This document contains a submittal register and related federal contract opportunity notice. The submittal register outlines submittal requirements for a $550 million unrestricted Multiple Award Task Order Contract for rapid disaster infrastructure response. Key submittals include accident prevention plans, quality control plans, schedules, drawings, certifications, and as-built documentation.
The federal contract opportunity is a pre-solicitation notice for a $999 million indefinite delivery, indefinite quantity Multiple Award Task Order Contract to provide time-sensitive construction and infrastructure support to various federal agencies. Example work includes security and defense mission support, disaster response, and infrastructure construction and repair. Task orders may be firm-fixed price or cost-plus-fixed-fee. The primary North American Industry Classification System code is 236220 and size standard is $36.5 million. Mobilization within three days may be required for emergency recovery actions. The scope includes domestic construction applications to support time-sensitive projects.
Submittal Register
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
$550M Unrestricted MATOC Rapid Disaster Infrastructure #2
01 12 00 SD-01 Preconstruction Submittals G AOProposed Methods of Operation
1.13 G AOProgress Charts
1.2Construction Right-of-Way 1.8.6State and Federal Highways 1.8.7State and Local Public Roads
SD-02 Shop Drawings
1.4 G AOCare of Water
1.8.3 G AOTraffic Control
SD-11 Closeout Submittals 1.15Warranty of Construction
01 30 00.24 SD-02 Shop Drawings
1.40 G [RO][Equipment Room Drawings
1.22 G [AO][Plant Layout Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G [RO]Project Scheduler Qualifications
3.4.1 G [RO]Preliminary Project Schedule
3.4.2 G [RO]Initial Project Schedule
3.6.2 G [RO]Periodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.9 G [RO][Submittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G ROPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G ROSustainability Action Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 33 29 1.5.3.1 G ROPreliminary Sustainability eNotebook
SD-11 Closeout Submittals
1.5.3.1 G ROFinal High Performance and
Sustainable Building Checklist
1.5.3.1 G ROFinal Sustainability eNotebook
1.5.3.1 G ROAmended Final Sustainability
eNotebook
1.5.3.1 G ROAmended Final High
Performance and Sustainable Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 G [RO]Accident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G [RO]Accident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators/Riggers
1.7.2.2 G [RO]Standard Lift Plan
1.7.2.3 G [RO]Critical Lift Plan
1.7.2.4 G [RO]Naval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
01 35 26 1.12.4Certificate of Compliance 1.14License Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G [RO]Contractor Quality Control (CQC)
Plan SD-06 Test Reports
3.9Verification Statement 01 74 19 SD-01 Preconstruction Submittals
1.5 G [RO]Waste Management Plan
SD-11 Closeout Submittals
1.6Records 01 78 36.00 24 SD-11 Closeout Submittals
1.2.5Equipment Warranty Booklet 01 78 39.00 24 SD-03 Product Data
1.7.2 G DO50 Percent Preliminary As-Built
Drawings
1.7.3 G DO100 Percent Preliminary As-Built
Drawings
SD-11 Closeout Submittals
1.7.4 G DOFinal As-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .