FILE 13 OF 15 07 Fire Protection DESIGN COMPLETE REV 01-12-2021.pdf

PDF 14 MB Posted

Attached to
FY21 Military Construction Army (MCA) Project Number (PN) 76897 Aircraft, Wheeler Army Airfield, Oahu, Hawaii
Solicitation number
W9128A21R0004
Issued by

About this file

This announcement constitutes a pre-solicitation notice for a construction project. The U.S. Army Corps of Engineers, Honolulu District intends to issue a request for proposal for Project Number 76897 to construct an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project has an estimated value between $50-100 million and will be awarded as a fixed price construction contract. The scope of work includes building an aircraft hangar, maintenance shops, administrative space, storage facilities, and supporting site development and utilities. The performance period will be determined in the forthcoming solicitation. The evaluation factors will assess experience, past performance, and price, with award determined by best value tradeoff procedures. The solicitation is planned for release on or after January 6, 2021.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

S

D

P

R

P,E

CO

F

A

M

IN

SD

SP

IM

WF

VS

PS

XX

SV

S

S C

C

B

XX

RTS

FSCP

FEP

FTR

ANT

ANN

LOC

LDP

FMCP

FACP

FCV

MVR

FIRE ALARM TRANSCEIVER

ADDRESSABLE INPUT MODULE

DRAIN PIPE

FIRE DEPARTMENT CONNECTION

PHOTOELECTRIC SYSTEM SMOKE DETECTOR/ SENSOR - SPOT TYPE

MANUAL FIRE ALARM STATION, MOUNTED 1220MM AFF TO TOP

WATER FLOW SWITCH

TAMPER SWITCH

ALARM PRESSURE SWITCH

OS&Y VALVE

CHECK VALVE

PIPE / CONDUIT BREAK FOR CONTINUATION OR CLARITY

PIPE / CONDUIT DOWN, AS NOTED

PIPE / CONDUIT UP, AS NOTED

WET PIPE FIRE SPRINKLER RISER

WET PIPE FIRE SPRINKLER PIPING

UPRIGHT SPRINKLER

PENDENT SPRINKLER

AUDIBLE/VISUAL DEVICE WITH MARKING ALERT, WALL MOUNTED, CANDELA

AS INDICATED ON THE DRAWINGS

FIRE ALARM TRANSCEIVER ANTENNA

FOAM DELUGE FIRE SPRINKLER RISER

MANUAL FOAM START STATION

FOAM SYSTEM CONTROL PANEL [FSCP] (SURFACE MOUNTED)

FOAM SUPPRESSION PIPING

FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

SOLENOID VALVE

MANUAL FOAM STOP DEADMAN SWITCH

DESCRIPTION

WP

ADDRESSABLE OUTPUT MODULE

SYMBOL

FIRE ALARM EXTENDER PANEL (SURFACE MOUNTED)

24 VOLT RELAY

TRANSIENT VOLTAGE SURGE SUPPRESSOR

FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

DESCRIPTIONSYMBOL

WEATHERPROOF

SPEAKER, CEILING MOUNTED

REMOTE ANNUNCIATOR (SURFACE MOUNTED)

REMOTE TEST SWITCH

LOCAL OPERATING CONSOLE (SURFACE MOUNTED)

COMBINATION FIRE ALARM/MASS NOTIFICATION PANEL (SEMI-RECESSED MOUNTING)

LEAK DETECTION PANEL, PROVIDED BY TANK SUPPLIER (SURFACE MOUNTED)

SPEAKER, WALL MOUNTED

AUDIBLE/VISUAL DEVICE WITH MARKING ALERT, CEILING MOUNTED, CANDELA

AS INDICATED ON THE DRAWINGS

TYP. TYPICAL

AFF ABOVE FINISH FLOOR

EP EXPLOSION PROOF

FIRE PUMP CONTROLLER PUMP RUNNING CONTACT

FIRE PUMP CONTROLLER PUMP TROUBLE CONTACT

FIRE PUMP CONTROLLER SWITCH POSITION CONTACT

A KEY OPERATED SUPERVISED DISCONNECT SWITCH TO PHYSICALLY DISABLE

THE SOLENOID FOR EACH FOAM/WATER AND PREACTION RISER. PROVIDE AND

INSTALL PER 3-6.19.2.3 OF UFC 4-211-01

BLUE ROTATING BEACON. PROVIDE AND INSTALL PER UFC 4-211-01 SECTION 5-6.5.

DET-TRONICS X3301 MULTISPECTRUM IR FLAME DETECTOR

2-POSITION NON-KEYED OPERATED SWITCH. LABEL THE SWITCH "INHIBIT OPTICAL

FLAME DETECTION". PROVIDE ENGRAVED LABELS ON THE INHIBIT SWITCH

INDICATING WHEN THE OPTICAL FLAME DETECTORS ARE IN "NORMAL" OR "INHIBIT"

MODE.

VISUAL DEVICE WITH MARKING ALERT, CEILING MOUNTED, CANDELA AS

INDICATED ON THE DRAWINGS

FIRE ALARM CONTROL PANEL (SEMI-RECESSED MOUNTING)

PHOTOELECTRIC SYSTEM SMOKE DETECTOR/ SENSOR - SPOT TYPE WITH

ELEVATOR RECALL

FLOOR CONTROL VALVE ASSEMBLY

CARBON MONOXIDE DETECTOR

SURGE PROTECTOR

MULTI-VOLTAGE RELAY MODULE, 10.0 AMP FORM C CONTACTS WITH THREE

INPUT VOLTAGES 24VDC, 24VAC AND 120VAC.

HORN/VISUAL DEVICE WITH MARKING ALERT, WALL MOUNTED, CANDELA

AS INDICATED ON THE DRAWINGS

HORN, WALL MOUNTED

PORTABLE FIRE EXTINGUISHER LOCATION, SEMI-RECESSED CABINET

ISOLATION MODULE

HIGH WATER AND LOW WATER LEVEL SENSOR, SEE FIRE ALARM/MNS NOTE 16

TVSS

AOM

PR

PT

CS

AIM

F

HW LW

S DUCT SMOKE DETECTOR

C SUBSCRIPT C, CEILING MOUNTED

PA PUBLIC ADDRESS SYSTEM

LCD / LED VISUAL TEXTUAL DISPLAYET

LOW FUEL SENSORLF

LEAK DETECTION SENSORLD

FL LOW FOAM CONCENTRATE LEVEL SWITCH

1. THE SPRINKLER SYSTEM DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA 13-2019, UFC 4-211-01 CHANGE 1, NOVEMBER 2017 AND SPECIFICATION SECTION 21 13 13.00 10 AND 21 30.00.

THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL SPRINKLER SYSTEM COMPONENTS AND

COORDINATE WITH THE VARIOUS TRADES.

2. ALL DEVICES AND EQUIPMENT SHALL BE UL LISTED OR FM APPROVED.

3. AUTOMATIC WET PIPE SPRINKLER PROTECTION SHALL BE PROVIDED THROUGHOUT THE BUILDING AS

SHOWN ON THE DRAWINGS.

4. WATER SUPPLY INFORMATION: ONE 250,00 GALLON ABOVEGROUND STORAGE TANK

PROVIDED.

TWO PRIMARY DIESEL AND ONE BACKUP DIESEL FIRE PUMP IS PROVIDED WITHIN THE PUMP HOUSE

FOR THE AIRCRAFT MAINTENANCE HANGAR.

PUMP PRESSURE: 130 PSI

PUMP FLOW: 2,000 GPM

DOMESTIC WATER SUPPLY INFORMATION: WHEELER ARMY AIR FIELD, WAHIAWA, HI

STATIC PRESSURE 75 PSI

RESIDUAL PRESSURE 20 PSI

FLOW AT RESIDUAL PRESSURE 2,839 GPM

WET PIPE SPRINKLER SYSTEM SERVING THE HANGAR SUPPORT AREA AND FIRE PUMP BUILDING, TO

BE SUPPLIED FROM DOMESTIC WATER SUPPLY. HYDRAULIC CALCULATIONS SHALL INCLUDE A

MINIMUM 10 PERCENT SAFETY FACTOR TAKEN PARALLEL TO THE RAW WATER CURVE.

5. THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH NFPA 13.

SPRINKLER SYSTEM DESIGN CRITERIA SHALL BE AS FOLLOWS:

OFFICES

OCCUPANCY HAZARD CLASSIFICATION: LIGHT HAZARD

SPRINKLER TYPE: QUICK RESPONSE

K-FACTOR: 5.6

SPRINKLER TEMPERATURE: ORDINARY

DESIGN DENSITY: 0.1 GPM/FT2

DESIGN METHOD: AREA/DENSITY

DESIGN AREA: 1,500 FT2

OUTSIDE HOSE STREAM: 250 GPM (HYDRANTS SUPPLIED BY BASE WATER)

DURATION: 60 MINUTES

ELEC, BOILER, COMPRESSOR, COMM, STORAGE

OCCUPANCY HAZARD CLASSIFICATION: ORDINARY HAZARD

SPRINKLER TYPE: QUICK RESPONSE

K-FACTOR: 8.0

SPRINKLER TEMPERATURE: INTERMEDIATE

DESIGN DENSITY: 0.2 GPM/FT2

DESIGN METHOD: AREA/DENSITY

DESIGN AREA: 2,500 FT2

OUTSIDE HOSE STREAM: 250 GPM (HYDRANTS SUPPLIED BY BASE WATER)

DURATION: 60 MINUTES

AUTOMATIC SPRINKLER SYSTEM NOTES

FIRE PUMP BUILDING

OCCUPANCY HAZARD CLASSIFICATION: EXTRA HAZARD GROUP 2

SPRINKLER TYPE: STANDARD RESPONSE

K-FACTOR: 11.2

SPRINKLER TEMPERATURE: INTERMEDIATE

DESIGN DENSITY: 0.4 GPM/FT2

DESIGN METHOD: AREA/DENSITY

DESIGN AREA: ENTIRE BUILDING

OUTSIDE HOSE STREAM: 500 GPM (HYDRANTS SUPPLIED BY BASE WATER)

DURATION: 90 MINUTES

HANGAR

OCCUPANCY HAZARD CLASSIFICATION: HANGAR FOR FUELED AIRCRAFT

SPRINKLER TYPE: QUICK RESPONSE

K-FACTOR: 8.0

SPRINKLER TEMPERATURE: 175° F

DESIGN DENSITY: 0.2 GPM/FT2 (SIMULTANEOUS WITH THE FOAM

SYSTEM DISCHARGE)

DESIGN METHOD: AREA/DENSITY

DESIGN AREA: 5000 FT2

OUTSIDE HOSE STREAM: N/A (HYDRANTS NOT SUPPLIED BY WATER TANKS)

DURATION: 45 MINUTES

HOSE STREAMS FOR ALL SYSTEMS TO BE SUPPLIED BY THE DOMESTIC BASE WATER SUPPLY.

