Replace Interior 480V Station Service Equipment, Ft Randall Dam FRD7

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 14.00 10

ASBESTOS ABATEMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 REFERENCED PUBLICATIONS

1.3 SUBMITTALS

1.4 PROTECTION OF ADJACENT WORK AREAS

1.5 RESPONSIBILITY FOR MATERIALS

1.6 SITE SECURITY

1.6.1 Authorized Personnel

1.6.2 Work Site Entry Log

1.7 TRAINING

1.7.1 Asbestos Abatement Worker Training

1.7.2 Asbestos Abatement Supervisory Personnel Training

1.8 RESPIRATORY PROTECTION

1.8.1 General

1.8.2 Respirator Fit Testing

1.8.3 Respirator Fit Checks

1.9 LOCAL EXHAUST SYSTEM

1.10 MEDICAL EXAMINATIONS

1.11 PERMITS AND NOTIFICATIONS

1.12 ASBESTOS ABATEMENT CONTRACTOR

1.13 CERTIFIED INDUSTRIAL HYGIENIST (CIH)

1.14 BULK SAMPLING PERSONNEL

1.15 TESTING LABORATORY

1.16 PROJECT DOCUMENTATION

1.16.1 Daily Narrative Log

1.16.2 Waste Disposal Site (WDS)

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 General

2.1.2 Polyethylene Sheeting

2.1.3 Asbestos Disposal Bags

2.1.4 Disposal Drums

2.1.5 Encapsulants

2.1.6 Surfactants

PART 3 EXECUTION

3.1 GENERAL

3.2 ABATEMENT WORK DESCRIPTION

3.3 WORK PROCEDURES

3.3.1 General

3.3.2 Asbestos Abatement Plan

3.3.3 Asbestos Waste

3.4 WARNING SIGNS AND LABELS

3.4.1 Warning Signs

3.4.2 Warning Labels

3.5 COMMENCEMENT OF WORK

SECTION 02 82 14.00 10 Page 1 Am0001

3.6 PERSONNEL AND AREA AIR MONITORING

3.6.1 General

3.6.2 Pre-Abatement Air Sampling

3.6.3 Air Monitoring During Abatement Work

3.6.4 Post-Abatement Air Sampling

3.7 SITE INSPECTION

3.8 DISPOSAL OF ASBESTOS-CONTAINING MATERIALS

3.8.1 Friable Asbestos-Containing Materials

3.8.2 Non-Friable Asbestos Containing Materials

3.8.3 Disposal

3.9 WASTE SHIPMENT RECORD (WSR)

-- End of Section Table of Contents --

SECTION 02 82 14.00 10 Page 2

SECTION 02 82 14.00 10

ASBESTOS ABATEMENT

06/29/2017

PART 1 GENERAL

1.1 GENERAL INFORMATION

This section covers the requirements for the removal and disposal of all Asbestos-Containing Materials (ACM) encountered during the execution of this contract. See Paragraph 3.2, ABATEMENT WORK DESCRIPTION, for a description of the anticipated abatement work to be performed under this contract. During the performance of this contract, the laws, ordinances, rules, and regulations of Federal, State, Regional, and local authorities shall be complied with regarding the removal, storage, transportation, and disposal of asbestos-containing materials. Where the requirements of these specifications and Federal, State, Regional or local regulations vary, the most stringent requirements shall be enforced.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification as they apply to the requirements for asbestos abatement work. If referenced in this specification, the publications will be referred by basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH (2003) Manual of Analytical Methods

STATE OF SOUTH DAKOTA

Codified Law 34-44 Asbestos Abatement Training Project

ARSD 74:36:08 Emission Standards for Hazardous Air Pollutants

SECTION 02 82 14.00 10 Page 3

ARSD 74:31 Asbestos Control Program

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Asbestos Abatement Plan; G, DO

Respirators

Surfactants

Local Exhaust Equipment

SD-06 Test Reports

Work Site Entry Logbook

Personnel and Area Air Monitoring Logs

SD-07 Certificates

Waste Disposal Site (WDS)

Asbestos Abatement Worker Training

Asbestos Abatement Contractor

Asbestos Abatement Supervisory Personnel Training

Respirator Fit Test Results

Medical Examinations

Permits and Notifications

Certified Industrial Hygienist (CIH)

Air Monitoring Personnel

Testing Laboratory

Asbestos Waste Shipment Record (WSR)

1.4 PROTECTION OF ADJACENT WORK AREAS

All asbestos removal shall be performed without contamination of adjacent work areas. Where such work contaminates adjacent work areas, these areas shall be decontaminated.

SECTION 02 82 14.00 10 Page 4

1.5 RESPONSIBILITY FOR MATERIALS

Although ACM resulting from the abatement work required by this contract shall remain the property of the Government, the Contractor shall be responsible for the proper disposal of the materials.

1.6 SITE SECURITY

1.6.1 Authorized Personnel

During abatement work, the regulated area shall be restricted to only authorized and trained personnel donning personal protection. These personnel may include Contractor's employees, Government-authorized representatives, State and local inspectors. A list of authorized personnel shall be established prior to the initiation of work and the Contractor shall be responsible for site security during the abatement work.

1.6.2 Work Site Entry Log

A work site entry logbook shall be kept, listing the names of all workers and visitors, including the date and time of entry and departure, entering the asbestos control area. A copy of the work site entry logbook shall be submitted daily for the previous work day.

