Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0002
Install Digital Governors, Oahe Dam, SD
See attached documentation for content of the amendment revisions
New Date for receipt of Proposals is 20 June 2018 at 2:00 pm
Government Point of Contact: Wayne Weidenhamer (402) 995-2074
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F18R0073
06/01/2018
05/08/2018
06/01/2018
Am #0002 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers
1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F18R0033 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 08 May 2018 :52.215-1 of Section 00 21 00 : New Date of Receiving Proposals:
20 June 2018
Amendment No. 0002 01 June 2018
SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of Install Digital Governors, Oahe Dam, SD.
Solicitation No. W9128F18R0033.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 00 10 00, SF1442 and CLIN Pricing Schedule, delete date and time of receiving proposals shown and substitute "20 June 2018" at "2:00 pm.”
b. Specifications (New). Add specification pages or sections as noted below. The substituted pages or sections are issued with this amendment.
Pages or Sections Added
Section 02 82 13.00 10
ASBESTOS CONTAINING MATERIALS
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged.
a. Proposal Submittal Instructions. See Section 00 22 00 for instructions on how to submit proposals.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 20 June 2018.
Attachments: Spec Pages listed in 1.b. above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
01 June 2018
MFS/2184
Install Digital Governors (FY17-18), Oahe Dam, SD OA73
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 82 13.00 10
ASBESTOS CONTAINING MATERIALS
02/10
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Asbestos-Containing Material (ACM)
1.2.2 Class IV Asbestos Work
1.2.3 Friable ACM
1.2.4 Intact
1.2.5 NESHAP
1.2.6 Nonfriable ACM
1.2.7 Permissible Exposure Limits (PELs)
1.2.7.1 PEL-Time Weighted Average(TWA)
1.3 SYSTEM DESCRIPTION
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Specific Requirements
1.5.2 Preconstruction Conference
1.6 SAFETY
1.6.1 Asbestos Hazard Plan Appendix
1.6.2 Activity Hazard Analyses Appendix
1.7 SECURITY
1.7.1 Warning Labels
1.8 PERSONAL PROTECTIVE EQUIPMENT
1.8.1 Respiratory Fit Testing
1.8.2 Respirator Selection and Use Requirements
1.9 TRAINING PROGRAM
PART 2 PRODUCTS
2.1 EXPENDABLE SUPPLIES
2.1.1 Disposal Containers
PART 3 EXECUTION
3.1 METHODS OF COMPLIANCE
3.1.1 Mandated Practices
3.1.2 Unacceptable Practices
3.2 EXPOSURE ASSESSMENT AND AIR MONITORING
3.2.1 General Requirements
3.2.2 Initial Exposure Assessment
3.3 CLEANUP AND DISPOSAL
3.3.1 Collection and Disposal of Asbestos
3.3.2 Records
3.3.2.1 Asbestos Waste Shipment Records
-- End of Section Table of Contents --
SECTION 02 82 13.00 10 Page 1 Am0002
SECTION 02 82 13.00 10 Page 2
SECTION 02 82 13.00 10
ASBESTOS CONTAINING MATERIALS
02/10
PART 1 GENERAL
The wire associated with the control room instrument boards which is scheduled to be removed for this project is covered with insulation that is assumed to contain asbestos. It is expected that the insulation is in good condition. It is not anticipated that the work activities required for the project will cause the insulation to become friable, disrupt the matrix of the asbestos-containing material, or generate the release of asbestos fibers;
however a negative exposure assessment for this work is not available. Work procedures and disposal of the wire shall be performed in accordance with this specification and applicable regulations.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.1101 Asbestos
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 763 Asbestos
42 CFR 84 Approval of Respiratory Protective Devices
1.2 DEFINITIONS
1.2.1 Asbestos-Containing Material (ACM)
Any materials containing more than one percent asbestos.
