- Construction of a Company Operations Facility at Butts Army Airfield, Fort Carson, Colorado (PN 77303)
- Solicitation number
- W9128F20R0031
About this file
This amendment to solicitation W9128F-19-R-0031 from the Department of the Army Corps of Engineers provides revisions to specifications, drawings, and the proposal due date. The specifications and drawings for the construction of a Company Operations Facility at Butts Army Airfield, Fort Carson, Colorado are modified, with general revisions and reissued sheets provided for site plans, sections, and details. A site visit is scheduled for February 11, 2020 and proposals are now due by March 6, 2020. The wage determinations for Colorado heavy construction and El Paso County building construction are also updated.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0001 W9128F
COMPANY OPERATIONS FACILITIES, PN 77303, BUTTS ARMY AIRFIELD (FY20), FORT CARSON, COLORADO
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of proposals is 6 MAR 2020 at 1400 hours
Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 6
W9128F-20-R-0031
01/31/2020
01/23/2020
01/31/2020
Am #0001 - 1
Am #0001 - 2 (Continuation SF 30)
31 January 2020 Solicitation No. W9128F 20 R 0031
Date of Issue: 23 January 2020 Date of Receiving Proposals: 6 MAR 2020
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of COMPANY OPERATIONS FACILITIES, PN 77303, BUTTS ARMY AIRFIELD
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 00 21 00 Page 12, paragraph 1.11, delete item (b) in its entirety and replace with the following:
“ (b) The Government intends to hold a site visit on 11 FEB 2020, at 1300 hours (1:00 p.m.) Mountain. The meeting will be held at Fort Carson South Resident Office, Building 1359, 6082 Magrath Avenue, Fort Carson, CO 80913. For Additional details, contact:
Austin Eidson Austin.W.Eidson@usace.army.mil
No reservations are required; however, each visitor will be required to obtain a day pass at the Fort Carson Visitor Control and Welcome Center, Building 6012, located just outside the main gate (Gate 1) at the intersection of HWY 115 and Nelson Blvd. To obtain a 24-hour pass, a valid state or federally-issued picture ID or driver's license, vehicle registration, and proof of insurance is required. The visitor must also pass a background check that is conducted when applying for the pass. The Visitor Control Center Phone is open between the hours of 0500 - 2100 and their phone number is 719-526-2332 or 719-526-2325 if there are any questions.”
(2) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO200002 in its entirety and substitute General Wage Rate Decision Number CO200002 dated 01/31/2020. General Wage Rate Decision Number CO200022 dated 01/31/2020 is included as an attachment to this Amendment.
(3) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO200022 in its entirety and substitute General Wage Rate Decision Number CO200022 dated 01/24/2020. General Wage Rate Decision Number CO200022 dated 01/24/2020 is included as an attachment to this Amendment.
b. Specifications (New and/or Revised and Reissued). NONE
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.
Volume 1 of 2 – Site Facilities Package:
Am #0001 - 3 (Continuation SF 30)
(1) Sheet CG101, GRADING AND DRAINAGE PLAN – AREA 1
(2) Sheet CG102, GRADING AND DRAINAGE PLAN – AREA 2
(3) Sheet CG301, SITE CROSS SECTIONS
(4) Sheet CG302, SITE CROSS SECTIONS
(5) Sheet CG303, SITE CROSS SECTIONS
Volume 2 of 2 – Single Company Building Package:
(1) Sheet A-620, WINDOW AND LOUVER DETAILS
(2) Sheet A-801, AIR BARRIER TESTING BOUNDARY
(3) Sheet A-802, AIR BARRIER TESTING BOUNDARY
(4) Sheet A-901, PERSPECTIVE VIEWS
(5) Sheet EY101, FIRST FLOOR SECURITY PLAN – AREA A
(6) Sheet EY102, FIRST FLOOR SECURITY PLAN – AREA B
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 6 MAR 2020.
Attachments:
General Wage Rate Decisions CO200002 dated 01/31/2020 CO200022 dated 01/24/2020 Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
31 JAN 2020
nep/2160
This page was intentionally left blank for duplex printing.
