1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0004 12 Sep 2018
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CECT – Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH) Ft Shafter, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
W9128A-18-B-0004 X
9B. DATED (SEE ITEM 11)
08/16/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Nawiliwili Harbor, Phase II Maintenance Dredging, Nawiliwili Island of Kauai, State of Hawaii
See Page 2 of 2 Pages
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Am-0004 Standard Form 30
IFB No. W9128A-18-B-0004 Page 2 of 2 Pages
Item No. 14 (Continued)
1. CHANGES TO SOLICITATION AND SPECIFICATIONS. Attached hereto are revised, new and deleted sections to the solicitation and specifications. Revised pages replace like-numbered pages. The revision mark (AM-0004) is shown on each revised page.
A. REVISED SECTIONS. The following are revised paragraphs to the SOLICITATION. Changes are shown in red text, or bold, or lined-out.
Section 00 10 00, Bid Schedule project title, and Bid Schedule Payment(s) CLIN 0002.
B. REVISED SECTIONS. The following are revised paragraphs to the SPECIFICATION section.
Section 01 57 20, paragraphs 1.9, 1.9.6, 3.3, and Attachment 1
Section 01 90 00, paragraph S-36.2, Magnitude of the Proposed Project
Section 35 20 23.13, paragraph 3.2.2
Section 35 20 23, paragraphs 1.8, 1.9, 3.2.2.1, 3.4, 3.5, 3.5.1, and 3.5.2.
C. NEW SECTIONS. The following sections are added to the SOLICITATION.
Section 00 73 00, Appendix B, Request for Information (RFIs) numbers 44 to 46
D. REPLACED SECTIONS. The following sections were replaced in their entirety.
SPECIFICATIONS dated September 8, 2018 are replaced is replaced in their entirety with
SPECIFICATIONS dated September 11, 2018 to add the footer with the section and page number.
2. CHANGES TO DRAWINGS.
A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:
SHEET ID SHEET NO. MARK REVISION DATE
CN100 02 of 21 4 09/10/2018 CN101 03 of 21 4 09/10/2018 CN102 04 of 21 4 09/10/2018 CN306 10 of 21 4 09/10/2018 CN307 11 of 21 4 09/10/2018
3. BID OPENING DATE. See SF1442, Block 13A.
(Am-0004) Section 00 10 00
Invitation for Bid No. W9128A-18-B-0004
SECTION 00 10 00
BID SCHEDULE
NAWILIWILI SMALL BOAT HARBOR, PHASE II MAINTENANCE DREDGING
NAWILIWILI, ISLAND OF KAUAI, STATE OF HAWAII
CLIN DESCRIPTION QUANTITY UNIT AMOUNT
BASE SCHEDULE:
0001 Mobilization/Demobilization 1 Job $_____________
0002 Dredging – Zone A 1 Job $_____________
TOTAL BASE SCHEDULE $_____________
OPTION:
0003 Dredging – Zones B, C, D, and E 1 Job $_____________
TOTAL BASE SCHEDULE AND OPTION $_____________
NOTES TO THE BID SCHEDULE:
1. This procurement is UNRESTRICTED.
2. See Section 00700, DFARS Clause 52.204-7, System for Award Management (Oct 2016), regarding registration in the SAM database. Lack of registration in the SAM database will make a bidder ineligible for award. Bidders must have and/or maintain an active registration with the System for Award Management (SAM) website. To register in SAM, go to https://www.sam.gov.
3. Award will be based on the total bid schedule.
4. Bidders must bid on all items. Failure to bid on all items in the Bid Schedule may cause the bid to be considered non-responsive.
5. Small Business Subcontracting Plan
In accordance with Section 00 72 00, FAR Clause 52.219-9, Small Business Subcontracting Plan, the apparent low bidder shall submit the Small Business Subcontracting Plan that offers subcontracting possibilities NO LATER THAN five (5) working days after bid opening. The apparent low bidder may https://www.sam.gov/ fax the small business subcontracting plan to (808)835-4395. Failure to submit the Small Business Subcontracting Plan in a timely manner may cause the bidder to be considered non-responsive.
