FILE 13 OF 15 07 Fire Protection DESIGN COMPLETE REV 01-12-2021.pdf
PDF 14 MB Posted
- Solicitation number
- W9128A21R0004
About this file
This announcement constitutes a pre-solicitation notice for a construction project. The U.S. Army Corps of Engineers, Honolulu District intends to issue a request for proposal for Project Number 76897 to construct an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project has an estimated value between $50-100 million and will be awarded as a fixed price construction contract. The scope of work includes building an aircraft hangar, maintenance shops, administrative space, storage facilities, and supporting site development and utilities. The performance period will be determined in the forthcoming solicitation. The evaluation factors will assess experience, past performance, and price, with award determined by best value tradeoff procedures. The solicitation is planned for release on or after January 6, 2021.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
S
S
D
P
R
P,E
CO
F
A
M
IN
SD
SP
IM
WF
VS
PS
XX
SV
S
S C
C
B
XX
RTS
FSCP
FEP
FTR
ANT
ANN
LOC
LDP
FMCP
FACP
FCV
MVR
FIRE ALARM TRANSCEIVER
ADDRESSABLE INPUT MODULE
DRAIN PIPE
FIRE DEPARTMENT CONNECTION
PHOTOELECTRIC SYSTEM SMOKE DETECTOR/ SENSOR - SPOT TYPE
MANUAL FIRE ALARM STATION, MOUNTED 1220MM AFF TO TOP
WATER FLOW SWITCH
TAMPER SWITCH
ALARM PRESSURE SWITCH
OS&Y VALVE
CHECK VALVE
PIPE / CONDUIT BREAK FOR CONTINUATION OR CLARITY
PIPE / CONDUIT DOWN, AS NOTED
PIPE / CONDUIT UP, AS NOTED
WET PIPE FIRE SPRINKLER RISER
WET PIPE FIRE SPRINKLER PIPING
UPRIGHT SPRINKLER
PENDENT SPRINKLER
AUDIBLE/VISUAL DEVICE WITH MARKING ALERT, WALL MOUNTED, CANDELA
AS INDICATED ON THE DRAWINGS
FIRE ALARM TRANSCEIVER ANTENNA
FOAM DELUGE FIRE SPRINKLER RISER
MANUAL FOAM START STATION
FOAM SYSTEM CONTROL PANEL [FSCP] (SURFACE MOUNTED)
FOAM SUPPRESSION PIPING
FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
SOLENOID VALVE
MANUAL FOAM STOP DEADMAN SWITCH
DESCRIPTION
WP
ADDRESSABLE OUTPUT MODULE
SYMBOL
FIRE ALARM EXTENDER PANEL (SURFACE MOUNTED)
24 VOLT RELAY
TRANSIENT VOLTAGE SURGE SUPPRESSOR
FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
DESCRIPTIONSYMBOL
WEATHERPROOF
SPEAKER, CEILING MOUNTED
REMOTE ANNUNCIATOR (SURFACE MOUNTED)
REMOTE TEST SWITCH
LOCAL OPERATING CONSOLE (SURFACE MOUNTED)
COMBINATION FIRE ALARM/MASS NOTIFICATION PANEL (SEMI-RECESSED MOUNTING)
LEAK DETECTION PANEL, PROVIDED BY TANK SUPPLIER (SURFACE MOUNTED)
SPEAKER, WALL MOUNTED
AUDIBLE/VISUAL DEVICE WITH MARKING ALERT, CEILING MOUNTED, CANDELA
AS INDICATED ON THE DRAWINGS
TYP. TYPICAL
AFF ABOVE FINISH FLOOR
EP EXPLOSION PROOF
FIRE PUMP CONTROLLER PUMP RUNNING CONTACT
FIRE PUMP CONTROLLER PUMP TROUBLE CONTACT
FIRE PUMP CONTROLLER SWITCH POSITION CONTACT
A KEY OPERATED SUPERVISED DISCONNECT SWITCH TO PHYSICALLY DISABLE
THE SOLENOID FOR EACH FOAM/WATER AND PREACTION RISER. PROVIDE AND
INSTALL PER 3-6.19.2.3 OF UFC 4-211-01
BLUE ROTATING BEACON. PROVIDE AND INSTALL PER UFC 4-211-01 SECTION 5-6.5.
DET-TRONICS X3301 MULTISPECTRUM IR FLAME DETECTOR
2-POSITION NON-KEYED OPERATED SWITCH. LABEL THE SWITCH "INHIBIT OPTICAL
FLAME DETECTION". PROVIDE ENGRAVED LABELS ON THE INHIBIT SWITCH
INDICATING WHEN THE OPTICAL FLAME DETECTORS ARE IN "NORMAL" OR "INHIBIT"
MODE.
VISUAL DEVICE WITH MARKING ALERT, CEILING MOUNTED, CANDELA AS
INDICATED ON THE DRAWINGS
FIRE ALARM CONTROL PANEL (SEMI-RECESSED MOUNTING)
PHOTOELECTRIC SYSTEM SMOKE DETECTOR/ SENSOR - SPOT TYPE WITH
ELEVATOR RECALL
FLOOR CONTROL VALVE ASSEMBLY
CARBON MONOXIDE DETECTOR
SURGE PROTECTOR
MULTI-VOLTAGE RELAY MODULE, 10.0 AMP FORM C CONTACTS WITH THREE
INPUT VOLTAGES 24VDC, 24VAC AND 120VAC.
HORN/VISUAL DEVICE WITH MARKING ALERT, WALL MOUNTED, CANDELA
AS INDICATED ON THE DRAWINGS
HORN, WALL MOUNTED
PORTABLE FIRE EXTINGUISHER LOCATION, SEMI-RECESSED CABINET
ISOLATION MODULE
HIGH WATER AND LOW WATER LEVEL SENSOR, SEE FIRE ALARM/MNS NOTE 16
TVSS
AOM
PR
PT
CS
AIM
F
HW LW
S DUCT SMOKE DETECTOR
C SUBSCRIPT C, CEILING MOUNTED
PA PUBLIC ADDRESS SYSTEM
LCD / LED VISUAL TEXTUAL DISPLAYET
LOW FUEL SENSORLF
LEAK DETECTION SENSORLD
FL LOW FOAM CONCENTRATE LEVEL SWITCH
1. THE SPRINKLER SYSTEM DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA 13-2019, UFC 4-211-01 CHANGE 1, NOVEMBER 2017 AND SPECIFICATION SECTION 21 13 13.00 10 AND 21 30.00.
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL SPRINKLER SYSTEM COMPONENTS AND
COORDINATE WITH THE VARIOUS TRADES.
2. ALL DEVICES AND EQUIPMENT SHALL BE UL LISTED OR FM APPROVED.
3. AUTOMATIC WET PIPE SPRINKLER PROTECTION SHALL BE PROVIDED THROUGHOUT THE BUILDING AS
SHOWN ON THE DRAWINGS.
4. WATER SUPPLY INFORMATION: ONE 250,00 GALLON ABOVEGROUND STORAGE TANK
PROVIDED.
TWO PRIMARY DIESEL AND ONE BACKUP DIESEL FIRE PUMP IS PROVIDED WITHIN THE PUMP HOUSE
FOR THE AIRCRAFT MAINTENANCE HANGAR.
PUMP PRESSURE: 130 PSI
PUMP FLOW: 2,000 GPM
DOMESTIC WATER SUPPLY INFORMATION: WHEELER ARMY AIR FIELD, WAHIAWA, HI
STATIC PRESSURE 75 PSI
RESIDUAL PRESSURE 20 PSI
FLOW AT RESIDUAL PRESSURE 2,839 GPM
WET PIPE SPRINKLER SYSTEM SERVING THE HANGAR SUPPORT AREA AND FIRE PUMP BUILDING, TO
BE SUPPLIED FROM DOMESTIC WATER SUPPLY. HYDRAULIC CALCULATIONS SHALL INCLUDE A
MINIMUM 10 PERCENT SAFETY FACTOR TAKEN PARALLEL TO THE RAW WATER CURVE.
5. THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH NFPA 13.
SPRINKLER SYSTEM DESIGN CRITERIA SHALL BE AS FOLLOWS:
OFFICES
OCCUPANCY HAZARD CLASSIFICATION: LIGHT HAZARD
SPRINKLER TYPE: QUICK RESPONSE
K-FACTOR: 5.6
SPRINKLER TEMPERATURE: ORDINARY
DESIGN DENSITY: 0.1 GPM/FT2
DESIGN METHOD: AREA/DENSITY
DESIGN AREA: 1,500 FT2
OUTSIDE HOSE STREAM: 250 GPM (HYDRANTS SUPPLIED BY BASE WATER)
DURATION: 60 MINUTES
ELEC, BOILER, COMPRESSOR, COMM, STORAGE
OCCUPANCY HAZARD CLASSIFICATION: ORDINARY HAZARD
SPRINKLER TYPE: QUICK RESPONSE
K-FACTOR: 8.0
SPRINKLER TEMPERATURE: INTERMEDIATE
DESIGN DENSITY: 0.2 GPM/FT2
DESIGN METHOD: AREA/DENSITY
DESIGN AREA: 2,500 FT2
OUTSIDE HOSE STREAM: 250 GPM (HYDRANTS SUPPLIED BY BASE WATER)
DURATION: 60 MINUTES
AUTOMATIC SPRINKLER SYSTEM NOTES
FIRE PUMP BUILDING
OCCUPANCY HAZARD CLASSIFICATION: EXTRA HAZARD GROUP 2
SPRINKLER TYPE: STANDARD RESPONSE
K-FACTOR: 11.2
SPRINKLER TEMPERATURE: INTERMEDIATE
DESIGN DENSITY: 0.4 GPM/FT2
DESIGN METHOD: AREA/DENSITY
DESIGN AREA: ENTIRE BUILDING
OUTSIDE HOSE STREAM: 500 GPM (HYDRANTS SUPPLIED BY BASE WATER)
DURATION: 90 MINUTES
HANGAR
OCCUPANCY HAZARD CLASSIFICATION: HANGAR FOR FUELED AIRCRAFT
SPRINKLER TYPE: QUICK RESPONSE
K-FACTOR: 8.0
SPRINKLER TEMPERATURE: 175° F
DESIGN DENSITY: 0.2 GPM/FT2 (SIMULTANEOUS WITH THE FOAM
SYSTEM DISCHARGE)
DESIGN METHOD: AREA/DENSITY
DESIGN AREA: 5000 FT2
OUTSIDE HOSE STREAM: N/A (HYDRANTS NOT SUPPLIED BY WATER TANKS)
DURATION: 45 MINUTES
HOSE STREAMS FOR ALL SYSTEMS TO BE SUPPLIED BY THE DOMESTIC BASE WATER SUPPLY.