1.7 TRAINING

1.7.1 Asbestos Abatement Worker Training

All personnel who are exposed to, or might reasonably expect to be exposed to, airborne concentrations of asbestos at or above the permissible exposure limit, are required to have successfully completed an Environmental Protection Agency-approved or State-accredited asbestos abatement workers course. Current asbestos worker identification cards or certificates of training verifying that each employee has successfully passed an EPA or State-certified asbestos worker course shall be submitted.

Successful completion of the course shall be prior to the time of initial assignment, and certification shall not lapse during the contract.

1.7.2 Asbestos Abatement Supervisory Personnel Training

Personnel to be designated as Asbestos Abatement Supervisory Personnel for this abatement project shall have successfully completed an Environmental Protection Agency-approved or State-accredited Contractor/supervisor 32-hour course. Current certificates of training verifying that each supervisor has successfully passed an EPA or State-approved course shall be submitted. Successful completion of the course shall be prior to the time of initial assignment, and certification shall not lapse during the contract.

1.8 RESPIRATORY PROTECTION

1.8.1 General

As a minimum, half-mask air-purifying respirators equipped with high-efficiency particulate air (HEPA) filters shall be used during all abatement work. Respirators providing greater protection for higher environmental concentrations of asbestos fibers shall be required, if their use is dictated by air sampling results. All respirators shall be approved

SECTION 02 82 14.00 10 Page 5 by the National Institute for Occupational Safety and Health (NIOSH). The Contractor shall submit manufacturer's data, certificates of compliance, and any safety data sheets (SDS) pertaining to the respirators to be used.

Each asbestos worker shall be provided with a personally-issued and individually-identified respirator.

1.8.2 Respirator Fit Testing

Each respirator issued to the worker shall be properly fitted. A qualitative respirator fit test to determine the ability of each worker to obtain a satisfactory fit shall be performed for each worker on initial fitting of the respirator and at least every 6 months thereafter. Fit test procedures shall be as specified in 29 CFR 1910.134, Appendix A, "Fit Testing Procedures (mandatory)". The Contractor shall submit a record entitled Respirator Fit Test Results which shall include the most recent respirator fit test for each employee required to wear a respirator during the performance of their work. As a minimum, the respirator fit test results shall include the following information:

a. Type of respirator fit test used and chemical agent.

b. Specific make, model, size, and approval number of the respirator tested.

c. Name of the person tested.

d. Name of the test operator.

e. Date of the test.

f. Results of the respirator fit test.

1.8.3 Respirator Fit Checks

Workers shall be required to perform a positive and negative pressure fit check each time a respirator is donned.

1.9 LOCAL EXHAUST SYSTEM

If required, a local exhaust system shall be utilized in the regulated area.

Local exhaust equipment shall utilize UL 586-labeled HEPA filters and shall be operated continuously, 24 hours per day, until the containment enclosure has been approved for removal.

1.10 MEDICAL EXAMINATIONS

As a minimum, a medical examination shall be given to each abatement worker on an annual basis. A certificate of compliance that includes the worker's name, the date of the most current medical examination, and the name and signature of the examining physician, shall be submitted for all employees who have the potential to be exposed to airborne asbestos fibers in performing their work. The content of the examination shall be consistent with the requirements set forth in 29 CFR 1926.1101, Appendix I.

1.11 PERMITS AND NOTIFICATIONS

The Contractor shall obtain all permits relating to the asbestos removal, storage, hauling, and disposition, as required to perform the work described herein. A copy of all permits and notifications as required by Federal, State, and local agencies shall be submitted. The Contractor shall notify the Contracting Officer in writing at least 10 working days prior to the commencement of work. It is the Contractor's sole responsibility for timely notification of such actions, as may be required by Federal, State, regional, and local agencies. The cost of all required

SECTION 02 82 14.00 10 Page 6

Federal and/or State permits will be reimbursed to the Contractor. The Contractor shall submit written proof of payment for the permits for reimbursement. The Government will not be responsible for the reimbursement of penalties and/or late fees, which are incurred as a result of Contractor negligence.

1.12 ASBESTOS ABATEMENT CONTRACTOR

The Asbestos Abatement Contractor's name, address, and telephone number, and certification verifying that the Contractor is licensed to perform abatement activities at the project location, shall be submitted.

1.13 CERTIFIED INDUSTRIAL HYGIENIST (CIH)

A Certified Industrial Hygienist (CIH) shall review and approve the asbestos abatement plan. The CIH shall be certified by the American Board of Industrial Hygiene and have a minimum of 2 years of prior experience working on asbestos-related projects. A copy of their certificate along with their name, address, and telephone number shall be submitted. This individual shall not be affiliated with the Contractor performing the abatement work in any way other than through this contract.

1.14 BULK SAMPLING PERSONNEL

If materials impacted by the project work that have not been identified as asbestos-containing are discovered, the Contractor shall notify the Contracting Officer. If the Contracting Officer approves of sampling the material, bulk samples to be obtained at the Contractor's expense and delivered to a laboratory accredited under the National Institute of Standards and Technology (NIST) "National Voluntary Laboratory Accreditation Program (NVLAP)" and analyzed by PLM. Sampling results shall be provided to the Contracting Officer. All personnel taking bulk samples shall be trained and certified "AHERA Accredited Building Inspectors."

Contractor shall submit proof of this certification.

1.15 TESTING LABORATORY

Personnel performing analysis of air samples shall have, as a minimum, one year of experience in the analysis of air samples, and shall have successfully completed the NIOSH 582 course. In addition, within the past year, these personnel shall have been judged proficient by their successful participation in the National Institute for Occupational Safety and Health ( NIOSH) Proficiency Analytical Testing (PAT) Program. The name, address, and telephone number of the testing laboratory selected to perform the analysis of the air samples for airborne concentrations of asbestos fibers shall be submitted.

