AMENDMENT 0001 for TELLER DAM CONSTRUCTION W9128F-19-R-0026 - SITE VISIT CHANGE AND UPDATE WAGE DETERMINATION

View the file

Other files for this federal contract opportunity

Other files attached to Fort Carson, Teller Dam Project, newest first.
File Type Posted
Am_0004.pdf PDF
Am_0003.pdf PDF
Am_0002.pdf PDF
Site_Visit_Attendee_List_27Feb2019.pdf PDF
W9128F-19-R-0026_Specs.pdf PDF
W9128F-19-R-0026_Plans.pdf PDF
Appendices.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0001

TELLER DAM, FORT CARSON, COLORADO

See attached documentation for content of the amendment changes to RFP

Date for receipt of proposals is 25 MAR 2019 at 1400 hours

Government Point of Contact: Ms. Zandra Hearn,Contract Specialist (402) 996-3713

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

5475 TECH CENTER DRIVE, SUITE 205

COLORADO SPRINGS, CO 80919

See Item 6

W9128F-19-R-0026

02/19/2019

02/07/2019

02/19/2019

Am #0001 - 1

Am #0001 - 2 (Continuation SF 30)

19 February 2019 Solicitation No. W9128F 19 R 0026

Date of Issue: 07 FEB 2019 Date of Receiving Proposals: 25 MAR 2019

SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of TELLER DAM.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 00 21 00, Page 12, paragraph 1.12, item (b) delete the first paragraph and substitute the following:

(b) The Government intends to hold a site visit on 27 FEB 2019, at 0900 hours (9:00 a.m.) MDT. The meeting will be held at 1626 Evans Street, Building 1219 at Fort Carson. Contractor personnel should meet in the Sunlight conference room (311A). For Additional details, contact:”

(2) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO190002 in its entirety and substitute General Wage Rate Decision Number CO190002 dated 02/01/2019. General Wage Rate Decision Number CO190002 dated 02/01/2019 is included as an attachment to this Amendment.

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 25 MAR 2019.

Attachments:

General Wage Rate Decisions CO190002 dated 02/01/2019

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

19 FEB 2019

nep/2160

Am #0001 CO190002 - 1 02/01/2019

General Decision Number: CO190002 02/01/2019 CO2

Superseded General Decision Number: CO20180012

State: Colorado

Construction Type: Heavy

Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 02/01/2019

Am #0001 CO190002 - 2 02/01/2019

ASBE0028-001 07/01/2018

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 31.73 14.23

* BRCO0007-004 01/01/2019

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,

JEFFERSON AND WELD COUNTIES

BRICKLAYER.......................$ 29.52 10.23

BRCO0007-006 05/01/2018

EL PASO AND PUEBLO COUNTIES

Rates Fringes

BRICKLAYER.......................$ 25.88 10.34

ELEC0012-004 09/01/2018

PUEBLO COUNTY

Rates Fringes

ELECTRICIAN

Electrical contract over $1,000,000..................$ 27.70 12.30+3% Electrical contract under $1,000,000..................$ 24.85 12.30+3%

ELEC0068-001 06/01/2018

JEFFERSON, LARIMER, AND WELD COUNTIES

ELECTRICIAN......................$ 35.80 15.45

ELEC0111-001 09/01/2017

Am #0001 CO190002 - 3 02/01/2019

Line Construction:

Groundman...................$ 25.68 25.25%+$5.75 Line Equipment Operator.....$ 31.35 25.25% + $5.75 Lineman and Welder..........$ 44.92 25.25%+$5.75

ELEC0113-002 06/01/2018

EL PASO COUNTY

Rates Fringes

ELECTRICIAN......................$ 31.80 15.90

* ELEC0969-002 01/01/2019

MESA COUNTY

Rates Fringes

ELECTRICIAN......................$ 24.80 9.84

ENGI0009-001 05/01/2017

Rates Fringes

Power equipment operators:

Blade: Finish...............$ 27.92 10.10 Blade: Rough................$ 27.60 10.10 Bulldozer...................$ 27.60 10.10 Cranes: 50 tons and under..$ 27.75 10.10 Cranes: 51 to 90 tons......$ 27.92 10.10 Cranes: 91 to 140 tons.....$ 28.55 10.10 Cranes: 141 tons and over...$ 29.82 10.10 Forklift....................$ 27.22 10.10 Mechanic....................$ 28.08 10.10 Oiler.......................$ 26.84 10.10 Scraper: Single bowl under 40 cubic yards........$ 27.75 10.10 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 27.92 10.10 Trackhoe....................$ 27.75 10.10

IRON0024-003 06/01/2018

Rates Fringes

Ironworkers:.....................$ 27.45 22.11 Structural

LABO0086-001 05/01/2009

Am #0001 CO190002 - 4 02/01/2019

Laborers:

Pipelayer...................$ 18.68 6.78

PLUM0003-005 06/01/2017

JEFFERSON, LARIMER AND WELD COUNTIES

PLUMBER..........................$ 39.08 16.44

PLUM0058-002 07/01/2018

EL PASO COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 32.75 14.85

PLUM0058-008 07/01/2018

PUEBLO COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 32.75 14.85

PLUM0145-002 07/01/2016

MESA COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 35.17 11.70

PLUM0208-004 06/01/2016

JEFFERSON, LARIMER AND WELD COUNTIES

PIPEFITTER.......................$ 37.10 16.62

SHEE0009-002 07/01/2018

Am #0001 CO190002 - 5 02/01/2019

Sheet metal worker...............$ 34.02 17.49

TEAM0455-002 07/01/2018

Rates Fringes

Truck drivers:

Pickup......................$ 21.41 4.32 Tandem/Semi and Water.......$ 22.04 4.32

SUCO2001-006 12/20/2001

Rates Fringes

BOILERMAKER......................$ 17.60

Carpenters:

Form Building and Setting...$ 16.97 2.74 All Other Work..............$ 15.14 3.37

Cement Mason/Concrete Finisher...$ 17.31 2.85

IRONWORKER, REINFORCING..........$ 18.83 3.90

Laborers:

Common......................$ 11.22 2.92 Flagger.....................$ 8.91 3.80 Landscape...................$ 12.56 3.21

Painters:

Brush, Roller & Spray.......$ 15.81 3.26

Power equipment operators:

Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other

Am #0001 CO190002 - 6 02/01/2019 health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates

Am #0001 CO190002 - 7 02/01/2019 the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Am #0001 CO190002 - 8 02/01/2019

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Standard_Form_30
Am-0001_W9128F-19-R-0026_Narrative
CO190002 - Heavy

File details come from the government source that posted it.