6. SPRINKLER PIPING SHALL COMPLY WITH NFPA 13, EXCEPT THAT COPPER AND PLASTIC PIPE SHALL
NOT BE PERMITTED. ALL PIPING IN FINISHED AREAS SHALL BE CONCEALED.
7. THE PIPE ROUTING AND SPRINKLER LOCATIONS ARE CONCEPTUAL. THE CONTRACTOR SHALL
INSTALL THE SYSTEM IN ACCORDANCE WITH THE APPLICABLE CODES, MANUFACTURER'S
RECOMMENDATIONS AND EQUIPMENT LISTINGS.
8. ALL FIRE SPRINKLER AND FOAM SYSTEM PIPING SHALL BE PROVIDED WITH EARTHQUAKE
PROTECTION IN ACCORDANCE WITH NFPA 13 INCLUDING BRANCH LINE RESTRAINT. CP SHALL BE
0.5 PER NFPA 13.
9. PROVIDE INSPECTION AND HYDROSTATIC TESTS IN ACCORDANCE WITH NFPA 13 AND
SPECIFICATION 21 13 13.00 10.
10. SPARE SPRINKLERS SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 13. HYDRAULIC DATA
PLATES SHALL BE PROVIDED AT THE RISER AND ABOVE THE FIRE SPRINKLER CABINET.
11. A PRESSURE RELIEF VALVE SHALL BE PROVIDED AT EACH RISER.
12. PROVIDE A NOMINAL CLEARANCE OF 50 MM AROUND PIPES 90 MM AND SMALLER, AND PROVIDE A
NOMINAL CLEARANCE OF 100 MM AROUND PIPES 100 MM AND LARGER PASSING THROUGH
CONCRETE / MASONRY WALLS OR FLOORS.
13. THE FIRE SUPPRESSION SYSTEM IS CONCEPTUAL. THE CONTRACTOR SHALL PROVIDE SHOP
DRAWINGS. THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL'S CEILING PLAN
FOR THE SPRINKLER'S EXACT LOCATION.
14. THE FIRE SUPPRESSION SYSTEM CONTRACTOR IS TO PROVIDE AN ENGINEERED SYSTEM,
COMPLETE WITH HYDRAULIC CALCULATIONS AND FINAL DESIGN DRAWINGS THAT ARE SIGNED
AND SEALED BY AN INDIVIDUAL WHO HAS OBTAINED NATIONAL INSTITUTE FOR CERTIFICATION IN
ENGINEERING TECHNOLOGIES (NICET) LEVEL III SYSTEMS OR LEVEL IV CERTIFICATION,
DEPENDING ON WHICH NFPA CODES ARE APPLICABLE; NFPA 13 AND NFPA 72: AUTOMATIC
SPRINKLER SYSTEM, SPECIAL HAZARD SYSTEMS FOR THE FOAM SYSTEM, AND FIRE ALARM
SYSTEM. A REGISTERED PROFESSIONAL ENGINEER LICENSED TO PRACTICE FIRE PROTECTION
ENGINEERING MUST STAMP THE SHOP DRAWINGS, PRIOR TO DISTRIBUTING THE FIRE
SUPPRESSION SYSTEM SHOP DRAWINGS AMONGST DESIGNATED FIRE PROTECTION ENGINEERS,
WHO ARE INSTALLING THE SYSTEM. THE CONTRACTOR SHALL SUBMIT DESIGN DRAWINGS WITH
THE PIPING AND THE FIRE SUPPRESSION SYSTEM.
15. IT IS THE RESPONSIBILITY OF THE FIRE SUPPRESSION SYSTEM CONTRACTOR TO ENSURE THAT
THE BACKGROUNDS USED ARE THE LATEST SET WITH ALL REVISIONS.
16. THE FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED TO MEET THE INTENT OF THE DRAWINGS
AND SPECIFICATIONS.
17. SIDE OUTLET TEES USING RUBBER GASKET FITTINGS AND HOLECUT MECHANICAL "TEE'S" ARE
PROHIBITED.
18. THE INSPECTOR'S TEST CONNECTION SHALL BE PROVIDED WITH A REMOVABLE END CAP ON THE
WET PIPE SYSTEM. FOR THE HANGAR BAY WET PIPE SPRINKLER SYSTEM, LOCATE THE
INSPECTOR'S TEST CONNECTION AT THE RISER. TEST STATIONS ARE NOT PERMITTED IN THE
HANGAR BAY.
19. THE FIRE PROTECTION ENGINEER RESPONSIBLE FOR STAMPING THE SHOP DRAWINGS SHALL
RE-VERIFY ALL REQUIREMENTS SHOWN IN THIS DESIGN.
20. PROVIDE LABEL TAG INDICATING "NORMALLY OPEN" OR "NORMALLY CLOSED" ON ALL VALVES INCLUDING AND NOT LIMITED TO ALL RISER AND TRIM, SECTIONAL VALVES, INSPECTORS TEST
VALVES AND DRAINS.
21. PROVIDE 10% CUSHION FOR ALL HYDRAULIC CALCULATIONS. SYSTEMS INCLUDING BACKFLOW
PREVENTERS SHALL INCLUDE A 8 PSI LOSS OR GREATER DEPENDING ON THE MANUFACTURER'S
DATA.
22. COORDINATE WITH OTHER TRADES PRIOR TO COMMENCING AND DURING CONSTRUCTION.
OVERLAY PLANS AND CHECK FOR ANY DISCREPANCIES OR CONFLICTS WITH OTHER TRADES.
23. PIPING INSTALLED IN ELECTRIC ROOMS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70.
FIRE SPRINKLER PIPING SHALL NOT BE INSTALLED IN ELECTRICAL ROOMS AND COMMUNICATION
ROOMS. PROVIDE SIDEWALL SPRINKLER(S) WITH UL LISTED WIRE HEAD GUARD(S) FOR
ELECTRICAL ROOMS AND COMMUNICATION ROOMS. DO NOT LOCATE SPRINKLER(S) ABOVE
PANEL(S) MOUNTED ON THE WALL BELOW. SEE SHEET T-401 FOR CONCEPTUAL LOCATION OF
SIDEWALL SPRINKLERS WITHIN COMMUNICATION ROOMS.
24. PROVIDE AIR RELEASE AS REQUIRED PER NFPA 13.
AUTOMATIC SPRINKLER SYSTEM NOTES (CONTINUED)
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F-001
F
IR
E P
R O
T E
C T
IO
N
N O
T E
S
S Y
M B
O L S
A N
D A
B B
R E
V
IA
T
IO
N S
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
1. THE FIRE ALARM/MASS NOTIFICATION SYSTEM SHALL BE DESIGNED AND INSTALLED IN
ACCORDANCE WITH NFPA 72-2016, SPECIFICATION SECTION 28 31 76(HANGAR) AND
SPECIFICATION 28 31 64.00 10 (FIRE PUMP BUILDING)
2. ALL DEVICES AND EQUIPMENT SHALL BE U.L. LISTED OR FM APPROVED.
3. DEVICE LOCATIONS AND CONDUIT ROUTING ARE CONCEPTUAL. DEVICES ARE SHOWN IN
SUGGESTED LOCATIONS. FINAL QUANTITY AND LAYOUT SHALL BE IN ACCORDANCE WITH
APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND EQUIPMENT LISTINGS.
COORDINATE LOCATIONS WITH LIGHTING SYSTEM.
4. ALL FIRE ALARM CONDUIT SHALL BE 3/4-IN MINIMUM. ALL CONDUIT IN FINISHED AREAS
SHALL BE CONCEALED.
5. SYNCHRONIZE ALL VISUAL NOTIFICATION APPLIANCES. SYNCHRONIZE ALL AUDIBLE
NOTIFICATION APPLIANCES. ALL DEVICES INSTALLED IN THE HANGAR BAY SHALL BE
WEATHER PROOF.
6. THE FIRE ALARM SIGNAL SHALL BE A TEMPORAL THREE PATTERN TONE FOR THE
HANGAR AND FIRE PUMP BUILDING.
7. VISUAL NOTIFICATION APPLIANCES CANDELA RATINGS ARE SHOWN ON THE DRAWINGS.
8. THE FIRE ALARM SYSTEM SHALL BE A VOICE EVACUATION SYSTEM. AUDIBLE
NOTIFICATION WILL BE PROVIDED THROUGH SPEAKERS.
9. PROVIDE 15 WATT SPEAKERS WITHIN THE HANGAR BAY. THE SPEAKER SHALL BE
CAPABLE OF PRODUCING 102 DBA AT 3.05M (10 FT).
10. SIGNALING LINE CIRCUITS SHALL BE CLASS B, INITIATING DEVICE CIRCUITS SHALL BE
CLASS B. NOTIFICATION APPLIANCE CIRCUITS SHALL BE CLASS B.
11. SMOKE DETECTORS SHALL BE LOCATED A MINIMUM OF 3 FEET FROM SUPPLY AIR
DIFFUSERS.
12. PROVIDE SIGNAGE AT THE FIRE ALARM CONTROL PANEL IDENTIFYING THE POWER PANEL
AND CIRCUIT.