6. Each Bidder shall submit the following documents. Failure to submit all required documents may result in the bidder being ineligible for award.
a. SF1442 (pages 1 and 2) including acknowledging all amendments.
b. Bid Schedule
c. Bid Guarantee (See SF1442, Block 13B and Clause 52.228-1, Bid Guarantee, in Section 00 72
00)
d. Section 00 45 00, Representations and Certifications
e. Section 00 45 00, Representations and Certifications, Appendix A – SF LLL, Disclosure of
Lobbying Activities
7. All Bidders shall provide one (1) copy of its entire bid on a CD within five (5) calendar days after the date of bid opening.
PAYMENT(S)
Compensation for all work to be performed under this task order will be made under the payment item(s) listed herein. The principal features of the work to be included under the payment item(s) are noted.
Work required by drawings and scope of work and not particularly mentioned shall be included in and be paid for under the task order price for the item to which the work pertains. Price(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with drawings, scope of work and shall be full compensation for all work in connection therewith, including quality control and cost of performance-and payment-bond premiums in the CONTRACT CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision labor, transportation, fuel, power, water, lodging and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the Government. For the purpose of CONTRACT CLAUSE entitled “PROMPT PAYMENT FOR CONSTRUCTON CONTRACTS”, the term “designated billing office” and “designated payment office” are as follows:
a. Billing Office
U.S. Army Engineer Division, Pacific Ocean Fort Shafter Area Office, Bldg 230 Fort Shafter, HI 96858-5440
b. Payment Office
USACE Finance Center Attn: CEFC-FP 5722 Integrity Drive Millington, TN 38054-5005
Item numbers mentioned herein after correspond to the item numbers in the BID SCHEDULE.
CLIN 0001 – Mobilization/Demobilization will be paid for at the contract lump sum price, complete, for the mobilization and demobilization of all the Contractor’s plant and equipment, including miscellaneous times, setting up, protection of the environment, cleanup, and all incidental items necessary to complete the work. FOB: Destination
1) 60 percent of lump sum price upon completion of the contractor’s mobilization at the work site.
2) The remaining 40 percent upon completion of demobilization.
CLIN 0002 – Nawiliwili Small Boat Harbor Maintenance Dredging will be paid for at the contract price, to include all labor, equipment and materials for the entire contract. This item shall include, but not be limited to environmental plans, excavation, backfill, and dredging. FOB: Destination.
CLIN 0003 – Dredging – Zones B, C, D, and E will be paid for at the contract price, to include all labor, equipment and materials for the entire contract. This item shall include, but not be limited to environmental plans, dredging, hauling, and disposal. FOB: Destination.
Nawilwili Harbor Maintenance Dredging Phase 2, Nawiliwili Harbor, Kauai, Hawaii
W9128A-18-B-0004
(Am-0004) Section 00 73 00, Appendix D, Requests for Information - 1
RFI # Question Response
In reference to Section 01 57 20, Section 1.9.6d, Specification states “Contractor shall not dredge deeper than the proposed dredge profile. Over-dredge is not proposed”. What is the acceptable vertical variance (plus and/or minus) of the final dredged bottom from the specified design dredge depth? Typical dredge project with similar scope allow up to two (2) feet of allowable over dredge
Yes, See Am-0004 Section 01 57 20, Paragraph 1.9.6
45 Please provide the digital survey points data file for the available hydrographic survey as shown on the bid plans Digital survey points will not be provided.
46 Please confirm whether a Water Quality Plan is required. Yes, see Am-0004 Section 01 57 20, Para 3.3 Water Resources.
| SF30-Am-0004 |
| Section 00 10 00, Bid Schedule |
| RFIs 44 to 46 |