1.2.2 Class IV Asbestos Work
Maintenance and custodial construction activities during which employees contact but do not disturb ACM and activities to clean-up dust, waste and debris resulting from Class I, II, and III activities. This may include dusting surfaces where ACM waste and debris and accompanying dust exists and cleaning up loose ACM debris from TSI or surfacing ACM following construction
1.2.3 Friable ACM
A term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any
SECTION 02 82 13.00 10 Page 3 material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763, Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
1.2.4 Intact
ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix. Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.
1.2.5 NESHAP
National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61, Subpart M.
1.2.6 Nonfriable ACM
A NESHAP term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
1.2.7 Permissible Exposure Limits (PELs)
1.2.7.1 PEL-Time Weighted Average(TWA)
Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8 hour time weighted average (TWA).
1.3 SYSTEM DESCRIPTION
This section covers all operations in which asbestos-containing materials (ACM) are encountered. These procedures and equipment are required to protect workers and building occupants from airborne asbestos fibers and ACM dust and debris.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Asbestos Waste Shipment Records; G, AO
SD-06 Test Reports
Exposure Assessment and Air Monitoring
1.5 QUALITY ASSURANCE
In addition to detailed requirements of this specification, work performed under this contract shall comply with EM 385-1-1, applicable federal, state, and local laws, ordinances, criteria, rules and regulations regarding handling, storing, transporting, and disposing of asbestos waste
SECTION 02 82 13.00 10 Page 4 materials.
1.5.1 Specific Requirements
Designate in writing, personnel meeting the following qualifications:
Workers: Worker training documentation shall be provided. Workers who will handle and remove wiring shall be provided training that contains the following information at a minimum: health effects of asbestos;
locations of ACM for this project; recognition of ACM damage and deterioration; prohibition of work practices such as grinding, abrading or pulverizing; instruction on actions to take if dust is present (cleaning with a HEPA-equipped vacuum or wet wiping); and methods for handling, packaging and disposal of the removed wire.
1.5.2 Preconstruction Conference
The Contractor shall meet with the Contracting Officer (CO) prior to beginning work at a safety preconstruction conference to discuss the details of the Contractor's submitted APP to include the AHAP and AHAs appendices. Deficiencies in the APP will be discussed. Onsite work shall not begin until the APP has been accepted.
1.6 SAFETY
Prepare a written comprehensive site-specific Accident Prevention Plan (APP) at least 30 days prior to the preconstruction conference. The APP shall be in accordance with the format and requirements in Appendix A of EM 385-1-1. The APP shall incorporate an Asbestos Hazard Abatement Plan (AHAP), and Activity Hazard Analyses (AHAs) as separate appendices into one site-specific document.
1.6.1 Asbestos Hazard Plan Appendix
The AHP shall include, but not be limited to, the following:
a. The personal protective equipment to be used, such as respirators, gloves and eye protection;
b. A description of work procedures for removal of the wire, and identification of prohibited work activies including grinding, abrading, and pulverizing the insulation. Identification of actions to take if dust is present, such as HEPA vacuuming and/or wet wiping.
c. Methods for handling, packaging, and disposal;
1.6.2 Activity Hazard Analyses Appendix
AHAs for each major phase of work, shall be submitted and updated during the project. The AHAs format shall be in accordance with EM 385-1-1. The analysis shall define the activities to be performed for a major phase of work, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on that phase until the AHA has been accepted and a preparatory meeting has been conducted by the Contractor to discuss its contents with everyone engaged in the activities, including the onsite Government representatives. The AHAs shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations.
SECTION 02 82 13.00 10 Page 5
1.7 SECURITY
Barriers to prevent entry of unauthorized personnel shall be provided.
1.7.1 Warning Labels
Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to requirements are acceptable.
1.8 PERSONAL PROTECTIVE EQUIPMENT
Gloves shall be provided to protect the hands where there is the potential for hand injuries (i.e., scrapes, punctures, cuts, etc.). Eye protection shall be provided, when operations present a potential eye injury hazard, and shall meet the requirements of ANSI/ISEA Z87.1. Respirators shall be worn until the results of the initial exposure assessment are available.
If the initial exposure assessment demonstrates that exposures associated with the work activities do not have the potential to exceed the PEL, respirator use may be discontinued.