1.16 PROJECT DOCUMENTATION

1.16.1 Daily Narrative Log

A daily narrative log kept by the industrial hygienist or his designee shall be maintained. The log shall include the names of all persons who visit the job site and all persons who enter the sealed or restricted work areas. It shall contain details such as the number of persons on the job, the time they entered the work area and the time they left, and the nature of the work-in-progress. It shall provide a comprehensive description of conditions in and around the job site and major events which occur each day such as details of all accidents, emergencies, breakdowns of equipment, and

SECTION 02 82 14.00 10 Page 7 any material, procedural or safety difficulties including issues and complaints brought to management's attention by the Contractor's employees. Each day's entries shall be signed and dated by the person who made them. A copy of the daily narrative log shall be submitted daily for the previous work day.

1.16.2 Waste Disposal Site (WDS)

Prior to disposal, written evidence shall be submitted stating that the State and local regulatory agencies approve the landfill selected for asbestos disposal.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 General

Deliver all the materials in their original package, container, or bundle bearing the name of the manufacturer and, where applicable, the brand names. Store all materials subject to damage off the ground, away from wet or damp surfaces, and under cover sufficient enough to protect them from damage or contamination. Replacement materials shall be stored outside of the work area until abatement is completed.

2.1.2 Polyethylene Sheeting

Polyethylene sheeting used for walls and floors shall have a minimum thickness of 6 mils. Polyethylene sheeting utilized for worker decontamination enclosures shall be opaque white or black in color. All polyethylene sheeting shall be used in widths selected to minimize the frequency of joints. Methods of attaching polyethylene sheeting to the building or structures in the building shall be submitted for approval. The method submitted shall be selected to minimize damage to equipment and surfaces; any resulting damage shall be the responsibility of the Contractor to repair at no additional cost to the Government.

2.1.3 Asbestos Disposal Bags

Disposal bags shall be of 6-mil polyethylene, pre-printed with labels as required in Paragraph 3.5.2, "Warning Labels".

2.1.4 Disposal Drums

If used, disposal drums shall be metal or plastic with locking ring tops and shall be labeled as required in Paragraph 3.5.2, "Warning Labels".

2.1.5 Encapsulants

The encapsulant shall be the bridging or penetrating type, depending on the particular application. The encapsulant shall not be solvent based, shall not utilize a vehicle consisting of hydrocarbons, and shall not be flammable. All encapsulants shall have been EPA approved prior to their application. Contractor shall submit manufacturer's data, certificates of compliance, and any material safety data sheets (MSDS) pertaining to the encapsulants to be used.

SECTION 02 82 14.00 10 Page 8

2.1.6 Surfactants

The surfactant or amending agent shall be EPA-approved prior to its application. Contractor shall submit manufacturer's data, certificates of compliance, and any material safety data sheets (MSDS) pertaining to the surfactants to be used.

PART 3 EXECUTION

3.1 GENERAL

This contract requires work to be performed in the vicinity of equipment and/or materials that are potentially asbestos-containing. Suspect or Potential Asbestos-Containing Material (PACM) shall be sampled as directed by the Government and in accordance with the requirements of these specifications. PACM shall not be abraded, sanded, cut, or damaged in any way, in order to prevent material degradation and release of asbestos fibers. Contractor employees who will be working in the vicinity of PACM shall have successfully completed a two-hour asbestos awareness class.

Identified ACM shall be properly removed and disposed of in accordance with the requirements of these specifications. The method of removal and disposal of all ACM shall be submitted for approval as part of the abatement plan. Where practical, entire asbestos-containing systems shall be removed and disposed of as complete units, to eliminate the potential of releasing airborne fibers.

3.2 ABATEMENT WORK DESCRIPTION

The 480 volt circuit breaker arc chutes being removed as a part of this contract contain asbestos (Transite, Gray/Black; 15%). Reference attached EMC LABS, INC., Laboratory Report 0179561. The Contractor shall handle the PACM carefully including wrapping each piece in accordance with the materials listed elsewhere in this specification and shall immediately deposit it in a roll off for proper disposal.

3.3 WORK PROCEDURES

3.3.1 General

Asbestos abatement work shall be performed by certified asbestos abatement workers, under the direct supervision of and whose activities and performance shall be monitored by the prime Contractor. Prior to the start of any abatement work, a representative of the Asbestos Abatement Contractor, as well as their onsite supervisory and air monitoring personnel, shall meet with the Government to discuss in detail the asbestos plan, including work procedures and safety precautions. No abatement work shall proceed without a GQAR present to witness the work. Unless otherwise approved, the Contracting Officer shall be notified in writing at least seven days prior to each individual occurrence of abatement work.

Personnel of other trades not engaged in the removal and disposal of ACM shall not be in the regulated area.

3.3.2 Asbestos Abatement Plan

Abatement work shall be performed as detailed in the approved asbestos plan, unless alternative procedures have been submitted and approved. The detailed asbestos plan, approved and signed by the certified Industrial Hygienist, shall describe the containment and work procedures to be used in the removal and demolition of ACM. The plan shall also include a sketch

SECTION 02 82 14.00 10 Page 9 showing the location, size, and details of the asbestos control areas;

location, layout, and details of the decontamination areas; and the locations of local exhaust equipment and pressure differential monitoring devices. The plan shall also include coordination between differing trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent to be used, air monitoring, respirators, protective equipment, pressure differential monitoring device, and a detailed description of the method to be employed in order to control pollution.