Am #0001 CO200002 - 1 01/31/2020
General Decision Number: CO20200002 01/31/2020
Superseded General Decision Number: CO20190002
State: Colorado
Construction Type: Heavy
Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/31/2020
Am #0001 CO200002 - 2 01/31/2020
ASBE0028-001 07/01/2019
Rates Fringes
Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 32.98 14.73
BRCO0007-004 01/01/2019
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON AND WELD COUNTIES
BRICKLAYER.......................$ 29.52 10.48
BRCO0007-006 05/01/2018
EL PASO AND PUEBLO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 25.88 10.34
ELEC0012-004 06/01/2019
PUEBLO COUNTY
Rates Fringes
ELECTRICIAN
Electrical contract over $1,000,000..................$ 27.50 12.50+3% Electrical contract under $1,000,000..................$ 24.85 12.50+3%
ELEC0068-001 06/01/2019
JEFFERSON, LARIMER, AND WELD COUNTIES
ELECTRICIAN......................$ 36.50 16.18
ELEC0111-001 03/01/2019
Am #0001 CO200002 - 3 01/31/2020
Line Construction:
Groundman...................$ 20.41 13.75%+$6.20 Line Equipment Operator.....$ 28.98 13.75%+$6.20 Lineman and Welder..........$ 44.92 25.25%+$5.75
ELEC0113-002 06/01/2019
EL PASO COUNTY
Rates Fringes
ELECTRICIAN......................$ 32.60 16.23
ELEC0969-002 06/01/2019
MESA COUNTY
Rates Fringes
ELECTRICIAN......................$ 25.20 10.06
ENGI0009-001 05/01/2018
Rates Fringes
Power equipment operators:
Blade: Finish...............$ 28.57 10.70 Blade: Rough................$ 28.25 10.70 Bulldozer...................$ 28.25 10.70 Cranes: 50 tons and under..$ 28.40 10.70 Cranes: 51 to 90 tons......$ 28.57 10.70 Cranes: 91 to 140 tons.....$ 29.55 10.70 Cranes: 141 tons and over...$ 31.07 10.70 Forklift....................$ 27.87 10.70 Mechanic....................$ 28.73 10.70 Oiler.......................$ 27.49 10.70 Scraper: Single bowl under 40 cubic yards........$ 28.40 10.70 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 28.57 10.70 Trackhoe....................$ 28.40 10.70
* IRON0024-003 11/01/2019
Rates Fringes
Ironworkers:.....................$ 30.85 22.26 Structural
LABO0086-001 05/01/2009
Am #0001 CO200002 - 4 01/31/2020
Laborers:
Pipelayer...................$ 18.68 6.78
PLUM0003-005 06/01/2017
JEFFERSON, LARIMER AND WELD COUNTIES
PLUMBER..........................$ 39.08 16.44
PLUM0058-002 07/01/2018
EL PASO COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 32.75 14.85
PLUM0058-008 07/01/2018
PUEBLO COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 32.75 14.85
PLUM0145-002 07/01/2016
MESA COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 35.17 11.70
PLUM0208-004 06/01/2016
JEFFERSON, LARIMER AND WELD COUNTIES
PIPEFITTER.......................$ 37.10 16.62
* SHEE0009-002 07/01/2019
Am #0001 CO200002 - 5 01/31/2020
Sheet metal worker...............$ 34.62 17.95
* TEAM0455-002 07/01/2019
Rates Fringes
Truck drivers:
Pickup......................$ 21.91 4.42 Tandem/Semi and Water.......$ 22.54 4.42
SUCO2001-006 12/20/2001
Rates Fringes
BOILERMAKER......................$ 17.60
Carpenters:
Form Building and Setting...$ 16.97 2.74 All Other Work..............$ 15.14 3.37
Cement Mason/Concrete Finisher...$ 17.31 2.85
IRONWORKER, REINFORCING..........$ 18.83 3.90
Laborers:
Common......................$ 11.22 2.92 Flagger.....................$ 8.91 3.80 Landscape...................$ 12.56 3.21
Painters:
Brush, Roller & Spray.......$ 15.81 3.26
Power equipment operators:
Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other
Am #0001 CO200002 - 6 01/31/2020 health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
Am #0001 CO200002 - 7 01/31/2020 the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Am #0001 CO200002 - 8 01/31/2020
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Am #0001 CO200022 - 1 01/24/2020
General Decision Number: CO20200022 01/24/2020
Superseded General Decision Number: CO20190022
State: Colorado
Construction Type: Building
County: El Paso County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020