13. PROVIDE NEMA 250 TYPE 4 WALL MOUNTED DEVICES AND APPLIANCES WITHIN THE
HANGAR BAY (INCLUDING BACK BOXES). PROVIDE WATERTIGHT CONDUIT AND JUNCTION
BOXES THROUGHOUT THE HANGAR BAY. ROUTE CONDUIT INTO THE BOTTOM OF THE
BACK BOX FOR MANUAL FOAM RELEASING STATIONS, STOP STATIONS, AND FLAME
DETECTORS, AND PROVIDE THE LOW POINT OF THIS CONDUIT WITH A DRAIN.
14. THE BUILDING FIRE ALARM PANEL SHALL BE ADDRESSABLE.
15. ALL STROBES SHALL BE SYNCHRONIZED.
16. PROVIDE A WATER CONDUCTANCE TYPE HIGH LEVEL AND LOW LEVEL ALARM SENSOR
FOR THE WATER TANK. SENSORS SHALL HAVE DRY CONTACTS TO PROVIDE SIGNALS TO
THE FACP FOR THE HIGH AND LOW LEVEL ALARMS.
17. COORDINATE WITH OTHER TRADES PRIOR TO COMMENCING AND DURING
CONSTRUCTION. OVERLAY PLANS AND CHECK FOR ANY DISCREPANCIES OR CONFLICTS
WITH OTHER TRADES.
FIRE ALARM/MASS NOTIFICATION SYSTEM NOTES
1. LOW LEVEL HIGH-EXPANSION FOAM SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH
NFPA 11-2016, UFC 4-211-01 CHANGE 1, NOVEMBER 2017, SPECIFICATION SECTION 21 13
25, FOAM EQUIPMENT MANUFACTURER'S RECOMMENDATIONS AND AS INDICATED.
2. FOAM GENERATORS SHALL BE LOCATED SO THAT FOAM DISCHARGE CLOSE TO, BUT NOT
DIRECTLY ON AIRCRAFT FUSELAGE. GENERATORS SHALL BE DESIGNED AND INSTALLED
PER FOAM EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.
3. FOAM SYSTEM SHALL COVER 90% OF ALL AIRCRAFT SILHOUETTES IN THE HANGAR IN ONE
MINUTE OR LESS, AND PROVIDE A FOAM BLANKET OF 1 METER HIGH IN 4 MINUTES OR LESS
OVER THE HANGER FLOOR.
4. MINIMUM FLOW RATE OF DISCHARGE SHALL BE IN ACCORDANCE WITH NFPA 11, BUT SHALL
NOT BE LESS THAN 2.6 FT3/MIN/FT2. A RANGE OF 2.6 FT3/MIN/FT2 - 4.0 FT3/MIN/FT2 IS
REQUIRED TO MEET THE REQUIREMENTS. A MINIMUM OF 15 MINUTE FOAM SUPPLY PLUS 30%
OVERAGE SHALL BE PROVIDED FOR THE FACILITY BASED ON A SYSTEM "SUPPLY"
CALCULATION.
5. ONLY HIGH EXPANSION FOAM SHALL BE USED AND SHALL BE LISTED/APPROVED FOR USE
WITH FOAM GENERATORS BEING INSTALLED.
6. THE FLOW CONTROL VALVE SHALL BE EXTERNALLY RESETTABLE WITHOUT ANY SPECIAL
TOOLS AND HAVE AN ABORT FEATURE. VALVE SHALL BE A VIKING SOLENOID OPERATED
FLOW CONTROL VALVE MODEL J-1.
7. FOAM CONCENTRATE PIPING SHALL BE WELDED OR FLANGED 304 OR 316 STAINLESS STEEL.
8. THE MANUFACTURER'S REPRESENTATIVE SHALL BE PRESENT AT THE PRELIMINARY AND
THE FINAL TESTING OF THE SYSTEMS.
9. ALL FOAM-WATER SOLUTION PIPING AND FITTINGS USED ON THE FOAM-WATER SYSTEM
SHALL BE SCHEDULE 40 STEEL PIPE. GALVANIZED PIPING IS PROHIBITED.
10. PROVIDE A MEANS TO INSTALL AND READ A PRESSURE GAGE A EACH FOAM GENERATOR
INLET.
11. THE FOAM RELEASING PANEL SHALL BE A DETRONICS, EAGLE QUANTUM PREMIER FIRE
DETECTION/RELEASING SYSTEM.
12. THE FOAM/WATER RELEASING SYSTEM (RSFACU) (DETRONICS) REPRESENTATIVE SHALL
BE PRESENT AT THE PRELIMINARY AND FINAL TESTING.
13. THE DETRONICS IIIR FLAME DETECTOR SHALL BE NON-LATCHING
LOW LEVEL HIGH EXPANSION FOAM NOTES
TESTING
AT A MINIMUM, PROVIDE THE TESTING AND REPORTS OUTLINED IN THIS SECTION. COORDINATE TESTING PERSONNEL AS REQUIRED TO DEMONSTRATE THE COORDINATION AND COMMUNICATION OF THE FIRE PROTECTION SYSTEMS THROUGH FULL FUNCTIONAL TESTING. INDEPENDENT TESTING OF EACH INDIVIDUAL FIRE PROTECTION SYSTEM IS NOT A SUBSTITUTE TO THE FUNCTIONAL TESTING REQUIREMENTS. E.G.
DEPRESSING THE STOP BUTTON AND WITNESSING THE DE-ENERGIZING OF THE SOLENOID, DOES NOT ADEQUATELY DEMONSTRATE THE FLOW CONTROL VALVE WILL STOP THE FOAM/WATER UNDER FULL FLOW.
TESTING PERSONNEL
PROVIDE A FIRE PROTECTION ENGINEER (FPE) MEETING THE REQUIREMENTS OF UFC 3-600-01, WHO WILL BE RESPONSIBLE TO WITNESS ALL TESTS AND REVIEW AND APPROVE OF TESTING REPORTS AS OUTLINED IN
THIS SECTION PRIOR TO RELEASING REPORTS TO THE GOVERNMENT.
AT A MINIMUM, PROVIDE A FACTORY AUTHORIZED REPRESENTATIVE FOR THE STARTUP AND/OR TESTING OF
THE FOLLOWING SYSTEMS AS OUTLINED BELOW:
· FIRE SUPPRESSION SYSTEM (PRELIMINARY AND FINAL TESTING)
· FOAM PROPORTIONING SYSTEM (PRELIMINARY AND FINAL TESTING)
· FIRE PUMP SYSTEM, WHEN PROVIDED (START UP)
· FIRE ALARM AND MASS NOTIFICATION SYSTEM (FACU/ACU) (PRELIMINARY AND FINAL TESTING)
· FOAM/WATER RELEASING SYSTEM RELEASING SERVICE FIRE ALARM CONTROL UNIT (RSFACU)
· (PRELIMINARY AND FINAL TESTING)
· FOAM/WATER DISCHARGE TESTING PLAN
· PROVIDE A TESTING PLAN CERTIFIED BY THE FPE THAT INCLUDES THE FOLLOWING:
- WHO WILL PERFORM THE TESTING AND WHO WILL BE THE ONSITE FACTORY AUTHORIZED
REPRESENTATIVES.
- AS A MINIMUM THE FOLLOWING PERSONNEL ARE REQUIRED TO BE PRESENT:
PRIME CONTRACTOR
- FIRE PROTECTION ENGINEER
- UNDERGROUND PIPE INSTALLER
- ABOVEGROUND PIPE INSTALLER
- FIRE SUPPRESSION SYSTEM INSTALLER (NICET)
- FIRE ALARM INSTALLER (NICET)
- MANUFACTURE'S REPRESENTATIVES
- FIRE PUMP/CONTROLLER REPRESENTATIVE
- FOAM SYSTEM REPRESENTATIVE
- TRIPLE IR MANUFACTURER
- HVAC (FOR DUCT DETECTION)
· WHAT ARE THE SAFETY PRECAUTIONS TAKEN DURING TESTING.
· HOW WILL THE FOAM/WATER SYSTEM BE TESTED TO DEMONSTRATE THE PERFORMANCE CRITERIA
HAS BEEN MET.
· HOW WILL THE EVENT BE RECORDED FOR FUTURE REVIEW. (USE BLOW HORN THAT CAN BE HEARD
· DURING VIDEO FOR FOAM FLOW TO SIGNAL START OF TIMER. START OF TIMER IS WHEN MANUAL
FOAM RELEASE STATION IS PULLED)
· WHAT ARE THE TESTING PROCEDURES TO DEMONSTRATE THE COORDINATION AND COMMUNICATION
OF THE FIRE PROTECTION SYSTEMS ASSOCIATED WITH THE FOAM/WATER DISCHARGE.
· HOW WILL THE HANGAR BAY BE PROTECTED DURING THE DISCHARGE OF FOAM.
· HOW WILL THE FOAM BE CAPTURED DURING THE DISCHARGE AND DISPOSED.
PRELIMINARY TESTING
PROVIDE ACCEPTANCE TESTING FOR THE FIRE SUPPRESSION AND FIRE ALARM SYSTEMS COMPLYING WITH NFPA 11, 13, 20, 24, AND 72 AS APPLICABLE. AT A MINIMUM, PROVIDE THE FOLLOWING PRELIMINARY TESTING
REPORTS.
· CONTRACTOR'S MATERIAL AND TESTING CERTIFICATE FOR UNDERGROUND PIPING PER NFPA 13 AND
24. PROVIDE PHOTOS OF INSTALLATION PRIOR TO BURIAL. (REVIEWED BY THE FPE) CONTRACTOR'S
MATERIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING PER NFPA 13 FOR EACH RISER,
MANIFOLD, AND FIRE DEPARTMENT CONNECTION. (REVIEWED BY THE FPE)
· FIRE PUMP TEST REPORT DEMONSTRATING COMPLIANCE WITH NFPA 20 ACCEPTANCE TESTING
CRITERIA. WHERE A CONCENTRATE PUMPING SYSTEM IS ALSO PROVIDED, DEMONSTRATE
COMPLIANCE WITH NFPA 11 AND 20 ACCEPTANCE TESTING CRITERIA. (REVIEWED BY FPE)
· WITH THE USE OF A TIME STAMPED VIDEO, DEMONSTRATE THE PERFORMANCE CRITERIA FOR FOAM
COVERAGE IS WITHIN THE LIMITATIONS UPON THE ACTUATION OF A MANUAL FOAM RELEASING
STATION. THE USE OF FOAM CONCENTRATE FOR THIS TEST IS REQUIRED TO DEMONSTRATE
PRELIMINARY COMPLIANCE. THE FLOOR MUST BE DRY WHEN PERFORMING THIS TEST. (WITNESSED BY
THE FPE)
· DEMONSTRATE THE PERFORMANCE CRITERIA FOR OPENING AND CLOSING THE FLOW CONTROL VALVE
IS MET UPON ACTUATION OF THE MANUAL FOAM STOP STATIONS. A WATER ONLY TEST IS
ACCEPTABLE. (WITNESSED BY THE FPE)
· PROVIDE THE RESIDUAL PRESSURE AT THE MOST REMOTE NOZZLE OR GENERATOR WITH ONLY THE
FOAM/WATER SYSTEM OPERATING. PROVIDE THE INLET AND OUTLET PRESSURES OF THE FLOW
CONTROL VALVE AND INDUCTOR. A WATER ONLY TEST IS ACCEPTABLE. USE THIS INFORMATION TO
VERIFY THE HYDRAULIC PERFORMANCE OF THE SYSTEM. (REVIEWED BY THE FPE)
· PROVIDE A PROPORTIONING SYSTEM TEST REPORT DEMONSTRATING COMPLIANCE IN ACCORDANCE
WITH NFPA 11. (REVIEWED BY THE FPE)
· SYSTEM RECORD OF INSPECTION AND TESTING, NOTIFICATION APPLIANCE SUPPLEMENTARY RECORD OF INSPECTION AND TESTING, INITIATING DEVICE SUPPLEMENTARY RECORD OF INSPECTION AND
TESTING, INTERFACE COMPONENT SUPPLEMENTARY RECORD OF INSPECTION AND TESTING, AND
MASS NOTIFICATION SYSTEM SUPPLEMENTARY RECORD OF INSPECTION AND TESTING PER NFPA 72
FOR THE FACU AND RSFACU. (REVIEWED BY THE FPE)
· TEST THE MASS NOTIFICATION SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF UFC 4-021-01 CHANGE 1, JANUARY 2010. AT A MINIMUM PROVIDE SOUND POWER LEVELS (DECIBEL A WEIGHTED SCALE (DBA)) AND INTELLIGIBILITY SCORES (CIS) THROUGHOUT THE FACILITY. SUBMIT DRAWING OR TABLE INDICATING DBA LEVELS AND CIS SCORES THROUGHOUT EACH SPACE. (REVIEWED BY THE FPE)
PRELIMINARY AND FINAL HANGAR FIRE
SUPPRESSION/DETECTION ACCEPTANCE
TESTING (PAT & FAT)
· 100% CIRCUIT INTEGRITY TESTING OF DEVICES (OPEN, SHORT, GROUND ON 100% OF DEVICES) DEMONSTRATE THE FUNCTIONALITY OF THE FIRE ALARM SYSTEM IS IN COMPLIANCE WITH THE FACU AND RFSACU FUNCTIONAL MATRIXES. (WITNESSED BY THE FPE) DEMONSTRATE THE PERFORMANCE REQUIREMENTS OF THE OPTICAL FLAME DETECTOR COVERAGE HAS BEEN MET THROUGH PAN FIRE ACCEPTANCE TESTING. USE THE EXPECTED FUEL IN A 2 FT. X 2 FT. (610 MM X 610 MM) TEST PAN, WITH CLOSABLE LID. THE USE OF A CLEANER BURNING FUEL MAY BE USED WHERE ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION (AHJ). REFER TO FIGURE E-17 - EXAMPLE OF FIRE PAN, FOR
ACCEPTANCE TEST OF OPTICAL DETECTORS. AT A MINIMUM, PLACE THE TEST FIRE IN EACH
DESIGNATED AIRCRAFT PARKING POSITION. TO PASS, ALL DETECTORS WITHIN THE CONE-OF-VISION OF THIS TEST FIRE MUST ACTIVATE WITHIN 30 SECONDS OF FULL FIRE DEVELOPMENT (MINIMUM OF THREE). CENTERED THE TEST FIRE 10 FT. (3.0 M) OUTSIDE THE HANGAR BAY OPENING. TO PASS, NO DETECTORS SHOULD ACTIVE AFTER 30 SECONDS OF FULL FIRE DEVELOPMENT. ALLOW TIME FOR ADJUSTMENTS IN POSITIONING OF THE TRIPLE IR DETECTION BY THE TRIPLE IR MANUFACTURER.
(WITNESSED BY THE FPE)
REQUEST FOR FINAL TESTING
PROVIDE A BREAK-IN PERIOD OF AT LEAST 14 CONSECUTIVE DAYS AFTER THE FACU AND RSFACU HAVE BEEN ENABLED, PRIOR TO ANY FINAL TESTING. PROVIDE A WRITTEN REQUEST FOR A FINAL TEST FROM THE FPE, AFTER PRELIMINARY TESTING IS COMPLETE, ADJUSTMENTS HAVE BEEN MADE TO THE SYSTEM, AND
THE SYSTEM IS READY FOR SERVICE.
FINAL TESTING
FINAL TESTING TO BE WITNESSED BY THE AHJ, AS DEFINED BY UFC 1-200-01, 20 JUNE 2016. (E.G. FOR AN AIR FORCE PROJECT THE AHJ IS THE AIR FORCE CIVIL ENGINEER CENTER, OPERATIONS DIRECTOR (AFCEC/CO), EVEN IF THE PROJECT IS CONSTRUCTED BY NAVFAC OR THE ARMY CORPS OF ENGINEERS. AFCEC/CO WOULD WITNESS FINAL TESTING IN THIS EXAMPLE.) THE FINAL TESTING MAY BE WITNESSED BY AN IN WRITING DELEGATED REPRESENTATIVE AT THE DISCRETION OF THE AHJ. WITH THE EXCEPTION OF SYSTEM FLUSHING AND HYDROSTATIC TESTING, REPEAT PRELIMINARY TESTS DURING THE FINAL TESTING AT THE DISCRETION OF THE AHJ. CORRECT SYSTEM FAILURES OR OTHER DEFICIENCIES IDENTIFIED DURING THE
FINAL TESTING AND RETEST IN THE PRESENCE OF THE AHJ, AT THEIR DISCRETION.
FINAL TESTING SEQUENCE OF EVENTS
AFCEC/CO FPE OR THEIR IN WRITING DESIGNATED FPE WILL BE ON SITE TO WITNESS ALL FATS. THE
FOLLOWING PROCEDURE OF EVENTS CAN BE EXPECTED
· CONTRACTOR LED SAFETY BRIEFING
· BATTERY TEST (FIRST THING AFTER SAFETY BRIEFING). WE WILL VERIFY TIME WITH ALARM CENTER
AND THEN COMPLETE BATTERY TEST BASED ON TIME STAMPED FROM ALARM CENTER. (DBA AND
INTELLIGIBILITY TEST COMPLETED DURING THE BATTERY TEST)
· FIRE ALARM/SUPPRESSION DEVICE CIRCUIT INTEGRITY TESTING TO INCLUDE HVAC (100% OF EVERY DEVICE REQUIRED AT TIME OF PAT AND WITNESSED BY A GOVERNMENT POC (FIRE DEPARTMENT OR
GOVERNMENT FPE AND DOR). THIS MUST BE COMPLETED AND WITNESS BY A GOVERNMENT
REPRESENTATIVE FOR 100% OF DEVICES DURING PAT. IT IS NOT A CONTRACTOR SELF-CHECK.
· LIVE PROPANE FIRE TESTS (COORDINATE FIRE DEPARTMENT IS PRESENT AND WITH TRIPLE IR
MANUFACTURER TO ENSURE DEVICE IS ON SITE).
· WATER TEST (TEST THE STOP STATIONS DURING THE WATER TEST.)
· FLOW FOAM (SAFETY BRIEFING CONDUCTED BEFORE FOAM TEST WITH WRITTEN ACCOUNTABILITY OF
ALL WHO ENTER THE HANGAR AREA)
FIGURE E-17: EXAMPLE OF FIRE PAN, FOR ACCEPTANCE TEST OF OPTICAL DETECTORS
610 mm x 610 mm (24" x 24").
PRELIMINARY AND FINAL HANGAR FIRE
SUPPRESSION/DETECTION ACCEPTANCE
TESTING (PAT & FAT) CONTINUED
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F-002
F
IR
E P
R O
T E
C T
IO
N
N O
T E
S
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M
REFERENCES
INTERNATIONAL CODES, INTERNATIONAL CODE COUNCIL:
IBC INTERNATIONAL BUILDING CODE, 2018 EDITION
NATIONAL FIRE CODES, NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS INCLUDING:
NFPA 1 UNIFORM FIRE CODE, 2018 EDITION
NFPA 10 STANDARD FOR PORTABLE FIRE EXNTINGUISHER, 2018 EDITION
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 11 STANDARD FOR LOW, MEDIUM AND HIGH EXPANSION FOAM 2016 EDITION
NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION
NFPA 22 STANDARD FOR WATER TANKS FOR PRIVATE FIRE PROTECTION, 2018 EDITION
NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE SERVICE MAINS AND THEIR APPURTENANCES, 2019 EDITION
NFPA 70 NATIONAL ELECTRICAL CODE, 2020 EDITION
NFPA 72 NATIONAL FIRE ALARM CODE AND SIGNALING CODE, 2019 EDITION
NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2018
EDITION
NFPA 101 LIFE SAFETY CODE, 2018 EDITION
NFPA 409 STANDARD ON AIRCRAFT HANGARS, 2016 EDITION
UNIFIED FACILITIES CRITERIA:
UFC 1-200-01 GENERAL BUILDING REQUIREMENTS, 8 OCTOBER 2019
UFC 3-520-01 INTERIOR ELECTRIAL SYSTEM, 6 OCTOBER 2015, CHANGE 1, 20 MAR 2019
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, 8 AUGUST 2016, CHANGE 3 10 MAY 2019
UFC 4-021-01 MASS NOTIFICATION SYSTEMS, 9 APRIL 2008, CHANGE 1, JANUARY 2010
UFC 4-211-01 AIRCRAFT MAINTENANCE HANGARS, 13 APRIL 2017, CHANGE 1, NOVEMBER 2017
PROJECT ADDRESS: WHEELER ARMY AIRFIELD, OAHU, HAWAII, USA PROJECT DESCRIPTION: 2-25 AIRCRAFT
MAINTENANCE HANGAR
OCCUPANCY CLASSIFICATION:
OCCUPANCY IBC OCCUPANCY NFPA OCCUPANCY
HANGAR (NON-SEPARATED, MIXED USE):
BUSINESS B NEW BUSINESS OCCUPANCY (CHAPTER 38)
FACTORY-INDUSTRIAL F-1 INDUSTRIAL OCCUPANCY (CHAPTER 40)
MODERATE-HAZARD STORAGE S-1 STORAGE OCCUPANCY (CHAPTER 42)
FIRE PUMP BUILDING:
FACTORY-INDUSTRIAL F-1 INDUSTRIAL OCCUPANCY (CHAPTER 40)
CONSTRUCTION TYPE:
TYPE II-B, NON-COMBUSTIBLE, NON-RATED CONSTRUCTION
BUILDING HEIGHT:
OCCUPANCY ALLOWABLE WITH SPRINKLER INCREASE PROVIDED
HANGAR:
MODERATE-HAZARD UNLIMITED* UNLIMITED* 55 FEET
STORAGE S-1 3 STORIES 4 STORIES 1 STORY
*THE ALLOWABLE HEIGHT OF A SPRINKLERED ONE-STORY AIRCRAFT HANGAR IS PERMITTED TO BE UNLIMITED PER
UFC 4-211-01, 3-3.1.7.
FIRE PUMP BUILDING:
FACTORY-INDUSTRIAL F-1 75 FEET 75 FEET 23 FEET
3 STORES 4 STORIES 1 STORY
BUILDING ALLOWABLE AREA:
OCCUPANCY ALLOWABLE PROVIDED
HANGAR:
MODERATE-HAZARD UNLIMITED** 82,100 SF
STORAGE S-1
**THE ALLOWABLE AREA OF A SPRINKLERED ONE-STORY AIRCRAFT HANGAR IS PERMITTED TO BE UNLIMITED PER
IBC, 507.4.
FIRE PUMP BUILDING:
FACTORY-INDUSTRIAL F-1 62,000 SF 1,700 SF
EXPOSURE PROTECTION:
LOCATION EXPOSURE FIRE SEPARATION PROVIDED REQUIRED FIRE RATING
HANGAR:
NORTH 60 FEET 30 FEET TO OPEN SPACE 0 HR
EAST GSE 30 FEET TO OPEN SPACE 0 HR
WEST AVIATION OPS 30 FEET TO OPEN SPACE 0 HR
SOUTH 60 FEET 30 FEET TO OPEN SPACE 0 HR
FIRE PUMP BUILDING:
NORTH 26'-0" TO WATER TANK 25 FEET TO OPEN SPACE 0 HR
EAST 50 FEET 25 FEET TO OPEN SPACE 0 HR
WEST 50 FEET 25 FEET TO OPEN SPACE 0 HR
SOUTH 50 FEET 25 FEET TO OPEN SPACE 0 HR
BUILDING CODE SUMMARY:
CONSTRUCTION REQUIREMENTS: FOR GENERAL STRUCTURAL DESIGN CRITERIA SEE STRUCTURAL DRAWINGS
FIRE RESISTANCE REQUIREMENTS, IBC TABLE 601:
BUILDING ELEMENT MATERIAL REQUIRED RATING SECTION
STRUCTURAL FRAME NON-COMBUSTIBLE 0 HR IBC, TABLE 601
BEARING WALLS - EXTERIOR NON-COMBUSTIBLE 0 HR IBC, TABLE 601
BEARING WALLS - INTERIOR NON-COMBUSTIBLE 0 HR IBC, TABLE 601
NONBEARING WALLS - EXTERIOR NON-COMBUSTIBLE TABLE 602 IBC, TABLE 602
NONBEARING WALLS - INTERIOR NON-COMBUSTIBLE 0 HR IBC, TABLE 601
FLOOR/CEILING ASSEMBLY NON-COMBUSTIBLE 0 HR IBC, TABLE 601
ROOF/CEILING ASSEMBLY NON-COMBUSTIBLE 0 HR IBC, TABLE 601
BASED ON IBC TABLE 602 FOR OCCUPANCY GROUP F-1 TYPE II-B CONSTRUCTION, THE EXTERIOR WALLS OF THE BUILDING DO NOT REQUIRE A FIRE RESISTANCE RATING WITH A MINIMUM 10' FIRE SEPARATION DISTANCE.
PER IBC 705.8.1, THERE IS NO LIMIT ON UNPROTECTED OPENINGS IN THE EXTERIOR WALLS WHEN THE EXTERIOR
WALLS ARE NOT REQUIRED TO HAVE A FIRE RESISTANCE RATING.
LIFE SAFETY CODE SUMMARY:
INTERIOR FINISH AND INTERIOR FLOOR FINISH:
OCCUPANCY EXITWAYS ROOM
INTERIOR FINISH:
BUSINESS A, B A, B, C
INDUSTRIAL A, B A, B, C
STORAGE A, B A, B, C
INTERIOR FLOOR FINISH:
BUSINESS I, II N/A
INDUSTRIAL I, II N/A
STORAGE I, II N/A
OCCUPANT LOAD FACTOR
BUSINESS USE - 150 SF/ PERSON
INDUSTRIAL USE - 100 SF/ PERSON
STORAGE USE - 500 SF/ PERSON
MAINTENANCE BAY - 500 SF/PERSON
HANGAR OCCUPANT LOAD:
OFFICES/WORK ROOMS: 90 PEOPLE
WORKSHOPS: 74 PEOPLE
STORAGE ROOMS: 20 PEOPLE
MAINTENANCE BAY: 88 PEOPLE
TOTAL CALCULATED LOAD: 272 PEOPLE
FIRE PUMP BUILDING OCCUPANT LOAD:
PUMP ROOM: 17 PEOPLE
NUMBER OF EXITS:
FIRST FLOOR*: AREA/LEVEL REQUIRED PROVIDED
HANGAR:
MAINTENANCE BAY EXITS AROUND PERIMETER EXITS COMPLY
WITHIN 150 FEET**
SUPPORT AREAS 2 6
PUMP HOUSE:
PUMP ROOM: 1 2
*NOTE: EACH SPACE IS PERMITTED TO HAVE A SINGLE EXIT PROVIDED THE COMMON PATH OF TRAVEL IS NOT EXCEEDED
PER NFPA 101, 38.2.4.2 & 40.2.4.1.2.
**NOTE: WHERE HANGAR BAY DOORS EXCEED 110 FEET, EXITS ARE PROVIDED WITHIN 20 FEET OF EACH END OF THE
HANGAR BAY DOOR OPENING PER UFC 4-211-01, 3-3.1.9.
CAPACITY OF MEANS OF EGRESS:
REQUIRED CAPACITY PROVIDED CAPACITY
HANGAR: 272 PEOPLE 1,700 PEOPLE
FIRE PUMP BUILDING: 17 PEOPLE 680 PEOPLE
MEANS OF EGRESS:
TRAVEL DISTANCE TO EXITS: TRAVEL DISTANCE MAX TRAVEL
ALLOWED DISTANCE
PROVIDED
HANGAR:
FIRST FLOOR 250 FEET 243 FEET
PUMP HOUSE:
FIRST FLOOR 250 FEET 75 FEET
COMMON PATH OF TRAVEL: COMMON PATH MAX COMMON
OF TRAVEL PATH OF TRAVEL
ALLOWED PROVIDED
HANGAR:
FIRST FLOOR 100 FEET 78 FEET
PUMP HOUSE:
FIRST FLOOR 100 FEET 54 FEET
DEAD END CORRIDORS: DEAD END MAX DEAD END
ALLOWED PROVIDED
HANGAR:
FIRST FLOOR 50 FEET 31 FEET
PUMP HOUSE:
FIRST FLOOR 50 FEET N/A
DISCHARGE FROM EXITS:
EXITS DISCHARGE DIRECTLY TO THE EXTERIOR TO GRADE WITH ACCESS TO
EXTERIOR ROADWAYS
ILLUMINATION OF MEANS OF EGRESS: REQUIRED AND PROVIDED.
EMERGENCY LIGHTING: REQUIRED AND PROVIDED.
FIRE ALARM AND MASS NOTIFICATION SYSTEM: AN ADDRESSABLE COMBINED FIRE
ALARM AND MASS NOTIFICATION SYSTEM WILL BE PROVIDED IN ACCORDANCE
WITH UFC 3-600-01, UFC 4-021-01 AND UFC 4-211-01 FOR THE AIRCRAFT
MAINTENANCE HANGAR. A FIRE ALARM SYSTEM WILL BE PROVIDED FOR THE
PUMP HOUSE.
