This document is a pre-solicitation notice for a Rapid Response Environmental Remediation Services Single Award Task Order Contract to be awarded by the Department of the Army Corps of Engineers Engineering District Omaha. The contract will have a value not to exceed $80 million over three base years and four optional years, or until the $80 million capacity is reached. The contract will provide both cost reimbursement and firm fixed price task orders for emergency, immediate, and rapid response environmental remediation services within 30 days, 72 hours, and 24 hours respectively of task order notification. Services will support sites in the Continental US, Alaska, Hawaii, and areas of responsibility for the South Atlantic and Pacific Ocean Divisions. The contract is set aside under NAICS code 562910.
W9128F19R0060 $80M UNR RR6
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F19R0060_Amendment_0003.pdf | ||
| W9128F19R0060_Amendment_0002.pdf | ||
| W9128F19R0060_Amendment_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 30 Aug 2019
X
A
X B
X C
D
EX
X
G
F 70 - 89
90 - 121
X H 122 - 132 glenda.a.canty@usace.army .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 132
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W9128F 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
1616 Capitol Ave, Omaha, NE conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
GLENDA A CANTY 402-995-2059
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 12
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
13 - 43 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 46 - 47 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 48 - 50 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
51 - 68
PART II - CO NTRACT CLAUSES
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
30 Jul 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9128F19R0060
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 80,000,000 Job Base Period - Rapid Response ERS/wMMRP
FFP
Base Period - Emergency/Immediate/Rapid Response under NAICS Code
562910, in support of the US Army Corps of Engineers, Omaha District (USACE) and its customers in the Contiguous United States (CONUS) including Alaska, Hawaii, the South Atlantic Division (SAD) Area of Responsibility (AOR), and the
Pacific Ocean Division (POD) AOR. The contract awarded will include both cost reimbursement and firm fixed price task orders, for environmental remediation services and response actions as identified in Section C. Total
SATOC capacity is $80M.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Job Base Period - Rapid Response ERS/wMMRP
CPFF
Base Period - Emergency/Immediate/Rapid Response under NAICS Code
562910, in support of the US Army Corps of Engineers, Omaha District
(USACE) and its customers in the Contiguous United States (CONUS) including
Alaska, Hawaii, the South Atlantic Division (SAD) Area of Responsibility
(AOR), and the Pacific Ocean Division (POD) AOR. The contract awarded will include both cost reimbursement and firm fixed price task orders, for environmental remediation services and response actions as identified in Section
C. Total SATOC capacity is $80M.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Job Contractor Manpower Reporting
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the U.S. Army Corps of Engineers, Omaha District (Requiring Activity’s Unit
Identification Code (UIC): W07106) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Contractors may direct technical questions to the “Send an Email” link at website or email contractormanpower@hqda.army.mil for current information on CMRA.
Information regarding changes to the reporting process, when data should be entered, general police information, how data is protected, and how to enter certain data can be found under the Frequently Asked Questions (FAQ) section at the CMRA website. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs
October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. (To be separately priced on each task order, if applicable.)
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Job OPTION Option Period - Rapid Response ERS/wMMRP
FFP
Option Period - Emergency/Immediate/Rapid Response under NAICS Code
562910, in support of the US Army Corps of Engineers, Omaha District (USACE) and its customers in the Contiguous United States (CONUS) including Alaska, Hawaii, the South Atlantic Division (SAD) Area of Responsibility (AOR), and the
Pacific Ocean Division (POD) AOR. The contract awarded will include both cost reimbursement and firm fixed price task orders, for environmental remediation services and response actions as identified in Section C. Total
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED Job OPTION Option Period - Rapid Response ERS/wMMRP
CPFF
Option Period - Emergency/Immediate/Rapid Response under NAICS Code
562910, in support of the US Army Corps of Engineers, Omaha District
(USACE) and its customers in the Contiguous United States (CONUS) including
Alaska, Hawaii, the South Atlantic Division (SAD) Area of Responsibility
(AOR), and the Pacific Ocean Division (POD) AOR. The contract awarded will include both cost reimbursement and firm fixed price task orders, for environmental remediation services and response actions as identified in Section
C. Total SATOC capacity is $80M.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
UNIT UNIT PRICE MAX AMOUNT
0006 UNDEFINED Job OPTION 6 Month Extension - RR ERS/wMMRP
FFP
6 Month Extension - Emergency/Immediate/Rapid Response under NAICS Code
562910, in support of the US Army Corps of Engineers, Omaha District (USACE) and its customers in the Contiguous United States (CONUS) including Alaska, Hawaii, the South Atlantic Division (SAD) Area of Responsibility (AOR), and the
Pacific Ocean Division (POD) AOR. The contract awarded will include both cost reimbursement and firm fixed price task orders, for environmental remediation services and response actions as identified in Section C. Total
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$80,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each
Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$2,500.00 $80,000,000.00
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and
CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
CLIN
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
0001 1.00 $2,500.00 80,000,000.00 $80,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
0001 1.00
$2,500.00
80,000,000.00
0002 1.00
0004 1.00
0005 1.00
0006 1.00
SUPPLIES OR SERVICES AND PRICE
Section B – Supplies or Services and Prices
1. Contract Definition
The contract awarded under this solicitation will be an Indefinite Delivery/Indefinite Quantity contract for
Emergency/Immediate/Rapid Response under NAICS Code 562910, in support of the US Army Corps of Engineers, Omaha District (USACE) and its customers in the Continental United States (CONUS) including Alaska and Hawaii, the South Atlantic Division (SAD) Area of Responsibility (AOR), and the Pacific Ocean Division (POD) AOR. The contract awarded will include both cost reimbursement and firm fixed price task orders, for response actions and remediation of various hazardous waste sites as identified in Section C.