3.3.3 Asbestos Waste

Asbestos waste shall be placed in approved containers, and caution labels shall be applied on the containers in accordance with 29 CFR 1926.1101 (k),

(7) & (8), if not already pre-printed on the containers. External surfaces of the filled containers shall be thoroughly cleaned by wet sponging prior to being transported out of the regulated areas. The method for containment of non-friable waste shall be submitted in the asbestos plan for approval.

3.4 WARNING SIGNS AND LABELS

3.4.1 Warning Signs

Warning signs shall be posted at all approaches to any location where airborne concentrations of asbestos may be expected to exceed ambient background levels. Signs shall be posted at a distance sufficiently far enough away from the work area to permit an employee to read the sign and take the necessary protective measure to avoid exposure. Warning signs shall be provided that are of sufficient size to be clearly legible, printed on a contrasting background, and display the following legend:

DANGER

ASBESTOS

CANCER AND LUNG DISEASE HAZARD

AUTHORIZED PERSONNEL ONLY

RESPIRATORS AND PROTECTIVE CLOTHING

ARE REQUIRED IN THIS AREA

3.4.2 Warning Labels

Warning labels shall be affixed on all containers that store asbestos waste materials. The warning label shall be legible, printed in large bold letters on a contrasting background, and display the following legend:

DANGER

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

CANCER AND LUNG DISEASE HAZARD

3.5 COMMENCEMENT OF WORK

Commencement of abatement work shall not occur until:

a. All pre-abatement submittals, notifications, postings, and permits have been provided and approved.

b. All required enclosure systems (if required) have been constructed and tested.

c. Local exhaust equipment and recording manometer (if required) are functioning properly.

SECTION 02 82 14.00 10 Page 10

d. All equipment for abatement, clean up, and disposal are on-site.

e. The Contractor receives written permission to commence abatement.

3.6 PERSONNEL AND AREA AIR MONITORING

3.6.1 General

Monitoring and testing of airborne concentrations of asbestos fibers shall be in accordance with 29 CFR 1926.1101 and shall be performed by an approved testing laboratory and by approved Air Monitoring Personnel. All air monitoring shall be performed by the Industrial Hygienist, or their approved designee and shall include as a minimum, pre-abatement, personal, area, and post-abatement air samples as required by Federal, State, and local regulations. Analysis of the air samples shall be performed at the work site, unless otherwise approved and shall be analyzed and the results reviewed by the approved air monitoring personnel within one hour of the time the samples were taken. Monitoring results shall be signed by the person performing the air monitoring and copies of the results shall be submitted as part of the Personnel and Area Air Monitoring Logs within 3 working days after the sample was taken. The Industrial Hygienist, or their designee, shall notify the Contractor and the Government on site immediately of the results of any air sample that indicates airborne fiber concentrations in excess of the acceptable limits.

3.6.2 Pre-Abatement Air Sampling

Area air samples shall be taken for each asbestos removal site and the reference Time-Weighted Average (TWA) established prior to the start of any abatement work. The number of general air samples required to be taken to establish the reference TWA for each abatement site shall be determined by the Industrial Hygienist and submitted for approval in the abatement plan.

3.6.3 Air Monitoring During Abatement Work

Personal and area air monitoring shall be provided and the TWA and excursion exposure levels shall be established during the first exposure to airborne concentrations of asbestos. Thereafter, provided the same type of work is performed, air monitoring shall be provided at a frequency as designated by the Industrial Hygienist. If monitoring outside the asbestos control area shows airborne concentrations have reached the action level, work shall be stopped and the Government on site notified immediately. The condition(s) causing this increase shall be corrected prior to the continuance of any abatement work.

3.6.4 Post-Abatement Air Sampling

Under aggressive conditions, area air samples shall be taken to establish the clearance TWA in the asbestos control area. A maximum TWA of less than

0.01 fibers/cc shall be established after final cleanup and before removal of the containment barrier. The fiber counts from these samples shall be less than 0.01 fibers/cc or less than or equal to the reference TWA whichever is less. Should any of the final samplings indicate a higher value, appropriate actions shall be taken by the Contractor to re-clean the area and the area air sampling shall be repeated.

3.7 SITE INSPECTION

While performing asbestos removal work, the Contractor shall be subject to on-site inspection. If the work is in violation of specification

SECTION 02 82 14.00 10 Page 11 requirements or any Federal, State, or local regulations, a stop work order will be issued to be in effect immediately and until the violation is resolved. Standby time and expenses required to resolve the violation shall be at the Contractor's expense.

3.8 DISPOSAL OF ASBESTOS-CONTAINING MATERIALS

3.8.1 Friable Asbestos-Containing Materials

Adequately wetted friable ACM shall be placed in approved containers.

Caution labels shall be applied on the containers in accordance with 29 CFR 1926.1101 (k), (7) & (8), if not already preprinted on the containers. External surfaces of the filled containers shall be thoroughly cleaned by wet sponging prior to being transported out of the regulated areas. Bags shall not be overfilled and shall be securely sealed to prevent accidental opening and leakage by twisting and taping the tops of bags in a goose-neck fashion. Unless otherwise approved, bags shall be placed in drums for staging and transportation to the approved landfill.

Friable asbestos-containing waste with sharp-edged components, or which may puncture the disposal bags or plastic sheeting, shall be placed into approved disposal drums and sealed with locking ring tops.

3.8.2 Non-Friable Asbestos Containing Materials

Non-friable asbestos materials shall be removed, transported, and disposed of, in such a manner as to prevent the materials from becoming friable. If at any time the non-friable materials are handled in a manner that they become friable, then all of the requirements for the removal, transportation, and disposal of friable ACM shall be required.

