Bid_Sheet.pdf
PDF 120 KB Posted
- Attached to
- Oahe Project: Hazelton Rec Area Approach Federal contract opportunity
- Solicitation number
- W9128F18Q0093
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Questions.pdf | ||
| Site_Visit_Notes.pdf | ||
| Record_of_Attendance.pdf | ||
| Hazelton_Tech-Specs.pdf | ||
| W9128F18Q0093_Oahe_Proj_Hazelton_Rec_Area_Solictation.pdf | ||
| Hazelton_Design.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDING SCHEDULE
Item Estimated Unit
No. Description Quantity Unit Price Amount
1. Strip/Stock Pile/ Replace Topsoil 435 CY $________ $ _
2. Haul and Place fill from
Govt. furnished borrow 1040 CY $________ $ _
3. Supply/Install Base Course 810 TONS $________ $ _
4. Supply and Place Superpave Asphalt -
FAA42 (include all materials and labor) 235 TONS $________ $ _
5. F&I 18” CMP 85 FT $________ $ _
6. F&I 18” CMP Safety End 2 EA. $________ $ _
7. Remove & Replace Fence 100 FT $________ $ _
8. All remaining work to include:
mobilization, traffic control, and all other work that is not included in the above items Job LS $________ $ _
TOTAL: $___________________
NOTES:
1. Prices must be entered for all line items in the Pricing Schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. In case of variation between the lump sum prices and the total amount, the lump sum prices will be considered in calculating the total bid amount. In case of variation between the unit prices and the extensions, the unit prices will be considered in calculating the total bid amount.
2. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY.
3. Funds are reasonably assured for this project. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date.
4. The category “All Remaining Work: shall include any activities not listed as pay items, such as Contractor staging, site access, restoration of disturbed surfaces, environmental protection measures, construction debris removal and disposal, care of water, quality control sampling and testing, required safety equipment, daily reports, etc.
5. Bids will be evaluated based on the total price submitted.