The purpose of this posting is to display the results of the bid opening conducted on 17 April 2019 at 2 PM. The Contracting Officer is conducting an internal review of the bids for compliance with the solicitation. This is only an abstract and final award is pending.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001_-_W9128F-19-B-0005.pdf | ||
| W9128F-19-B-0005_Specifications.pdf | ||
| W9128F-19-B-0005_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
USACE, Omaha District (CENWO-CT-M) 1616 Capitol Avenue Omaha, NE 68102
Parking Lot, USSTRATCOM
PN 3100/SGBP1047602
Offutt AFB, NE
Construct Parking Areas
Contract with OPPD for Electrical Site Work
Base Subtotal
Construct Southwest Gardens Hardscape
Construct Cafe Garden Area
Construct SW Gardens Landscaping
Construct Communications Infrastructure
Total Amount (Base Plus Options)
JB
JB
SBTL
JB
JB
JB
JB
Total
5,336,437.00
330,154.00
5,666,591.00
387,607.00
166,416.00
307,227.00
244,691.00
6,772,532.00
5,336,437.00
330,154.00
5,666,591.00
387,607.00
166,416.00
307,227.00
244,691.00
6,772,532.00
8,290,000.00
330,154.49
8,620,154.40
429,000.00
124,500.00
198,000.00
374,000.00
9,745,654.40
8,290,000.00
330,154.49
8,620,154.40
429,000.00
124,500.00
198,000.00
374,000.00
9,745,654.40 17,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,000.00
W9128F-19-B-0005 1 2
A Plus Byrne JV, LLC Arrow Striping, Inc.
Bid bond 20% of bid price None
0 0
04/17/201903/18/2019
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W9128F-19-B-0005
Parking Lot, USSTRATCOM
PN 3100/SGBP1047602
Offutt AFB, NE
Bid bond 20% of bid price Bid bond 20% of bid price None
1 1 1
8,062,554.498,062,554.499,184,154.499,184,154.499,556,795.819,556,795.81Total1
2,892,860.002,892,860.00440,400.00440,400.00294,732.00294,732.00JB16
808,620.00808,620.00202,000.00202,000.00389,266.53389,266.53JB15
416,810.00416,810.00106,400.00106,400.00254,933.15254,933.15JB14
1,380,200.001,380,200.00498,200.00498,200.00308,184.22308,184.22JB13
2,564,064.492,564,064.497,930,154.497,930,154.498,309,679.908,309,679.90Base SBTL1
330,154.49330,154.49330,154.49330,154.49330,154.49330,154.49JB12
1 JB 7,979,525.41 7,979,525.41 7,600,000.00 7,600,000.00 2,233,910.00 2,233,910.00
2 2
3 4 5
LS Black-Loeffel Construction Sapper Construction Black Rock Homes
| OF 1419 - Parking Lot___ |
| OF 1419A - Parking Lot____ |
File details come from the government source that posted it.