3.8.3 Disposal

ACM shall be disposed of by burial at a State-permitted sanitary landfill.

ACM shall be hauled to the landfill in a closed container and all procedures for hauling and disposal shall comply with 40 CFR 61 Subpart M, 49 CFR 171, and 49 CFR 172, and State and local standards. ACM shall not be allowed to accumulate on site for more than 30 days.

3.9 WASTE SHIPMENT RECORD (WSR)

A WSR shall be completed and submitted for this contract as specified in 40 CFR 61, subpart M. Other state waste manifest shipment records shall be submitted within 10 days of delivery to the landfill and before the completion date of this contract.

-- End of Section --

SECTION 02 82 14.00 10 Page 12

DIVISION 26 - ELECTRICAL

SECTION 26 00 00.00 26

GENERAL ELECTRICAL WORK AND EQUIPMENT

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

1.2 REFERENCES

1.3 SUBMITTALS

1.4 GENERAL REQUIREMENTS

1.4.1 Materials, Equipment and Installation

1.4.2 Standard Products

1.4.3 Environmental Requirements

1.4.4 Storage and Handling

1.4.5 Corrosion Prevention

1.5 CONTRACT DRAWINGS

1.5.1 General

1.5.2 Departure From Drawings

1.6 WORKMANSHIP

PART 2 PRODUCTS

2.1 CONDUIT

2.1.1 Rigid Metal Conduit

2.1.2 Liquid Tight Flexible Steel Conduit

2.1.3 Rigid Metal Conduit Fittings

2.1.4 Conduit Hangers

2.1.5 Wireways

2.2 INSULATED WIRE AND CABLE

2.3 TERMINAL BLOCKS

2.3.1 General

2.3.2 Control Signal Type

2.3.3 Power Terminal Blocks

2.3.4 Marking

2.4 Conduit Pull Boxes

2.4.1 General

2.5 SELECTOR SWITCHES

2.6 ESCUTCHEONS AND NAMEPLATES

2.7 INDICATING LAMP ASSEMBLIES

2.8 INDICATING METERS

2.8.1 Instrument Transformers

2.8.2 Voltmeters

2.8.3 Ammeters

2.8.4 Wattmeters

2.9 SWITCHGEAR TERMINATIONS

2.10 MOLDED-CASE CIRCUIT BREAKERS

2.11 FUSES

2.11.1 FUSES

2.11.2 FUSE BLOCKS

2.12 MAINTENANCE

2.12.1 Spare Parts

PART 3 EXECUTION

SECTION 26 00 00.00 26 Page 1

3.1 DEMOLITION, INSTALLATION, AND RECONFIGURATION

3.2 NEW 480 VAC SWITCHGEAR RETRO-FILL

3.3 CONDUIT

3.3.1 General

3.3.2 Installation

3.3.3 Pull Wires

3.3.4 Changes in Direction of Runs

3.3.5 Exposed Conduit

3.3.5.1 General

3.3.5.2 Conduit Cleaning

3.3.5.3 Conduit Inspection

3.3.6 Exposed Raceways

3.3.7 Supports

3.3.8 Expansion Fittings

3.3.9 Grounding of Conduit System

3.3.10 Coordination

3.3.11 Cutting and Threading

3.3.12 Thread Compound

3.3.13 Bends

3.3.14 Termination at Sheet Metal Boxes

3.3.15 Termination at Cast Boxes

3.3.16 Outlet Boxes as Part of Conduit System

3.3.17 Mandrel Requirement

3.4 WIREWAYS

3.5 BOXES AND ENCLOSURES

3.5.1 General

3.5.2 Installation

3.6 WIRE AND CABLE

3.6.1 General

3.6.2 External Wiring

3.6.3 Internal Wiring

3.6.4 Terminations

3.6.5 Identification

3.7 GROUNDING

3.8 FEEDER CABLES

3.8.1 Installation

3.9 PAINTING

3.9.1 New Equipment

3.9.2 Existing Equipment

3.10 DISPOSAL OF REMOVED EQUIPMENT

3.11 DELIVERY, STORAGE, AND HANDLING

3.12 TEMPORARY POWER

3.13 FIELD TESTING

-- End of Section Table of Contents --

SECTION 26 00 00.00 26 Page 2

SECTION 26 00 00.00 26

GENERAL ELECTRICAL WORK AND EQUIPMENT

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This section specifies the electrical equipment and work required to complete the Fort Randall Replace Interior 480V Station Service Equipment.

All equipment and systems shall be fully operational as per the plans and specifications, which provide an overview of the major equipment covered by this contract.

This contract installation shall be in accordance with NFPA 70 and IEEE C2 except where otherwise specifically indicated on the contract drawings or called for in the specifications. Omission of details on the drawings or in the specifications shall not be construed as permitting deviations from Code requirements.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI C12.1 (2008) Electric Meters Code for Electricity Metering

ANSI C39.1 (1981; R 1992) Requirements for Electrical Analog Indicating Instruments

ANSI C80.1 (2005) American National Standard for Electrical Rigid Steel Conduit (ERSC)

ASTM INTERNATIONAL (ASTM)

ASTM A 123/A 123M (2009) Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A 153/A 153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A 780/A 780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2012; Errata 1 2012; INT 1-4 2012; Errata

2 2013; INT 5-7 2013; INT 8-10 2014; INT

SECTION 26 00 00.00 26 Page 3

11 2015) National Electrical Safety Code

IEEE C57.13 (2008; INT 2009) Standard Requirements for Instrument Transformers

NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)

