Update_with_Line_Items_Abstract.xls

XLS spreadsheet 73 KB Posted

Attached to
Platte River Flood Risk Reduction Project, Phase 1, Shell Creek Levee Federal contract opportunity
Solicitation number
W9128F-13-B-0010
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Bid Abstract Updated with Line Items

View the file

Other files for this federal contract opportunity

Other files attached to Platte River Flood Risk Reduction Project, Phase 1, Shell Creek Levee, newest first.
File Type Posted
ABSTRACT-13-B-0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE1

ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER2. DATE ISSUED3. DATE OPENEDPAGE 1 OF 5
W9128F-13-B-001022-Jul-1329-Aug-13
4. ISSUING OFFICEI CERTIFY THAT I HAVE OPENED, READ ANDNAME AND TITLE OF CERTIFYING OFFICIAL (Type)
US ARMY CORPS OF ENGINEERSAND RECORDED ON THIS ABSTRACT
CONTRACTING DIVISION (CECT-NWO-C)ALL OFFERS RECEIVED IN RESPONSESIGNATUREDATE SIGNED
1616 CAPITOL AVENUETO THIS SOLICITATION
OMAHA, NE 68102-4901Signed
5. PROJECT TITLE8. GOVERNMENT ESTIMATE9. OFFERS
(Check A, B or C AND COMPLETE D, E AND F)NO. 1NO. 2
Platte River Flood Protection ProjectA. HIRED LABORA. OFFERORA. OFFEROR
Phase 1 Shell CreekPhillips Hardy IncHDB Construction
Schuyler NEBoonville MOTopeka KS
XB. REASONABLE CONTRACTB. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)
(Without Profit)20%20%
6. NUMBER OF AMENDMENTS ISSUEDC. REASONABLE CONTRACTC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
1(Including Profit)33
7A7B7CD.E.F.E.F.E.F.
ITEM #DESCRIPTION OF ITEMEST. QUANTITYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT
1All work to complete placement of cohesive fill IAW drawings & specs41,740CY$ 15.70$ 655,318.00$ 10.50$ 438,270.00$ 9.19$ 383,590.60
2All work to complete placement of random fill IAW drawings & specs153,520CY$ 12.45$ 1,911,324.00$ 9.40$ 1,443,088.00$ 6.91$ 1,060,823.20
3All work to complete construction of toe drain IAW drawings & specs1,500LF$ 98.20$ 147,300.00$ 21.00$ 31,500.00$ 192.18$ 288,270.00
4All work to complete placement of topsoil IAW drawings & specs1LS$ 102,858.00$ 301,000.00$ 153,381.57
5All work to complete placement of levee surfacing IAW drawings & specs3,400Tons$ 26.85$ 91,290.00$ 18.00$ 61,200.00$ 40.67$ 138,278.00
6All work to complete placement of riprap IAW drawings & specs200Tons$ 96.05$ 19,210.00$ 47.00$ 9,400.00$ 67.83$ 13,566.00
7All work to complete installation of drainage structure 1 IAW drawings & specs1LS$ 140,265.00$ 230,000.00$ 78,719.25
8All work to complete installation of drainage structure 2 IAW drawings & specs1LS$ 139,543.00$ 113,000.00$ 135,372.91
9All work to complete construction of road raise IAW drawings & specs1LS$ 531,062.00$ 300,000.00$ 658,410.40
10All work to complete construction of utility crossing IAW drawings & specs7Ea$ 16,384.00$ 114,688.00$ 21,300.00$ 149,100.00$ 63,196.28$ 442,373.96
11All work to complete demolition IAW drawings & specs1LS$ 5,211.00$ 46,000.00$ 42,169.95
12All work to complete all remaining work (items 0001 - 0011)1LS$ 364,494.00$ 710,000.00$ 410,652.48
BASE ITEMS TOTAL$ 4,222,563.00$ 3,832,558.00$ 3,805,608.32
Option
13All work to complete placement of cohesive fill IAW drawings & specs4,260CY$ 15.60$ 66,456.00$ 12.00$ 51,120.00$ 13.42$ 57,169.20
14All work to complete placement of random fill IAW drawings & specs6,480CY$ 11.70$ 75,816.00$ 11.00$ 71,280.00$ 11.09$ 71,863.20
15All work to complete placement of topsoil IAW drawings & specs1LS$ 7,200.00$ 32,000.00$ 105,830.53
16All work to complete placement of levee surfacing IAW drawings & specs300Tons$ 26.85$ 8,055.00$ 29.00$ 8,700.00$ 114.87$ 34,461.00
17All work to complete placement of riprap IAW drawings & specs2,530Tons$ 65.60$ 165,968.00$ 25.00$ 63,250.00$ 54.12$ 136,923.60
18All work to complete all remaining work (items 0001 - 0017)1LS$ 6,605.00$ 27,000.00$ 508,778.42
(Items 0013 -0018) Option 1 Total$ 330,100.00$ 253,350.00$ 915,025.95
(Items 0001 -0012) Base Total$ 4,222,563.00$ 3,832,558.00$ 3,805,608.32
(Base and Option 1) Contract Total$ 4,552,663.00$ 4,085,908.00$ 4,720,634.27

G6CTXSDH:

Amount of $70,400 entered on bid is incorrect. Contractor did not multiply correctly.

PAGE2

ABSTRACT OF OFFERS -1. SOLICITATION NUMBERPAGE 2 OF 5
W9128F-13-B-0010
CONSTRUCTIONINSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation
CONTINUATION SHEETsheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
2. PROJECT TITLE4. OFFERS (Continued)
NO. 3NO. 4NO. 5
Platte River Flood Protection ProjectA. OFFERORA. OFFERORA. OFFEROR
Phase 1 Shell CreekRange and Civil ConstructionHB Construction IncCommercial Contractors
Schuyler NEJunction City KSPlatte City MOLincoln NE
B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)
20%20%20%
3. CONTRACT ITEMSC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
333
ABCD.E.D.E.D.E.E.E.
ITEM #EST. QUANTITYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEUNIT PRICEESTIMATED AMOUNTESTIMATED AMOUNT
141,740CY$ 8.00$ 333,920.00$ 9.50$ 396,530.00$ 12.75$ 121.13$ 532,185.00$
2153,520CY$ 6.12$ 939,542.40$ 9.50$ 1,458,440.00$ 9.75$ 92.63$ 1,496,820.00$
31,500LF$ 57.25$ 85,875.00$ 55.00$ 82,500.00$ 60.80$ 3,344.00$ 91,200.00$
41LS$ 145,500.00$ 100,000.00$ 145,500.00$ 125,000.00$
53,400Tons$ 50.75$ 172,550.00$ 44.52$ 151,368.00$ 35.00$ 1,558.20$ 119,000.00$
6200Tons$ 65.00$ 13,000.00$ 60.00$ 12,000.00$ 70.00$ 4,200.00$ 14,000.00$
71LS$ 172,000.00$ 188,104.00$ 172,000.00$ 250,000.00
81LS$ 174,500.00$ 98,361.00$ 174,500.00$ 155,000.00
91LS$ 700,000.00$ 325,065.00$ 700,000.00$ 433,300.00$
107Ea$ 11,720.00$ 82,040.00$ 12,000.00$ 84,000.00$ 8,805.00$ 105,660,000.00$ 61,635.00$
111LS$ 44,000.00$ 65,000.00$ 44,000.00$ 15,000.00$
121LS$ 316,000.00$ 633,000.00$ 316,000.00$ 655,500.00$
BASE ITEMS TOTAL$ 3,178,927.40$ 3,594,368.00$ 107,221,315.95$ 3,948,640.00
Option 1
134,260CY$ 8.00$ 34,080.00$ 9.50$ 40,470.00$ 14.00$ 133.00$ 59,640.00$
146,480CY$ 6.50$ 42,120.00$ 9.50$ 61,560.00$ 14.00$ 133.00$ 90,720.00$
151LS$ 4,500.00$ 10,000.00$ 4,500.00$ 10,000.00$
16300Tons$ 50.75$ 15,225.00$ 44.52$ 13,356.00$ 35.00$ 1,558.20$ 10,500.00
172,530Tons$ 65.00$ 164,450.00$ 60.00$ 151,800.00$ 63.00$ 3,780.00$ 159,390.00
181LS$ 15,000.00$ 25,000.00$ 15,000.00$ 160,000.00$
Option 1 Total$ 275,375.00$ 302,186.00$ 25,104.20$ 490,250.00
Base Total$ 3,178,927.40$ 3,594,368.00$ 107,221,315.95$ 3,948,640.00
Contract Total$ 3,454,302.40$ 3,896,554.00$ 107,246,420.15$ 4,438,890.00

PAGE3

ABSTRACT OF OFFERS -1. SOLICITATION NUMBERPAGE 3 OF 5
W9128F-13-B-0010
CONSTRUCTIONINSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation
CONTINUATION SHEETsheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
2. PROJECT TITLE4. OFFERS (Continued)
NO. 6NO. 7NO. 8
Platte River Flood Protection ProjectA. OFFERORA. OFFERORA. OFFEROR
Phase 1 Shell CreekValley CorpCoastal Environmental GroupPruss Excavation
Schuyler NEValley, NEOmaha NEDodge NE
B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)
20%20%20%
3. CONTRACT ITEMSC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
333
ABCD.E.D.E.D.E.E.E.
ITEM #EST. QUANTITYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEUNIT PRICEESTIMATED AMOUNTESTIMATED AMOUNT
141,740CY$ 9.63$ 401,956.20$ 10.80$ 450,792.00$ 17.21$ 185.87$ 718,345.40$
2153,520CY$ 5.21$ 799,839.20$ 6.00$ 921,120.00$ 10.12$ 60.72$ 1,553,622.40$
31,500LF$ 41.56$ 62,340.00$ 35.00$ 52,500.00$ 49.40$ 1,729.00$ 74,100.00$
41LS$ 55,653.80$ 71,400.00$ 145,500.00$ 90,000.00$
53,400Tons$ 35.29$ 119,986.00$ 33.00$ 112,200.00$ 30.10$ 993.30$ 102,340.00$
6200Tons$ 58.52$ 11,704.00$ 60.00$ 12,000.00$ 76.54$ 4,592.40$ 15,308.00$
71LS$ 210,173.29$ 245,000.00$ 172,000.00$ 185,338.00
81LS$ 183,685.32$ 185,000.00$ 174,500.00$ 161,980.00
91LS$ 382,257.70$ 500,000.00$ 700,000.00$ 241,435.00$
107Ea$ 5,626.10$ 39,382.70$ 11,000.00$ 77,000.00$ 8,730.00$ 96,030,000.00$ 61,110.00$
111LS$ 27,895.17$ 27,000.00$ 44,000.00$ 10,000.00$
121LS$ 579,781.30$ 330,000.00$ 316,000.00$ 795,235.64$
BASE ITEMS TOTAL$ 2,874,654.68$ 2,984,012.00$ 97,589,561.29$ 4,008,814.44
Option 1
134,260CY$ 9.10$ 38,766.00$ 12.00$ 51,120.00$ 17.21$ 206.52$ 73,314.60$
146,480CY$ 5.62$ 36,417.60$ 9.00$ 58,320.00$ 10.12$ 91.08$ 65,577.60$
151LS$ 3,484.98$ 4,000.00$ 4,500.00$ 3,400.00$
16300Tons$ 35.29$ 10,587.00$ 35.00$ 10,500.00$ 30.10$ 1,053.50$ 9,030.00
172,530Tons$ 62.10$ 157,113.00$ 50.00$ 126,500.00$ 48.34$ 2,417.00$ 122,300.20
181LS$ 23,250.04$ 12,570.00$ 15,000.00$ 10,000.00$
Option 1 Total$ 269,618.62$ 263,010.00$ 23,268.10$ 283,622.40
Base Total$ 2,874,654.68$ 2,984,012.00$ 97,589,561.29$ 4,008,814.44
Contract Total$ 3,144,273.30$ 3,247,022.00$ 97,612,829.39$ 4,292,436.84

PAGE4

ABSTRACT OF OFFERS -1. SOLICITATION NUMBERPAGE 4 OF 5
W9128F-13-B-0010
CONSTRUCTIONINSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation
CONTINUATION SHEETsheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
2. PROJECT TITLE4. OFFERS (Continued)
NO. 9NO. 10NO. 11
Platte River Flood Protection ProjectA. OFFERORA. OFFERORA. OFFEROR
Phase 1 Shell CreekTCW ConstructionK & L Landscape and ConstDoernemann Const
Schuyler NELincoln, NESergeant Bluff IAClarskson, NE
B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)
20%20%20%
3. CONTRACT ITEMSC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
333
ABCD.E.D.E.D.E.E.E.
ITEM #EST. QUANTITYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEUNIT PRICEESTIMATED AMOUNTESTIMATED AMOUNT
141,740CY$ 12.68$ 529,263.20$ 7.25$ 302,615.00$ 14.40$ 104.40$ 601,056.00$
2153,520CY$ 5.31$ 815,191.20$ 5.50$ 844,360.00$ 8.75$ 48.13$ 1,343,300.00$
31,500LF$ 33.00$ 49,500.00$ 25.00$ 37,500.00$ 55.22$ 1,380.50$ 82,830.00$
41LS$ 91,636.66$ 98,713.00$ 145,500.00$ 48,600.00$
53,400Tons$ 32.06$ 109,004.00$ 31.50$ 107,100.00$ 54.47$ 1,715.81$ 185,198.00$
6200Tons$ 58.84$ 11,768.00$ 55.00$ 11,000.00$ 67.54$ 3,714.70$ 13,508.00$
71LS$ 117,343.29$ 295,600.00$ 172,000.00$ 194,604.90
81LS$ 90,564.33$ 332,500.00$ 174,500.00$ 170,079.00
91LS$ 421,608.21$ 155,000.00$ 700,000.00$ 305,000.00$
107Ea$ 1,930.59$ 13,514.13$ 55,000.00$ 385,000.00$ 26,149.20$ 1,438,206,000.00$ 183,044.40$
111LS$ 29,538.61$ 15,500.00$ 44,000.00$ 24,000.00$
121LS$ 732,580.66$ 596,500.00$ 316,000.00$ 398,400.00$
BASE ITEMS TOTAL$ 3,011,512.29$ 3,181,388.00$ 1,439,764,963.53$ 3,549,620.30
Option 1
134,260CY$ 12.40$ 52,824.00$ 7.25$ 30,885.00$ 14.40$ 104.40$ 61,344.00$
146,480CY$ 5.31$ 34,408.80$ 5.50$ 35,640.00$ 8.75$ 48.13$ 56,700.00$
151LS$ 10,535.23$ 9,500.00$ 4,500.00$ 1,500.00$
16300Tons$ 32.60$ 9,780.00$ 34.20$ 10,260.00$ 54.47$ 1,862.87$ 16,341.00
172,530Tons$ 57.80$ 146,234.00$ 55.00$ 139,150.00$ 67.54$ 3,714.70$ 170,876.20
181LS$ 47,026.67$ 195,000.00$ 15,000.00$ 25,000.00$
Option 1 Total$ 300,808.70$ 420,435.00$ 25,230.10$ 331,761.20
Base Total$ 3,011,512.29$ 3,181,388.00$ 1,439,764,963.53$ 3,549,620.30
Contract Total$ 3,312,320.99$ 3,601,823.00$ 1,439,790,193.63$ 3,881,381.50

PAGE5

ABSTRACT OF OFFERS -1. SOLICITATION NUMBERPAGE 5 OF 5
W9128F-13-B-0010
CONSTRUCTIONINSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation
CONTINUATION SHEETsheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
2. PROJECT TITLE4. OFFERS (Continued)
NO. 12NO. 13NO. 14
Platte River Flood Protection ProjectA. OFFERORA. OFFERORA. OFFEROR
Phase 1 Shell CreekFutureNet GroupTJC Engineering Inc.
Schuyler NEDetroit MIProspect KY
B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)
20%20%
3. CONTRACT ITEMSC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
33
ABCD.E.D.E.D.E.E.E.
ITEM #EST. QUANTITYUNITUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEUNIT PRICEESTIMATED AMOUNTESTIMATED AMOUNT
141,740CY$ 23.50$ 980,890.00$ 7.00$ 292,180.00$
2153,520CY$ 14.50$ 2,226,040.00$ 6.00$ 921,120.00$
31,500LF$ 28.00$ 42,000.00$ 90.00$ 135,000.00$
41LS$ 56,345.00$ 94,000.00$
53,400Tons$ 28.00$ 95,200.00$ 45.00$ 153,000.00$
6200Tons$ 9.00$ 1,800.00$ 45.00$ 9,000.00$
71LS$ 198,500.00$ 134,550.00
81LS$ 199,750.00$ 93,600.00
91LS$ 695,000.00$ 501,605.00$
107Ea$ 14,000.00$ 98,000.00$ 14,000.00$ 98,000.00$
111LS$ 16,000.00$ 10,000.00$
121LS$ 1,179,750.00$ 387,750.00$
BASE ITEMS TOTAL$ 5,789,275.00$ 2,829,805.00
Option 1
134,260CY$ 9.00$ 38,340.00$ 6.00$ 25,560.00$
146,480CY$ 17.50$ 113,400.00$ 6.00$ 38,880.00$
151LS$ 15,500.00$ 6,000.00$
16300Tons$ 23.00$ 6,900.00$ 45.00$ 13,500.00
172,530Tons$ 27.00$ 68,310.00$ 45.00$ 113,850.00
181LS$ 99,750.00$ 50,000.00$
Option 1 Total$ 342,200.00$ 247,790.00
Base Total$ 5,789,275.00$ 2,829,805.00
Contract Total$ 6,131,475.00$ 3,077,595.00

G6CTXSDH:

etimatied amount of $18K in bid relects a $90 unit price, contractor used $9

G6CTXSDH:

Contractor's amount on bid of $38K incorrectly recorded as the total for option 1 is correct

TOTALS

Offeror 13TJC Engineering Inc.$ 3,077,595.00
Offeror 6Valley Corp$ 3,144,273.30
Offeror 7Coastal Environmental Group$ 3,247,022.00
Offeror 9TCW Construction$ 3,312,320.99
Offeror 3Range and Civil Construction$ 3,454,302.40
Offeror 10K & L Landscape and Const$ 3,601,823.00
Offeror 4HB Construction Inc$ 3,896,554.00
Offeror 1Phillips Hardy Inc$ 4,085,908.00
Offeror 8Pruss Excavation$ 4,292,436.84
Offeror 5Commercial Contractors$ 4,438,890.00
Offeror 2HDB Construction$ 4,720,634.27
Offeror 12FutureNet Group$ 6,131,475.00
Offeror 11Doernemann Const$ 3,881,381.50