2. Total Amount of Contract
The total amount of contract capacity under this solicitation shall not exceed $80 Million. There is no limit of the number of task orders that may be executed against this contract. The cumulative amount of the task orders shall not exceed $80M.
3. Minimum Guarantee
The contract awarded under this solicitation shall have a minimum guarantee amount of $2,500.00 which will be obligated at contract award.
4. Ordering Period
This SATOC will have a base ordering period of three (3) years with a four (4) year optional ordering period, or until the $80M contract capacity is expended, whichever occurs first. The Federal Acquisition Regulations (FAR) Clause
52.217-8, “Option to Extend Service” will be incorporated into the contract and may be exercised at the discretion of the Government.
5. Firm Fixed Pricing Task Orders
5.1 Binding Capped Hourly Labor Rates
The binding capped labor rates for this contract shall be provided by the Offeror in Table 1. The amount to be paid to the contractor for each firm-fixed price task order shall not exceed the “maximum” hourly rates proposed by the contractor for the labor disciplines listed in paragraph 5.1., Table 1, “Binding Capped Labor Rate Schedule.”
5.1.2 The capped hourly rates provided on Table 1 shall be “Fully Burdened,” i.e., shall include Overhead, General/Administrative (G&A), Labor Burden Fringes, and any other indirect costs exclusive of profit.
5.1.3 Subcontracted personnel are subject to the same caps as established for the prime contractor for Overhead, General/Administrative (G&A), Labor Burden Fringes, and any other indirect cost caps.
5.1.4 Labor rates used in formulating task order proposals shall not exceed the capped labor rates as of the date of task order requirement.
5.1.5 The Offeror shall indicate for each discipline whether it is employed by the prime or a subcontractor by annotating PRIME or SUB next to the discipline in the first column. For example, “CADD Operator (SUB)”.
The rates shown per labor discipline shall be fully burdened rates, exclusive of profit.
5.1.6 The hourly burdened labor rates proposed in the Binding Capped Labor Rate Schedule are binding upon contract award for the life of the SATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications.
5.1.7 The capped hourly, fully-burdened labor rates shall include all applied direct and indirect costs, e.g., direct labor costs, payroll taxes, insurance, benefits, applied OH, applied G&A, and any applied indirect costs, but shall not include profit.
5.1.8 If a discipline is not listed in the contract rate pricing schedule and is required for the contractor to perform a specific task order, the contractor may propose the required labor category and provide the unburdened labor rate along with all applied direct and indirect costs which formulate the fully burdened labor rate
(exclusive of profit) in the proposal submitted in response to the issued Request for Task Order Proposal
(RTOP). The Government will review the proposed fully burdened labor rate in order to determine whether the rate is considered fair and reasonable and may negotiate the proposed rate if it is not considered fair and reasonable.
5.1.9 If during the Contract Period of Performance, any of the Offeror’s Government approved personnel (prime or subcontracted) are no longer available, the Offeror shall replace these individuals with personnel whom, at a minimum, have the same qualifications as the personnel being replaced. The Offeror shall be responsible for negotiating labor rates for those personnel that do not exceed the rates provided in Table 1, which are the maximum rates the Government will pay for any personnel. The Contractor shall submit the replacement personnel’s qualifications to the Contracting Officer for approval.
5.1.10 The applicable capped labor rates shall be governed by the effective date of the Task Order. Task Orders will use the prices for the 12-month period effective on the date the Task Order is issued. Modifications to Task
Orders will reflect the rates of the “current 12-month” binding labor rate schedule. For example, if the rate schedule changes over on 1 November of each year, and a Task Order is issue on 1 September 2020 for 12 months work, the maximum rates will be the rates that were effective on 1 November 2019. Under the same assumptions, if a modification to the Task Order is required in December 2020, the labor rates effective on 1
November 2020 will apply.