6. SPRINKLER PIPING SHALL COMPLY WITH NFPA 13, EXCEPT THAT COPPER AND PLASTIC PIPE SHALL

NOT BE PERMITTED. ALL PIPING IN FINISHED AREAS SHALL BE CONCEALED.

7. THE PIPE ROUTING AND SPRINKLER LOCATIONS ARE CONCEPTUAL. THE CONTRACTOR SHALL

INSTALL THE SYSTEM IN ACCORDANCE WITH THE APPLICABLE CODES, MANUFACTURER'S

RECOMMENDATIONS AND EQUIPMENT LISTINGS.

8. ALL FIRE SPRINKLER AND FOAM SYSTEM PIPING SHALL BE PROVIDED WITH EARTHQUAKE

PROTECTION IN ACCORDANCE WITH NFPA 13 INCLUDING BRANCH LINE RESTRAINT. CP SHALL BE

0.5 PER NFPA 13.

9. PROVIDE INSPECTION AND HYDROSTATIC TESTS IN ACCORDANCE WITH NFPA 13 AND

SPECIFICATION 21 13 13.00 10.

10. SPARE SPRINKLERS SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 13. HYDRAULIC DATA

PLATES SHALL BE PROVIDED AT THE RISER AND ABOVE THE FIRE SPRINKLER CABINET.

11. A PRESSURE RELIEF VALVE SHALL BE PROVIDED AT EACH RISER.

12. PROVIDE A NOMINAL CLEARANCE OF 50 MM AROUND PIPES 90 MM AND SMALLER, AND PROVIDE A

NOMINAL CLEARANCE OF 100 MM AROUND PIPES 100 MM AND LARGER PASSING THROUGH

CONCRETE / MASONRY WALLS OR FLOORS.

13. THE FIRE SUPPRESSION SYSTEM IS CONCEPTUAL. THE CONTRACTOR SHALL PROVIDE SHOP

DRAWINGS. THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL'S CEILING PLAN

FOR THE SPRINKLER'S EXACT LOCATION.

14. THE FIRE SUPPRESSION SYSTEM CONTRACTOR IS TO PROVIDE AN ENGINEERED SYSTEM,

COMPLETE WITH HYDRAULIC CALCULATIONS AND FINAL DESIGN DRAWINGS THAT ARE SIGNED

AND SEALED BY AN INDIVIDUAL WHO HAS OBTAINED NATIONAL INSTITUTE FOR CERTIFICATION IN

ENGINEERING TECHNOLOGIES (NICET) LEVEL III SYSTEMS OR LEVEL IV CERTIFICATION,

DEPENDING ON WHICH NFPA CODES ARE APPLICABLE; NFPA 13 AND NFPA 72: AUTOMATIC

SPRINKLER SYSTEM, SPECIAL HAZARD SYSTEMS FOR THE FOAM SYSTEM, AND FIRE ALARM

SYSTEM. A REGISTERED PROFESSIONAL ENGINEER LICENSED TO PRACTICE FIRE PROTECTION

ENGINEERING MUST STAMP THE SHOP DRAWINGS, PRIOR TO DISTRIBUTING THE FIRE

SUPPRESSION SYSTEM SHOP DRAWINGS AMONGST DESIGNATED FIRE PROTECTION ENGINEERS,

WHO ARE INSTALLING THE SYSTEM. THE CONTRACTOR SHALL SUBMIT DESIGN DRAWINGS WITH

THE PIPING AND THE FIRE SUPPRESSION SYSTEM.

15. IT IS THE RESPONSIBILITY OF THE FIRE SUPPRESSION SYSTEM CONTRACTOR TO ENSURE THAT

THE BACKGROUNDS USED ARE THE LATEST SET WITH ALL REVISIONS.

16. THE FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED TO MEET THE INTENT OF THE DRAWINGS

AND SPECIFICATIONS.

17. SIDE OUTLET TEES USING RUBBER GASKET FITTINGS AND HOLECUT MECHANICAL "TEE'S" ARE

PROHIBITED.

18. THE INSPECTOR'S TEST CONNECTION SHALL BE PROVIDED WITH A REMOVABLE END CAP ON THE

WET PIPE SYSTEM. FOR THE HANGAR BAY WET PIPE SPRINKLER SYSTEM, LOCATE THE

INSPECTOR'S TEST CONNECTION AT THE RISER. TEST STATIONS ARE NOT PERMITTED IN THE

HANGAR BAY.

19. THE FIRE PROTECTION ENGINEER RESPONSIBLE FOR STAMPING THE SHOP DRAWINGS SHALL

RE-VERIFY ALL REQUIREMENTS SHOWN IN THIS DESIGN.

20. PROVIDE LABEL TAG INDICATING "NORMALLY OPEN" OR "NORMALLY CLOSED" ON ALL VALVES INCLUDING AND NOT LIMITED TO ALL RISER AND TRIM, SECTIONAL VALVES, INSPECTORS TEST

VALVES AND DRAINS.

21. PROVIDE 10% CUSHION FOR ALL HYDRAULIC CALCULATIONS. SYSTEMS INCLUDING BACKFLOW

PREVENTERS SHALL INCLUDE A 8 PSI LOSS OR GREATER DEPENDING ON THE MANUFACTURER'S

DATA.

22. COORDINATE WITH OTHER TRADES PRIOR TO COMMENCING AND DURING CONSTRUCTION.

OVERLAY PLANS AND CHECK FOR ANY DISCREPANCIES OR CONFLICTS WITH OTHER TRADES.

23. PIPING INSTALLED IN ELECTRIC ROOMS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70.

FIRE SPRINKLER PIPING SHALL NOT BE INSTALLED IN ELECTRICAL ROOMS AND COMMUNICATION

ROOMS. PROVIDE SIDEWALL SPRINKLER(S) WITH UL LISTED WIRE HEAD GUARD(S) FOR

ELECTRICAL ROOMS AND COMMUNICATION ROOMS. DO NOT LOCATE SPRINKLER(S) ABOVE

PANEL(S) MOUNTED ON THE WALL BELOW. SEE SHEET T-401 FOR CONCEPTUAL LOCATION OF

SIDEWALL SPRINKLERS WITHIN COMMUNICATION ROOMS.

24. PROVIDE AIR RELEASE AS REQUIRED PER NFPA 13.

AUTOMATIC SPRINKLER SYSTEM NOTES (CONTINUED)

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F-001

F

IR

E P

R O

T E

C T

IO

N

N O

T E

S

S Y

M B

O L S

A N

D A

B B

R E

V

IA

T

IO

N S

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

1. THE FIRE ALARM/MASS NOTIFICATION SYSTEM SHALL BE DESIGNED AND INSTALLED IN

ACCORDANCE WITH NFPA 72-2016, SPECIFICATION SECTION 28 31 76(HANGAR) AND

SPECIFICATION 28 31 64.00 10 (FIRE PUMP BUILDING)

2. ALL DEVICES AND EQUIPMENT SHALL BE U.L. LISTED OR FM APPROVED.

3. DEVICE LOCATIONS AND CONDUIT ROUTING ARE CONCEPTUAL. DEVICES ARE SHOWN IN

SUGGESTED LOCATIONS. FINAL QUANTITY AND LAYOUT SHALL BE IN ACCORDANCE WITH

APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND EQUIPMENT LISTINGS.

COORDINATE LOCATIONS WITH LIGHTING SYSTEM.

4. ALL FIRE ALARM CONDUIT SHALL BE 3/4-IN MINIMUM. ALL CONDUIT IN FINISHED AREAS

SHALL BE CONCEALED.

5. SYNCHRONIZE ALL VISUAL NOTIFICATION APPLIANCES. SYNCHRONIZE ALL AUDIBLE

NOTIFICATION APPLIANCES. ALL DEVICES INSTALLED IN THE HANGAR BAY SHALL BE

WEATHER PROOF.

6. THE FIRE ALARM SIGNAL SHALL BE A TEMPORAL THREE PATTERN TONE FOR THE

HANGAR AND FIRE PUMP BUILDING.

7. VISUAL NOTIFICATION APPLIANCES CANDELA RATINGS ARE SHOWN ON THE DRAWINGS.

8. THE FIRE ALARM SYSTEM SHALL BE A VOICE EVACUATION SYSTEM. AUDIBLE

NOTIFICATION WILL BE PROVIDED THROUGH SPEAKERS.

9. PROVIDE 15 WATT SPEAKERS WITHIN THE HANGAR BAY. THE SPEAKER SHALL BE

CAPABLE OF PRODUCING 102 DBA AT 3.05M (10 FT).

10. SIGNALING LINE CIRCUITS SHALL BE CLASS B, INITIATING DEVICE CIRCUITS SHALL BE

CLASS B. NOTIFICATION APPLIANCE CIRCUITS SHALL BE CLASS B.

11. SMOKE DETECTORS SHALL BE LOCATED A MINIMUM OF 3 FEET FROM SUPPLY AIR

DIFFUSERS.

