Text version
2. DATE ISSUED 3. DATE OPENED
17-Jul-20
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
C. REASONABLE CONTRACT
7A 7B 7C D.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT
A001 Topsoil Borrow 100 CY $36.26 $36.99 $37.73 $38.48 $39.25 $18,871.00 A002 Unclassified Excavation 500 CY $22.18 $22.62 $23.07 $23.53 $24.00 $57,700.00 A003 Rock Excavation 10 CY $174.73 $178.22 $181.78 $185.42 $189.13 $9,092.80 A004 Embankment Borrow Material 500 CY $29.59 $30.18 $30.78 $31.40 $32.03 $76,990.00 A005 Select Granular Material 10 TON $43.20 $44.06 $44.94 $45.84 $46.76 $2,248.00 A006 Overhaul 1 CY/MI $0.83 $0.85 $0.87 $0.89 $0.91 $4.35
A007 Supplied in Place 300 SY $11.09 $11.31 $11.54 $11.77 $12.01 $17,316.00
A008 2" Mill Salvage & Stockpile 400 SY $10.81 $11.03 $11.25 $11.48 $11.71 $22,512.00 A009 4" Mill Salvage & Stockpile 400 SY $20.51 $20.92 $21.34 $21.77 $22.21 $42,700.00
A010 Asphalt 3000 FT $4.53 $4.62 $4.71 $4.80 $4.90 $70,680.00
A011 First 1,000 Tons (Stockpiled) 250 TON $26.79 $27.33 $27.88 $28.44 $29.01 $34,862.50 A012 Over 1,000 Tons (Stockpiled) 250 TON $25.71 $26.22 $26.74 $27.27 $27.82 $33,440.00 A013 Aggregate (Supplied-In-Place) 250 TON $47.09 $48.03 $48.99 $49.97 $50.97 $61,262.50 A014 Road Grading 10 HRS $280.00 $285.60 $291.31 $297.14 $303.08 $14,571.30
A015 Single 10000 SY $3.87 $3.95 $4.03 $4.11 $4.19 $201,500.00
A016 Pave Gravel Surface 300 TON $193.48 $197.35 $201.30 $205.33 $209.44 $302,070.00 A017 Overlay Paved Surface 300 TON $179.95 $183.55 $187.22 $190.96 $194.78 $280,938.00 A018 Patch (4" Deep) 400 SF $7.51 $7.66 $7.81 $7.97 $8.13 $15,632.00
A019 Pavement 4" Thick 200 SF $9.69 $9.88 $10.08 $10.28 $10.49 $10,084.00 A020 Pavement 6" Thick 200 SF $14.15 $14.43 $14.72 $15.01 $15.31 $14,724.00 A021 Curb & Cutter (Cast) 100 FT $52.50 $53.55 $54.62 $55.71 $56.82 $27,320.00 A022 Rebar (#4) 100 FT $1.59 $1.62 $1.65 $1.68 $1.71 $825.00
A023 Shoulder Striping 4" 10000 FT $1.37 $1.40 $1.43 $1.46 $1.49 $71,500.00 A024 Centerline Striping 4" 5000 FT $1.37 $1.40 $1.43 $1.46 $1.49 $35,750.00 A025 Parking Area Striping 300 FT $2.83 $2.89 $2.95 $3.01 $3.07 $4,425.00 A026 Stop Line Striping (12") 20 FT $24.63 $25.12 $25.62 $26.13 $26.65 $2,563.00 A027 Handicap & Misc. Symbols 2 EA $149.65 $152.64 $155.69 $158.80 $161.98 $1,557.52
A028 Seeding 300 SY $5.14 $5.24 $5.34 $5.45 $5.56 $8,019.00 A029 Erosing Blanket 300 SY $4.90 $5.00 $5.10 $5.20 $5.30 $7,650.00
A030 18" CMP 0'-10' Deep 20 FT $110.14 $112.34 $114.59 $116.88 $119.22 $11,463.40 A031 18" CMP 10'-20' Deep 20 FT $140.64 $143.45 $146.32 $149.25 $152.24 $14,638.00 A032 18" Flared End 1 EA $430.27 $438.88 $447.66 $456.61 $465.74 $2,239.16 A033 18" Elbow (22.5 or 45 Degree) 1 EA $429.18 $437.76 $446.52 $455.45 $464.56 $2,233.47 A034 24" CMP 0'-10' Deep 20 FT $138.15 $140.91 $143.73 $146.60 $149.53 $14,378.40 A035 24" CMP 10'-20' Deep 20 FT $176.40 $179.93 $183.53 $187.20 $190.94 $18,360.00 A036 24" Flared End 1 EA $514.16 $524.44 $534.93 $545.63 $556.54 $2,675.70 A037 24" Elbow (22.5 or 45 Degree) 1 EA $539.86 $550.66 $561.67 $572.90 $584.36 $2,809.45 A038 Erosion Riprap 10 TON $47.63 $48.58 $49.55 $50.54 $51.55 $2,478.50 A039 Drainage Structure 4' Depth 1 EA $5,900.00 $6,018.00 $6,138.36 $6,261.13 $6,386.35 $30,703.84
$1,548,787.89
STORM DRAINAGE PIPING - INSTALLED (SPECIFICATION SECTION 33 40 00)
SEEDING (SPECIFICATION SECTION 32 92 19)
TOTAL
EARTHWORK (SPECIFICATION SECTION 31 00 00)
COLD MILLING OF BITUMINOUS PAVEMENT (SPECIFICATION SECTION 32 01 16.17)
GEOTEXTILE FABRIC (SPECIFICATION SECTION 31 05 19)
PAVEMENT MARKINGS (SPECIFICATION SECTION 32 17 24.00 10)
CONCRETE WORK (SPECIFICATION SECTION 32 16 13)
HOT MIX ASPHALT (SPECIFICATION SECTION 32 12 16)
BITUMINOUS SURFACE TREATMENT (SPECIFICATION SECTION 32 12 11)
AGGREGATE BASE COURSE (SPECIFICATION SECTION 32 11 23)
CRACK SEALING (SPECIFICATION SECTION 32 01 17.16
TOTALUNIT PRICE (YEAR
1) UNIT PRICE (YEAR 2) UNIT PRICE (YEAR 3) UNIT PRICE (YEAR 4) UNIT PRICE (YEAR 5)
6. NUMBER OF AMENDMENTS ISSUED
Road Rehab IDIQ SATOC - Cold Brook and Cottonwood
B. REASONABLE CONTRACT
(Without Profit)
(Including Profit)
A. HIRED LABOR
IGE
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F20B0019
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David Neal - Contracting Officer
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
2. DATE ISSUED 3. DATE OPENED
17-Jul-20
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
7A 7B 7C D.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT
EARTHWORK
A001 Topsoil Borrow 100 CY $25.00 $25.50 $26.01 $26.53 $27.06 $13,010.10 A002 Unclassified Excavation 500 CY $16.00 $16.32 $16.65 $16.98 $17.32 $41,632.32 A003 Rock Excavation 10 CY $100.00 $102.00 $104.04 $106.12 $108.24 $5,204.04 A004 Embankment Borrow Material 500 CY $25.00 $25.50 $26.01 $26.53 $27.06 $65,050.50 A005 Select Granular Material 10 TON $26.00 $26.52 $27.05 $27.59 $28.14 $1,353.05 A006 Overhaul 1 CY/MI $1.00 $1.02 $1.04 $1.06 $1.08 $5.20
A007 Supplied in Place 300 SY $4.00 $4.08 $4.16 $4.24 $4.33 $6,244.85
A008 2" Mill Salvage & Stockpile 400 SY $8.00 $8.16 $8.32 $8.49 $8.66 $16,652.93 A009 4" Mill Salvage & Stockpile 400 SY $10.00 $10.20 $10.40 $10.61 $10.82 $20,816.16
A010 Asphalt 3000 FT $3.50 $3.57 $3.64 $3.71 $3.79 $54,642.42
A011 First 1,000 Tons (Stockpiled) 250 TON $27.00 $27.54 $28.09 $28.65 $29.23 $35,127.27 A012 Over 1,000 Tons (Stockpiled) 250 TON $26.00 $26.52 $27.05 $27.59 $28.14 $33,826.26 A013 Aggregate (Supplied-In-Place) 250 TON $29.00 $29.58 $30.17 $30.78 $31.39 $37,729.29
A014 Single 10 HRS $125.00 $127.50 $130.05 $132.65 $135.30 $6,505.05
A015 Pave Gravel Surface 10000 SY $6.60 $6.73 $6.87 $7.00 $7.14 $343,466.65 A016 Overlay Paved Surface 300 TON $294.00 $299.88 $305.88 $312.00 $318.24 $458,996.34 A017 Patch (4" Deep) 300 TON $294.00 $299.88 $305.88 $312.00 $318.24 $458,996.34
A018 Fog Seal 400 SF $22.00 $22.44 $22.89 $23.35 $23.81 $45,795.55
A019 Pavement 4" Thick 200 SF 10 $10.20 $10.40 $10.61 $10.82 $10,408.08 A020 Pavement 6" Thick 200 SF 12 $12.24 $12.48 $12.73 $12.99 $12,489.70 A021 Curb & Cutter (Cast) 100 FT 65 $66.30 $67.63 $68.98 $70.36 $33,826.26 A022 Rebar (#4) 100 FT 2 $2.04 $2.08 $2.12 $2.16 $1,040.81
A023 Shoulder Striping 4" 10000 FT 1.2 $1.22 $1.25 $1.27 $1.30 $62,448.48 A024 Centerline Striping 4" 5000 FT 1.2 $1.22 $1.25 $1.27 $1.30 $31,224.24 A025 Parking Area Striping 300 FT 4 $4.08 $4.16 $4.24 $4.33 $6,244.85 A026 Stop Line Striping (12") 20 FT 120 $122.40 $124.85 $127.34 $129.89 $12,489.70 A027 Handicap & Misc. Symbols 2 EA 375 $382.50 $390.15 $397.95 $405.91 $3,903.03
A028 Seeding 300 SY 2 $2.04 $2.08 $2.12 $2.16 $3,122.42 A029 Erosing Blanket 300 SY 5 $5.10 $5.20 $5.31 $5.41 $7,806.06
A030 18" CMP 0'-10' Deep 20 FT 65 $66.30 $67.63 $68.98 $70.36 $6,765.25 A031 18" CMP 10'-20' Deep 20 FT 80 $81.60 $83.23 $84.90 $86.59 $8,326.46 A032 18" Flared End 1 EA 400 $408.00 $416.16 $424.48 $432.97 $2,081.62 A033 18" Elbow (22.5 or 45 Degree) 1 EA 400 $408.00 $416.16 $424.48 $432.97 $2,081.62 A034 24" CMP 0'-10' Deep 20 FT 75 $76.50 $78.03 $79.59 $81.18 $7,806.06 A035 24" CMP 10'-20' Deep 20 FT 90 $91.80 $93.64 $95.51 $97.42 $9,367.27 A036 24" Flared End 1 EA 500 $510.00 $520.20 $530.60 $541.22 $2,602.02 A037 24" Elbow (22.5 or 45 Degree) 1 EA 500 $510.00 $520.20 $530.60 $541.22 $2,602.02 A038 Erosion Riprap 10 TON 70 $71.40 $72.83 $74.28 $75.77 $3,642.83 A039 Drainage Structure 4' Depth 1 EA 5000 $5,100.00 $5,202.00 $5,306.04 $5,412.16 $26,020.20
TOTAL: $1,901,353.32
PAVEMENT MARKINGS (SPECIFICATION SECTION 32 17 24.00 10)
SEEDING (SPECIFICATION SECTION 32 92 19)
STORM DRAINAGE PIPING - INSTALLED (SPECIFICATION SECTION 33 40 00)
BITUMINOUS SURFACE TREATMENT (SPECIFICATION SECTION 32 12 11)
HOT MIX ASPHALT (SPECIFICATION SECTION 32 12 16)
ASPHALTIC SEAL & FOG COATS (SPECIFICATION SECTION 32 12 36.13)
AGGREGATE BASE COURSE (SPECIFICATION SECTION 32 11 23)
CRACK SEALING (SPECIFICATION SECTION 32 01 17.16
COLD MILLING OF BITUMINOUS PAVEMENT (SPECIFICATION SECTION 32 01 16.17)
GEOTEXTILE FABRIC (SPECIFICATION SECTION 31 05 19)
CONCRETE WORK (SPECIFICATION SECTION 32 16 13)
TOTALUNIT PRICE (YEAR
1) UNIT PRICE (YEAR 2) UNIT PRICE (YEAR 3) UNIT PRICE (YEAR 4) UNIT PRICE (YEAR
5)
6. NUMBER OF AMENDMENTS ISSUED
Road Rehab IDIQ SATOC - Cold Brook and Cottonwood
C. AMENDMENTS ACKNOWLEDGED
RP&H Incorporated
B. BID SECRUITY (Type & Amount)
A. OFFEROR
NO.1
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F20B0019
4. ISSUING OFFICE
5. PROJECT TITLE 9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David Neal - Contracting Officer
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
| Bid Abstract_W9128F20B0019 IGE |
| PAGE1 |
| Bid Abstract_W9128F20B0019_Offer 1 |
| PAGE1 |
| 2020-07-21T05:46:43-0500 | |
| David Neal, Contracting Officer |
| 2020-07-21T05:46:16-0500 | |
| David Neal, Contracting Officer |
File details come from the government source that posted it. Updated .