5.1.11 The Offeror has the responsibility to provide labor rates that comply with all potential Service Contract Act wage determinations and/or Davis Bacon wage decisions for each labor discipline subject to those wage determinations/wage decisions. The Government will provide the applicable wage determination(s) for the specific geographic location of the task orders in the RTOP.
5.1.12 Provide one (1) rate per labor discipline, regardless of whether the individuals employed for that discipline are directly employed or subcontracted.
TABLE 1 - BINDING CAPPED LABOR RATE SCHEDULE
Labor Discipline
U n b u rd en ed
L ab o r
R at e (B as e
P er io d
B u rd en ed
L ab o r
R at e (B as e
P er io d
Y ea r
B u rd en ed
L ab o r
R at e (B as e
P er io d
Y e a r
B u rd en ed
L ab o r
R at e (B as e
P er io d
Y e a r
B u rd en ed
L ab o r
R at e (O p ti o n
P er io d
Y e a r rd en ed
L ab o r
R at e (O p ti io d
Y e a r rd en ed
L ab o r
R at e (O p ti io d
Y e a r rd en ed
L ab o r
R at e (O p ti io d
Y e a r rd en ed
L ab o r
R at e (6
M o n th
E x te n si o n
0001 - Operations/
Program Manager
0002 – Response/
Project Manager
0003 - Senior
Engineer
0004 - Mid-Level
0005 - Junior
0006 - Senior Scientist
0007 - Mid-Level
0008 - Junior
0009 - Site Safety and Health Officer
0010 - Regulatory
Specialist/T&D Coordinator
0011 - Quality Control
Supervisor
0012 - Site
Superintendent / Site Manager
0013 - Health
Physicist
0014 -
Geophysicist
0015 - Certified
Industrial
Hygienist
0016 - Program Chemist
0017 - Project
Chemist
0018 - Hazardous
Waste Specialist
0019 - Senior Engineering
Technician
0020 - Mid-Level
0021 – Jr.
0022 - GIS
Specialist
0023 - CADD
Operator
0024 - Word Processor/Clerical
0025 – Cost
Tracker
0026 - Data
Processor
0027 - Specification
Writer
0028 -
Community Relations
0029 - Senior
Contracts Manager
0030 - Procurement
0031 - Data Base Administrator
0032 - Senior
UXO Supervisor
0033 - UXO QC
0034 - UXO
Safety Officer
0035 - UXO
Sweeper
0036 - UXO
Technician I
0037 - UXO
Technician II
0038 - UXO
Technician III
5.3. Firm-Fixed Price Escalation Rate and Maximum Profit
5.3.1. Escalation Rate. The escalation rate applied to years 2 through 5 shall be provided by the Offeror in Table 2:
Table 2: Escalation Rate
5.3.2. Maximum Profit.
Profit will be negotiated at the task order level for each Firm-Fixed Price task order but shall not exceed the maximum profit rate provided by the Offeror in Table 2, “Maximum Profit.” The maximum profit shall be binding for the life of the contract, to include all option periods and extensions, and shall be the maximum profit the Contractor will be allowed to propose for all firm-fixed-price task orders and modifications issued under this contract.
The Contractor shall provide its proposed profit for each task order based upon calculations derived from use of the
DD Form 1547 as found in DFAR 215.404-70 based on the tasks identified in the RTOP and the risk associated with the project.
The maximum profit on this contract shall be provided by the Offeror in Table 3:
Table 3: Maximum Profit
6. Cost Reimbursable Task Orders
The contractor shall have the ability to support cost reimbursement task orders (i.e., an adequate cost accounting system for determining costs applicable to the contract order and an acceptable purchasing system). The Government reserves the right to request a Defense Contract Audit Agency (DCAA) audit prior to or after contract award.
Additionally, each cost reimbursable task order issued will be subject to DCAA Audit.
The contractor shall be reimbursed for all allocable, allowable and reasonable costs in accordance with FAR Part 31 up to the "estimated" cost for work specified in the task order scope of work. The Government will not reimburse the contractor for preparation and negotiation of task orders.
6.1. Accounting System
The contractor will use DCAA approved forward pricing rates or Certified Public Accountant (CPA) established cost pools in accordance with FAR Part 31 for applied Overhead, G&A, and other indirect applied rates, and shall have an accounting system that is in compliance with Cost Accounting Standards (CAS) [large business firms only] and
Generally Accepted Accounting Principles (GAAP).
6.2. Fixed Fee
Fixed Fee will be negotiated on each cost reimbursement task order. In no case can the fixed fee exceed the statutory limit of 10% for cost reimbursement task orders, in accordance with Federal Acquisition Regulations 15.404-4.
6.2.1 The maximum Fixed Fee shall be provided by the Offeror in Table 4, Maximum Fixed Fee, and is binding upon contract award for the life of the SATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications.