12. PROVIDE SIGNAGE AT THE FIRE ALARM CONTROL PANEL IDENTIFYING THE POWER PANEL

AND CIRCUIT.

13. PROVIDE NEMA 250 TYPE 4 WALL MOUNTED DEVICES AND APPLIANCES WITHIN THE

HANGAR BAY (INCLUDING BACK BOXES). PROVIDE WATERTIGHT CONDUIT AND JUNCTION

BOXES THROUGHOUT THE HANGAR BAY. ROUTE CONDUIT INTO THE BOTTOM OF THE

BACK BOX FOR MANUAL FOAM RELEASING STATIONS, STOP STATIONS, AND FLAME

DETECTORS, AND PROVIDE THE LOW POINT OF THIS CONDUIT WITH A DRAIN.

14. THE BUILDING FIRE ALARM PANEL SHALL BE ADDRESSABLE.

15. ALL STROBES SHALL BE SYNCHRONIZED.

16. PROVIDE A WATER CONDUCTANCE TYPE HIGH LEVEL AND LOW LEVEL ALARM SENSOR

FOR THE WATER TANK. SENSORS SHALL HAVE DRY CONTACTS TO PROVIDE SIGNALS TO

THE FACP FOR THE HIGH AND LOW LEVEL ALARMS.

17. COORDINATE WITH OTHER TRADES PRIOR TO COMMENCING AND DURING

CONSTRUCTION. OVERLAY PLANS AND CHECK FOR ANY DISCREPANCIES OR CONFLICTS

WITH OTHER TRADES.

FIRE ALARM/MASS NOTIFICATION SYSTEM NOTES

1. LOW LEVEL HIGH-EXPANSION FOAM SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH

NFPA 11-2016, UFC 4-211-01 CHANGE 1, NOVEMBER 2017, SPECIFICATION SECTION 21 13

25, FOAM EQUIPMENT MANUFACTURER'S RECOMMENDATIONS AND AS INDICATED.

2. FOAM GENERATORS SHALL BE LOCATED SO THAT FOAM DISCHARGE CLOSE TO, BUT NOT

DIRECTLY ON AIRCRAFT FUSELAGE. GENERATORS SHALL BE DESIGNED AND INSTALLED

PER FOAM EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.

3. FOAM SYSTEM SHALL COVER 90% OF ALL AIRCRAFT SILHOUETTES IN THE HANGAR IN ONE

MINUTE OR LESS, AND PROVIDE A FOAM BLANKET OF 1 METER HIGH IN 4 MINUTES OR LESS

OVER THE HANGER FLOOR.

4. MINIMUM FLOW RATE OF DISCHARGE SHALL BE IN ACCORDANCE WITH NFPA 11, BUT SHALL

NOT BE LESS THAN 2.6 FT3/MIN/FT2. A RANGE OF 2.6 FT3/MIN/FT2 - 4.0 FT3/MIN/FT2 IS

REQUIRED TO MEET THE REQUIREMENTS. A MINIMUM OF 15 MINUTE FOAM SUPPLY PLUS 30%

OVERAGE SHALL BE PROVIDED FOR THE FACILITY BASED ON A SYSTEM "SUPPLY"

CALCULATION.

5. ONLY HIGH EXPANSION FOAM SHALL BE USED AND SHALL BE LISTED/APPROVED FOR USE

WITH FOAM GENERATORS BEING INSTALLED.

6. THE FLOW CONTROL VALVE SHALL BE EXTERNALLY RESETTABLE WITHOUT ANY SPECIAL

TOOLS AND HAVE AN ABORT FEATURE. VALVE SHALL BE A VIKING SOLENOID OPERATED

FLOW CONTROL VALVE MODEL J-1.

7. FOAM CONCENTRATE PIPING SHALL BE WELDED OR FLANGED 304 OR 316 STAINLESS STEEL.

8. THE MANUFACTURER'S REPRESENTATIVE SHALL BE PRESENT AT THE PRELIMINARY AND

THE FINAL TESTING OF THE SYSTEMS.

9. ALL FOAM-WATER SOLUTION PIPING AND FITTINGS USED ON THE FOAM-WATER SYSTEM

SHALL BE SCHEDULE 40 STEEL PIPE. GALVANIZED PIPING IS PROHIBITED.

10. PROVIDE A MEANS TO INSTALL AND READ A PRESSURE GAGE A EACH FOAM GENERATOR

INLET.

11. THE FOAM RELEASING PANEL SHALL BE A DETRONICS, EAGLE QUANTUM PREMIER FIRE

DETECTION/RELEASING SYSTEM.

12. THE FOAM/WATER RELEASING SYSTEM (RSFACU) (DETRONICS) REPRESENTATIVE SHALL

BE PRESENT AT THE PRELIMINARY AND FINAL TESTING.

13. THE DETRONICS IIIR FLAME DETECTOR SHALL BE NON-LATCHING

LOW LEVEL HIGH EXPANSION FOAM NOTES

TESTING

AT A MINIMUM, PROVIDE THE TESTING AND REPORTS OUTLINED IN THIS SECTION. COORDINATE TESTING PERSONNEL AS REQUIRED TO DEMONSTRATE THE COORDINATION AND COMMUNICATION OF THE FIRE PROTECTION SYSTEMS THROUGH FULL FUNCTIONAL TESTING. INDEPENDENT TESTING OF EACH INDIVIDUAL FIRE PROTECTION SYSTEM IS NOT A SUBSTITUTE TO THE FUNCTIONAL TESTING REQUIREMENTS. E.G.

DEPRESSING THE STOP BUTTON AND WITNESSING THE DE-ENERGIZING OF THE SOLENOID, DOES NOT ADEQUATELY DEMONSTRATE THE FLOW CONTROL VALVE WILL STOP THE FOAM/WATER UNDER FULL FLOW.

TESTING PERSONNEL

PROVIDE A FIRE PROTECTION ENGINEER (FPE) MEETING THE REQUIREMENTS OF UFC 3-600-01, WHO WILL BE RESPONSIBLE TO WITNESS ALL TESTS AND REVIEW AND APPROVE OF TESTING REPORTS AS OUTLINED IN

THIS SECTION PRIOR TO RELEASING REPORTS TO THE GOVERNMENT.

AT A MINIMUM, PROVIDE A FACTORY AUTHORIZED REPRESENTATIVE FOR THE STARTUP AND/OR TESTING OF

THE FOLLOWING SYSTEMS AS OUTLINED BELOW:

· FIRE SUPPRESSION SYSTEM (PRELIMINARY AND FINAL TESTING)

· FOAM PROPORTIONING SYSTEM (PRELIMINARY AND FINAL TESTING)

· FIRE PUMP SYSTEM, WHEN PROVIDED (START UP)

· FIRE ALARM AND MASS NOTIFICATION SYSTEM (FACU/ACU) (PRELIMINARY AND FINAL TESTING)

· FOAM/WATER RELEASING SYSTEM RELEASING SERVICE FIRE ALARM CONTROL UNIT (RSFACU)

· (PRELIMINARY AND FINAL TESTING)

· FOAM/WATER DISCHARGE TESTING PLAN

· PROVIDE A TESTING PLAN CERTIFIED BY THE FPE THAT INCLUDES THE FOLLOWING:

- WHO WILL PERFORM THE TESTING AND WHO WILL BE THE ONSITE FACTORY AUTHORIZED

REPRESENTATIVES.

- AS A MINIMUM THE FOLLOWING PERSONNEL ARE REQUIRED TO BE PRESENT:

PRIME CONTRACTOR

- FIRE PROTECTION ENGINEER

- UNDERGROUND PIPE INSTALLER

- ABOVEGROUND PIPE INSTALLER

- FIRE SUPPRESSION SYSTEM INSTALLER (NICET)

- FIRE ALARM INSTALLER (NICET)

- MANUFACTURE'S REPRESENTATIVES

- FIRE PUMP/CONTROLLER REPRESENTATIVE

- FOAM SYSTEM REPRESENTATIVE

- TRIPLE IR MANUFACTURER

- HVAC (FOR DUCT DETECTION)

· WHAT ARE THE SAFETY PRECAUTIONS TAKEN DURING TESTING.

· HOW WILL THE FOAM/WATER SYSTEM BE TESTED TO DEMONSTRATE THE PERFORMANCE CRITERIA

HAS BEEN MET.

· HOW WILL THE EVENT BE RECORDED FOR FUTURE REVIEW. (USE BLOW HORN THAT CAN BE HEARD

· DURING VIDEO FOR FOAM FLOW TO SIGNAL START OF TIMER. START OF TIMER IS WHEN MANUAL

FOAM RELEASE STATION IS PULLED)

· WHAT ARE THE TESTING PROCEDURES TO DEMONSTRATE THE COORDINATION AND COMMUNICATION

OF THE FIRE PROTECTION SYSTEMS ASSOCIATED WITH THE FOAM/WATER DISCHARGE.

· HOW WILL THE HANGAR BAY BE PROTECTED DURING THE DISCHARGE OF FOAM.

· HOW WILL THE FOAM BE CAPTURED DURING THE DISCHARGE AND DISPOSED.

PRELIMINARY TESTING

PROVIDE ACCEPTANCE TESTING FOR THE FIRE SUPPRESSION AND FIRE ALARM SYSTEMS COMPLYING WITH NFPA 11, 13, 20, 24, AND 72 AS APPLICABLE. AT A MINIMUM, PROVIDE THE FOLLOWING PRELIMINARY TESTING

REPORTS.