Am #0001 CO200022 - 2 01/24/2020
ASBE0028-002 07/01/2019
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 32.98 14.73
ELEC0113-005 06/01/2019
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 32.60 16.23
* ELEV0025-001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 46.53 35.245
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0009-017 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
(Crane) 141 tons and over...........$ 31.07 10.70 50 tons and under...........$ 28.40 10.70 51 to 90 tons...............$ 28.57 10.70 91 to 140 tons..............$ 29.55 10.70
* IRON0024-009 11/01/2019
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 30.85 11.92
* IRON0024-011 11/01/2019
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 30.85 11.92
Am #0001 CO200022 - 3 01/24/2020
PAIN0079-009 08/01/2017
PAINTER (Spray)..................$ 20.50 8.41
PLAS0577-002 05/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.13 12.10
PLUM0058-003 07/01/2018
Rates Fringes
PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 32.75 14.85
PLUM0058-004 07/01/2018
Rates Fringes
PIPEFITTER, Includes HVAC Pipe Installation (Excludes HVAC Duct and Unit Installation)....................$ 32.75 14.85
SFCO0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 36.73 20.47
* SHEE0009-005 07/01/2019
Rates Fringes
SHEET METAL WORKER (Excludes HVAC Duct, Pipe and Unit Installation)....................$ 34.62 17.95
SUCO2013-008 07/31/2015
Rates Fringes
BRICKLAYER.......................$ 21.96 0.00
CARPENTER........................$ 22.63 6.98
LABORER: Common or General......$ 13.40 1.40
LABORER: Mason Tender - Brick...$ 15.99 0.00
Am #0001 CO200022 - 4 01/24/2020
LABORER: Mason Tender - Cement/Concrete..................$ 16.00 0.00
LABORER: Pipelayer..............$ 16.96 3.68
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.26 8.62
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.58 2.42
OPERATOR: Grader/Blade..........$ 21.50 0.00
PAINTER (Brush and Roller).......$ 17.20 0.00
ROOFER...........................$ 16.71 0.00
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 25.18 6.30
SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 24.00 2.18
TRUCK DRIVER: Dump Truck........$ 17.34 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
Am #0001 CO200022 - 5 01/24/2020
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Am #0001 CO200022 - 6 01/24/2020
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Am #0001 CO200022 - 7 01/24/2020
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
This page was intentionally left blank for duplex printing.
FORCE MAIN
SANITARY SEWER
' C
H A
IN
L
IN
K
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
N
KEY PLAN
SCALE 1" = 400'
30' 60'0
SCALE: 1" = 30'-0"
N
CB
58455
SD-3
SDF-CI1
SDF-AI1
S D
E -P
IP
E
STORM DRAIN F
SDF-PIPE1
SDF-PIPE2
IE = 5834.00
IE = 5833.50
SEE DETAIL CG510
INFILTRATION CELL
BOTTOM
INFILTRATION CELL
(18" DIA. PVC)
OUTLET CULVERT
INFILTRATION CELL
+5845.53'
+5845.43'
+5844.97'
+5844.22'
+5840.19'
+5835.00'
+5835.00'
+5834.50'
+5834.00'
K C
G
C G
C G
J
C G
C G
C G
M
CG30
CG10
2CG10
N 1,307,691.82
E 3,208,452.65
N 1,307,711.19
E 3,208,651.73
N 1,307,816.00
E 3,208,336.81
INFILTRATION SWALE
INFILTRATION SWALE
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
NEW CULVERT PIPE
NEW STORM DRAIN PIPE
NEW STORM DRAIN MANHOLE
NEW ROOF DRAIN CLEANOUT
NEW TYPE "R" CURB INLET
+5886.45' SPOT ELEVATION
EXISTING/CONCURRENT MAJOR CONTOUR
EXISTING/CONCURRENT MINOR CONTOUR
NEW "TYPE A" STORM DRAIN AREA INLET
NOTES:
1. ADJUST EXISTING MANHOLES, VAULT LIDS, SWITCHES,
CATHODIC TEST STATIONS, TRACER WIRE TEST STATIONS,
AND ALL OTHER UTILITY APPURTENANCES TO NEW GRADE,
IF APPLICABLE.
2. SEE CG200 SERIES SHEETS FOR ROADWAY, CULVERT, AND
STORM DRAIN PROFILES.
3. SEE CG300 SERIES SHEETS FOR SITE AND ROADWAY
CROSS SECTIONS.
4. SEE CG500 SERIES SHEETS FOR STORM DRAIN, ROOF DRAIN,
DRAINAGE FLUMES, AND STORMWATER STORAGE SYSTEM
DETAILS.