Table 4: Maximum Fixed Fee
7. Binding Capped Rates for Firm Fixed and Cost Reimbursable Task Orders
The Binding Capped Rates represent the maximum Overhead, G&A, or other Indirect rates that the Contractor shall use when responding to a RTOP issued by the Government. These rates are applicable to both Firm Fixed Price and
Cost Reimbursable task orders and shall also apply to all modifications. The Offeror may use lower rates in proposals, but not higher. If a Contractor proposes a lower rate than the capped rate on a cost reimbursement task order proposal because its actual rates are lower than the capped rates, those proposed Overhead, G&A, and other indirect rates become the cap for that specific task order. However, it does not affect the Overhead, G&A and other indirect rates used on other task orders.
The Binding Capped Rates for this contract shall be provided by the Offeror in Table 5. The capped rates provided by the Offeror are binding upon contract award for the life of the SATOC, to include all option periods and extensions.
These rates are applicable to both task orders and modifications.
Table 5: Binding Capped Rates
Overhead Rate
G&A Rate
8. Department of Labor Wage Rates
For individual task orders written against the contract, the appropriate Wage Determination/Decision will be provided with the RTOP.
9. Travel
The Contractor shall perform all travel and attend all meetings necessary for completion of the work required by the
Task Orders. Per Diem (lodging and MI & E expenses) shall be paid at the current Government rates in accordance with the Federal Travel Regulation (FTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current FTR. Per Diem rate information may be obtained at http://www.defensetravel.dod.mil/. Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Air travel shall (if possible) be planned in advance in order to acquire the best prices available. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the FTR. The maximum amount paid for an airline ticket shall be the cost of travel via coach class.
10. Task Order Allocation
The allocated contract capacity between Firm-Fixed Price and Cost-Plus-Fixed-Fee CLINs will adjust as necessary based on the nature of the work to be executed.
11. Award To Successful Offeror
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO) or an Administrative
Contracting Officer (ACO)), acting within their appointed limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting
Officer will be at the Contractor’s own risk.
(End of Section B)
If Applicable: Other Indirect Applied Rates
(Specifically identify rate and reason for rate below) http://www.defensetravel.dod.mil/
Section C - Descriptions and Specifications
SCOPE OF SERVICES
Section C – Description/Specifications
1. Contract Requirements.
The contractor, operating as an independent contractor and not as an agent of the Government, shall provide all labor, materials, facilities, and equipment to perform all work identified in each individual task order. The contractor may be required to perform work under multiple task orders at different sites simultaneously. The contractor shall be cognizant of all appropriate laws, regulations, and guidance. The contractor shall ensure that all work activities performed by his or her personnel, subcontractors and suppliers are completed in accordance with applicable laws and regulations.
Any incident of noncompliance noted by the contractor shall immediately be brought to the attention of the Contracting
Officer (KO) and/or the Contracting Officer's Representative (COR) by written notice. Nothing in this contract shall relieve the contractor of the responsibility to comply with these laws and regulations. Any conflicts between laws/regulations and contract/task order requirements shall be brought to the attention of the KO and/or COR.
The contractor shall be responsible for acquiring the latest version of applicable regulatory or agency guidance, including but not limited to, the referenced documents cited in this Section C and/or subsequent task orders issued after award of the contract, unless otherwise specified.
1.1 Permits.
The contractor shall obtain permits and licenses necessary to conduct the work required by this contract including, but not necessarily limited to, environmental permits, building permits, discharge permits, Nuclear Regulatory
Commission (NRC) or state license for radiation activities, and Department of Transportation (DOT) permits for transport of MEC and HTRW on public highways. The contractor shall comply with all applicable Federal, State, and local laws and regulations, including Technical Bulletin TB 700-2, “DEPARTMENT OF DEFENSE AMMUNITION
AND EXPLOSIVES HAZARD CLASSIFICATION PROCEDURES,” when transporting MEC. Rights of entry on and off Government property may be required. For cost reimbursement task orders, the Government will reimburse the contractor for all reasonable, allocable, and allowable costs related to obtaining such permits and licenses.
1.2 Rights in Technical Data.
All reports and data necessary to satisfy the Government’s needs will be acquired in accordance with Defense Federal
Acquisition Supplement (DFARS) Subpart 227.71.
2. General Information.
a. This contract for an Unrestricted Indefinite Delivery/ Indefinite Quantity (IDIQ) Single Award Task Order
Contract (SATOC) for Rapid Response/Immediate Response/Emergency Response (RR/IR/ER), Environmental Remediation (ERS) Services and Other Mission Related Support Services under NAICS Code
562910, in support of the US Army Corps of Engineers (USACE) and its customers CONUS (Continental
United States) and within the Pacific Ocean Division (POD) and South Atlantic Division (SAD) Areas of
Responsibilities (AORs), including Alaska, Hawaii, U.S. Territories and other OCONUS locations. The successful Offeror shall provide emergency, immediate, or rapid response environmental response and/or remediation services at sites within the geographic boundaries of the contracts in accordance with the scope of this contract.
b. Task Orders issued under this contract will be firm-fixed price or cost reimbursement with the applicable wage determination provided with the Request for Task Order Proposal (RTOP) and incorporated in the resulting task order. It is anticipated that a majority of work will be accomplished using cost plus fixed fee task orders. The contractor shall provide personnel with current training and medical monitoring as required by the Occupational Safety and Health Administration (OSHA), and other applicable training that may be necessary for work in hazardous environments.
c. The contractor shall comply with all federal, state and local laws and regulations that may be applicable to the specific performance based work statement in the task order. The task orders will use a Performance
Work Statement (PWS) which will provide the performance objectives of the project but will also provide the contractor with the maximum amount of flexibility for successfully completing the project at the lowest price. The Government intends to describe the work in terms of the required results rather than “how” the work is to be accomplished in accordance with FAR 37.6. If OCONUS performance is required, task orders will incorporate applicable requirements including, but not limited to, host country regulations and Status of
Forces Agreement (SOFA) requirements, as applicable.
d. The majority of the task orders that will be issued under this contract will provide services related to requirements of the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental
Response, Compensation and Liability Act (CERCLA), the Environmental Protection Agency (EPA)
Emerging Contaminate Program; the National Oil and Hazardous Substances Pollution Contingency Plan
(NCP), Military Munitions Response Program (MMRP), the Clean Water Act, the Clean Air Act, National
Environmental Policy Act (NEPA), National Historic Preservation Act, Endangered Species Act and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal, radioactive waste/mixed waste management/disposal, and with Underground
Storage Tanks (USTs), and other fuels related issues. Actions may address both regulated and non-regulated toxic substances and emerging contaminants. Incidental construction (i.e. excavation/removal of contaminated soil, off-site disposal of contaminated soil, installation of treatment systems, etc.) will also be included in this contract; however, construction activities will be incidental to the remediation effort.
2.1 Management Information Systems. Prior to the award of a cost reimbursement task order, the Contractor will submit their Management Information System (MIS) for approval by the Government, unless the Government allows an exception to this requirement. The MIS is considered critical to the success of cost reimbursement task orders. This
MIS should integrate cost and schedule information to provide at a minimum: daily tracking of costs incurred, daily tracking of costs scheduled, projection of cost and schedules, earned value, and time phased budget and spending curves. Automated information should be remotely accessible at the work site and other locations to allow for daily cost tracking of actual labor (both on-site and home office), equipment, purchases, subcontracts, other commitments, obligations, and expenditures. This system should be able to be used as a project management tool to capture committed or obligated costs as they occur, not when reconciled at invoice.
These capabilities will be needed on cost reimbursement task orders. Any exceptions would be identified in the task order specific Performance Work Statement (PWS).
The cost tracking system shall be maintained on-site and shall provide real time ability to capture costs.
The cost tracking system shall have the ability to forecast costs.
The cost tracking system shall provide a daily report for review and approval by the Government.
The cost tracking system shall allow for active management and budgeting of task order costs, including but not limited to home office costs, direct field costs, indirect costs, subcontractor costs, equipment costs, and other project costs.
The cost tracking system shall have the ability to provide a weekly cost comparison/cost variance report. This report shall capture all committed/expended costs and shall allow the comparison of the forecasted total task order cost with the budgeted cost. It shall also show the overruns/under runs on the individual task order tasks.
2.2 Response Time Requirements
Rapid Response (RR). The contractor must be capable of initiating fieldwork within 30 days after receiving the task order notification. Initial notification of a potential RR mission can happen Monday through Friday 7:00 a.m. – 4:30 p.m. U.S. Central Standard time, excluding holidays.
Immediate Response (IR). The contractor must be capable of initiating fieldwork 72 hours after receipt of the task order notification. Initial notification of a potential IR can happen at any time, seven days a week, holidays, and weekends.
Emergency Response (ER).
The contractor must be capable of initiating fieldwork within 24 hours after receiving the task order award notification.
Initial notification of a potential ER mission can happen any time, seven days a week, to include holidays.
Note: The contractor most likely will not be able to be on-site within 24 or 72 hours for sites outside the U.S. or its territories. However, USACE will require the contractor to initiate deployment plans, coordinate such plans as required, and ensure deploying personnel meet project requirements, etc. during the first 24 to 72 hour period after task order award.
2.3 Project Specific Information.
USACE will provide the contractor with any site-specific information with the Task Order RFP, if practicable.
Otherwise, the Government will provide the information to the contractor as soon as it is available.
