Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| Amendment_0001_Maps.pdf | ||
| PWS_Revised_31_Jan_2017_.pdf | ||
| Maps.pdf | ||
| solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG63554203
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the Amendment is to adjust the active period of performance for all line items. The active period of performance w as originaly stated as "1 April - 30 Sep" Amendment 0002 has corrected it to say "1 April - 31 Oct No other changes w ere made as a result of Amendment 0002 Government POC for this Amendment is Matthew Hibbert 402 995 2480
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-17-Q-0025
X 9B. DATED (SEE ITEM 11)
23-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Mar-2017
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F-17-Q-0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480.
CLIN 0002
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0003
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0004
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0005
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0006
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0007
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0008
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0009
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0010
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0011
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0012
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0013
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0014
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0015
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0016
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0017
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0018
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0019
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
CLIN 0020
The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.
e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services
(End of Summary of Changes)