1.8.1 Respiratory Fit Testing
The Contractorshall conduct a qualitative or quantitative fit test conforming to Appendix A of 29 CFR 1910.134 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test shall be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test shall be performed. Functional fit checks shall be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.
1.8.2 Respirator Selection and Use Requirements
Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with the manufacturer's recommendations. Respirators shall be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84, for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter shall be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type shall be made by the Contractor based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.
1.9 TRAINING PROGRAM
Establish a training program as specified by State of South Dakota regulations , and OSHA requirements at 29 CFR 1926.1101 (k)(9). Contractor employees shall complete the required training for the type of work they are to perform and such training shall be documented and provided to the CO.
Class IV operations 2 hour Awareness Training
Prior to commencement of work the Contractor shall instruct each worker about:
SECTION 02 82 13.00 10 Page 6
a. The hazards and health effects of the specific types of ACM to be abated; and
b. The content and requirements of the Contractor's APP to include the AHP and AHAs and site-specific safety and health precautions.
PART 2 PRODUCTS
2.1 EXPENDABLE SUPPLIES
2.1.1 Disposal Containers
Leak-tight (defined as solids, liquids, or dust that cannot escape or spill out) disposal containers shall be provided for ACM wastes as required by
29 CFR 1926.1101 .
PART 3 EXECUTION
3.1 METHODS OF COMPLIANCE
3.1.1 Mandated Practices
The specific abatement techniques and items identified shall be detailed in the Contractor's AHP. Use the following engineering controls and work practices in all operations:
a. Vacuum cleaners equipped with HEPA filters.
b. Wet methods except where it can be demonstrated that the use of wet methods is unfeasible due to the creation of electrical hazards, or equipment malfunction.
c. Prompt clean-up and disposal.
3.1.2 Unacceptable Practices
The following work practices shall not be used:
a. High-speed abrasive disc saws that are not equipped with point of cut ventilator or enclosures with HEPA filtered exhaust air.
b. Compressed air used to remove asbestos containing materials
c. Dry sweeping, shoveling, or other dry clean up.
3.2 EXPOSURE ASSESSMENT AND AIR MONITORING
3.2.1 General Requirements
a. Exposure assessment, air monitoring and analysis of airborne concentration of asbestos fibers shall be performed in accordance with 29 CFR 1926.1101, and the Contractor's air monitoring plan. Results of breathing zone samples shall be posted at the job site and made available to the CO. Submit all documentation regarding initial exposure assessments, negative exposure assessments, and air-monitoring results.
b. Worker Exposure.
SECTION 02 82 13.00 10 Page 7
(1) The Contractor shall collect samples representative of the exposure of each employee who is assigned to work within a regulated area. Breathing zone samples shall be taken for at least 25 percent of the workers in each shift, or a minimum of 2, whichever is greater.
3.2.2 Initial Exposure Assessment
The Contractor shall conduct an exposure assessment immediately before or at the initiation of an asbestos operation to ascertain expected exposures during that operation. The assessment shall be completed in time to comply with the requirements, which are triggered by exposure data or the lack of a negative exposure assessment, and to provide information necessary to assure that all control systems planned are appropriate for that operation. The assessment shall take into consideration monitoring results and all observations, information or calculations which indicate employee exposure to asbestos, including any previous monitoring conducted in the workplace, or of the operations of the Contractor which indicate the levels of airborne asbestos likely to be encountered on the job.
3.3 CLEANUP AND DISPOSAL
3.3.1 Collection and Disposal of Asbestos
All ACM waste shall be collected and disposed of at an EPA, state and local approved asbestos landfill. Procedure for hauling and disposal shall comply with 40 CFR 61, Subpart M, state, regional, and local standards.
3.3.2 Records
3.3.2.1 Asbestos Waste Shipment Records
Complete and provide the CO final completed copies of the Waste Shipment Record for all shipments of waste material as specified in 40 CFR 61, Subpart M and other required state waste manifest shipment records, within 3 days of delivery to the landfill. Each Waste Shipment Record shall be signed and dated by the Contractor, the waste transporter and disposal facility operator.
-- End of Section --