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:16:53 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG101
F C
E O
C G
.d g n
O M
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
E O
C G
.d g n
F C
E O
C G
.d
E O
C G
.d g n
O M
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T C
O M
P A
N Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG101
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
A N
S I
D
W F -2
-R -0
A R
E A
A R
E A
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG101
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
A N
S I
D
W F -2
-R -0
F -8
-0
F -8
-0
A N
S I
D A
N S I
D
W .C .D
A V
E N
P O
R T
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG101
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
W .C .D
A V
E N
P O
R T
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG101
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
D
B
IR
K B
Y
W F -2
-R -0
W F -2
-R -0
P N
F
Y
P N
F
Y
P N
F
Y
P N
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
B U
T T S A
R M
Y A
IR
F
IE
L D
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:16:53 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG101
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P N
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D
A H
A
N E
C
A P
IT
O L A
V E
O M
A H
A D
IS
T R
IC
T
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
F C
E O
C G
.d g n
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG101
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG101
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
F C
E O
C G
.d g nF -8
-0
D
B
IR
K B
Y
A N
S I
D
W F -2
-R -0
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/2
/2
/2
/2
G E
N E
R A
L R
E V
IS
IO
N S
/2
/2
G E
N E
R A
L R
E V
IS
IO
N S
/2
/2
G E
N E
R A
L R
E V
IS
IO
N S
/2
/2
G E
N E
R A
L R
E V
IS
IO
N S
/2
/2
G E
N E
R A
L R
E V
IS
IO
N S
G E
N E
R A
L R
E V
IS
IO
N S
D
CO
CB
5850 5
' C
H A
IN
L
IN
K
W
W W
W
E E E
SIZE = 12"
MATERIAL = RCP
INVERT = 5859.81
SIZE = 12"
MATERIAL = RCP
INVERT = 5860.22
W W
W W
MATERIAL = PVC
SIZE = 10"
INV. OUT EAST = 5845.96
INV. IN WEST = 5846.29
RIM = 5861.50
SANITARY SEWER MANHOLE
S
C
CB
MATERIAL = RCP
SIZE = 12"
INV. OUT SOUTH = 5860.57
RIM = 5862.51
STORM DRAIN CATCH BASIN
CB
MATERIAL = RCP
SIZE = 12"
INV. OUT SOUTH = 5860.06
INV. IN NORTH = 5859.98
RIM = 5862.49
STORM DRAIN CATCH BASIN
CB
MATERIAL = RCP
SIZE = 12"
INV. OUT EAST = 5861.42
INV. IN WEST = 5861.44
RIM = 5863.97
STORM DRAIN CATCH BASIN
MATERIAL = PVC
SIZE = 10"
INV. OUT EAST = 5847.83
INV. IN NORTH = 5848.29
INV. IN WEST = 5849.65
RIM = 5864.15
SANITARY SEWER MANHOLE
S
CB
MATERIAL = RCP
SIZE = 12"
INV. OUT EAST = 5861.73
RIM = 5864.60
STORM DRAIN CATCH BASIN
CB
MATERIAL = RCP
SIZE = 12"
INV. OUT SOUTH = 5860.99
INV. IN WEST = 5861.35
RIM = 5865.14
STORM DRAIN CATCH BASIN
M
CB
MATERIAL = RCP
SIZE = 12"
INV. OUT SOUTH = 5860.54
INV. IN WEST = 5860.60
INV. IN NORTH = 5860.53
RIM = 5864.45
STORM DRAIN CATCH BASIN
BASED ON G-TAB MAPPING
NON-POT WATER LINE
FOUNTAIN VALLEY
APPROX. LOCATION
BASED ON LIDAR INFORMATION
ARE APPROXIMATE AND
CONTOURS IN THIS DRAW
FORCE MAIN
SANITARY SEWER
AIRFIELD RD (ASPHALT)
AIRFIELD RD (ASPHALT)
7' C
HAIN
LIN
K
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
N
KEY PLAN
SCALE 1" = 400'
30' 60'0
SCALE: 1" = 30'-0"
N
CB
CB
CO
CO
CO
CO CO
CB
CB
CO
D
CI-4
PAVEMENT ELEVATION
MATCH EXISTING
PAVEMENT ELEVATION
MATCH EXISTING
STORM DRAIN E
ONE COMPANY COF
FFE 5858.00
SDE-AI1
SDE-AI2
SDE-AI3
SDE-MH1
SDE-AI4
SDE-CI1
S D
E -P
IP
E
ROOF DRAIN, SEE PLUMBING
CONNECT TO BUILDING
ROOF DRAIN, SEE PLUMBING
CONNECT TO BUILDING
IE = 5855.00
ROOF DRAIN
IE = 5852.00
ROOF DRAIN
IE = 5851.50
ROOF DRAIN
S D
E -P
IP
E
S D E -P
IP
E
S D
E -P
IP
E
SDE-PIPE5
SPUR1
STORM DRAIN E
C U
L V
E R
T
SDE-PIPE6
FLUME (TYP.)