FIRE SUPPRESSION SYSTEM: A WET PIPE SPRINKLER SYSTEM WILL BE PROVIDED
THROUGHOUT THE FACILITY AND A HIGH EXPANSION FOAM SYSTEM WILL BE
PROVIDED FOR THE MAINTENANCE BAY IN ACCORDANCE WITH UFC 3-600-01 AND
UFC 4-211-01. A WET PIPE SPRINKLER SYSTEM WILL BE PROVIDED FOR THE PUMP
HOUSE. A 250,000 GALLON WATER TANK WILL BE PROVIDED FOR THE
SUPPRESSION SYSTEM.
PORTABLE FIRE EXTINGUISHER: GENERAL PURPOSE PORTABLE FIRE
EXTINGUISHERS ARE NOT REQUIRED WHEN THE BUILDING IS PROTECTED WITH A
COMPLETE AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH UFC 3-600-01.
PORTABLE FIRE EXTINGUISHERS WILL BE PROVIDED OPTIONALLY AT THE
REQUEST OF THE USER AND LOCATED IN ACCORDANCE WITH NFPA 10.
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F-003
B U
IL
D
IN
G
C O
D E
S U
M M
A R
Y
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M
GSE STORAGE
ENCLOSURE
FIRE PUMP
BUILDING
FOAM
TANK
POL
STORAGE
HAZ WASTE
STORAGE
FFE=824.32
FIRE
PROTECTION
WATER
STORAGE
TANK, 250,000
GALLONS
S18
S
S
S6
S8
S
S
S6
S
S18
S
S
S6 S8
S18
S
S18
S
S
S8 D15
S
S8
S
D2
D6
D18
D18D18
D6
D
D18
D
D
D
D6
D4 D4
D15
D15
D
D18
D
D15
D6
D6
D6
D6
D6 D6 D6
D
D15
D15
W
F
W
W6
W8
F
S
U C
T
IO
N
F24
W
W
W6 F
W2
W
W 1-1/2
H B
W8
W
W4
W6
F24 F24
W
W8
W
F
F
IR
E
L O
O P
F24 F24 F24
HB
W1
W1
HB
W8
W8
W
F
HB
W1 F24
W
W6
W
W8
W
F
F6F
F
COMM
ES
E S
E S
ES
E S
EMH
T=820.96
FFE=811.71
C h a in
L in k F e n c e
SMH
T=821.60 Inv=812.12
SMH
T=821.03 Inv=809.97S12" S10"
.0
820.00
.0
820.00
820.00
820.00 820.00
.0
.0
821.00
819.00
.0
819.00
821.00
822.00
823.00
821.00
821.00
Signal Corps MH T=820.96 (Bolted)
LP
LP
LP
LP
Chain Link Fence
S
C H S
/RH
W S
/R
WV
T=820.20
TS=816.91
WV
T=820.46
TS=817.68
WV
T=820.44
TS=817.47
WV
T=820.48
TS=817.73
WV
T=820.27
TS=817.48
WV
T=820.46
TS=817.44
WV
T=820.44
TS=817.26
ARV
T=820.85
TS=820.16
WV
T=821.02
TS=819.22
WV
T=821.04
TS=819.98
WV
T=818.78
TS=816.10
WV
T=818.90
TS=816.77
W
(T o n e d
Stub out (Asbuilt Location)
W
WV
T=821.21
TS=819.96
W
W
WV
T=818.88
TS=816.56
Stub out Stub out Stub out
Stub out
W8"W8"
W8" W8"
W8"W8"
DI
T=817.79 Inv=808.73
DI
T=819.78 Inv=809.73
DI
T=819.02 Inv=808.97
D
D
D
D
TB-25
(Hub) 114,194.66 N 1,630,568.64 E
ELEV=820.74 FT
.1
T
C .6
T
C .6
T
C
WV
T=819.99
TS=816.04
WV
T=820.14
TS=817.36
WV
T=820.19
TS=817.25
WV
T=820.46
TS=817.33
WV
T=820.31
TS=817.75
WV
T=820.34
TS=817.57
Stub out Stub out
Stub out Stub out
Stub-out
Stub out
W6"W8"W8"
W8"
W8"W8"
87" MIN
33" MIN
30" MIN
CARPOOL ONLYCARPOOL ONLY CARPOOL ONLYCARPOOL ONLYCARPOOL ONLY CARPOOL ONLYCARPOOL ONLYCARPOOL ONLYCARPOOL ONLY
MOTORCYCLE
PARKING
WWWW
W
W
S
WWWW
WW
W
S
CO
C
E
W
W
W
W
W
W
W
D
CO
TB-26
(Hub) 114,004.21 N 1,630,084.93 E
ELEV=819.36 FT
FUTURE
AVIATION
COFS
AIRCRAFT MAINTENANCE HANGAR
60'-0"
SEPARATION
DISTANCE
50'-0"
SEPARATION
DISTANCE
60'-0"
SEPARATION
DISTANCE
230'-0"
HYDRANT COVERAGE
S
E P
A R
A T
IO
N
D
IS
T
A N
C E
230'-0"
HYDRANT COVERAGE
126'-0"
HYDRANT COVERAGE
126'-0"
HYDRANT COVERAGE
220'-0"
HYDRANT COVERAGE
257'-0"
HYDRANT COVERAGE
135'-0"
HYDRANT COVERAGE
135'-0"
HYDRANT COVERAGE
60'-0"
SEPARATION
DISTANCE
102'-0"
FROM FDC TO HYDRANT
FIRE
HYDRANT
FIRE
HYDRANT
FIRE DEPARTMENT
CONNECTION
FIRE
HYDRANT
FIRE
HYDRANT
FIRE
HYDRANT
FIRE DEPARTMENT
CONNECTION
120'-0"
HYDRANT
COVERAGE
119'-0"
HYDRANT
COVERAGE
55'-0"
FROM FDC
TO HYDRANT
FA
F A
FAFAFAFA
F A
F A
F A
FA FA FA FA
F A
F A
F A
FA FA
50'-0"
FIRE DEPARTMENT
ACCESS
IR
E D
E P
A R
T M
E
T
A C
C E
S S
IR
E
D E
P A
R T
M E
T
C
E S
S
65'-10"
FIRE
DEPARTMENT
ACCESS
WALL MOUNTED
PIV
R
"R
20' - 0"
R 20' - 0
R
R 20' - 0"
WALL MOUNTED
POST INDICATOR
VALVE
FD
FIRE TRUCK ACCESS ROUTE
BUILDING CODE SITE LEGEND
FIRE HYDRANT
FA
FIRE DEPARTMENT CONNECTION
BUILDING SEPARATION REQUIREMENT
FD FIRE DEPARTMENT ACCESS POINT
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
ST
T
R E
S R
ED
PROFESS IONAL
EN
G
IN
E
E R
E T
I G
FP1427
R O
B
ERT T. B I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F-101
C O
D E
C O
M P
L
IA
N C
E S
IT
E
P L A
N
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
1" = 30'-0"1
CODE COMPLIANCE SITE PLAN
SCALE: 1" = 30'-0"
30' 60' 90'
PLAN NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C
E
F
G
H
J
K
1.9 2.9 3.9 4.4 5.6 6.6 7.5 8.4 9.4 10.4 12.1
C.9
H.1
S
S
S S
S S S
S S
S
S
S
S S
S S S
S S S
S
S S
S
S
S S S
S
S
S
S
S
66'/183'
68'/133' 2
/3
/1
85/170
/3
/1
169/340
/1
/1
/1
S
S S S S
S
S
S
S
S
S-1
500 1
STORAGE
B
50 21
BUSINESS
S-1
500 1
STORAGE
B
150 13
BUSINESS
F-1
100 13
INDUSTRIAL
F-1
100 50
INDUSTRIAL
S-1
500 4
STORAGE
B
150 3
BUSINESS
S-1
500 2
STORAGE
S-1
500 1
STORAGE
B
150 7
BUSINESS
B
150 7
BUSINESS
S-1
500 5
STORAGE
B
150 20
BUSINESS
S-1
500 4
STORAGE
F-1
100 11
INDUSTRIAL
S-1
500 1
STORAGE
78'/78'
F-1
500 1
INDUSTRIAL
0' /2
0'
0.9 13.1
CREW CHIEF WORK
ROOM (COMPANY C)
MAINTENANCE TEST
PILOT OFFICE
CREW CHIEF WORK
ROOM (COMPANY A)
AVIATION LIFE
SUPPORT EQUIPMENT
(ALSE) SHOP
FACILITY STORAGE
ROOM
S S
S
S S
S S
BLADE REPAIR SHOP
SHOP SECTION HQ
1ST SERGEANT
OFFICE
RECYCLE ROOM
ELECTRICAL ROOM
COMMUNICATIONS
ROOM
COMPONENT REPAIR
PLATOON
COMPONENT REPAIR
PLATOON OFFICE
ACN EQUIPMENT
138JANITOR
AIRLOCK 2
157F
COMMUNICATIONS
ROOM
SPECIAL TOOLS ROOM
AIRFRAME REPAIR
PLATOON
COMMUNICATIONS
ROOM
MECHANICAL ROOM
PLATOON OFFICE
AIRCRAFT PARTS
SUPPLY OFFICE / 101
AIRLOCK 3
157G
STRUCTURAL REPAIR
SHOP
CORRIDOR 1
157A
POWER PLANT/
POWERTRAIN SHOP
NONDESTRUCTIVE
INSPECTION (NDI)
ROOM
ARMS VAULT
(COMPANY D)
COMPRESSOR ROOM
COMMANDER OFFICE
ELECTRICAL ROOM
PRODUCTION
CONTROL OFFICE
QUALITY CONTROL
OFFICE
QUALITY CONTROL
CORRIDOR 4
157D
UNIT STORAGE
(COMPANY D)
ELECTRICAL ROOM
CONTRACTOR
LOGISTICS SUPPORT
MECHANICAL ROOM
AIRFRAME REPAIR
PLATOON OFFICE
SYSTEMS REPAIR
SHOP
CORRIDOR 3
157C
PNEUDRALICS REPAIR
SHOP
AIRCRAFT PARTS
SUPPLY / 102
CORRIDOR 2
157B
MULTI PURPOSE /
BREAK / CONF
AVIATION LIFE
SUPPORT EQUIPMENT
(ALSE) STORAGE
PRODUCTION
CONTROL
140 FIRE PROTECTION
LOGISTICS
ASSISTANCE
REPRESENTATIVES
(LARS)
ORDERLY ROOM
(COMPANY D)
COMSEC SECURE
STORAGE
AIRCRAFT MOUNTED
WEAPONS VAULT
REPAIR SECTION
WORKROOM
AIRLOCK 1
157E
AIRCRAFT
MAINTENANCE BAY
WOMEN'S SHOWER
MEN'S SHOWER
MOTHER'S ROOM
CAGE
C125
CAGE
C131
CAGE
C142
COMMUNICATIONS
STORAGE
C146A
NON-SENSITIVE
SECURE STORAGE
146A CAGE
C155B
NBC STORAGE
C146B
VESTIBULE
155A
OXYGEN GENERATOR
CAGE
C152
CAGE
C149
CAGE
C147
CAGE
C108B
CAGE
C108A
CAGE
C106
CAGE
C107
SS
S S
S S
S
S
S S
S S
S
S S
S
S S
S
S S
S S
S S S
S
S
B
15 47
BUSINESS
44250
F-1
500 89
INDUSTRIAL
0' /2
3'
B
50 91
BUSINESS
B
150 1
BUSINESS
74'/74'
16/370 16/370 16/370 1
/3
1-HR RATED WALL, FIRE RESISTIVE
CONSTRUCTION.