NECA 1 (2010.01.01) Standard for Good Workmanship in Electrical Construction

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA AB 3 (2006) Molded Case Circuit Breakers and Their Application

NEMA FB 1 (2007) Standard for Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable

NEMA FU 1 (2012) Low Voltage Cartridge Fuses

NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 5 (2000; R 2010) Control Circuit and Pilot Devices

NEMA/ANSI C12.11 (2007) Instrument Transformers for Revenue Metering, 10 kV BIL through 350 kV BIL (0.6 kV NSV through 69 kV NSV)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017) National Electrical Code

UNDERWRITERS LABORATORIES (UL)

UL 6 (2007; reprint Nov 2010) Electrical Rigid Metal Conduit-Steel

UL 360 (2009; R 2009) Standard for Liquid-Tight Flexible Steel Conduit

UL 467 (2007) Grounding and Bonding Equipment

UL 489 (2009; Reprint Jun 2013) Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures

UL 514B (2004; R 2006 thru 2009) Conduit, Tubing and Cable Fittings

UL 870 (2008) Standard for Wireways, Auxiliary Gutters, and Associated Fittings

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation.

SECTION 26 00 00.00 26 Page 4

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Equipment Crate Size, Storage Location and Proposed Routing at Site;

G, HDC

Submit no less than 60 days prior to equipment delivery

SD-03 Product Data

Equipment

Within 60 calendar days after receipt of notice to proceed, submit manufacturer's data, drawings, catalog cuts, and wiring diagrams.

Submitted manufacturer's data sheets shall be color copies of the original documents and be of good quality, easily read and marked or highlighted indicating the specific equipment being submitted and labeled as to which equipment (by designation) the submitted equipment is installed with and show compliance with the contract specifications. Manufacturer's data sheets submitted for the O&M manuals shall be the original documents and not be copies. As a minimum, submittals shall be required for but not be limited to the following:

Rigid Metal Conduit; G, HDC

Rigid Metal Conduit Fittings; G, HDC

Conduit Hangers; G, HDC

Wireways; G, HDC

Terminal Blocks; G, HDC

Selector Switches; G, HDC

Escutcheons and Nameplates; G, HDC

Indicating Lamp Assemblies; G, HDC

Indicating Meters; G, HDC

Molded-Case Circuit Breakers; G, HDC

SD-06 Test Reports

Field Test Reports; G, HDC Submit within 14 days after completion of tests, PARAGRAPH Field Testing.

SD-08 Manufacturer's Instructions

Spare Parts; G, HDC

SECTION 26 00 00.00 26 Page 5

1.4 GENERAL REQUIREMENTS

1.4.1 Materials, Equipment and Installation

New and unused materials and equipment shall be furnished and any defective material or equipment damaged in the course of installation shall be replaced or repaired. Existing conduits shall be reused except where called out as new on the contract drawings; or as approved by the Contracting Officer's Representative. Testing shall be performed to check the installation of and the proper operational functions of the accessory electrical equipment per SECTION 26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING. The installations shall be in accordance with the National Electrical Code, NFPA 70, and the National Electrical Safety Code, IEEE C2, except where otherwise specifically shown or specified, in which case the drawings and specifications shall govern. Omission of details on the drawings or in the specifications shall not be construed as permitting deviations from Code requirements.

1.4.2 Standard Products

Material and equipment shall be the standard products of manufacturers regularly engaged in the manufacture of these products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to proposal due date.

1.4.3 Environmental Requirements

Communication, control, and protective equipment shall be rated for continuous operation in ambient environmental conditions of 0 degrees C to 50 degrees C (32 degrees F to 120 degrees F), and 0 percent to 90 percent relative humidity, non-condensing. Power equipment shall be rated as required in these specifications.

1.4.4 Storage and Handling

Electrical equipment shall be shipped as completely assembled and wired as feasible so as to require a minimum of installation work. All electrical material and equipment delivered to site, shall until immediately prior to installation, be protected from damaging environmental and construction activities. Special care shall be taken for panelboards, transformers, switchgear, and control equipment. Control equipment shall include, but not be limited to, meters, wire and cables and various types of switches.

The above equipment and devices shall be kept dry and free from precipitation and condensation during storage, installation, and after installation. All electrical equipment shall be stored in in accordance with the manufacturer's recommendations to prevent damage. Method of on-site storage and storage containers will be subject to approval by the Contracting Officer. The Contractor shall be responsible for energizing the heaters mounted in the equipment or to provide other means as required to avoid damage to the equipment due to humidity, weather, and other damaging environmental activities.

1.4.5 Corrosion Prevention

Equipment shall be protected to prevent deterioration from corrosion. The general requirements are specified below; however, other corrosion-resisting treatments that are the equivalent of those specified may be used.

SECTION 26 00 00.00 26 Page 6

a. Fastenings and Fittings. Screws, bolts, nuts, pins, studs, springs, washers and other miscellaneous fastening devices and fittings shall be of corrosion-resistant material or shall be treated in an approved manner to render them resistant to corrosion. Fasteners exposed directly to the weather shall be of corrosion-resisting material.

b. Corrosion-Resisting Materials. Corrosion-resisting steel, copper, brass, bronze, copper-nickel-copper alloys are acceptable corrosion-resisting materials.

c. Corrosion-Resisting Treatments. Treatments shall be in accordance with ASTM A 123/A 123M or ASTM A 153/A 153M.

d. Finish. Final painting shall be done in accordance with paragraph

PAINTING.

1.5 CONTRACT DRAWINGS

1.5.1 General

The contract drawings indicate the work to be accomplished in as much detail as is practical. Except for such modifications as may be required for coordination with equipment actually furnished (either supplied by the Government or by the Contractor), they constitute the working drawings for construction and for purchase of required materials. When shop drawings for equipment to be furnished by the Government and installed by the Contractor have been "Approved", the appropriate contract drawings for installation of embedded or exposed Contractor furnished material will be revised by the Contractor as required. Where design changes, required for coordination, affect contract drawings showing location or terminating details for conduit, grounding, wiring, piping, etc., prints of such contract drawings, indicating necessary changes as approved, or equivalent field sketches, will be furnished by the Contracting Officer.

1.5.2 Departure From Drawings

a. If departures from the contract drawings other than those required for equipment actually furnished, are deemed necessary by the Contractor, details of such departures and reasons therefore shall be submitted to the Contracting Officer for approval as soon as practicable, but not later than 30 days before scheduled installation date. No such departures shall be made without prior approval.

b. The control schemes shown in the reference drawings for Contractor-furnished equipment are not intended to exclude available standard package units for the functions indicated. However, when alternate equipment proposed by the Contractor is approved, the Contractor shall be responsible for any additional devices, conduit and wiring required as a consequence and such additional devices, etc., shall be furnished and installed at no additional cost to the Government.

1.6 WORKMANSHIP

All work shall be completed in a neat and workmanlike manner and shall conform to the best modern practice in the class of work regardless of any omission in the drawings and specifications. Accepted industry practices are as described in NECA 1 and other ANSI approved installation standards.

SECTION 26 00 00.00 26 Page 7

PART 2 PRODUCTS

2.1 CONDUIT

All conduit shall be galvanized rigid steel, except where specifically shown or specified otherwise. Manufacturer's descriptive literature shall be submitted for approval

2.1.1 Rigid Metal Conduit

Rigid metal conduit shall be minimum 3/4-inch trade size and shall, in addition, be zinc coated (galvanized) both inside and outside by the hot-dip method and shall conform to UL 6 and ANSI C80.1. Thin-wall or EMT conduit will not be allowed at any location.

2.1.2 Liquid Tight Flexible Steel Conduit

Conduit shall conform to UL 360. Conduit shall have an interlocked flexible galvanized steel core with a permanently bonded waterproof exterior gray polyvinyl chloride jacket. Conduits 1-1/4 inch and smaller shall have an internal copper bonding conductor wound spirally in the space between each convolution for the equipment ground provided by the manufacturer. Flexible conduit shall only be used on connections to equipment subject to motion, and shall have a maximum length of 36 inches and installed only where approved by the Contracting Officer's Representative.

2.1.3 Rigid Metal Conduit Fittings

Rigid metal conduit fittings shall be threaded and cadmium- or zinc-coated (by hot-dipped galvanizing or by electroplating) on the inside and outside and shall conform to NEMA FB 1, UL 467, and UL 514B. Fittings shall be galvanized cast or malleable iron. Expansion fittings shall be UL Listed, shall allow up to 4 inches of movement, be required at construction joints, and have external Bonding jumpers. Fittings for flexible conduit shall provide positive bonding, have external jumpers, and shall conform to

UL 514B

2.1.4 Conduit Hangers

a. Conduit hangers shall be fabricated from two or more galvanized steel hanger rods, a galvanized steel horizontal member, U-bolts, clamps, and other attachments as necessary for securing hanger rods and conduits. Hanger rods shall be not smaller than 3/8-inch diameter and threaded either full length or for a sufficient distance at each end to permit at least 1-1/2 inches of adjustment. Horizontal members shall be standard structural steel shapes such as angles or channels, 1-1/2 by 1-1/2 inch or 1-5/8 by 1-5/8 inch, 12 gauge, cold-formed, lipped channel, and designed to accept special spring-held hardened steel nuts for securing hanger rods or other attachments. Nuts and clamps shall be compatible with the channel. Two or more channels may be welded together to form horizontal members of greater strength. All members shall be hot-dip galvanized after fabrication in accordance with ASTM A 123/A 123M or ASTM A 153/A 153M as applicable.

b. Conduit hangers shall be capable of supporting a load equal to the sum of the weights of the conduits and wires, the weight of the hanger itself, plus 200 pounds. The stress at the root of the thread of the hanger rods shall be not more than 9,475 psi at design load. The

SECTION 26 00 00.00 26 Page 8 horizontal member shall be sized such that the maximum stress will be not more than 12,650 psi at design load. Hanger assemblies shall comply with the applicable requirements of SECTION 13 48 00.00 26, SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT.

2.1.5 Wireways

Wireways shall be Listed to UL 870. Wireways and all fittings and connectors shall be made of sheet metal, except for the battery monitoring system wireway which may be non-metallic as recommended by the battery monitoring system supplier. Covers and bodies of wireways shall otherwise have minimum thickness equal to 18 gauge steel. Seams shall be continuously welded and ground smooth, with no screws or bolts protruding into the inside of the wireway. All edges and corners shall be rounded and smooth. All covers and connectors including elbows, tees, crosses, nipples, and closure plates shall be gasketed. Metallic wireways shall be NEMA Type 12.

2.2 INSULATED WIRE AND CABLE

Wire and cable used for power, lighting, control, metering, and relaying systems shall be provided by the Contractor and shall conform to the requirements specified in SECTION 26 05 19.00 26, INSULATED WIRE AND CABLE.