CONCRETE DRAINAGE
+5855.32'
+5855.92'
+5857.48'
+5854.51'
+5853.49'
+5856.90'
+5857.21'
+5857.25'
+5856.75'
+5856.71' +5856.40'
+5856.90'
+5856.30'
+5856.69'
+5856.14'
+5856.68'
+5856.90'
+5856.30'
+5857.66'
+5857.80'
+5858.15'
+5856.86'
+5856.77'
+5855.32'
+5854.25'
+5856.28'
+5857.88'
+5854.06'
+5853.89'
+5853.31'+5853.05'
+5853.53'
+5856.22'
+5856.42'
+5856.92'
+5858.80'
+5862.75'
+5863.34'
+5864.50'
+5864.19'
+5865.13'
+5859.38'
+5857.40'
+5854.06'
+5855.27'
+5855.00' +5854.98'
+5853.06'
+5851.94' +5851.71'
+5852.16'
+5852.59'
+5854.76'
+5855.16'
+5854.93'
+5854.79'
+5854.49' +5854.68'
+5849.40'
+5850.01'+5850.04' +5849.57'
+5851.35'
+5851.82'
+5852.33'
+5853.35'+5853.30'
+5858.26'
+5853.43' +5853.31'
+5864.17'+5864.61'
+5857.80'
+5857.88'
IE = 5854.00
ROOF DRAIN
K C
G
C G
C G
J
C G
C G
C G
M
CG30
CG10
2CG10
L
CG30
CG10
L
CG30
CG10
N 1,308,353.45
E 3,208,170.74
N 1,307,933.57
E 3,208,612.81
N 1,308,074.34
E 3,208,157.34
N 1,308,231.11
E 3,208,525.34
N 1,308,280.82
E 3,208,409.02
.0
+5854.19'
INFILTRATION SWALE
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
NEW CULVERT PIPE
NEW STORM DRAIN PIPE
NEW STORM DRAIN MANHOLE
NEW ROOF DRAIN CLEANOUT
NEW TYPE "R" CURB INLET
+5886.45' SPOT ELEVATION
EXISTING/CONCURRENT MAJOR CONTOUR
EXISTING/CONCURRENT MINOR CONTOUR
NEW "TYPE A" STORM DRAIN AREA INLET
NOTES:
1. ADJUST EXISTING MANHOLES, VAULT LIDS, SWITCHES,
CATHODIC TEST STATIONS, TRACER WIRE TEST STATIONS,
AND ALL OTHER UTILITY APPURTENANCES TO NEW GRADE,
IF APPLICABLE.
2. SEE CG200 SERIES SHEETS FOR ROADWAY, CULVERT, AND
STORM DRAIN PROFILES.
3. SEE CG300 SERIES SHEETS FOR SITE AND ROADWAY
CROSS SECTIONS.
4. SEE CG500 SERIES SHEETS FOR STORM DRAIN, ROOF DRAIN,
DRAINAGE FLUMES, AND STORMWATER STORAGE SYSTEM
DETAILS.
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:00 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG102
E O
C G
.d
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
E O
C G
.d g n
F C
E O
C G
.d
E O
C G
.d g n
O M
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG102
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
A N
S I
D
W F -2
-R -0
A R
E A
A R
E A
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG102
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
A N
S I
D
W F -2
-R -0
F -8
-0
F -8
-0
A N
S I
D A
N S I
D
W .C .D
A V
E N
P O
R T
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG102
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
W .C .D
A V
E N
P O
R T
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG102
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
D
B
IR
K B
Y
W F -2
-R -0
W F -2
-R -0
P N
F
Y
P N
F
Y
P N
F
Y
P N
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:00 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG102
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
A H
A
N E
C
A P
IT
O L A
V E
O M
A H
A D
IS
T R
IC
T
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
F C
E O
C G
.d g n
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG102
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
W .C .D
A V
E N
P O
R T
A R
E A
G R
A D
IN
G A
N D D
R A
IN
A G
E P
L A
N
CG102
D
B
IR
K B
Y
W .C .D
A V
E N
P O
R T
F C
E O
C G
.d g nF -8
-0
D
B
IR
K B
Y
A N
S I
D
W F -2
-R -0
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
D
CO
CB
EXISTING GRADE
FINISHED GRADE
SIDEWALK
SIDEWALK
SIDEWALK
3" BITUMINOUS SURFACE COURSE
6" AGGREGATE SUBBASE COURSE
3" BITUMINOUS INTERMEDIATE COURSE
6" AGGREGATE BASE COURSE
STOOP
3" BITUMINOUS SURFACE COURSE
6" AGGREGATE SUBBASE COURSE
3" BITUMINOUS INTERMEDIATE COURSE
6" AGGREGATE BASE COURSE
10" PCC CONCRETE
10" RIGID PAVEMENT BASE COURSE
INTEGRAL CURB
INFILTRATION SWALE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
58755875
E L E
V A
T
IO
N
FFE 5858.00
1 COMPANY COF
E L .5
S T
A .2
E L .3
S T
A .8
E L .1
S T
A .9
E L .2
S T
A .9
E L .8
S T
A .9
E L .9
S T
A .9
E L .0
S T
A .9
E L .0
S T
A .7
E L .4
S T
A .7
E L .4
