Bid_Sheet.pdf

PDF 120 KB Posted

Attached to
Oahe Project: Hazelton Rec Area Approach Federal contract opportunity
Solicitation number
W9128F18Q0093
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Oahe Project: Hazelton Rec Area Approach, newest first.
File Type Posted
Site_Visit_Questions.pdf PDF
Site_Visit_Notes.pdf PDF
Record_of_Attendance.pdf PDF
Hazelton_Tech-Specs.pdf PDF
W9128F18Q0093_Oahe_Proj_Hazelton_Rec_Area_Solictation.pdf PDF
Hazelton_Design.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING SCHEDULE

Item Estimated Unit

No. Description Quantity Unit Price Amount

1. Strip/Stock Pile/ Replace Topsoil 435 CY $________ $ _

2. Haul and Place fill from

Govt. furnished borrow 1040 CY $________ $ _

3. Supply/Install Base Course 810 TONS $________ $ _

4. Supply and Place Superpave Asphalt -

FAA42 (include all materials and labor) 235 TONS $________ $ _

5. F&I 18” CMP 85 FT $________ $ _

6. F&I 18” CMP Safety End 2 EA. $________ $ _

7. Remove & Replace Fence 100 FT $________ $ _

8. All remaining work to include:

mobilization, traffic control, and all other work that is not included in the above items Job LS $________ $ _

TOTAL: $___________________

NOTES:

1. Prices must be entered for all line items in the Pricing Schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. In case of variation between the lump sum prices and the total amount, the lump sum prices will be considered in calculating the total bid amount. In case of variation between the unit prices and the extensions, the unit prices will be considered in calculating the total bid amount.

2. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY.

3. Funds are reasonably assured for this project. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date.

4. The category “All Remaining Work: shall include any activities not listed as pay items, such as Contractor staging, site access, restoration of disturbed surfaces, environmental protection measures, construction debris removal and disposal, care of water, quality control sampling and testing, required safety equipment, daily reports, etc.

5. Bids will be evaluated based on the total price submitted.