Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_W9128F-19-Q-0016.pdf | ||
| SOW_for_Riprap_Delivery_Mid_Decatur_Repair_12-6-18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG83121358
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Middle Decatur Bend Riprap Delivery
The purpose for this amendment is to update the statement of w ork, section 1, Scope. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F19Q0016
X 9B. DATED (SEE ITEM 11)
07-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Dec-2018
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F19Q0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
STATEMENT OF WORK
SCOPE OF WORK
FOR
SUPPLY AND STOCKPILE STONE AT
MIDDLE DECATUR BEND
1. Scope.
Contractor shall provide all equipment, labor, riprap and trucking to supply up to 6,000 tons of fractured riprap from a certified quarry to the specified location which is to 2-miles West of Onawa, Iowa on Highway 175 then proceed Southwest on County Road Cypress Avenue for 3- miles where the riprap can be unloaded. The specific area is the access road adjacent to the project area, which will be flagged, and the Missouri River Project Office (MRPO) staff will be available to assist, if needed, the trucks to unload which is at the point of entry on the access road to the site.
A pre-delivery conference will be conducted to ensure the trucks are not held up for unloading. The delivery date shall be between January 14, 2019 and February 22, 2019 for the 2-week period with requirements stated an on-site meeting with MRPO staff to determine the time and delivery location before any material arrives on site. Upon delivery, the contractor shall pile the Riprap in the designated areas to approximately 10-feet in height. In addition, the contractor shall keep the stockpile site neat and orderly to facilitate the truck traffic flowing easily and safely.
2. Quantities:
The contract will consist of a total of 6,000 tons of riprap material, delivered in intervals over a two-week period.
3. Riprap:
All stone for riprap protection shall be durable ledge rock or field stone. Fieldstone shall be mechanically fractured on a minimum of three (3) sides and shall meet the grading requirements set forth in these specifications. Stone shall be in pieces rectangular in cross section, free from thin slabby pieces having maximum dimension more than four times the least dimension. Stone for riprap shall be reasonably, well-graded from coarse to fine. Dirt and fines of less than ½-inch maximum cross section, accumulated from inter ledge layers or from blasting or handling operations shall not exceed 5 percent by weight.
The contractor shall be responsible of all sampling and testing specified herein. The Government may perform verification tests as determined necessary for final approval of the riprap material. All samples including samples taken during production shall be representative of the riprap material furnished or proposed to be furnished.
Samples shall be taken in accordance with ASTM D 75 or other approved method. No rock shall be furnished from any source, which has not been sampled, tested, and approved for delivery to the site.
Tests for specific gravity shall be performed on samples of material obtained from each source proposed for use as riprap prior to start of delivery. Bulk specific gravity shall be computed in accordance with COE CRD-C 107 except that the total sample shall weigh 5000 grams +2 percent and individual particles shall weigh approximately 300 grams each. Riprap material shall be tested in a saturated surface-dry (SSD) condition. The computed bulk specific gravity so determined shall not be less than 2.7. Testing of stone shall be waived if the stone is obtained from a certified quarry. Riprap shall be a well-graded fractured stone with the following gradations and weights:
INDEX
Limits of Stone Weight Percent Lighter Weight Size in Approx.
by Weight in Pounds (lbs) Spherical Diameter (in) % Maximum Minimum Maximum Minimum
4. Stockpile Area:
Riprap shall be stockpiled specified location which is to 2-miles West of Onawa, Iowa on Highway 175 then proceed Southwest on County Road Cypress Avenue for 3-miles where the riprap can be unloaded.
A location map is attached for reference of the stockpile sites, the exact locations shall be shown by the Missouri River Project Staff. Riprap quantities shall be split evenly between the stockpile location. It shall be the contractor’s responsibility to track the amount of stone in each pile. The contractor shall have equipment on site to keep the riprap pushed up at all times. Riprap shall be piled in the designated areas to approximately 10 feet in height. The contractor shall keep the stockpile site neat and orderly to facilitate the truck traffic flowing easily and safely.
5. Protection of Existing Facilities:
Contractor shall be responsible for protection of all existing facilities during delivery of the riprap. Any damage done to the facilities during delivery shall be repaired at the cost of the contractor.
6. Safety Requirements:
The Contractor shall ensure that safe working practices are utilized and that all equipment meets the requirements of the US Army Corps of Engineers, “Safety and Health Requirement s Manual”, EM 385-1-1, 30 November 2014, before work begins. A copy of this manual is available at the Missouri River Project Office, 9901 John J Pershing Dr., Omaha, Nebraska 68112. The contractor shall submit a site-specific safety plan for approval prior to commencement of work.
7. Submittals:
The successful contractor’s stone supplier shall be submitted to the Contracting Officer’s Representative for approval prior to commencement of delivery of the riprap along with providing the test result.
8. Measurement and Payment:
Per Ton. Riprap material will be measured for payment by the number of tons satisfactorily delivered and stockpiled. The riprap material shall be weighed: (1) on public or private scales which have been certified by the State. The contractor shall furnish the government inspector a copy of each printed weigh bill when self-printing scales are used, or a copy signed by a public or bonded weigh master as each load is delivered; or (2) riprap material may be weighed on the Contractor-furnished scales under the supervision of the Government inspector. Each printed weigh bill shall contain the following; date, unit number, time of gross, tare and net weight, name of project, contractor, contract number and signature of bonded weigh master. All riprap shall be weighed to the nearest 20 pounds and the net weight reduced to the nearest hundredth of a ton.
The contractor shall be paid within 30 days of successful delivery of the specified riprap and upon the receipt to the project office a proper invoice and proper weigh tickets containing the fore mentioned information.
100 532 213 22 16.2 50 158 106 14.7 12.8 15 79 33 11.6 8.7
(End of Summary of Changes)