S T
A .7
E L .8
S T
A .9
E L .7
S T
A .1
E L .5
S T
A .4
E L .8
S T
A .4
4+80 5+00 5+20 5+40 5+60 5+80 6+00 6+20 6+40 6+60 6+80 7+00 7+20
E L .4
S T
A .0
E L .1
S T
A .3
E L .1
S T
A .3
E L .6
S T
A .5
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:09 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG301
E O
C G
.d
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
E O
C G
.d g n
F C
E O
C G
.d
E O
C G
.d g n
O M
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
VERTICAL SCALE: 1" = 5' - 0"
5+20
E L E
V A
T
IO
N
5' 10'0
T H
IS
S
H E
E T
M A
T C
H L
IN
E
T H
IS
S
H E
E T
M A
T C
H L
IN
E
STATION
STATION
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00
E L E
V A
T
IO
N
58755875
SECTION J
CG102
CG101 CG301
4+80
E L E
V A
T
IO
N
HORIZONTAL SCALE: 1" = 20' - 0"
20' 40'0
P N
F
Y
P N
F
Y
P N
F
Y
P N
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG301
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
A N
S I
D
W F -2
-R -0
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG301
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
A N
S I
D
W F -2
-R -0
F -8
-0
F -8
-0
A N
S I
D A
N S I
D
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG301
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG301
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
D
B
IR
K B
Y
W F -2
-R -0
W F -2
-R -0
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:09 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG301
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
A H
A
N E
C
A P
IT
O L A
V E
O M
A H
A D
IS
T R
IC
T
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
/1
/2
/1
/2
/1
/2
/1
/2
F C
E O
C G
.d g n
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG301
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG301
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
F C
E O
C G
.d g nF -8
-0
D
B
IR
K B
Y
A N
S I
D
W F -2
-R -0
/1
/2
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
3" BITUMINOUS SURFACE COURSE
6" AGGREGATE SUBBASE COURSE
3" BITUMINOUS INTERMEDIATE COURSE
6" AGGREGATE BASE COURSE
10" PCC CONCRETE
10" RIGID PAVEMENT BASE COURSE
6" AGGREGATE SURFACE COURSE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E L .9
S T
A .8
E L .5
S T
A .6
E L .0
S T
A .6
E L .0
S T
A .5
58705870
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20
E L E
V A
T
IO
N
E L .9
S T
A .8
58705870
4+80 5+00 5+20 5+40 5+60 5+80 6+00 6+20
E L E
V A
T
IO
N
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:16 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG302
E O
C G
.d
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
E O
C G
.d g n
F C
E O
C G
.d
E O
C G
.d g n
O M
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
L E
V A
T
IO
N
T H
IS
S
H E
E T
M A
T C
H L
IN
E
VERTICAL SCALE: 1" = 5' - 0"
HORIZONTAL SCALE: 1" = 20' - 0"
5' 10'0
20' 40'0
STATION
SECTION K
CG102
CG101 CG302
T H
IS
S
H E
E T
M A
T C
H L
IN
E
58705870
E L E
V A
T
IO
N
STATION
5+20
4+80
P N
F
Y
P N
F
Y
P N
F
Y
P N
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG302
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
A N
S I
D
W F -2
-R -0
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG302
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
A N
S I
D
W F -2
-R -0
F -8
-0
F -8
-0
A N
S I
D A
N S I
D
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG302
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG302
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
D
B
IR
K B
Y
W F -2
-R -0
W F -2
-R -0
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:16 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG302
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
A H
A
N E
C
A P
IT
O L A
V E
O M
A H
A D
IS
T R
IC
T
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
/1
/2
/1
/2
/1
/2
/1
/2
F C
E O
C G
.d g n
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG302
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG302