3. Scope of Work
The contractor shall be capable of furnishing all labor, materials, equipment, and services required to investigate and/or remediate various sites located within the geographic boundaries of the contract. These sites will include:
a. Sites currently owned or controlled by the Federal Government;
b. Sites formerly owned or controlled by the Federal Government;
c. Sites where the Federal Government is otherwise authorized to respond.
Listed below are the major areas of support provided by this contract:
a. Federal Response: The contract will provide a full response service to the federal customer in situations where rapid, immediate, or emergency response action is necessary to protect human life, public health, or the environment. In addition, this contract will provide the need for a rapid, immediate, or emergency response action as dictated by congressionally mandated start dates, the Environmental Protection Agency, or regulatory constraints.
b. Homeland Defense/Security: The contract will provide time sensitive support to Homeland
Defense/Security initiatives that would involve the assessment and/or implementation of preventative measures to address facility vulnerabilities, or the abatement, minimization, stabilization, containment, mitigation, or elimination of damages or materials remaining from an actual attack by a terrorist, terrorist organization, or hostile country.
c. Defense/Security initiatives: The contract would involve the assessment and/or implementation of preventative measures to address facility vulnerabilities, or the abatement, minimization, stabilization, containment, mitigation, or elimination of damages or materials remaining from an actual attack by a terrorist, terrorist organization, or hostile country.
d. USACE Mission Support: The contract will provide full support to USACE components who directly request assistance in meeting their base mission support needs where there is an immediate threat to human life, public health, or the environment. As part of USACE responsibilities to Federal Emergency Management
Agency, this contract may be used to perform characterization, treatment, management and disposal of contaminated debris or other materials. In addition, these contracts are available to provide USACE Mission
Support through the local MSC or District Commander, provided the requested services comply with the provisions of the contract.
e. Rapid Response Business Process Appropriate: The contract will provide support to projects that may not involve imminent threats to human life, public health, or the environment, but may have significant impacts on human life, public health, or the environment. The contract will provide support to projects where unforeseen conditions are highly prevalent and the ability to adequately define project requirements such that the contractor can provide a firm-fixed price accurately.
3.1 Investigation/ Remediation Requirements.
Each task order will specifically describe the requirements of the project; however, the following services provides most of the anticipated activities:
3.1.2 Preliminary Phase/ Investigation
a. Site characterization and evaluation, including, but not limited to, wetlands and archaeological evaluations.
b. Development of risk assessments, EE/CA’s, Action Memorandums or other similar documents.
c. Survey and mapping.
d. Soil sampling, testing, boring or other geotechnical analysis.
e. Installation, development of groundwater monitoring wells, production/extraction wells, and piezometers.
f. Hydrology and Hydrologic analysis and incidental design
g. Hydro-geological field-testing, analysis and data interpretation.
h. Biological/Chemical/Radiological Assessment.
i. Chemical/geotechnical sampling and analysis.
j. On-site perimeter real-time air monitoring, sampling and analysis.
k. Provide and/or develop engineering/cost recommendation of potential remedial strategies.
l. On-site/off-site chemical analysis for a wide variety of parameters including but not limited to;
routine HTRW procedures, characterizations pursuant to removal actions, explosive, chemical warfare, radiation and other chemical, physical and composite testing.
m. Identification of action levels for regulated hazardous substances through development of human health and ecological risk assessments.
n. Explosives survey (HTRW & OE).
o. Geophysical mapping and associated activities.
3.1.3 Remediation
a. Incidental engineering design/support to removal actions such as; design of soil vapor extraction systems, RCRA caps/liners, water treatment and/or supply systems etc.
b. Construction of soil vapor extraction systems, RCRA caps/liners, water treatment and/or supply systems, etc., pursuant to removal actions.
c. On-site source control and containment such as; buried drum removal, storage tank removal, product recovery, liner installation or other similar activities.
d. On-site treatment such as water treatment, PFOS/PFOA mitigation, fuel recovery, incineration, chemical neutralization or stabilization, air stripping or other similar activities.
e. Transportation, storage, treatment and/or disposal of waste at an off-site facility.
f. Survey, removal, transportation and disposal of asbestos containing materials.
g. Installation of site support facilities.
h. Preparation of applicable Operation and Maintenance manuals and associated training of facility personnel.
i. Incidental Operation and Maintenance of completed facilities constructed under this contract.
j. Protection of building(s) against chemical, biological and radiological contamination.
k. Survey, removal, transportation and disposal of explosives (HTRW & OE).
l. Soil sampling, testing, boring or other geotechnical analysis.
m. Asbestos abatement activities to remove construction materials containing friable/or non-friable
Asbestos Containing Materials (ACMs).
n. Lead abatement activities to eliminate Lead Based Paint (LBP) hazards as defined by the EPA.
