Amendment_0002.pdf

PDF 34 KB Posted

Attached to
Oahe Project Mowing and Cleanup Services Federal contract opportunity
Solicitation number
W9128F-17-Q-0025
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Oahe Project Mowing and Cleanup Services, newest first.
File Type Posted
Amendment_0001.pdf PDF
Amendment_0001_Maps.pdf PDF
PWS_Revised_31_Jan_2017_.pdf PDF
Maps.pdf PDF
solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W59XQG63554203

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of the Amendment is to adjust the active period of performance for all line items. The active period of performance w as originaly stated as "1 April - 30 Sep" Amendment 0002 has corrected it to say "1 April - 31 Oct No other changes w ere made as a result of Amendment 0002 Government POC for this Amendment is Matthew Hibbert 402 995 2480

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-17-Q-0025

X 9B. DATED (SEE ITEM 11)

23-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2017

CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128F-17-Q-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480.

CLIN 0002

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0003

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0004

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (30 Sep 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2017) to (31 Oct 2017). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0005

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0006

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0007

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0008

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (30 Sep 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2018) to (31 Oct 2018). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0009

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0010

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0011

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0012

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (30 Sep 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2019) to (31 Oct 2019). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0013

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0014

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0015

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0016

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (30 Sep 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2020) to (31 Oct 2020). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0017

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0018

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0019

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

CLIN 0020

The CLIN extended description has changed from The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

*******************************************************************************************Th e Active Period of Performance will be from (1 April 2021) to (30 Sep 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services during this period.Government POC is Matthew Hibbert 402 995 2480 to The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform the tasks IAW the attached PWS dated 31 Jan 2017.

e Active Period of Performance will be from (1 April 2021) to (31 Oct 2021). The contractor shall be required to perform the services as stated in the PWS. The Non-Active Period of Performance will be all dates not identified within the active period of performance as stated above . The contractor is not required to perform any services

(End of Summary of Changes)

File details come from the government source that posted it. Updated .