TRAVEL PATH POINT OF CHOICE OF TWO
EXITS, COMMON PATH OF TRAVEL ENDS.
COMMON PATH OF TRAVEL
DEAD-ENDSMOKE PARTITION
FIRE EXIT
EXIT PATH (COMMON PATH OF TRAVEL/
TRAVEL DISTANCE)
S
EXIT CAPACITY (EXIT OCCUPANT LOAD/
EXIT CAPACITY)
XXX
LEGEND
XX / XX
XX / XX
EXIT ACCESS, ALLOCATED
OCCUPANCY LOAD
AREAIBC OCCUPANCY
GROUP / DIVISION
OCCUPANCY LOAD
(PERSONS)
OCCUPANCY LOAD
FACTOR (SF / PERSON)
E
15415
OFFICE
OCCUPANCY TABLE
NFPA OCCUPANCY
3/4 - HOUR FIRE RATED DOOR WITH SELF
CLOSING AND LATCHING HARDWARE
1 - HOUR FIRE RATED DOOR WITH SELF
CLOSING AND LATCHING HARDWARE
S WITH SELF CLOSING AND LATCHING HARDWARE
AINROFICF
E
A
NOITCETORPERI
F
LAO
ST
T
R E
S
RED
PROFESS IONAL
ENG
IN
E E
R
ET
I
G
FP1427
R O
BERT T. B I G
TA
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F-102
A M
H O
V E
R A
L L F
L O
O R
P L A
N
L
IF
E S
A F
E T
Y
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
1/16" = 1'-0"1
AMH OVERALL FLOOR PLAN - LIFE SAFETY
08' 16' 32'4'12'16'
SCALE: 1/16"=1'-0"
PLAN NORTH
NOTE:
1. REFER TO SHEET E-101 FOR ELECTRICAL HAZARDOUS AREAS
F1 F2
FB
FA
F-1
100 17
INDUSTRIAL
35'/75'
9/340 8/340
54'/62'
FIRE PUMP BUILDING
1-HR RATED WALL, FIRE RESISTIVE
CONSTRUCTION.
TRAVEL PATH POINT OF CHOICE OF TWO
EXITS, COMMON PATH OF TRAVEL ENDS.
COMMON PATH OF TRAVEL
DEAD-ENDSMOKE PARTITION
FIRE EXIT
EXIT PATH (COMMON PATH OF TRAVEL/
TRAVEL DISTANCE)
S
EXIT CAPACITY (EXIT OCCUPANT LOAD/
EXIT CAPACITY)
XXX
LEGEND
XX / XX
XX / XX
EXIT ACCESS, ALLOCATED
OCCUPANCY LOAD
AREAIBC OCCUPANCY
GROUP / DIVISION
OCCUPANCY LOAD
(PERSONS)
OCCUPANCY LOAD
FACTOR (SF / PERSON)
E
15415
OFFICE
OCCUPANCY TABLE
NFPA OCCUPANCY
3/4 - HOUR FIRE RATED DOOR WITH SELF
CLOSING AND LATCHING HARDWARE
1 - HOUR FIRE RATED DOOR WITH SELF
CLOSING AND LATCHING HARDWARE
S WITH SELF CLOSING AND LATCHING HARDWARE
AINROFICF
E
A
NOITCETORPERI
F
LAO
ST
T
R E
S
RED
PROFESS IONAL
ENG
IN
E E
R
ET
I
G
FP1427
R O
BERT T. B I G
TA
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F-103
F
IR
E P
U M
P B
U
IL
D
IN
G
L
IF
E S
A F
E T
Y
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
1/4" = 1'-0"1
FIRE PUMP BUILDING - LIFE SAFETY
4' 4' 8'
SCALE: 1/4"=1'-0"
3' 2' 1' 0'
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C
E
F
G
H
J
K
1.9 2.9 3.9 4.4 5.6 6.6 7.5 8.4 9.4 10.4 12.1
C.9
H.1
FX105
FX107
FX106
FX103
FX109
FX108
SEE FOR FIRE SPRINKLER
FX104SEE FOR FIRE SPRINKLER
SEE FOR FIRE SPRINKLER SEE FOR FIRE SUPPRESSION SEE FOR FIRE SPRINKLER SEE FOR FIRE SUPPRESSION
SEE FOR FIRE SPRINKLER
0.9 13.1
BLADE REPAIR SHOP
SHOP SECTION HQ
1ST SERGEANT
OFFICE
RECYCLE ROOM
ELECTRICAL ROOM
COMMUNICATIONS
ROOM
COMPONENT REPAIR
PLATOON
COMPONENT REPAIR
PLATOON OFFICE
ACN EQUIPMENT
JANITOR
MAINTENANCE TEST
PILOT OFFICE
CREW CHIEF WORK
ROOM (COMPANY A)
AIRLOCK 2
157F
COMMUNICATIONS
ROOM
SPECIAL TOOLS ROOM
AIRFRAME REPAIR
PLATOON
COMMUNICATIONS
ROOM
MECHANICAL ROOM
PLATOON OFFICE
AIRCRAFT PARTS
SUPPLY OFFICE / 101
AIRLOCK 3
157G
STRUCTURAL REPAIR
SHOP
CORRIDOR 1
157A
POWER PLANT/
POWERTRAIN SHOP
NONDESTRUCTIVE
INSPECTION (NDI)
ROOM
ARMS VAULT
(COMPANY D)
COMPRESSOR ROOM
COMMANDER OFFICE
ELECTRICAL ROOM
PRODUCTION
CONTROL OFFICE
QUALITY CONTROL
OFFICE
QUALITY CONTROL
CORRIDOR 4
157D
UNIT STORAGE
(COMPANY D)
AVIATION LIFE
SUPPORT EQUIPMENT
(ALSE) SHOP
FACILITY STORAGE
ROOM
ELECTRICAL ROOM
CONTRACTOR
LOGISTICS SUPPORT
MECHANICAL ROOM
AIRFRAME REPAIR
PLATOON OFFICE
SYSTEMS REPAIR
SHOP
CREW CHIEF WORK
ROOM (COMPANY C)
CORRIDOR 3
157C
PNEUDRALICS REPAIR
SHOP
AIRCRAFT PARTS
SUPPLY / 102
CORRIDOR 2
157B
MULTI PURPOSE /
BREAK / CONF
AVIATION LIFE
SUPPORT EQUIPMENT
(ALSE) STORAGE
PRODUCTION
CONTROL
FIRE PROTECTION
LOGISTICS
ASSISTANCE
REPRESENTATIVES
(LARS)
141 ORDERLY ROOM
(COMPANY D)
COMSEC SECURE
STORAGE
AIRCRAFT MOUNTED
WEAPONS VAULT
REPAIR SECTION
WORKROOM
AIRLOCK 1
157E
AIRCRAFT
MAINTENANCE BAY
WOMEN'S SHOWER
MEN'S SHOWER
MOTHER'S ROOM
CAGE
C125
CAGE
C131
CAGE
C142
COMMUNICATIONS
STORAGE
C146A
NON-SENSITIVE
SECURE STORAGE
146A CAGE
C155B
NBC STORAGE
C146B
VESTIBULE
155A
OXYGEN GENERATOR
CAGE
C152
CAGE
C149
CAGE
C147
CAGE
C108B
CAGE
C108A
CAGE
C106
CAGE
C107
CAGE
C101
SERVED BY FIRE SPRINKLER RISER - 1SERVED BY FIRE SPRINKLER RISER - 1
SERVED BY FIRE SPRINKLER RISER - 2 SERVED BY FIRE SPRINKLER RISER - 2 SERVED BY FIRE SUPPRESSION RISER - 1SERVED BY FIRE SUPPRESSION RISER - 2
SERVED BY FIRE
SPRINKLER RISER - 1
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX101
A M
H O
V E
R A
L L F
L O
O R
P L A
N
F
IR
E S
P R
IN
K
L E
R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
1/16" = 1'-0"1
AMH OVERALL FLOOR PLAN - FIRE SPRINKLER
08' 16' 32'4'12'16'
SCALE: 1/16"=1'-0"
PLAN NORTH
NOTE:
PROVIDE PIPING EXPANSION JOINTS/LOOPS WHERE REQUIRED. SEE STRUCTURAL DRAWINGS S-203 THRU S-206 FOR ISOLATION JOINT LOCATIONS BETWEEN HANGAR MAINTENANCE BAY AND HANGAR ADMINISTRATION WING CMU WALLS.