4. Environmental Requirements
4.1 General.
The contractor shall be cognizant of all appropriate laws, regulations, and guidelines. The contractor shall ensure that all work activities performed by his personnel, sub-contractors and suppliers comply with the laws and regulations.
Any incident of non-compliance noted by the contractor shall immediately be brought to the attention of the contracting officer and/or COR. The contractor shall utilize trained, experienced on-site personnel to ensure that all on-site procedures for the treatment, transportation, and disposal of hazardous/special wastes are implemented and enforced. The contractor shall provide personnel with current training as required by the Occupational Safety and
Health Administration (OSHA), and Department of Transportation (DOT) Certification in accordance with 49 CFR part 172.700 for HAZMAT employees if applicable.
4.2 Permits/ Approvals.
The contractor shall investigate the requirements for and obtain base permits, environmental permits, licenses, approvals, and/or certificates necessary to accomplish the work specified in the individual task orders. The Contractor shall notify the contracting officer and/or COR of any delay occurring in obtaining the necessary permits or approvals.
4.3 Treatment Storage and/ or Disposal of Hazardous Materials.
The contractor shall ensure the on-site management, transportation, storage, treatment, and disposal of all hazardous/special waste materials complies with all federal, state, and local laws and regulations. The Contractor shall identify and perform any additional analyses necessary to ensure compliance with transportation, storage, treatment, and disposal requirements. Selection of the approved treatment, storage or disposal facility (TSDF) shall be based upon cost-effectiveness, compliance status, regulatory agency input and contracting officer approval. If the waste is sent for off-site storage or disposal, the Contractor shall provide the following to the contracting officer at a minimum:
a. Waste Characterization based upon analysis protocol recommendation by the contractor and approval of the Government in accordance with specific task order PWS. Identification of the disposal facility based upon cost-effectiveness and compliance with all local, State, and Federal laws
b. Transportation selection based upon cost-effectiveness and compliance with all local, State, and Federal laws.
c. Analytical and Manifest Package in accordance with specific task order PWS and paragraph entitled
“Complete Manifest Package”.
d. Shipment tracking in accordance with task order PWS and all applicable laws.
e. Written acceptance from the TSDF.
f. Asbestos wastes must be wetted so that they can be properly handled and containerized. They should be placed in leak tight containers. Each container or wrapped item should be labeled as specified by OSHA standards under 29 CFR 1910.1001(j)(2).
4.4 Complete Manifest Package.
The “complete manifest package” consists of, at a minimum, all hazardous waste manifests, hazardous material shipping papers, waste profile sheets, and land disposal restriction notification and certification forms, CERCLA Off-
Site response approval memo, and all other supporting documentation. Supporting documentation shall include waste disposal history, all analytical results, material safety data sheets available, and any other information received in identifying the proper waste code. The Contractor shall also include as part of the supporting documentation, the specific type of inner and outer packaging, markings, labeling, and placards offered to the transporter. The contractor shall also comply with the requirements listed below:
a. The contractor shall have/appoint a single Contractor Regulatory Specialist/Transportation and Disposal
Coordinator (CRS/TDC) who will review the complete manifest package and shipping documentation.
This individual shall certify as correct all documentation in the complete manifest package and provide a description of the “decision logic” used to classify a particular waste.
b. The contractor shall submit to the contracting officer and/or COR a copy of the complete manifest package for approval.
c. The contractor shall not transport any wastes prior to approval of the complete manifest package by the
Government.
d. For asbestos waste the containers must also include the name of the waste generator and the location at which the waste was generated.
4.5 Transportation of Hazardous/ Special Wastes.
The contractor’s on-site personnel overseeing the transporter prior to shipment of the waste shall certify that the packaging, marking, labeling, handling, and placarding of waste complies with Federal, State, and local laws and regulations and it correlates with the waste classification and quantities designated on the manifest prior to the signature of the transporter. The certification shall be submitted to the Rapid Response On-Site Representative (RR-
OSR), prior to transport and included as part of the final project report. The contractor shall also comply with or provide the requirements listed below:
a. Vehicles used to transport waste must be adequately marked and comply with 49 CFR (Subtitle B- Other
Regulations Relating to Transportation) and in 40 (Protection of the Environment) 61.149(d)(1)(i), (ii), and
(iii).
b. The contractor shall develop and utilize a transportation and disposal tracking form in order to comply with
DOT, NESHAPS, TSCA and RCRA guidelines concerning hazardous waste/materials disposal schedules and associated recordkeeping requirements. Applicable regulations include, but are not limited to 40 CFR
(Protection of the Environment) part 262 (Standards Applicable to Generators of Hazardous Waste), 40
CFR 61.150 (Standards for Waste Disposal for Manufacturing, Fabrication, Demolition, Renovation, and
Spraying Activities), 40 CFR 61.154 (National Emission Standards for Hazardous Air Pollutants) 40 CFR
761.207 (The Manifest General Requirements), and 40 CFR 172.201 (Preparation and Retention of
Shipping Papers) and all applicable 49 CFR Department of Transportation Hazardous Materials
Regulations Subchapter A (Hazardous Materials and Oils Trans). When not specifically required by regulation, the contractor shall provide the contracting officer and/or COR with a delivery receipt from the designated facility.
c. Discrepancy reports if differences between the quantities or types of hazardous waste designated on the manifest or shipping papers and the quantity or type of hazardous waste the TSDF receives. The contractor shall immediately advise the contracting officer and/or COR of manifest discrepancies associated with rejected loads and residues and/or the use of an alternate facility.
d. Exception reports. The contractor shall verify if the generator or his representative have received a copy of the signed manifest from the TSDF on or before the 35th day after transporter signature in accordance with
40 CFR part 262 (Standards Applicable to Generators of Hazardous Waste). The contractor shall prepare a draft exception report for the government’s approval by the timeframes listed in 40 CFR part 262 if necessary. The Contractor shall prepare a draft exception report for the government’s approval by following the data correction process identified in 40 CFR 264.71(I).
4.6 Regulator Notices of Non-Compliance.
In the event the contractor is notified by a Federal, State, or local agent that a manifest, shipment, waste disposal document, or any related activity concerning a task order under this contract is in non-compliance with the law, the contractor shall notify the contracting officer and/or COR immediately.
5. Safety and Health
The contractor shall have an ongoing Safety and Health Program meeting the requirements of all applicable federal, state, and local laws and regulations. In addition, the contractor shall prepare, implement, and enforce for each site a site safety and health plan (SSHP) whenever work is to be performed in a contaminated or potentially contaminated area. The contractor shall ensure that their subcontractors, suppliers and support personnel follow all appropriate safety and health provisions.
5.1. Accident Prevention Plan (APP)/Site Safety and Health Plan (SSHP).
a. The contractor shall develop and implement an accident prevention plan (APP) which includes a site safety and health plan (SSHP) as an appendix. The APP/SSHP shall address all occupational safety and health hazards (traditional construction as well as contaminant related hazards) associated with field activities. The
APP/SSHP shall cover each SSHP element identified in USACE, ER 385-1-92 (Safety and Occupational
Health Requirements for Hazardous Waste (HTRW) Activities, publication date 2007) or newer, and
Technical Bulletin 700-2 Department of Defense Ammunition and Explosives Hazard Classification
Procedures.
b. Elements that overlap with APP elements need not be duplicated in the APP/SSHP, provided each safety and occupational health issue receives adequate attention and detail and is documented in the APP/SSHP. The
APP/SSHP shall be developed under the direct supervision of a qualified safety and health manager (SHM).
On-site activities shall not commence until the plan has been reviewed and accepted. On-site implementation and enforcement of the APP/SSHP shall be managed by a qualified site safety and health officer (SSHO).
See USACE EM 385-1-1 (Safety and Health Requirements) for SHM and SSHO qualifications and experience requirements.
5.2 Site Safety and Health Plan (SSHP).
For each task order issued the contractor shall prepare a written SSHP prior to beginning on-site work. As a minimum the SSHP shall contain the following elements:
a. Site description and contaminant characterization.
b. Safety and health hazard (s) assessment and risk analysis in the form of an Activity Hazard Analysis
(AHA) for each site task and operation.
c. Accident prevention per USACE, EM 385-1-1 Safety and Health Requirements, USACE, EM 1110-1-4007
Safety and Health Aspects HTWR Remediation Technologies, USACE EM 385-1-97 Radiation Protection
Manual, and USACE, EP 200-1-23 Spill Reporting Procedures for HTWR Projects.
d. Safety and health staff organization and responsibilities.
e. Site-specific training.
f. Site-specific medical surveillance parameters.
g. Personal protective equipment (PPE) to be used and establishment of action levels for upgrades or downgrades of PPE.
h. Monitoring and sampling, including personal and perimeter air sampling, heat and cold stress, noise, and radiation monitoring.
i. Safety and health work precautions and procedures.
j. Work permit requirements.
k. Material handling procedures.
l. Site control measures.
m. Personnel and equipment decontamination facilities and procedures.
n. On-site first aid and emergency equipment.
o. At least two persons currently certified in standard First Aid and CPR by the American Red Cross or equivalent agency shall be present on site at all times during site operations.
p. On-site and off-site emergency response plan and contingency procedures.
q. Logs, reports, and record keeping.
5.3 Document Revisions, Addenda, and Field Modifications.
Review comments issued prior to APP/SSHP approval shall be incorporated by revising and reissuing affected pages.
Minor changes affecting only a few pages may be made by addenda sheets and resubmitted.