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
F C
E O
C G
.d g nF -8
-0
D
B
IR
K B
Y
A N
S I
D
W F -2
-R -0
/1
/2
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
3" BITUMINOUS SURFACE COURSE
6" AGGREGATE SUBBASE COURSE
3" BITUMINOUS INTERMEDIATE COURSE
6" AGGREGATE BASE COURSE
INFILTRATION SWALE
FINISHED GRADE
EXISTING GRADE
3" BITUMINOUS SURFACE COURSE
6" AGGREGATE SUBBASE COURSE
3" BITUMINOUS INTERMEDIATE COURSE
6" AGGREGATE BASE COURSE
10" PCC CONCRETE
10" RIGID PAVEMENT BASE COURSE
INFILTRATION SWALE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E L .7
S T
A .8
E L .2
S T
A .9
E L .2
S T
A .0
E L .0
S T
A .3
E L .6
S T
A .3
E L .8
S T
A .3
E L .4
S T
A .3
E L .6
S T
A .3
E L .4
S T
A .9
E L .4
S T
A .8
58605860
58605860
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00
E L E
V A
T
IO
N
E L E
V A
T
IO
N
STATION
58655865
58655865
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00
E L E
V A
T
IO
N
E L E
V A
T
IO
N
STATION
FFE 5858.00
1 COMPANY COF
E L .4
S T
A .4
E L .4
S T
A .9
E L .5
S T
A .9
E L .8
S T
A .7
E L .8
S T
A .3
E L .5
S T
A .0
E L .0
S T
A .1
E L .0
S T
A .7
E L .9
S T
A .7
E L .0
S T
A .0
E L .9
S T
A .5
E L .9
S T
A .5
E L .9
S T
A .5
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:22 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG303
E O
C G
.d
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
E O
C G
.d g n
F C
E O
C G
.d
E O
C G
.d g n
O M
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
VERTICAL SCALE: 1" = 5' - 0"
HORIZONTAL SCALE: 1" = 20' - 0"
5' 10'0
20' 40'0
SECTION L
CG101 CG303
SECTION M
CG102
CG101 CG303
P N
F
Y
P N
F
Y
P N
F
Y
P N
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
D O
O M
A H
A D
IS
T R
IC
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG303
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
A N
S I
D
W F -2
-R -0
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG303
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
A N
S I
D
W F -2
-R -0
F -8
-0
F -8
-0
A N
S I
D A
N S I
D
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG303
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG303
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
D
B
IR
K B
Y
W F -2
-R -0
W F -2
-R -0
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg8:17:22 AM 1/30/2020
...\FC\FCEO\40000 Design Products\CAD_BIM\_Sheets\FCEOCG303
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
F
Y
B U
T T S A
R M
Y A
IR
F
IE
L D
C O
M P
A N
Y O
P E
R A
T
IO
N S F
A C
IL
IT
IE
S
F O
R T C
A R
S O
N
C O
L O
R A
A H
A
N E
C
A P
IT
O L A
V E
O M
A H
A D
IS
T R
IC
T
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
/1
/2
/1
/2
/1
/2
/1
/2
F C
E O
C G
.d g n
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG303
F -8
-0
D
B
IR
K B
Y
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
W
C .D
A V
E N
P O
R T
S
IT
E C
R O
S S S
E C
T
IO
N S
CG303
D
B
IR
K B
Y
W
D A
V E
N P
O R
T
F C
E O
C G
.d g nF -8
-0
D
B
IR
K B
Y
A N
S I
D
W F -2
-R -0
/1
/2
/2
/2
A M G
E N
E R
A L R
E V
IS
IO
FORMED DRIP, TYP.
INSUL., PRECAST
PANEL, TYP.
0'-7 1/2"
1" INSUL. GLASS,
TYP.
FIXED WINDOW FRAME
SYSTEM, TYP.
CONT. BEAD SEALANT, TYP.
2 1/2" FRAMING (UNO)
@ 16" O.C., TYP.
P.T. BLOCKING
AS REQ'D, TYP.
METAL HEAD FLASHING, TYP.
O /F
P R
EC
AS
T
O /F
F R
AM
E
LAY-IN CEILING
TILE, TYP.
5/8" GYPSUM
WALLBOARD, TYP.
0' -6
2 1/2"
CONT. BEAD SEALANT, TYP.
-LOCATE FRAME IN WINDOW
TO ENSURE SEALANT IS APPLIED
TO PRECAST CONC.
INSUL., PRECAST
PANEL, TYP.
1" INSUL. GLASS, TYP. FIXED WINDOW FRAME
SYSTEM, TYP.
CONT. BEAD SEALANT, TYP.
2 1/2" FRAMING (UNO)
@ 16" O.C., TYP.
5/8" GYPSUM
WALLBOARD, TYP.
P.T. BLOCKING
AS REQ'D, TYP.
METAL PAN FLASHING
W/ END DAM, EA. END, TYP.
O /F
P R
EC
AS
T
O /F
F R
AM
E
SLOPE
0'-2 1/2" 0'-7 1/2"
1/2" SS WINDOW
STOOL
0'-9 1/8" 0'-0 1/2"
O /F
G W
B
BE
LO
W
22 GA., METAL ANGLE
AS REQ'D @ OPNG, TYP.
1/2" SOLID SURFACE WINDOW STOOL
5/8" GYPSUM WALLBOARD, TYP.