2.3 TERMINAL BLOCKS

2.3.1 General

Terminal blocks shall be UL listed. Terminal blocks shall be removable and of the binding, fillister or washer-head screw type, or stud type with contact and locking nuts. Terminal blocks shall be molded type with barriers, equipped with hinged covers to protect against inadvertent contact rated not less than 600 volts. Each terminal shall be not less than No. 10 in size, having length and space for connecting at least two No. 12 AWG conductors using ring tongue connectors to each terminal. Terminal blocks shall be provided to terminate all internal and external cables and shall contain at least four spare terminals or 10 percent, whichever is greater. Terminal blocks shall be rated, at minimum, for 90 degree C terminations. Manufacturer's descriptive literature shall be submitted for approval. Terminal blocks provided as part of the breaker retrofill unit, for internal wiring only, are to be the manufacturer standard products.

2.3.2 Control Signal Type

All terminal blocks for control signal wiring, shall be sliding link disconnect molded or fabricated type with barriers, rated not less than 600 volts with 30 ampere capacity and shall be States terminal block type NT or equivalent that have sliding link for testing, high barrier between poles, with marker strips for circuit identification and heavy nickel plated brass contacts.

2.3.3 Power Terminal Blocks

Terminal blocks for 120 VAC and 480 VAC and all DC connections in terminal cabinets shall be rated not less than 600 volts and of adequate capacity for the conductors. The terminals shall be of either the stud type with contact nuts and locking nuts or of the removable screw type, having length and space for at least two ring-tongue terminals of the size required on the conductors to be terminated. For conductors rated more than 50 amperes, SECTION 26 00 00.00 26 Page 9 screws shall have hexagonal heads. Conducting parts between connected terminals shall have adequate contact surface and cross-section to operate without overheating. Each connected terminal shall have the circuit designation or wire number placed on or near the terminal in permanent contrasting color.

2.3.4 Marking

White or other light-colored plastic marking strips, fastened by screws to each terminal block, shall be provided for wire designations. Marking strips for rail terminal blocks may be fastened by another means than screws. The manufacturer's wire number and the Government's wire number shall both be shown for each connected terminal on the marking strips with permanent marking fluid. The marking strips shall be reversible to permit marking both sides, or two marking strips shall be furnished with each block, to accommodate the two sets of wire numbers.

2.4 Conduit Pull Boxes

2.4.1 General

The following simplified rules are for use with conductors covered with accepted jacket materials per SECTION 26 05 19.00.26 INSULATED WIRE AND

CABLE:

a. When odd sized dimensions are obtained the next larger standard size should be used. References to conduit diameter should be used as trade size.

b. Straight Pulls: The length of the box should not be less than 12 inches or 12 times the diameter of the largest conduit, whichever is greatest. The width should not be less than the sum of the locknut diameters plus 1/2 inch between adjacent conduits and between locknuts and box edges. The depth should not be less than 4 inches for conduits up to 2 inches in size and two times diameter for all others.

c. Angle Pulls: The length of the box should not be less than 12 inches or 8 times the diameter of the largest conduit, whichever is greatest. The distance should be increased for additional conduits by the sum of the diameters of the conduits entering the same side of the box. Where conductors turn 90 degrees and parallel to the cover the box length and width should be equal and the depth should be determined the same as for straight pulls. Where the conductors turn 90 degrees in a plane perpendicular to the cover the width should be determined the same as for straight pulls and the depths should be equal to the length.

2.5 SELECTOR SWITCHES

Control, instrument and selector switches shall be of the rotary switchboard type rated for alternating-current operation at 600 volts and conform to NEMA ICS 5. On all switches, contacts shall be capable of satisfactorily withstanding a life test of at least 10,000 operations with rated current flowing in the switch contacts, and shall be capable of continuously carrying 20 amperes without exceeding a temperature rise of more than 30 degrees C above ambient. The single-break inductive load interrupting ratings shall be not less than 1.5 amperes for 125 volts DC or 10 amperes for 120 volts ac. Each switch shall be provided with ample contact stages including spare contacts where shown on the drawings to

SECTION 26 00 00.00 26 Page 10 perform the functions of the control system. Contacts of switches shall be self-aligning and shall operate with a wiping action. A positive means of maintaining high pressure on closed contacts shall be provided.

Compression springs or pivoted joints shall not be depended upon to carry current. The covers or plates on the switches shall be readily removable for inspection of contacts. Each switch shall be provided with an escutcheon clearly marked to show each operating position. Switch identifications and handle positions shall be engraved on escutcheons or may be provided on separate nameplates. Escutcheon engravings shall be white on a black background. Manufacturer's descriptive literature shall be submitted for approval for all switches.

2.6 ESCUTCHEONS AND NAMEPLATES

Identifying nameplates shall be provided and are in addition to manufacturer's nameplates and shall be made of 1/16-inch thick laminated sheet plastic or of 1/32-inch thick anodized aluminum engraved to provide white letters on a black background. All nameplates shall be fastened to enclosures in proper positions with black finished round-head screws. In general, each control switch shall be provided with an identifying nameplate in addition to an escutcheon plate to show operating position as shown in the contract drawings. Nameplates designations shall be submitted for approval. Nameplates for cabinets shall be as shown in the contract drawings. Designations may be changed when shop drawings are submitted for approval.

2.7 INDICATING LAMP ASSEMBLIES

Indicating Lamp Assemblies shall be of the switchboard type, insulated for 125-volt dc service, with appropriate colored caps and integrally mounted resistors for 125-volt service. Lamps shall be long-life LED type with a minimum normal life span of 50,000 hours.