· CONTRACTOR'S MATERIAL AND TESTING CERTIFICATE FOR UNDERGROUND PIPING PER NFPA 13 AND

24. PROVIDE PHOTOS OF INSTALLATION PRIOR TO BURIAL. (REVIEWED BY THE FPE) CONTRACTOR'S

MATERIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING PER NFPA 13 FOR EACH RISER,

MANIFOLD, AND FIRE DEPARTMENT CONNECTION. (REVIEWED BY THE FPE)

· FIRE PUMP TEST REPORT DEMONSTRATING COMPLIANCE WITH NFPA 20 ACCEPTANCE TESTING

CRITERIA. WHERE A CONCENTRATE PUMPING SYSTEM IS ALSO PROVIDED, DEMONSTRATE

COMPLIANCE WITH NFPA 11 AND 20 ACCEPTANCE TESTING CRITERIA. (REVIEWED BY FPE)

· WITH THE USE OF A TIME STAMPED VIDEO, DEMONSTRATE THE PERFORMANCE CRITERIA FOR FOAM

COVERAGE IS WITHIN THE LIMITATIONS UPON THE ACTUATION OF A MANUAL FOAM RELEASING

STATION. THE USE OF FOAM CONCENTRATE FOR THIS TEST IS REQUIRED TO DEMONSTRATE

PRELIMINARY COMPLIANCE. THE FLOOR MUST BE DRY WHEN PERFORMING THIS TEST. (WITNESSED BY

THE FPE)

· DEMONSTRATE THE PERFORMANCE CRITERIA FOR OPENING AND CLOSING THE FLOW CONTROL VALVE

IS MET UPON ACTUATION OF THE MANUAL FOAM STOP STATIONS. A WATER ONLY TEST IS

ACCEPTABLE. (WITNESSED BY THE FPE)

· PROVIDE THE RESIDUAL PRESSURE AT THE MOST REMOTE NOZZLE OR GENERATOR WITH ONLY THE

FOAM/WATER SYSTEM OPERATING. PROVIDE THE INLET AND OUTLET PRESSURES OF THE FLOW

CONTROL VALVE AND INDUCTOR. A WATER ONLY TEST IS ACCEPTABLE. USE THIS INFORMATION TO

VERIFY THE HYDRAULIC PERFORMANCE OF THE SYSTEM. (REVIEWED BY THE FPE)

· PROVIDE A PROPORTIONING SYSTEM TEST REPORT DEMONSTRATING COMPLIANCE IN ACCORDANCE

WITH NFPA 11. (REVIEWED BY THE FPE)

· SYSTEM RECORD OF INSPECTION AND TESTING, NOTIFICATION APPLIANCE SUPPLEMENTARY RECORD OF INSPECTION AND TESTING, INITIATING DEVICE SUPPLEMENTARY RECORD OF INSPECTION AND

TESTING, INTERFACE COMPONENT SUPPLEMENTARY RECORD OF INSPECTION AND TESTING, AND

MASS NOTIFICATION SYSTEM SUPPLEMENTARY RECORD OF INSPECTION AND TESTING PER NFPA 72

FOR THE FACU AND RSFACU. (REVIEWED BY THE FPE)

· TEST THE MASS NOTIFICATION SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF UFC 4-021-01 CHANGE 1, JANUARY 2010. AT A MINIMUM PROVIDE SOUND POWER LEVELS (DECIBEL A WEIGHTED SCALE (DBA)) AND INTELLIGIBILITY SCORES (CIS) THROUGHOUT THE FACILITY. SUBMIT DRAWING OR TABLE INDICATING DBA LEVELS AND CIS SCORES THROUGHOUT EACH SPACE. (REVIEWED BY THE FPE)

PRELIMINARY AND FINAL HANGAR FIRE

SUPPRESSION/DETECTION ACCEPTANCE

TESTING (PAT & FAT)

· 100% CIRCUIT INTEGRITY TESTING OF DEVICES (OPEN, SHORT, GROUND ON 100% OF DEVICES) DEMONSTRATE THE FUNCTIONALITY OF THE FIRE ALARM SYSTEM IS IN COMPLIANCE WITH THE FACU AND RFSACU FUNCTIONAL MATRIXES. (WITNESSED BY THE FPE) DEMONSTRATE THE PERFORMANCE REQUIREMENTS OF THE OPTICAL FLAME DETECTOR COVERAGE HAS BEEN MET THROUGH PAN FIRE ACCEPTANCE TESTING. USE THE EXPECTED FUEL IN A 2 FT. X 2 FT. (610 MM X 610 MM) TEST PAN, WITH CLOSABLE LID. THE USE OF A CLEANER BURNING FUEL MAY BE USED WHERE ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION (AHJ). REFER TO FIGURE E-17 - EXAMPLE OF FIRE PAN, FOR

ACCEPTANCE TEST OF OPTICAL DETECTORS. AT A MINIMUM, PLACE THE TEST FIRE IN EACH

DESIGNATED AIRCRAFT PARKING POSITION. TO PASS, ALL DETECTORS WITHIN THE CONE-OF-VISION OF THIS TEST FIRE MUST ACTIVATE WITHIN 30 SECONDS OF FULL FIRE DEVELOPMENT (MINIMUM OF THREE). CENTERED THE TEST FIRE 10 FT. (3.0 M) OUTSIDE THE HANGAR BAY OPENING. TO PASS, NO DETECTORS SHOULD ACTIVE AFTER 30 SECONDS OF FULL FIRE DEVELOPMENT. ALLOW TIME FOR ADJUSTMENTS IN POSITIONING OF THE TRIPLE IR DETECTION BY THE TRIPLE IR MANUFACTURER.

(WITNESSED BY THE FPE)

REQUEST FOR FINAL TESTING

PROVIDE A BREAK-IN PERIOD OF AT LEAST 14 CONSECUTIVE DAYS AFTER THE FACU AND RSFACU HAVE BEEN ENABLED, PRIOR TO ANY FINAL TESTING. PROVIDE A WRITTEN REQUEST FOR A FINAL TEST FROM THE FPE, AFTER PRELIMINARY TESTING IS COMPLETE, ADJUSTMENTS HAVE BEEN MADE TO THE SYSTEM, AND

THE SYSTEM IS READY FOR SERVICE.

FINAL TESTING

FINAL TESTING TO BE WITNESSED BY THE AHJ, AS DEFINED BY UFC 1-200-01, 20 JUNE 2016. (E.G. FOR AN AIR FORCE PROJECT THE AHJ IS THE AIR FORCE CIVIL ENGINEER CENTER, OPERATIONS DIRECTOR (AFCEC/CO), EVEN IF THE PROJECT IS CONSTRUCTED BY NAVFAC OR THE ARMY CORPS OF ENGINEERS. AFCEC/CO WOULD WITNESS FINAL TESTING IN THIS EXAMPLE.) THE FINAL TESTING MAY BE WITNESSED BY AN IN WRITING DELEGATED REPRESENTATIVE AT THE DISCRETION OF THE AHJ. WITH THE EXCEPTION OF SYSTEM FLUSHING AND HYDROSTATIC TESTING, REPEAT PRELIMINARY TESTS DURING THE FINAL TESTING AT THE DISCRETION OF THE AHJ. CORRECT SYSTEM FAILURES OR OTHER DEFICIENCIES IDENTIFIED DURING THE

FINAL TESTING AND RETEST IN THE PRESENCE OF THE AHJ, AT THEIR DISCRETION.

FINAL TESTING SEQUENCE OF EVENTS

AFCEC/CO FPE OR THEIR IN WRITING DESIGNATED FPE WILL BE ON SITE TO WITNESS ALL FATS. THE

FOLLOWING PROCEDURE OF EVENTS CAN BE EXPECTED

· CONTRACTOR LED SAFETY BRIEFING

· BATTERY TEST (FIRST THING AFTER SAFETY BRIEFING). WE WILL VERIFY TIME WITH ALARM CENTER

AND THEN COMPLETE BATTERY TEST BASED ON TIME STAMPED FROM ALARM CENTER. (DBA AND

INTELLIGIBILITY TEST COMPLETED DURING THE BATTERY TEST)

· FIRE ALARM/SUPPRESSION DEVICE CIRCUIT INTEGRITY TESTING TO INCLUDE HVAC (100% OF EVERY DEVICE REQUIRED AT TIME OF PAT AND WITNESSED BY A GOVERNMENT POC (FIRE DEPARTMENT OR

GOVERNMENT FPE AND DOR). THIS MUST BE COMPLETED AND WITNESS BY A GOVERNMENT

REPRESENTATIVE FOR 100% OF DEVICES DURING PAT. IT IS NOT A CONTRACTOR SELF-CHECK.

· LIVE PROPANE FIRE TESTS (COORDINATE FIRE DEPARTMENT IS PRESENT AND WITH TRIPLE IR

MANUFACTURER TO ENSURE DEVICE IS ON SITE).

· WATER TEST (TEST THE STOP STATIONS DURING THE WATER TEST.)

· FLOW FOAM (SAFETY BRIEFING CONDUCTED BEFORE FOAM TEST WITH WRITTEN ACCOUNTABILITY OF

ALL WHO ENTER THE HANGAR AREA)

FIGURE E-17: EXAMPLE OF FIRE PAN, FOR ACCEPTANCE TEST OF OPTICAL DETECTORS

610 mm x 610 mm (24" x 24").

