This document contains an amendment to a solicitation for construction services as well as the original solicitation details. The amendment provides revised drawings and responses to bidder questions regarding a project to repair the gymnasium building at Aliamanu Military Reservation on Oahu, Hawaii. The pre-solicitation notice describes a sealed bid procurement for design-bid-build construction work including concrete spall repair, louver replacement, window repair and gym floor patching. The project value is estimated between $500,000 to $1,000,000 with a 270 calendar day period of performance. The solicitation will be set aside for woman-owned small businesses with a NAICS code of 236220 and $39.5 million size standard. The Army Corps of Engineers intends to award a firm fixed-price contract and issue the solicitation on or around June 7, 2021 via beta.SAM.gov where interested parties should monitor for changes, questions and answers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY21 Gymnasium Building 1795 Repairs, Aliamanu Military Reservation, Oahu, Haw aii
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A21B0001
X 9B. DATED (SEE ITEM 11)
29-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
Am-0004
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2021
CODE
CONTRACTING DIVISION
USAED, HONOLULU BLDG 230
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A21B0001 Am-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0004)” is shown on each revised page.
a. NEW SECTIONS. The follow are new sections to the solicitation.
Section 00 60 00, Appendix B – Requests for Information (#3-8) Section 00 60 00, Appendix C – As-Built Drawings
2. CHANGES TO DRAWINGS.
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings.
Sheet ID Mark A-101 4
AD101 4
G-002 4 S-001 4
3. The bid opening date and time remains unchanged.
FY21 Gymnasium Building 1795 Repairs, Alimanu Military Reservation, Oahu, Hawaii
RFI # References Question Government Response 3 09 64 66
AD101 Demo Note D1/D4 What is the expectation of the line repainting where the wood-floor repair will erase the existing (2 places). I suggest an approximation to the existing color based on usual paint matching, as opposed to the original yellow color which won't match the fading that's there now.
See Revised Drawing AD101, General Sheet Notes, per Am-0004.
4 09 90 00 A101 Detail A1
Gymnasium Floor – Please advise if re-striping entire floor is required, or if this will only be required where flooring is replaced w/ best recommended matching paint color.
See Revised Drawing A-101, General Sheet Notes and Sheet Keynotes, per Am- 0004.
5 01 50 00 G002 General Note 23
Please confirm if the trees adjacent to the building will be trimmed prior to the start of work, or if KTR will need to provide arborist & landscaper to perform any necessary tree trimming work.
See Revised Drawing G-002, General Notes 23, per Am-0004.
6 01 90 06 S-201 1.10
On the East side of the building, Can we operate boom lift/ scissor lift on the existing concrete slab?
See Revised Drawing S-001, General Note H, per Am-0004. As-Built Drawings have been provided for reference in Section 00 60 00, Appendix C, per Am-0004.
7 01 90 06 S-201 1.10
Accessing to the North Side of the building, can the boom lift and scissor lift be driven through the Cosa Area?
It is the contractor's means and methods. The contractor must provide an effective means of protecting the existing area from damage.
8 Sec 01 9006 S-201 C-1
Can we walk/ step on the top (highest point - 3rd layer) of the metal roof? It is the contractor's means and methods. All work shall comply by the guidelines set forth under the latest edition of EM 385-1-1.
Section 00 60 00, Attachment B (Am‐0004)
(Am-0004)
Section 00 60 00, Appendix C Asbestos Survey
| 21B0001 Am-0004 |
| 21B0001 - 00 60 00, App. B - RFIs (3-8) |
| 21B0001 - 00 60 00, App. C - AMR Gym Structural As-Builts |
| S-1 |
| S-2 |
| S-3 |
| S-4 |
| S-5 |
| S-6 |
| S-7 |
| S-8 |
| S-9 |
File details come from the government source that posted it. Updated .