2 1/2" FRAMING (UNO)
@ 16" O.C., TYP.
CONT. BEAD, SEALANT, TYP.
FIXED WINDOW FRAME
SYSTEM, TYP.
METAL PAN FLASHING,
W/ END DAM, EA. END, TYP.
INSUL. PRECAST PANEL, TYP.
1" INSUL. GLASS, TYP.
0' -0
/2
0'-2 1/2" 1'-4 5/8" 0'-0 1/2"
O /F
P R
EC
AS
T
O /F
F R
AM
E
O /F
G W
B, BE
LO
W
0' -0
/8
TOP/PRECAST OPNG
EDGE / SLOPE ED
G
E / S
LO
PE
1'-4"
CONT. SEALANT, TYP.
CONT. BACKER ROD
W/ SEALANT, TYP.
FORMED DRIP, TYP.
INSUL., PRECAST
PANEL, TYP.
METAL HEAD FLASHING,
TYP.
O /F
P R
EC
AS
T
O /F
F R
AM
E
STORM PROOF
LOUVER W/ BIRD
SCREEN
MOUNTING ANGLE
SHIM, BACKER ROD
AND SEALANT, BOTH
SIDES DAMPER WHERE REQ'D,
SEE MECH SHEETS
CORROSION -
RESISTANT FLASH'G
W/ DRIP
2 1/2"
INSUL., PRECAST
PANEL, TYP.
METAL PAN FLASHING
W/ END DAM, EA. END, TYP.
O /F
P R
EC
AS
T
O /F
F R
AM
E
SLOPE
0'-2 1/2"
STORM PROOF
LOUVER W/ BIRD
SCREEN
MOUNTING ANGLESHIM, BACKER ROD
AND SEALANT, BOTH
SIDES DAMPER WHERE REQ'D,
SEE MECH SHEETS
CORROSION -
RESISTANT JAMB
TRIM
METAL PAN FLASHING,
W/ END DAM, EA. END, TYP. INSUL. PRECAST PANEL, TYP.
0' -0
/2
O /F
P R
EC
AS
T
O /F
F R
AM
E
TOP/PRECAST OPNG
EDGE / SLOPE ED
G
E / S
LO
PE
STORM PROOF
LOUVER W/ BIRD
SCREEN
SHIM, BACKER
ROD & SEALANT
BOTH SIDES
DAMPER WHERE REQ'D,
SEE MECH SHEETS
PREFINISHED MTL
SILL FLASHING,
SET IN SEALANT
MOUNTING ANGLE
2 1/2"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-620
W
IN
D O
W A
N D
L O
U
VE
R D
ET
AI
L S
FO
R
T C
AR
SO
N , C
O
LO
R
AD
O C
O M
P A N
Y O
P E R
AT
IO
N S
FA
C
I L
IT
IE
S
BU
TT
S
AR
M Y
A I R
FI
EL
D
FY
2 0 , P
N
O M
A H A
D
IS
T R
IC
T
C
AP
IT
O L
AV
E
O M
A H A, N E
6 8
A.
P
AR
KE
R
A.
P
AR
KE
R
B.
G
O R
U P
/1
0/
W
F-
-R
-0
FC
EO
_C O
F1 _D
M _A
I.R
VT
F1
-8 5-
A.
P
AR
KE
R
3" = 1'-0"
1 WINDOW DETAIL - HEAD1
3" = 1'-0"
2 WINDOW DETAIL - JAMB1
3" = 1'-0"
3 WINDOW DETAIL - SILL1
3" = 1'-0"
4 DETAIL - HEAD
3" = 1'-0"
5 DETAIL - JAMB
3" = 1'-0"
6 DETAIL - SILL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
G
EN
ER
AL
R
EV
IS
IO
N
S
/2 9/
GENERAL NOTES:
1. AIR BARRIER TESTING IS REQUIRED IN THIS FACILITY.
2. THE PLANS AND SECTIONS SHOWN IN THE A-8XX SHEETS
IDENTIFY AREAS TO BE TESTED AS WELL AS AREAS EXEMPT FROM
TESTING. ALL WALL, CEILING, FLOOR AND ROOF CONDITIONS THAT
COME IN CONTACT WITH THE EXTERIOR, AN UNTESTED AREA, OR
AN ADJACENT AIR BARRIER TESTING AREA SHALL BE TREATED AS
AN AIR BARRIER BOUNARY.
3. PRIMARY AIR BARRIER MATERIALS IN THIS PROJECT INCLUDE
PRECAST CONCRETE PANELS, STEEL STUD CONSTRUCTION WITH
SPRAY FOAM CAVITIES, AS WELL AS SHEATHING, WEATHER