PRELIMINARY AND FINAL HANGAR FIRE

SUPPRESSION/DETECTION ACCEPTANCE

TESTING (PAT & FAT) CONTINUED

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F-002

F

IR

E P

R O

T E

C T

IO

N

N O

T E

S

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M

REFERENCES

INTERNATIONAL CODES, INTERNATIONAL CODE COUNCIL:

IBC INTERNATIONAL BUILDING CODE, 2018 EDITION

NATIONAL FIRE CODES, NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS INCLUDING:

NFPA 1 UNIFORM FIRE CODE, 2018 EDITION

NFPA 10 STANDARD FOR PORTABLE FIRE EXNTINGUISHER, 2018 EDITION

NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 11 STANDARD FOR LOW, MEDIUM AND HIGH EXPANSION FOAM 2016 EDITION

NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION

NFPA 22 STANDARD FOR WATER TANKS FOR PRIVATE FIRE PROTECTION, 2018 EDITION

NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE SERVICE MAINS AND THEIR APPURTENANCES, 2019 EDITION

NFPA 70 NATIONAL ELECTRICAL CODE, 2020 EDITION

NFPA 72 NATIONAL FIRE ALARM CODE AND SIGNALING CODE, 2019 EDITION

NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2018

EDITION

NFPA 101 LIFE SAFETY CODE, 2018 EDITION

NFPA 409 STANDARD ON AIRCRAFT HANGARS, 2016 EDITION

UNIFIED FACILITIES CRITERIA:

UFC 1-200-01 GENERAL BUILDING REQUIREMENTS, 8 OCTOBER 2019

UFC 3-520-01 INTERIOR ELECTRIAL SYSTEM, 6 OCTOBER 2015, CHANGE 1, 20 MAR 2019

UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, 8 AUGUST 2016, CHANGE 3 10 MAY 2019

UFC 4-021-01 MASS NOTIFICATION SYSTEMS, 9 APRIL 2008, CHANGE 1, JANUARY 2010

UFC 4-211-01 AIRCRAFT MAINTENANCE HANGARS, 13 APRIL 2017, CHANGE 1, NOVEMBER 2017

PROJECT ADDRESS: WHEELER ARMY AIRFIELD, OAHU, HAWAII, USA PROJECT DESCRIPTION: 2-25 AIRCRAFT

MAINTENANCE HANGAR

OCCUPANCY CLASSIFICATION:

OCCUPANCY IBC OCCUPANCY NFPA OCCUPANCY

HANGAR (NON-SEPARATED, MIXED USE):

BUSINESS B NEW BUSINESS OCCUPANCY (CHAPTER 38)

FACTORY-INDUSTRIAL F-1 INDUSTRIAL OCCUPANCY (CHAPTER 40)

MODERATE-HAZARD STORAGE S-1 STORAGE OCCUPANCY (CHAPTER 42)

FIRE PUMP BUILDING:

FACTORY-INDUSTRIAL F-1 INDUSTRIAL OCCUPANCY (CHAPTER 40)

CONSTRUCTION TYPE:

TYPE II-B, NON-COMBUSTIBLE, NON-RATED CONSTRUCTION

BUILDING HEIGHT:

OCCUPANCY ALLOWABLE WITH SPRINKLER INCREASE PROVIDED

HANGAR:

MODERATE-HAZARD UNLIMITED* UNLIMITED* 55 FEET

STORAGE S-1 3 STORIES 4 STORIES 1 STORY

*THE ALLOWABLE HEIGHT OF A SPRINKLERED ONE-STORY AIRCRAFT HANGAR IS PERMITTED TO BE UNLIMITED PER

UFC 4-211-01, 3-3.1.7.

FIRE PUMP BUILDING:

FACTORY-INDUSTRIAL F-1 75 FEET 75 FEET 23 FEET

3 STORES 4 STORIES 1 STORY

BUILDING ALLOWABLE AREA:

OCCUPANCY ALLOWABLE PROVIDED

HANGAR:

MODERATE-HAZARD UNLIMITED** 82,100 SF

STORAGE S-1

**THE ALLOWABLE AREA OF A SPRINKLERED ONE-STORY AIRCRAFT HANGAR IS PERMITTED TO BE UNLIMITED PER

IBC, 507.4.

FIRE PUMP BUILDING:

FACTORY-INDUSTRIAL F-1 62,000 SF 1,700 SF

EXPOSURE PROTECTION:

LOCATION EXPOSURE FIRE SEPARATION PROVIDED REQUIRED FIRE RATING

HANGAR:

NORTH 60 FEET 30 FEET TO OPEN SPACE 0 HR

EAST GSE 30 FEET TO OPEN SPACE 0 HR

WEST AVIATION OPS 30 FEET TO OPEN SPACE 0 HR

SOUTH 60 FEET 30 FEET TO OPEN SPACE 0 HR

FIRE PUMP BUILDING:

NORTH 26'-0" TO WATER TANK 25 FEET TO OPEN SPACE 0 HR

EAST 50 FEET 25 FEET TO OPEN SPACE 0 HR

WEST 50 FEET 25 FEET TO OPEN SPACE 0 HR

SOUTH 50 FEET 25 FEET TO OPEN SPACE 0 HR

BUILDING CODE SUMMARY:

CONSTRUCTION REQUIREMENTS: FOR GENERAL STRUCTURAL DESIGN CRITERIA SEE STRUCTURAL DRAWINGS

FIRE RESISTANCE REQUIREMENTS, IBC TABLE 601:

BUILDING ELEMENT MATERIAL REQUIRED RATING SECTION

STRUCTURAL FRAME NON-COMBUSTIBLE 0 HR IBC, TABLE 601

BEARING WALLS - EXTERIOR NON-COMBUSTIBLE 0 HR IBC, TABLE 601

BEARING WALLS - INTERIOR NON-COMBUSTIBLE 0 HR IBC, TABLE 601

NONBEARING WALLS - EXTERIOR NON-COMBUSTIBLE TABLE 602 IBC, TABLE 602

NONBEARING WALLS - INTERIOR NON-COMBUSTIBLE 0 HR IBC, TABLE 601

FLOOR/CEILING ASSEMBLY NON-COMBUSTIBLE 0 HR IBC, TABLE 601

ROOF/CEILING ASSEMBLY NON-COMBUSTIBLE 0 HR IBC, TABLE 601

BASED ON IBC TABLE 602 FOR OCCUPANCY GROUP F-1 TYPE II-B CONSTRUCTION, THE EXTERIOR WALLS OF THE BUILDING DO NOT REQUIRE A FIRE RESISTANCE RATING WITH A MINIMUM 10' FIRE SEPARATION DISTANCE.

PER IBC 705.8.1, THERE IS NO LIMIT ON UNPROTECTED OPENINGS IN THE EXTERIOR WALLS WHEN THE EXTERIOR

WALLS ARE NOT REQUIRED TO HAVE A FIRE RESISTANCE RATING.

LIFE SAFETY CODE SUMMARY:

INTERIOR FINISH AND INTERIOR FLOOR FINISH:

OCCUPANCY EXITWAYS ROOM

INTERIOR FINISH:

BUSINESS A, B A, B, C

INDUSTRIAL A, B A, B, C

STORAGE A, B A, B, C

INTERIOR FLOOR FINISH:

BUSINESS I, II N/A

INDUSTRIAL I, II N/A

STORAGE I, II N/A

OCCUPANT LOAD FACTOR

BUSINESS USE - 150 SF/ PERSON

INDUSTRIAL USE - 100 SF/ PERSON

STORAGE USE - 500 SF/ PERSON

MAINTENANCE BAY - 500 SF/PERSON

HANGAR OCCUPANT LOAD:

OFFICES/WORK ROOMS: 90 PEOPLE

WORKSHOPS: 74 PEOPLE

STORAGE ROOMS: 20 PEOPLE

MAINTENANCE BAY: 88 PEOPLE

TOTAL CALCULATED LOAD: 272 PEOPLE

FIRE PUMP BUILDING OCCUPANT LOAD:

PUMP ROOM: 17 PEOPLE

NUMBER OF EXITS:

FIRST FLOOR*: AREA/LEVEL REQUIRED PROVIDED

HANGAR:

MAINTENANCE BAY EXITS AROUND PERIMETER EXITS COMPLY

WITHIN 150 FEET**

SUPPORT AREAS 2 6

PUMP HOUSE:

PUMP ROOM: 1 2

*NOTE: EACH SPACE IS PERMITTED TO HAVE A SINGLE EXIT PROVIDED THE COMMON PATH OF TRAVEL IS NOT EXCEEDED

PER NFPA 101, 38.2.4.2 & 40.2.4.1.2.

**NOTE: WHERE HANGAR BAY DOORS EXCEED 110 FEET, EXITS ARE PROVIDED WITHIN 20 FEET OF EACH END OF THE

HANGAR BAY DOOR OPENING PER UFC 4-211-01, 3-3.1.9.

CAPACITY OF MEANS OF EGRESS:

REQUIRED CAPACITY PROVIDED CAPACITY

HANGAR: 272 PEOPLE 1,700 PEOPLE

FIRE PUMP BUILDING: 17 PEOPLE 680 PEOPLE

MEANS OF EGRESS:

TRAVEL DISTANCE TO EXITS: TRAVEL DISTANCE MAX TRAVEL

ALLOWED DISTANCE

PROVIDED

HANGAR:

FIRST FLOOR 250 FEET 243 FEET

PUMP HOUSE:

FIRST FLOOR 250 FEET 75 FEET

COMMON PATH OF TRAVEL: COMMON PATH MAX COMMON

OF TRAVEL PATH OF TRAVEL

ALLOWED PROVIDED

HANGAR:

FIRST FLOOR 100 FEET 78 FEET

PUMP HOUSE:

FIRST FLOOR 100 FEET 54 FEET

DEAD END CORRIDORS: DEAD END MAX DEAD END

ALLOWED PROVIDED

HANGAR:

FIRST FLOOR 50 FEET 31 FEET

PUMP HOUSE:

FIRST FLOOR 50 FEET N/A

DISCHARGE FROM EXITS:

EXITS DISCHARGE DIRECTLY TO THE EXTERIOR TO GRADE WITH ACCESS TO

EXTERIOR ROADWAYS

ILLUMINATION OF MEANS OF EGRESS: REQUIRED AND PROVIDED.

EMERGENCY LIGHTING: REQUIRED AND PROVIDED.

FIRE ALARM AND MASS NOTIFICATION SYSTEM: AN ADDRESSABLE COMBINED FIRE

ALARM AND MASS NOTIFICATION SYSTEM WILL BE PROVIDED IN ACCORDANCE

WITH UFC 3-600-01, UFC 4-021-01 AND UFC 4-211-01 FOR THE AIRCRAFT

MAINTENANCE HANGAR. A FIRE ALARM SYSTEM WILL BE PROVIDED FOR THE

PUMP HOUSE.

FIRE SUPPRESSION SYSTEM: A WET PIPE SPRINKLER SYSTEM WILL BE PROVIDED

THROUGHOUT THE FACILITY AND A HIGH EXPANSION FOAM SYSTEM WILL BE

PROVIDED FOR THE MAINTENANCE BAY IN ACCORDANCE WITH UFC 3-600-01 AND

UFC 4-211-01. A WET PIPE SPRINKLER SYSTEM WILL BE PROVIDED FOR THE PUMP

HOUSE. A 250,000 GALLON WATER TANK WILL BE PROVIDED FOR THE

SUPPRESSION SYSTEM.

PORTABLE FIRE EXTINGUISHER: GENERAL PURPOSE PORTABLE FIRE

EXTINGUISHERS ARE NOT REQUIRED WHEN THE BUILDING IS PROTECTED WITH A

COMPLETE AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH UFC 3-600-01.

PORTABLE FIRE EXTINGUISHERS WILL BE PROVIDED OPTIONALLY AT THE

REQUEST OF THE USER AND LOCATED IN ACCORDANCE WITH NFPA 10.

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F-003

B U

IL

D

IN

G

C O

D E

S U

M M

A R

Y

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M

GSE STORAGE

ENCLOSURE

FIRE PUMP

BUILDING

FOAM

TANK

POL

STORAGE

HAZ WASTE

STORAGE

FFE=824.32

FIRE

PROTECTION

WATER

STORAGE

TANK, 250,000

GALLONS

S18

S

S

S6

S8

S

S

S6

S

S18

S

S

S6 S8

S18

S

S18

S

S

S8 D15

S

S8

S

D2

D6

D18

D18D18

D6

D

D18

D

D

D

D6

D4 D4

D15

D15

D

D18

D

D15

D6

D6

D6

D6

D6 D6 D6

D

D15

D15

W

F

W

W6

W8

F

S

U C

T

IO

N

F24

W

W

W6 F

W2

W

W 1-1/2

H B

W8

W

W4

W6

F24 F24

W

W8

W

F

F

IR

E

L O

O P

F24 F24 F24

HB

W1

W1

HB

W8

W8

W

F

HB

W1 F24

W

W6

W

W8

W

F

F6F

F

COMM

ES

E S

E S

ES

E S

EMH

T=820.96

FFE=811.71

C h a in

L in k F e n c e

SMH

T=821.60 Inv=812.12

SMH

T=821.03 Inv=809.97S12" S10"

.0

820.00

.0

820.00

820.00

820.00 820.00

.0

.0

821.00

819.00

.0

819.00

821.00

822.00

823.00

821.00

821.00

Signal Corps MH T=820.96 (Bolted)

LP

LP

LP

LP

Chain Link Fence

S

C H S

/RH

W S

/R

WV

T=820.20

TS=816.91

WV

T=820.46

TS=817.68

WV

T=820.44

TS=817.47

WV

T=820.48

TS=817.73

WV

T=820.27

TS=817.48

WV

T=820.46

TS=817.44

WV

T=820.44

TS=817.26

ARV

T=820.85

TS=820.16

WV

T=821.02

TS=819.22

WV

T=821.04

TS=819.98

WV

T=818.78

TS=816.10

WV

T=818.90

TS=816.77

W

(T o n e d

Stub out (Asbuilt Location)

W

WV

T=821.21

TS=819.96

W

W

WV

T=818.88

TS=816.56

Stub out Stub out Stub out

Stub out

W8"W8"

W8" W8"

W8"W8"

DI

T=817.79 Inv=808.73

DI

T=819.78 Inv=809.73

DI

T=819.02 Inv=808.97

D

D

D

D

TB-25

(Hub) 114,194.66 N 1,630,568.64 E

ELEV=820.74 FT

.1

T

C .6

T

C .6

T

C

WV

T=819.99

TS=816.04

WV

T=820.14

TS=817.36

WV

T=820.19

TS=817.25

WV

T=820.46

TS=817.33

WV

T=820.31

TS=817.75

WV

T=820.34

TS=817.57

Stub out Stub out

Stub out Stub out

Stub-out

Stub out

W6"W8"W8"

W8"

W8"W8"

87" MIN

33" MIN

30" MIN

CARPOOL ONLYCARPOOL ONLY CARPOOL ONLYCARPOOL ONLYCARPOOL ONLY CARPOOL ONLYCARPOOL ONLYCARPOOL ONLYCARPOOL ONLY

MOTORCYCLE

PARKING

WWWW

W

W

S

WWWW

WW

W

S

CO

C

E

W

W

W

W

W

W

W

D

CO

TB-26

(Hub) 114,004.21 N 1,630,084.93 E

ELEV=819.36 FT

FUTURE

AVIATION

COFS

AIRCRAFT MAINTENANCE HANGAR

60'-0"

SEPARATION

DISTANCE

50'-0"

SEPARATION

DISTANCE

60'-0"

SEPARATION

DISTANCE

230'-0"

HYDRANT COVERAGE

S

E P

A R

A T

IO

N

D

IS

T

A N

C E

230'-0"

HYDRANT COVERAGE

126'-0"

HYDRANT COVERAGE

126'-0"

HYDRANT COVERAGE

220'-0"

HYDRANT COVERAGE

257'-0"

HYDRANT COVERAGE

135'-0"

HYDRANT COVERAGE

135'-0"

HYDRANT COVERAGE

60'-0"

SEPARATION

DISTANCE

102'-0"

FROM FDC TO HYDRANT

FIRE

HYDRANT

FIRE

HYDRANT

FIRE DEPARTMENT

CONNECTION

FIRE

HYDRANT

FIRE

HYDRANT

FIRE

HYDRANT

FIRE DEPARTMENT

CONNECTION

120'-0"

HYDRANT

COVERAGE

119'-0"

HYDRANT

COVERAGE

55'-0"

FROM FDC

TO HYDRANT

FA

F A

FAFAFAFA

F A

F A

F A

FA FA FA FA

F A

F A

F A

FA FA

50'-0"

FIRE DEPARTMENT

ACCESS

IR

E D

E P

A R

T M

E

T

A C

C E

S S

IR

E

D E

P A

R T

M E

T

C

E S

S

65'-10"

FIRE

DEPARTMENT

ACCESS

WALL MOUNTED

PIV

R

"R

20' - 0"

R 20' - 0

R

R 20' - 0"

WALL MOUNTED

POST INDICATOR

VALVE

FD

FIRE TRUCK ACCESS ROUTE

BUILDING CODE SITE LEGEND

FIRE HYDRANT

FA

FIRE DEPARTMENT CONNECTION

BUILDING SEPARATION REQUIREMENT

FD FIRE DEPARTMENT ACCESS POINT

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

ST

T

R E

S R

ED

PROFESS IONAL

EN

G

IN

E

E R

E T

I G

FP1427

R O

B

ERT T. B I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F-101

C O

D E

C O

M P

L

IA

N C

E S

IT

E

P L A

N

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

1" = 30'-0"1

CODE COMPLIANCE SITE PLAN

SCALE: 1" = 30'-0"

30' 60' 90'

PLAN NORTH

1 2 3 4 5 6 7 8 9 10 11 12 13 14

C

E

F

G

H

J

K

1.9 2.9 3.9 4.4 5.6 6.6 7.5 8.4 9.4 10.4 12.1

C.9

H.1

S

S

S S

S S S

S S

S

S

S

S S

S S S

S S S

S

S S

S

S

S S S

S

S

S

S

S

66'/183'

68'/133' 2

/3

/1

85/170

/3

/1

169/340

/1

/1

/1

S

S S S S

S

S

S

S

S

S-1

500 1

STORAGE

B

50 21

BUSINESS

S-1

500 1

STORAGE

B

150 13

BUSINESS

F-1

100 13

INDUSTRIAL

F-1

100 50

INDUSTRIAL

S-1

500 4

STORAGE

B

150 3

BUSINESS

S-1

500 2

STORAGE

S-1

500 1

STORAGE

B

150 7

BUSINESS

B

150 7

BUSINESS

S-1

500 5

STORAGE

B

150 20

BUSINESS

S-1

500 4

STORAGE

F-1

100 11

INDUSTRIAL

S-1

500 1

STORAGE

78'/78'

F-1

500 1

INDUSTRIAL

0' /2

0'

0.9 13.1

CREW CHIEF WORK

ROOM (COMPANY C)

MAINTENANCE TEST

PILOT OFFICE

CREW CHIEF WORK

ROOM (COMPANY A)

AVIATION LIFE

SUPPORT EQUIPMENT

(ALSE) SHOP

FACILITY STORAGE

ROOM

S S

S

S S

S S

BLADE REPAIR SHOP

SHOP SECTION HQ

1ST SERGEANT

OFFICE

RECYCLE ROOM

ELECTRICAL ROOM

COMMUNICATIONS

ROOM

COMPONENT REPAIR

PLATOON

COMPONENT REPAIR

PLATOON OFFICE

ACN EQUIPMENT

138JANITOR

AIRLOCK 2

157F

COMMUNICATIONS

ROOM

SPECIAL TOOLS ROOM

AIRFRAME REPAIR

PLATOON

COMMUNICATIONS

ROOM

MECHANICAL ROOM

PLATOON OFFICE

AIRCRAFT PARTS

SUPPLY OFFICE / 101

AIRLOCK 3

157G

STRUCTURAL REPAIR

SHOP

CORRIDOR 1

157A

POWER PLANT/

POWERTRAIN SHOP

NONDESTRUCTIVE

INSPECTION (NDI)

ROOM

ARMS VAULT

(COMPANY D)

COMPRESSOR ROOM

COMMANDER OFFICE

ELECTRICAL ROOM

PRODUCTION

CONTROL OFFICE

QUALITY CONTROL

OFFICE

QUALITY CONTROL

CORRIDOR 4

157D

UNIT STORAGE

(COMPANY D)

ELECTRICAL ROOM

CONTRACTOR

LOGISTICS SUPPORT

MECHANICAL ROOM

AIRFRAME REPAIR

PLATOON OFFICE

SYSTEMS REPAIR

SHOP

CORRIDOR 3

157C

PNEUDRALICS REPAIR

SHOP

AIRCRAFT PARTS

SUPPLY / 102

CORRIDOR 2

157B

MULTI PURPOSE /

BREAK / CONF

AVIATION LIFE

SUPPORT EQUIPMENT

(ALSE) STORAGE

PRODUCTION

CONTROL

140 FIRE PROTECTION

LOGISTICS

ASSISTANCE

REPRESENTATIVES

(LARS)

ORDERLY ROOM

(COMPANY D)

COMSEC SECURE

STORAGE

AIRCRAFT MOUNTED

WEAPONS VAULT

REPAIR SECTION

WORKROOM

AIRLOCK 1

157E

AIRCRAFT

MAINTENANCE BAY

WOMEN'S SHOWER

MEN'S SHOWER

MOTHER'S ROOM

CAGE

C125

CAGE

C131

CAGE

C142

COMMUNICATIONS

STORAGE

C146A

NON-SENSITIVE

SECURE STORAGE

146A CAGE

C155B

NBC STORAGE

C146B

VESTIBULE

155A

OXYGEN GENERATOR

CAGE

C152

CAGE

C149

CAGE

C147

CAGE

C108B

CAGE

C108A

CAGE

C106

CAGE

C107

SS

S S

S S

S

S

S S

S S

S

S S

S

S S

S

S S

S S

S S S

S

S

B

15 47

BUSINESS

44250

F-1

500 89

INDUSTRIAL

0' /2

3'

B

50 91

BUSINESS

B

150 1

BUSINESS

74'/74'

16/370 16/370 16/370 1

/3

1-HR RATED WALL, FIRE RESISTIVE

CONSTRUCTION.

TRAVEL PATH POINT OF CHOICE OF TWO

EXITS, COMMON PATH OF TRAVEL ENDS.

COMMON PATH OF TRAVEL

DEAD-ENDSMOKE PARTITION

FIRE EXIT

EXIT PATH (COMMON PATH OF TRAVEL/

TRAVEL DISTANCE)

S

EXIT CAPACITY (EXIT OCCUPANT LOAD/

EXIT CAPACITY)

XXX

LEGEND

XX / XX

XX / XX

EXIT ACCESS, ALLOCATED

OCCUPANCY LOAD

AREAIBC OCCUPANCY

GROUP / DIVISION

OCCUPANCY LOAD

(PERSONS)

OCCUPANCY LOAD

FACTOR (SF / PERSON)

E

15415

OFFICE

OCCUPANCY TABLE

NFPA OCCUPANCY

3/4 - HOUR FIRE RATED DOOR WITH SELF

CLOSING AND LATCHING HARDWARE

1 - HOUR FIRE RATED DOOR WITH SELF

CLOSING AND LATCHING HARDWARE

S WITH SELF CLOSING AND LATCHING HARDWARE

AINROFICF

E

A

NOITCETORPERI

F

LAO

ST

T

R E

S

RED

PROFESS IONAL

ENG

IN

E E

R

ET

I

G

FP1427

R O

BERT T. B I G

TA

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F-102

A M

H O

V E

R A

L L F

L O

O R

P L A

N

L

IF

E S

A F

E T

Y

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

1/16" = 1'-0"1

AMH OVERALL FLOOR PLAN - LIFE SAFETY

08' 16' 32'4'12'16'

SCALE: 1/16"=1'-0"

PLAN NORTH

NOTE:

1. REFER TO SHEET E-101 FOR ELECTRICAL HAZARDOUS AREAS

F1 F2

FB

FA

F-1

100 17

INDUSTRIAL

35'/75'

9/340 8/340

54'/62'

FIRE PUMP BUILDING

1-HR RATED WALL, FIRE RESISTIVE

CONSTRUCTION.

TRAVEL PATH POINT OF CHOICE OF TWO

EXITS, COMMON PATH OF TRAVEL ENDS.

COMMON PATH OF TRAVEL

DEAD-ENDSMOKE PARTITION

FIRE EXIT

EXIT PATH (COMMON PATH OF TRAVEL/

TRAVEL DISTANCE)

S

EXIT CAPACITY (EXIT OCCUPANT LOAD/

EXIT CAPACITY)

XXX

LEGEND

XX / XX

XX / XX

EXIT ACCESS, ALLOCATED

OCCUPANCY LOAD

AREAIBC OCCUPANCY

GROUP / DIVISION

OCCUPANCY LOAD

(PERSONS)

OCCUPANCY LOAD

FACTOR (SF / PERSON)

E

15415

OFFICE

OCCUPANCY TABLE

NFPA OCCUPANCY

3/4 - HOUR FIRE RATED DOOR WITH SELF

CLOSING AND LATCHING HARDWARE

1 - HOUR FIRE RATED DOOR WITH SELF

CLOSING AND LATCHING HARDWARE

S WITH SELF CLOSING AND LATCHING HARDWARE

AINROFICF

E

A

NOITCETORPERI

F

LAO

ST

T

R E

S

RED

PROFESS IONAL

ENG

IN

E E

R

ET

I

G

FP1427

R O

BERT T. B I G

TA

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F-103

F

IR

E P

U M

P B

U

IL

D

IN

G

L

IF

E S

A F

E T

Y

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

1/4" = 1'-0"1

FIRE PUMP BUILDING - LIFE SAFETY

4' 4' 8'

SCALE: 1/4"=1'-0"

3' 2' 1' 0'

1 2 3 4 5 6 7 8 9 10 11 12 13 14

C

E

F

G

H

J

K

1.9 2.9 3.9 4.4 5.6 6.6 7.5 8.4 9.4 10.4 12.1

C.9

H.1

FX105

FX107

FX106

FX103

FX109

FX108

SEE FOR FIRE SPRINKLER

FX104SEE FOR FIRE SPRINKLER

SEE FOR FIRE SPRINKLER SEE FOR FIRE SUPPRESSION SEE FOR FIRE SPRINKLER SEE FOR FIRE SUPPRESSION

SEE FOR FIRE SPRINKLER

0.9 13.1

BLADE REPAIR SHOP

SHOP SECTION HQ

1ST SERGEANT

OFFICE

RECYCLE ROOM

ELECTRICAL ROOM

COMMUNICATIONS

ROOM

COMPONENT REPAIR

PLATOON

COMPONENT REPAIR

PLATOON OFFICE

ACN EQUIPMENT

JANITOR

MAINTENANCE TEST

PILOT OFFICE

CREW CHIEF WORK

ROOM (COMPANY A)

AIRLOCK 2

157F

COMMUNICATIONS

ROOM

SPECIAL TOOLS ROOM

AIRFRAME REPAIR

PLATOON

COMMUNICATIONS

ROOM

MECHANICAL ROOM

PLATOON OFFICE

AIRCRAFT PARTS

SUPPLY OFFICE / 101

AIRLOCK 3

157G

STRUCTURAL REPAIR

SHOP

CORRIDOR 1

157A

POWER PLANT/

POWERTRAIN SHOP

NONDESTRUCTIVE

INSPECTION (NDI)

ROOM

ARMS VAULT

(COMPANY D)

COMPRESSOR ROOM

COMMANDER OFFICE

ELECTRICAL ROOM

PRODUCTION

CONTROL OFFICE

QUALITY CONTROL

OFFICE

QUALITY CONTROL

CORRIDOR 4

157D

UNIT STORAGE

(COMPANY D)

AVIATION LIFE

SUPPORT EQUIPMENT

(ALSE) SHOP

FACILITY STORAGE

ROOM

ELECTRICAL ROOM

CONTRACTOR

LOGISTICS SUPPORT

MECHANICAL ROOM

AIRFRAME REPAIR

PLATOON OFFICE

SYSTEMS REPAIR

SHOP

CREW CHIEF WORK

ROOM (COMPANY C)

CORRIDOR 3

157C

PNEUDRALICS REPAIR

SHOP

AIRCRAFT PARTS

SUPPLY / 102

CORRIDOR 2

157B

MULTI PURPOSE /

BREAK / CONF

AVIATION LIFE

SUPPORT EQUIPMENT

(ALSE) STORAGE

PRODUCTION

CONTROL

FIRE PROTECTION

LOGISTICS

ASSISTANCE

REPRESENTATIVES

(LARS)

141 ORDERLY ROOM

(COMPANY D)

COMSEC SECURE

STORAGE

AIRCRAFT MOUNTED

WEAPONS VAULT

REPAIR SECTION

WORKROOM

AIRLOCK 1

157E

AIRCRAFT

MAINTENANCE BAY

WOMEN'S SHOWER

MEN'S SHOWER

MOTHER'S ROOM

CAGE

C125

CAGE

C131

CAGE

C142

COMMUNICATIONS

STORAGE

C146A

NON-SENSITIVE

SECURE STORAGE

146A CAGE

C155B

NBC STORAGE

C146B

VESTIBULE

155A

OXYGEN GENERATOR

CAGE

C152

CAGE

C149

CAGE

C147

CAGE

C108B

CAGE

C108A

CAGE

C106

CAGE

C107

CAGE

C101

SERVED BY FIRE SPRINKLER RISER - 1SERVED BY FIRE SPRINKLER RISER - 1

SERVED BY FIRE SPRINKLER RISER - 2 SERVED BY FIRE SPRINKLER RISER - 2 SERVED BY FIRE SUPPRESSION RISER - 1SERVED BY FIRE SUPPRESSION RISER - 2

SERVED BY FIRE

SPRINKLER RISER - 1

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX101

A M

H O

V E

R A

L L F

L O

O R

P L A

N

F

IR

E S

P R

IN

K

L E

R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

1/16" = 1'-0"1

AMH OVERALL FLOOR PLAN - FIRE SPRINKLER

08' 16' 32'4'12'16'

SCALE: 1/16"=1'-0"

PLAN NORTH

NOTE:

PROVIDE PIPING EXPANSION JOINTS/LOOPS WHERE REQUIRED. SEE STRUCTURAL DRAWINGS S-203 THRU S-206 FOR ISOLATION JOINT LOCATIONS BETWEEN HANGAR MAINTENANCE BAY AND HANGAR ADMINISTRATION WING CMU WALLS.

