANCES ARE MAINTAINED AT ALL TIMES WHEN
CONTRACTOR.
2. THE EXISTING RAIL CART MAY BE USED IF DETERMINED TO BE SAFE BY THE
THE EXISTING GROUNDING GRID.
GROUND CONNECTIONS PRIOR TO REMOVAL. TAKE CARE TO NOT DAMAGE
1. REMOVE THE EXISTING RAILS AND TIES AS INDICATED ON SD-101. REMOVE THE
NOTES:
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
S -9
X X
X .d g n
C
G
IE
R E
K
B S
T O
L T P
E
A
M U
E H
L E
C K P .E
D L
IN
E S
U P
P O
R T
P H
O T
O G
R A
P H
S O
F E
X
IS
T
IN
G R
A
IL
S-901
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-4 -0
A /8
F O
R T P
E C
K D
A M
/0
/0
EXISTING PIPE SUPPORTS
SCALE: NTS
CABLE TUNNEL STAIRS
SCALE: NTS
EXISTING OILOSTATIC WALL PENETRATION - PHOTO 1
SCALE: NTS
EXISTING OILOSTATIC WALL PENETRATION - PHOTO 2
NOTES:
PLAN AS REQUIRED BY SPECIFICATION 03 60 00.01 26.
PRIOR TO CUTTING/DRILLING. SUBMIT A CONCRETE DEMOLITION
ALL NEW PENETRATIONS REQUIRE CONCRETE IMAGING
1. REUSE THE EXISTING PENETRATIONS AS PRACTICABLE.
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
S -9
X X
X .d g n
C
G
IE
R E
K
B S
T O
L T P
E
A
M U
E H
L E
C K P .E
L L P
E N
E T
R A
T
IO
N
P H
O T
O G
R A
P H
S O
F E
X
IS
T
IN
G O
IL
O S
T A
T
IC
S-902 0 0
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-4 -0
A /9
F O
R T P
E C
K D
A M
/0
/0
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
S-902SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:17 AM
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
ED101SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:34 AM
NOTES:
OMKIGDCBA F
EC
NK LJH
KV7A
GCB762
G C
B
G C
B
G C
B
G C
B
G C
B
G C
B
FLOW
DRAWING NO. TITLE
REFERENCE DRAWINGS:
MFP-OPN93E103.7 SWITCHYARD 1 LOWER LEVEL BUSSES
P L
A N
T N
O .1
KEY PLAN
SCALE: NTS
FLOW
WORK AREA
N
SWITCHYARD 1 - ELECTRICAL DEMOLITION - PLAN VIEW
5' 0 10' 20' 30'
"= 1'-0"16
1SCALE:
TRANSFORMER BANK 2 BAY TRANSFORMER BANK 3 BAY TRANSFORMER BANK 4 BAY
TRANSFORMERS IDENTIFIED UNDER THIS CONTRACT.
DRAIN ALL OIL; AND REMOVE FOR DISPOSAL, AT CONTRACTOR'S EXPENSE, ALL
2. REMOVE ALL EXTERNAL CONNECTIONS TO THE NEAREST POINT OF ATTACHMENT;
UNDER THIS CONTRACT.
1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED
/0
/0
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
E
D
X X
X .d g n
C
G
IE
R E
K R S
H A
N K P
E
R E
M O
V A
L P
L A
N V
IE
W
S W
IT
C H
Y A
R D E
L E
C T
R
IC
A L D
E M
O L
IT
IO
ED101
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-6 -1
A /1
F O
R T P
E C
K D
A M
ED304
C
ED304
E
ED302
TRANSFORMER 3 BAYTRANSFORMER 2 BAY
TRANSFORMER 4 BAY
.5
K V
W O
L F P
O
IN
T
K V
L
IN
E N
O .2
W O
L F P
O
IN
T
K V
L
IN
E N
O .1
W O
L F P
O
IN
T
STATIC WIRE
A
C
B
C
B
A
C
B
A
ABC ABC
69KV
WHATELY LINE
161KV
COULEE LINE
RICHARDSON
BC A
A
B
C
C
B
A
B
A
C
A
B
C
NK LJH
C E
CBA D F MKIG
O
NOTES:
DRAWING NO. TITLE
REFERENCE DRAWINGS:
MFP-OPN93E104.6 SWITCHYARD 1 UPPER LEVEL BUSSES
P L
A N
T N
O .1
KEY PLAN
SCALE: NTS
FLOW
WORK AREA
N
FLOW
5' 0 10' 20' 30'
"= 1'-0"16
1SCALE:
SWITCHYARD 1 - PLAN VIEW - UPPER LEVEL BUSSES
UNDER THIS CONTRACT.
1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED
/0
/0
K F
L O
R E
N C
E P
E
U P
P E
R L
E V
E L B
U S
S E
S
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
E
D
X X
X .d g n
C
G
IE
R E
K R S
H A
N K P
E
R E
M O
V A
L
S W
IT
C H
Y A
R D P
L A
N V
IE
ED102
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-6 -1
A /2
F O
R T P
E C
K D
A M
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
ED102SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:40 AM
.5
CONTROL CONDUITS
EL. 2061.0
SEE DWG. 5576.2-1A-23
OILOSTATIC FEEDERS
EL. 2069.0
EL. 2071.0
COLUMN
EL. 2089.83
EL. 2068.75
CUBICLE
FILLED PIPE FEEDERS
13.8 KV OILOSTATIC OIL
FOR TRANSFORMER KV7A FEEDERS
CABLE TUNNEL PENETRATION
SEE NOTE 3
NOTES:
SCALE: 1"= 20'
20' 0 20'
P L
A N
T N
O .1
KEY PLAN
SCALE: NTS
FLOW
N
WORK AREA
CABLE TUNNEL FROM POWERHOUSE 1 TO SWITCHYARD 1
TRANSFORMER FEEDER ROUTING
REFERENCE DRAWINGS:
CONDUIT LAYOUT AND DETAILS
CABLE TUNNEL DETAILS - SHEET NO. 3
CABLE TUNNEL DETAILS - SHEET NO. 2
CABLE TUNNEL DETAILS - SHEET NO. 1
115KV SWITCHYARD INTERMEDIATE PLAN BELOW EL 2100.0
TITLE
5576.2-1A-28
5576.2-1A-26
5576.2-1A-25
5576.2-1A-24
5576.2-1A-4
DRAWING NO.
CABLE TUNNEL BUTTERFLY VALVE CORRIDOR
TO TRANSFORMER BANK T3 AND TRANSFORMER BANK T4.
3. REMOVE 13.8 KV OILOSTATIC OIL-FILLED PIPE CABLE FEEDERS
THE NEAREST POINT OF ATTACHMENT.
HAVE ALL EXTERNAL CONNECTIONS REMOVED TO
2. TRANSFORMERS IDENTIFIED IN THIS DRAWING WILL
UNDER THIS CONTRACT.
1. BOLD ITEMS INDICATE EQUIPMENT TO BE MODIFIED AND/OR REMOVED
/0
/0
K F
L O
R E
N C
E P
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
E V
E N R
M
IL
E S P .E
A N
S I F
F P F P
P -1 .0
E
D
X X
X .d g n
C
G
IE
R E
K R S
H A
N K P
E
R E
M O
V A
L F
R O
M P
O W
E R
H O
U S
E T
O S
W
IT
C H
Y A
R D
T R
A N
S F
O R
M E
R R
O U
T
IN
G C
A B
L E T
U N
N E
ED103
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
S W
IT
C H
Y A
R D
M
IS
S O
U R I
R
IV
E R
W F
R
F P
P -1 .0
-6 -1
A /3
F O
R T P
E C
K D
A M
SECTION
SCALE: 1/8"=1'-0"
SECTION
SCALE: 1/8"=1'-0"
A
ED103
B
ED103
ED103
A
ED103
B
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
ED103SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:47 AM
GENERATOR ROOM
POWER HOUSE
C U
B
IC
L E R
O O
M
ROOM
SERVICE
TRANSFORMER
BEAM
4000 & 3000 C, B, A
1000 A, B, C & 500
800 A, B, C
DOOR.
ENTRANCE
TUNNEL
CABLE
CONDUIT NOS. LT. TO RT.
EXISTING
" OILOSTATIC PIPES8
2- 6 " OILOSTATIC PIPES2
6- 3
" OILOSTATIC PIPES8
2- 6
" OILOSTATIC PIPES2
6- 3
SYSTEM EQUIPMENT
OIL FILLED PIPE CABLE
SEE NOTE 2
F
R
F
R
E V
E N R
M
IL
E S P .E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I F
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
OMAHA DISTRICT
M
IS
S O
U R I
R
IV
E R
F O
R T P
E C
K D
A M
S T
E V
E N R
M
IL
E S P .E
A N
S I F
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
W E
R H
O U
S E
P O
W E
R H
O U
S E
R E
M O
V A
L R
E M
O V
A L
T U
R B
IN
E F
L O
O R P
L A
N E
L
.5
T U
R B
IN
E F
L O
O R P
L A
N E
L
.5
NOTES:
K F
L O
R E
N C
E P
E /0
/0
C
G
IE
R E
K C
G
IE
R E
K
G S
U T
R A
N S
F O
R M
E R I
N S
T A
L L
A T
IO
N
R S
H A
N K P
E R S
H A
N K P
E
REFERENCE DRAWINGS:
NO SCALE
KEY PLAN
PLANT NO.1
F L
O W
WORK AREA
5' 0 5' 10'
1SCALE:
POWERHOUSE 1 TURBINE FLOOR PLAN
ED104
S W
IT
C H
Y A
R D
MFP-OPN87E501.3
MFP-OPN83E2012.2
MFP-OPN83E2011.1
FP17-70-230
FP17-70-211
FP17-70-200
MFP-OPN84E104.3
DRAWING NO.
DIAGRAM - POWER PLANT 1
INSULATING OIL SYSTEM - FLOW
WIRING POWER PLANT 1
PUMPING UNIT CONTROL CABINET -
OIL FILLED PIPE CABLE SYSTEM -
ASSEMBLY - POWER PLANT 1
PUMPING UNIT CONTROL CABINET -
OIL FILLED PIPE CABLE SYSTEM -
SHEET NO. 2
MISCELLANEOUS PIPING DETAILS -
SYSTEM - PIPING DETAILS
INSULATING OIL PURIFICATION
EL. 2051.50
FLOOR & SURGE TANK STRUCTURE
PIPING PLAN & DETAILS AT TURBINE -
TURBINE FLOOR PLAN
POWER PLANT 1
TITLE
PENSTOCK GALLERY
WORK THIS DRAWING WITH:
E-904
DRAWING NO.
PENSTOCK GALLERY PHOTOS
TITLE
DESCRIPTION
OIL VOLUMES
OIL VOLUME (GALLONS)
" 8 54 - 6
OIL FILLED PIPE CABLE PIPE (OILOSTATIC SYSTEM)
F P F P
P -1 .0
E
D
X X
X .d g n
F P F P
P -1 .0
E
D
X X
X .d g n
NEAREST POINT OF TERMINATION
- ELECTRICAL PIPING AND CONDUCTORS TO THE
- ALL ASSOCIATED SUPPLY AND RETURN PIPING
- OIL STORAGE TANK
PUMPING UNIT CONTROL CABINET -
REMOVE OIL FILLED PIPE CABLE SYSTEM INCLUDING THE FOLLOWING:2.
1. BOLD ITEMS INDICATE EQUIPMENT TO BE REMOVED.
BUTTERFLY VALVE CORRIDOR
CABLE TUNNEL
(CONTROL ROOM LOCATED ABOVE)
CABLE SPREADING ROOM
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/7 /2
BORDER VERSION UPDATE [09-2012]
c o e -n w p n v p o r.
n w p .d s .u s a c e .a rm y .m il \C
A D
D \C
A D
D
W o rk s p a c e s \N
W P \W o rk s p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
ED104SHEET NAME:g2hdcmg9 Untitled WorkspaceBY USERNAME:DATE AND TIME PLOTTED: 7/7/2020 11:16:53 AM
9'-0"8'-0"8'-0"9'-0"
3'-0"
4'-8"6'-7"15'-6"15'-6"15'-6"11'-3"3'-8"
34'-0"34'-0"
NOTES:
G F D
BUS SUPPORTS
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .