| ATTACHMENT A |
| EXHIBIT LINE ITEM (ELIN) PRICING SCHEDULE |
The quantities provided below are estimates covering the entire life of the contract for each year (Base and Option Periods). These quantities are not fixed amounts. These quantities are not minimum nor maximum amounts. The government does not anticipate these quantities being spread evently across the base and option periods. More or less quantity may be used over the life of the contract. Quantities are provided for estimate purposes only.
ELIN PRICING SCHEDULE QTY UNIT UNIT PRICE (YEAR 1) UNIT PRICE (YEAR 2) UNIT PRICE (YEAR 3) UNIT PRICE (YEAR 4) UNIT PRICE (YEAR 5) TOTAL
| EARTHWORK (SPECIFICATION SECTION 31 00 00) | ||||
| A001 | Topsoil Borrow | 100 | CY | $0.00 |
| A002 | Unclassified Excavation | 500 | CY | $0.00 |
| A003 | Rock Excavation | 10 | CY | $0.00 |
| A004 | Embankment Borrow Material | 500 | CY | $0.00 |
| A005 | Select Granular Material | 10 | TON | $0.00 |
| A006 | Overhaul | 1 | CY/MI | $0.00 |
| GEOTEXTILE FABRIC (SPECIFICATION SECTION 31 05 19) | ||||
| A007 | Supplied in Place | 300 | SY | $0.00 |
| COLD MILLING OF BITUMINOUS PAVEMENT (SPECIFICATION SECTION 32 01 16.17) | ||||
| A008 | 2" Mill Salvage & Stockpile | 400 | SY | $0.00 |
| A009 | 4" Mill Salvage & Stockpile | 400 | SY | $0.00 |
| CRACK SEALING (SPECIFICATION SECTION 32 01 17.16 | ||||
| A010 | Asphalt | 3000 | FT | $0.00 |
| AGGREGATE BASE COURSE (SPECIFICATION SECTION 32 11 23) | ||||
| A011 | First 1,000 Tons (Stockpiled) | 250 | TON | $0.00 |
| A012 | Over 1,000 Tons (Stockpiled) | 250 | TON | $0.00 |
| A013 | Aggregate (Supplied-In-Place) | 250 | TON | $0.00 |
| A014 | Road Grading | 10 | HRS | $0.00 |
| BITUMINOUS SURFACE TREATMENT (SPECIFICATION SECTION 32 12 11) | ||||
| A015 | Single | 10000 | SY | $0.00 |
| HOT MIX ASPHALT (SPECIFICATION SECTION 32 12 16) | ||||
| A016 | Pave Gravel Surface | 300 | TON | $0.00 |
| A017 | Overlay Paved Surface | 300 | TON | $0.00 |
| A018 | Patch (4" Deep) | 400 | SF | $0.00 |
| CONCRETE WORK (SPECIFICATION SECTION 32 16 13) | ||||
| A019 | Pavement 4" Thick | 200 | SF | $0.00 |
| A020 | Pavement 6" Thick | 200 | SF | $0.00 |
| A021 | Curb & Cutter (Cast) | 100 | FT | $0.00 |
| A022 | Rebar (#4) | 100 | FT | $0.00 |
| PAVEMENT MARKINGS (SPECIFICATION SECTION 32 17 24.00 10) | ||||
| A023 | Shoulder Striping 4" | 10000 | FT | $0.00 |
| A024 | Centerline Striping 4" | 5000 | FT | $0.00 |
| A025 | Parking Area Striping | 300 | FT | $0.00 |
| A026 | Stop Line Striping (12") | 20 | FT | $0.00 |
| A027 | Handicap & Misc. Symbols | 2 | EA | $0.00 |
| SEEDING (SPECIFICATION SECTION 32 92 19) | ||||
| A028 | Seeding | 300 | SY | $0.00 |
| A029 | Erosing Blanket | 300 | SY | $0.00 |
| STORM DRAINAGE PIPING - INSTALLED (SPECIFICATION SECTION 33 40 00) | ||||
| A030 | 18" CMP 0'-10' Deep | 20 | FT | $0.00 |
| A031 | 18" CMP 10'-20' Deep | 20 | FT | $0.00 |
| A032 | 18" Flared End | 1 | EA | $0.00 |
| A033 | 18" Elbow (22.5 or 45 Degree) | 1 | EA | $0.00 |
| A034 | 24" CMP 0'-10' Deep | 20 | FT | $0.00 |
| A035 | 24" CMP 10'-20' Deep | 20 | FT | $0.00 |
| A036 | 24" Flared End | 1 | EA | $0.00 |
| A037 | 24" Elbow (22.5 or 45 Degree) | 1 | EA | $0.00 |
| A038 | Erosion Riprap | 10 | TON | $0.00 |
| A039 | Drainage Structure 4' Depth | 1 | EA | $0.00 |
| $0.00 |