$95M Multiple Award Task Order Contract (MATOC) for Rapid Disaster Infrastructure (RDI) 8(a)
Solicitation number
W9128F19R0027
Issued by

About this file

This document provides details for a $95 million Multiple Award Task Order Contract (MATOC) opportunity for Rapid Disaster Infrastructure projects issued by the Department of the Army Corps of Engineers Engineering District Omaha. The MATOC is set aside for 8(a) small businesses and allows for a variety of time-sensitive disaster, infrastructure, and construction tasks to support federal customers on a cost-reimbursable, cost-plus-fixed-fee, or firm-fixed price basis depending on project risk. Examples include flood recovery, infrastructure restoration, emergency management, and military construction. The base period of performance is one year with four one-year options and a minimum guarantee of $2,500. Contractors must be prepared to mobilize within three days of notification to support recovery actions. Individual task orders will define specific project requirements.

Submittal Register Template

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

$550M Unrestricted MATOC Rapid Disaster Infrastructure #2

01 12 00 SD-01 Preconstruction Submittals G AOProposed Methods of Operation

1.13 G AOProgress Charts

1.2Construction Right-of-Way 1.8.6State and Federal Highways 1.8.7State and Local Public Roads

SD-02 Shop Drawings

1.4 G AOCare of Water

1.8.3 G AOTraffic Control

SD-11 Closeout Submittals 1.15Warranty of Construction

01 30 00.24 SD-02 Shop Drawings

1.40 G [RO][Equipment Room Drawings

1.22 G [AO][Plant Layout Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G [RO]Project Scheduler Qualifications

3.4.1 G [RO]Preliminary Project Schedule

3.4.2 G [RO]Initial Project Schedule

3.6.2 G [RO]Periodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 G [RO][Submittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 33 29 1.5.3.1 G ROPreliminary Sustainability eNotebook

SD-11 Closeout Submittals

1.5.3.1 G ROFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G ROFinal Sustainability eNotebook

1.5.3.1 G ROAmended Final Sustainability

eNotebook

1.5.3.1 G ROAmended Final High

Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 G [RO]Accident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G [RO]Accident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 G [RO]Standard Lift Plan

1.7.2.3 G [RO]Critical Lift Plan

1.7.2.4 G [RO]Naval Architecture Analysis

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

01 35 26 1.12.4Certificate of Compliance 1.14License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G [RO]Contractor Quality Control (CQC)

Plan SD-06 Test Reports

3.9Verification Statement 01 74 19 SD-01 Preconstruction Submittals

1.5 G [RO]Waste Management Plan

SD-11 Closeout Submittals

1.6Records 01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet 01 78 39.00 24 SD-03 Product Data

1.7.2 G DO50 Percent Preliminary As-Built

Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .