A.2.11.3 W9128A22B0001 Am-0002.pdf
PDF 2 MB Posted
- Solicitation number
- W9128A22B0001
About this file
This document contains an amendment to a solicitation and responses to bidder questions regarding a federal construction contract opportunity. The amendment provides revised specifications sections and attachments including a site visit attendance roster and responses to three bidder questions.
The solicitation is for the FY22 Replace Fuel Piping, Underground Storage Tanks, and Vent Lines at Building 80, Schofield Barracks, Oahu, Hawaii project. The scope of work involves removing and replacing an existing fuel system including six underground storage tanks, dispenser issue piping, and under-dispenser containment sumps. The estimated period of performance is 603 days with a project magnitude between $5-10 million. The solicitation is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The award will be a firm fixed-price construction contract.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY22 Replace Fuel Piping, Underground Storage Tanks, and Vent Lines at Building 80, Schofield Barracks, Oahu, Haw aii
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A22B0001
X 9B. DATED (SEE ITEM 11)
03-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
Am-0002
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2022
CODE
CONTRACTING DIVISION
BLDG 230 OTAKE ST.
FORT SHAFTER HI 96858
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A22B0001 Am-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0002)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.
Section 00 10 00 – Page 2 Section 00 72 00 – Page 2
b. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Attachment A – Site Visit Attendance Roster Section 00 60 00, Attachment B – Request for Information (#1-3)
2. The bid opening date and time remains unchanged.
Section 00 10 00 – 2 license, state identification card, or passport. Drivers must possess a valid license, vehicle safety inspection, registration and proof of no-fault insurance. Operators of Rental Vehicles must have the no-fault insurance statement in their agreement or in possession of their personal vehicle insurance card. Please plan accordingly to ensure you have ample time to obtain a base pass to attend the site visit.
7. Requests for Information (RFIs) must be submitted no later than August 19, 2022, 2:00 PM Hawaii Standard Time. The Government Points of Contact for RFIs are as follows:
Mr. Colin Waki Mr. Kent Tamai E-mail: colin.k.waki@usace.army.mil E-mail: kent.a.tamai@usace.army.mil
8. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
(Am-0002)
Section 00 60 00, Attachment A - 1
Section 00 60 00, Attachment A - 2
Section 00 60 00, Attachment A - 3
FY22 Replace Fuel Piping, Underground Storage Tanks, and Vent Lines at Building 80, Schofield Barracks, Oahu, Hawaii
RFI # Reference Question Government Response
1 Please confirm that RFI's are to be submitted via email only per item #7 on page Section 00 10 00 - 2 of the IFB, and that ProjNet is not used for RFI submission.
Confirmed.
2 A bid guarantee is required, per SF1442 Box 13B. In 52.228-1 on page Section 00 21 13 -4 of the IFB there is more discussion of the Bid Guarantee, but it does not point me to a Bid Guarantee Form. I downloaded SF 24 Rev 8/2016 from GSA website--please confirm this is the correct form to use.
See Section 00 21 13, FAR Provision 52.228-1(b), per the original solicitation, for acceptable forms of bid guaranties.
Refer to FAR 53.228 for a list of standard forms available for certain forms of bid guaranties.
3 Could the Government please provide a copy of the site visit attendee list? See Section 00 60 00, Attachment A, per Am-0002.
Section 00 60 00, Attachment B
Section 00 72 00 – 2 (Am-0002)
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations MAY 2014 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-50 Combating Trafficking in Persons DEC 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 JAN 2022 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. JUN 2016 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air
Conditioners.
JUN 2016
52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving JUN 2020 52.223-20 Aerosols JUN 2016 52.223-21 Foams JUN 2016 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Individual Surety--Pledge of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payments DEC 2021 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award Management OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors DEC 2021 52.233-1 Disputes MAY 2014 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements APR 1984 52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I APR 1984
| 22-B-0001 Am-0002 |
| 22-B-0001 - 00 10 00, Page 2 |
| 22-B-0001 - 00 60 00, Attachment A - Site Visit Roster |
| 22-B-0001 - 00 60 00, Attachment B - RFI (#1-3) |
| 22-B-0001 - 00 72 00, Page 2 |
File details come from the government source that posted it. Updated .