FA
FIRE PUMP BUILDING
LEGEND FOR HAZARD GROUPS
SYMBOL DESCRIPTION
LIGHT HAZARD
ORDINARY HAZARD
SPECIAL HAZARD HANGAR
EXTRA HAZARD
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX102
F
IR
E P
U M
P B
U
IL
D
IN
G P
L A
N
F
IR
E S
P R
IN
K
L E
R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
1/4" = 1'-0"FX102
1 FIRE PUMP BUILDING PLAN - FIRE SPRINKLER
4' 4' 8'
SCALE: 1/4"=1'-0"
3' 2' 1' 0'
PFPF
C D
B
E
1 2 3 4 5 6 7
A
C
E
1.9 2.9 3.9 4.4 5.6 6.6
COMMUNICATIONS
ROOM
ELECTRICAL
ROOM
RECYCLE ROOM
ACN EQUIPMENT
JANITOR
MAINTENANCE
TEST PILOT
OFFICE
CREW CHIEF
WORK ROOM
(COMPANY A)
AIRLOCK 2
157F
SPECIAL TOOLS
ROOM
COMMUNICATIONS
ROOM
ARMS VAULT
(COMPANY D)
PRODUCTION
CONTROL OFFICE
QUALITY
CONTROL OFFICE
QUALITY
CONTROL
CORRIDOR 4
157D
UNIT STORAGE
(COMPANY D)
AVIATION LIFE
SUPPORT
EQUIPMENT
(ALSE) SHOP
FACILITY
STORAGE ROOM
ELECTRICAL
ROOM
CREW CHIEF
WORK ROOM
(COMPANY C)
CORRIDOR 2
157B
MULTI PURPOSE /
BREAK / CONF
AVIATION LIFE
SUPPORT
EQUIPMENT
(ALSE) STORAGE
PRODUCTION
CONTROL
AIRLOCK 1
157E
WOMEN'S
SHOWER
MEN'S SHOWER
MOTHER'S ROOM
AIRCRAFT
MAINTENANCE
BAY
0.9
LEGEND FOR HAZARD GROUPS
SYMBOL DESCRIPTION
LIGHT HAZARD
ORDINARY HAZARD
SPECIAL HAZARD HANGAR
EXTRA HAZARD
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX103
A M
H P
A R
T
IA
L F
L O
O R
P L A
N S
E C
T
IO
N A
F
IR
E
S P
R
IN
K L
E R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
04' 8' 16'2'6'8'
SCALE: 1/8"=1'-0"
PLAN NORTH
KEY PLAN
1/8" = 1'-0"FX103
1 AMH PARTIAL FLOOR PLAN SECTION A - FIRE SPRINKLER
D
B
E
7 8 9 10 11 12 13
A
C
E
7.5 8.4 9.4 10.4 12.1
C.9
BLADE REPAIR
SHOP
SHOP SECTION
HQ
1ST SERGEANT
OFFICE
COMMUNICATIONS
ROOM
COMPONENT
REPAIR PLATOON
COMPONENT
REPAIR PLATOON
OFFICE
AIRLOCK 2
157F
SPECIAL TOOLS
ROOM
AIRFRAME
REPAIR PLATOON
COMMUNICATIONS
ROOM
MECHANICAL
ROOM
PLATOON OFFICE
AIRLOCK 3
157G
STRUCTURAL
REPAIR SHOP
CORRIDOR 1
157A
POWER PLANT/
POWERTRAIN
SHOP
NONDESTRUCTIVE
INSPECTION (NDI)
ROOM
COMPRESSOR
ROOM
COMMANDER
OFFICE
ELECTRICAL
ROOM
ELECTRICAL
ROOM
CONTRACTOR
LOGISTICS
SUPPORT
MECHANICAL
ROOM
AIRFRAME
REPAIR PLATOON
OFFICE
SYSTEMS REPAIR
SHOP
CORRIDOR 3
157C
PNEUDRALICS
REPAIR SHOP
CORRIDOR 2
157B
FIRE
PROTECTION
LOGISTICS
ASSISTANCE
REPRESENTATIVES
(LARS)
141 ORDERLY ROOM
(COMPANY D)
COMSEC SECURE
STORAGE
AIRCRAFT
MOUNTED
WEAPONS VAULT
REPAIR SECTION
WORKROOM
AIRCRAFT
MAINTENANCE
BAY
13.1
FX112
SEE FOR FIRE SPRINKLER
FIRE DEPARTMENT CONNECTION
(FIRE SPRINKLER RISER-1)
CORRIDOR 2
157B
LEGEND FOR HAZARD GROUPS
SYMBOL DESCRIPTION
LIGHT HAZARD
ORDINARY HAZARD
SPECIAL HAZARD HANGAR
EXTRA HAZARD
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX104
A M
H P
A R
T
IA
L F
L O
O R
P L A
N S
E C
T
IO
N B
F
IR
E
S P
R
IN
K L
E R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
04' 8' 16'2'6'8'
SCALE: 1/8"=1'-0"
PLAN NORTH
KEY PLAN
1/8" = 1'-0"FX104
1 AMH PARTIAL FLOOR PLAN SECTION B - FIRE SPRINKLER
P
A
C D
B
E
13 14
E
F
G
H
C.9
H.1
BLADE REPAIR
SHOP
AIRCRAFT PARTS
SUPPLY OFFICE /
CORRIDOR 3
157C
PNEUDRALICS
REPAIR SHOP
AIRCRAFT PARTS
SUPPLY / 102
AIRCRAFT
MAINTENANCE
BAY
13.1
CAGE
C101
LEGEND FOR HAZARD GROUPS
SYMBOL DESCRIPTION
LIGHT HAZARD
ORDINARY HAZARD
SPECIAL HAZARD HANGAR
EXTRA HAZARD
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX105
A M
H P
A R
T
IA
L F
L O
O R
P L A
N S
E C
T
IO
N C
F
IR
E
S P
R
IN
K L E
R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
04' 8' 16'2'6'8'
SCALE: 1/8"=1'-0"
PLAN NORTH
KEY PLAN
1/8" = 1'-0"FX105
1 AMH PARTIAL FLOOR PLAN SECTION C - FIRE SPRINKLER
PFPF
F
A
C D
B
E
1 2 3 4 5 6 7
E
F
G
H
J
K
1.9 2.9 3.9 4.4 5.6 6.6
AIRCRAFT
MAINTENANCE
BAY
0.9
CREW CHIEF WORK
ROOM (COMPANY C)
MAINTENANCE TEST
PILOT OFFICE
CREW CHIEF WORK
ROOM (COMPANY A)
COMMUNICATIONS
ROOM
AIRLOCK 1
157E
MEN'S SHOWER
MEN'S SHOWER
MEN'S SHOWER
MEN'S SHOWER
MULTI PURPOSE /
BREAK / CONF
SPECIAL TOOLS ROOM
AIRCRAFT
MAINTENANCE BAY
DRAFT CURTAIN DRAFT CURTAIN DRAFT CURTAIN
LEGEND FOR HAZARD GROUPS
SYMBOL DESCRIPTION
LIGHT HAZARD
ORDINARY HAZARD
SPECIAL HAZARD HANGAR
EXTRA HAZARD
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX106
A M
H P
A R
T
IA
L F
L O
O R
P L A
N S
E C
T
IO
N D
F
IR
E
S P
R
IN
K L E
R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
04' 8' 16'2'6'8'
SCALE: 1/8"=1'-0"
PLAN NORTH
KEY PLAN
1/8" = 1'-0"FX106
1 AMH PARTIAL FLOOR PLAN SECTION D - FIRE SPRINKLER
PFPF
P F
A
C D
B
E
7 8 9 10 11 12 13
E
F
G
H
J
K
7.5 8.4 9.4 10.4 12.1
H.1
AIRCRAFT
MAINTENANCE
BAY
13.1
SPECIAL TOOLS ROOM
AIRLOCK 2
157F
REPAIR SECTION
WORKROOM
AIRFRAME REPAIR
PLATOON OFFICE
AIRCRAFT MOUNTED
WEAPONS VAULT
COMSEC SECURE
STORAGE
AIRLOCK 3
157G
POWER PLANT/
POWERTRAIN SHOP
STRUCTURAL REPAIR
SHOP
BLADE REPAIR SHOP
PNEUDRALICS REPAIR
SHOP
AIRCRAFT PARTS
SUPPLY / 102
AIRCRAFT PARTS
SUPPLY OFFICE / 101
AIRCRAFT PARTS
SUPPLY OFFICE / 101
CAGE
C101
AIRCRAFT
MAINTENANCE BAY
DRAFT CURTAIN DRAFT CURTAIN DRAFT CURTAIN
LEGEND FOR HAZARD GROUPS
SYMBOL DESCRIPTION
LIGHT HAZARD
ORDINARY HAZARD
SPECIAL HAZARD HANGAR
EXTRA HAZARD
AI
NROFICF
E A
N
OITCETORP
ERI
F
LAO
S
T T
R E
S R
ED
PROFESS IONAL
E N
G
IN
E E
R
E T
I G
FP1427
R O
B
ERT T. B
I G
T A
S
06/30/2022 Expiration Date of the License
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
FX107
A M
H P
A R
T
IA
L F
L O
O R
P L A
N S
E C
T
IO
N E
F
IR
E
S P
R
IN
K L
E R
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
R T
B
J B
P
K A
J T
H
J
A N
C O
N T
R A
C T
N O
F
IL
E N
A M
E
DESIGN COMPLETE REV 12 JAN 2021
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
w h -W
A A
F D
M M
F
04' 8' 16'2'6'8'
SCALE: 1/8"=1'-0"
PLAN NORTH
KEY PLAN
1/8" = 1'-0"FX107
1 AMH PARTIAL…
This is the start of the file's text. The full file is on GovTribe.