FA

FIRE PUMP BUILDING

LEGEND FOR HAZARD GROUPS

SYMBOL DESCRIPTION

LIGHT HAZARD

ORDINARY HAZARD

SPECIAL HAZARD HANGAR

EXTRA HAZARD

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX102

F

IR

E P

U M

P B

U

IL

D

IN

G P

L A

N

F

IR

E S

P R

IN

K

L E

R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

1/4" = 1'-0"FX102

1 FIRE PUMP BUILDING PLAN - FIRE SPRINKLER

4' 4' 8'

SCALE: 1/4"=1'-0"

3' 2' 1' 0'

PFPF

C D

B

E

1 2 3 4 5 6 7

A

C

E

1.9 2.9 3.9 4.4 5.6 6.6

COMMUNICATIONS

ROOM

ELECTRICAL

ROOM

RECYCLE ROOM

ACN EQUIPMENT

JANITOR

MAINTENANCE

TEST PILOT

OFFICE

CREW CHIEF

WORK ROOM

(COMPANY A)

AIRLOCK 2

157F

SPECIAL TOOLS

ROOM

COMMUNICATIONS

ROOM

ARMS VAULT

(COMPANY D)

PRODUCTION

CONTROL OFFICE

QUALITY

CONTROL OFFICE

QUALITY

CONTROL

CORRIDOR 4

157D

UNIT STORAGE

(COMPANY D)

AVIATION LIFE

SUPPORT

EQUIPMENT

(ALSE) SHOP

FACILITY

STORAGE ROOM

ELECTRICAL

ROOM

CREW CHIEF

WORK ROOM

(COMPANY C)

CORRIDOR 2

157B

MULTI PURPOSE /

BREAK / CONF

AVIATION LIFE

SUPPORT

EQUIPMENT

(ALSE) STORAGE

PRODUCTION

CONTROL

AIRLOCK 1

157E

WOMEN'S

SHOWER

MEN'S SHOWER

MOTHER'S ROOM

AIRCRAFT

MAINTENANCE

BAY

0.9

LEGEND FOR HAZARD GROUPS

SYMBOL DESCRIPTION

LIGHT HAZARD

ORDINARY HAZARD

SPECIAL HAZARD HANGAR

EXTRA HAZARD

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX103

A M

H P

A R

T

IA

L F

L O

O R

P L A

N S

E C

T

IO

N A

F

IR

E

S P

R

IN

K L

E R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

1/8" = 1'-0"FX103

1 AMH PARTIAL FLOOR PLAN SECTION A - FIRE SPRINKLER

D

B

E

7 8 9 10 11 12 13

A

C

E

7.5 8.4 9.4 10.4 12.1

C.9

BLADE REPAIR

SHOP

SHOP SECTION

HQ

1ST SERGEANT

OFFICE

COMMUNICATIONS

ROOM

COMPONENT

REPAIR PLATOON

COMPONENT

REPAIR PLATOON

OFFICE

AIRLOCK 2

157F

SPECIAL TOOLS

ROOM

AIRFRAME

REPAIR PLATOON

COMMUNICATIONS

ROOM

MECHANICAL

ROOM

PLATOON OFFICE

AIRLOCK 3

157G

STRUCTURAL

REPAIR SHOP

CORRIDOR 1

157A

POWER PLANT/

POWERTRAIN

SHOP

NONDESTRUCTIVE

INSPECTION (NDI)

ROOM

COMPRESSOR

ROOM

COMMANDER

OFFICE

ELECTRICAL

ROOM

ELECTRICAL

ROOM

CONTRACTOR

LOGISTICS

SUPPORT

MECHANICAL

ROOM

AIRFRAME

REPAIR PLATOON

OFFICE

SYSTEMS REPAIR

SHOP

CORRIDOR 3

157C

PNEUDRALICS

REPAIR SHOP

CORRIDOR 2

157B

FIRE

PROTECTION

LOGISTICS

ASSISTANCE

REPRESENTATIVES

(LARS)

141 ORDERLY ROOM

(COMPANY D)

COMSEC SECURE

STORAGE

AIRCRAFT

MOUNTED

WEAPONS VAULT

REPAIR SECTION

WORKROOM

AIRCRAFT

MAINTENANCE

BAY

13.1

FX112

SEE FOR FIRE SPRINKLER

FIRE DEPARTMENT CONNECTION

(FIRE SPRINKLER RISER-1)

CORRIDOR 2

157B

LEGEND FOR HAZARD GROUPS

SYMBOL DESCRIPTION

LIGHT HAZARD

ORDINARY HAZARD

SPECIAL HAZARD HANGAR

EXTRA HAZARD

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX104

A M

H P

A R

T

IA

L F

L O

O R

P L A

N S

E C

T

IO

N B

F

IR

E

S P

R

IN

K L

E R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

1/8" = 1'-0"FX104

1 AMH PARTIAL FLOOR PLAN SECTION B - FIRE SPRINKLER

P

A

C D

B

E

13 14

E

F

G

H

C.9

H.1

BLADE REPAIR

SHOP

AIRCRAFT PARTS

SUPPLY OFFICE /

CORRIDOR 3

157C

PNEUDRALICS

REPAIR SHOP

AIRCRAFT PARTS

SUPPLY / 102

AIRCRAFT

MAINTENANCE

BAY

13.1

CAGE

C101

LEGEND FOR HAZARD GROUPS

SYMBOL DESCRIPTION

LIGHT HAZARD

ORDINARY HAZARD

SPECIAL HAZARD HANGAR

EXTRA HAZARD

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX105

A M

H P

A R

T

IA

L F

L O

O R

P L A

N S

E C

T

IO

N C

F

IR

E

S P

R

IN

K L E

R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

1/8" = 1'-0"FX105

1 AMH PARTIAL FLOOR PLAN SECTION C - FIRE SPRINKLER

PFPF

F

A

C D

B

E

1 2 3 4 5 6 7

E

F

G

H

J

K

1.9 2.9 3.9 4.4 5.6 6.6

AIRCRAFT

MAINTENANCE

BAY

0.9

CREW CHIEF WORK

ROOM (COMPANY C)

MAINTENANCE TEST

PILOT OFFICE

CREW CHIEF WORK

ROOM (COMPANY A)

COMMUNICATIONS

ROOM

AIRLOCK 1

157E

MEN'S SHOWER

MEN'S SHOWER

MEN'S SHOWER

MEN'S SHOWER

MULTI PURPOSE /

BREAK / CONF

SPECIAL TOOLS ROOM

AIRCRAFT

MAINTENANCE BAY

DRAFT CURTAIN DRAFT CURTAIN DRAFT CURTAIN

LEGEND FOR HAZARD GROUPS

SYMBOL DESCRIPTION

LIGHT HAZARD

ORDINARY HAZARD

SPECIAL HAZARD HANGAR

EXTRA HAZARD

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX106

A M

H P

A R

T

IA

L F

L O

O R

P L A

N S

E C

T

IO

N D

F

IR

E

S P

R

IN

K L E

R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

1/8" = 1'-0"FX106

1 AMH PARTIAL FLOOR PLAN SECTION D - FIRE SPRINKLER

PFPF

P F

A

C D

B

E

7 8 9 10 11 12 13

E

F

G

H

J

K

7.5 8.4 9.4 10.4 12.1

H.1

AIRCRAFT

MAINTENANCE

BAY

13.1

SPECIAL TOOLS ROOM

AIRLOCK 2

157F

REPAIR SECTION

WORKROOM

AIRFRAME REPAIR

PLATOON OFFICE

AIRCRAFT MOUNTED

WEAPONS VAULT

COMSEC SECURE

STORAGE

AIRLOCK 3

157G

POWER PLANT/

POWERTRAIN SHOP

STRUCTURAL REPAIR

SHOP

BLADE REPAIR SHOP

PNEUDRALICS REPAIR

SHOP

AIRCRAFT PARTS

SUPPLY / 102

AIRCRAFT PARTS

SUPPLY OFFICE / 101

AIRCRAFT PARTS

SUPPLY OFFICE / 101

CAGE

C101

AIRCRAFT

MAINTENANCE BAY

DRAFT CURTAIN DRAFT CURTAIN DRAFT CURTAIN

LEGEND FOR HAZARD GROUPS

SYMBOL DESCRIPTION

LIGHT HAZARD

ORDINARY HAZARD

SPECIAL HAZARD HANGAR

EXTRA HAZARD

AI

NROFICF

E A

N

OITCETORP

ERI

F

LAO

S

T T

R E

S R

ED

PROFESS IONAL

E N

G

IN

E E

R

E T

I G

FP1427

R O

B

ERT T. B

I G

T A

S

06/30/2022 Expiration Date of the License

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX107

A M

H P

A R

T

IA

L F

L O

O R

P L A

N S

E C

T

IO

N E

F

IR

E

S P

R

IN

K L

E R

F Y

M

C A

P N

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

H A

N G

A R

H O

N O

L U

L U

D

IS

T R

IC

T

F T

S

H A

F T

E R

H

A W

A

II

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

R T

B

J B

P

K A

J T

H

J

A N

C O

N T

R A

C T

N O

F

IL

E N

A M

E

DESIGN COMPLETE REV 12 JAN 2021

W H

E E

L E

R A

R M

Y A

IR

F

IE

L D

O

A H

U H

A W

A

II

w h -W

A A

F D

M M

F

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

1/8" = 1'-0"FX107

1 AMH PARTIAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .