1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0003 9 Sep 2018

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CECT – Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH) Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-18-B-0004 X

9B. DATED (SEE ITEM 11)

08/16/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Nawiliwili Harbor, Phase II Maintenance Dredging, Nawiliwili Island of Kauai, State of Hawaii

See Page 2 of 2 Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0003 Standard Form 30

IFB No. W9128A-18-B-0004 Page 2 of 2 Pages

Item No. 14 (Continued)

1. CHANGES TO SOLICITATION AND SPECIFICATIONS. Attached hereto are revised, new and deleted sections to the solicitation and specifications. Revised pages replace like-numbered pages. The revision mark

(AM-0003) is shown on each revised page.

A. REVISED SECTIONS. The following are revised paragraphs to the SOLICITATION. Changes are shown in red text, or bold, or lined-out.

Section 00 72 00, Clause 52.211-10, Commencement, Prosecution, and Completion of Work

Section 00 72 00, Clause 52.217-9, Option to Extend the Term of the Contract

B. REVISED SECTIONS. The following are revised paragraphs to the SPECIFICATION section.

Section 01 32 00, paragraph 3.3.20, Anticipated Adverse Weather changed “(Section 00 73 00)” to

“(Section 01 90 00)”

Section 01 57 20, paragraph 1.9.2, BMPs for Natural Resource Protection was replaced in its entirety.

Section 01 57 20, paragraph 2.2, Environmental Clamshell Bucket was deleted in its entirety.

C. NEW SECTIONS. The following sections are added to the SOLICITATION.

Section 00 73 00, Appendix B, Request for Information (RFIs) number 15, and 22 to 43

D. REPLACED SECTIONS. The following sections were replaced in their entirety.

SPECIFICATIONS dated August 3, 2018 are replaced is replaced in their entirety with

SPECIFICATIONS dated September 8, 2018. NOTE: In addition to the revisions to SPECIFICATIONS noted in paragraph 1.B above, every reference to “environmental clamshell buckets” in the specifications has been revised to read “clamshell buckets.”

Section 00 72 00, Appendix A, Davis Bacon Wage Rate General Decision Number HI80001 dated

08/31/2018 is replaced with General Decision Number HI80001 dated 09/07/2018.

2. CHANGES TO DRAWINGS.

A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:

None.

3. BID OPENING DATE. See SF1442, Block 13A.

(Am-0003)

Section 00 72 00

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC

2014)

The Contractor's representations and certifications, including those completed electronically via the System for

Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within seven (7) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than four hundred (400) calendar days (base), and ninety-seven (97) calendar days

(option). The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,003.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within seven (7) calendar days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least seven (7) calendar days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed sixteen (16 months) four hundred ninety-seven calendar days.

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)

(a) Definitions. As used in this clause (in accordance with 29 CFR 13.2)--

Child, domestic partner, and domestic violence have the meaning given in 29 CFR 13.2.

Nawilwili Harbor Maintenance Dredging Phase 2, Nawiliwili Harbor, Kauai, Hawaii

W9128A‐18‐B‐0004

RFI # Question Response

15 If the contractor takes a predredge survey and finds that there is more material than the last survey from the contract drawings, what is the criteria for getting additional payment? No. The Government intends to award a firm fixed price contract.

22 Can the Government provide the Sediment Characterization of the material to be dredged? Material to be dredged includes sand, silt and mud.

23 Will the normal Pier operations (barge deliveries, cruise ships etc.) take precedence over the dredging work? Yes.

24 What will the process be if vessel moorings need to be temporarily located during dredging? The contractor shall coordinate with the Harbor Master.

25 Who will be responsible to cover the cost if moorings need to be temporarily located? The contractor shall be responsible for the cost of temporary moorings.

In reference to Section 01 90 00, Section 1.14, Specification states “Night work and work on weekends and holidays is permitted with written permission from the Harbor Manager and the Contracting Officer.” Will continuous 24/7 operations be permitted?

See Am-0002, answer to RFI #12

In reference to Section 35 20 23, Section 1.9, Specification states “the Contractor is responsible for other conditions encountered which are not unusual when compared to conditions recognized in the dredging business as usual in dredging activities such as those required under this contract.” This sentence is extremely ambiguous and it is not clear what the Contractor is responsible for. Please clarify

The Government does not know of any other conditions that will be encountered by the Contractor than those identified in the contract documents. If other conditions are encountered, whether or not such conditions are standard will be determined through coordination between the Contractor and Government at that time.

If the dredge quantities derived from the pre-construction survey exceed the dredge quantities derived from the bid survey, how will the contractor be compensated for the additional dredge quantity?

The Government intends to award a firm fixed price contract.

The survey data provided in the bid documents is from the 2016 dredge event performed by the dredge Essayons. Furthermore, the specifications state that conditions are likely to be different from those shown on the plans. How much additional dredge material should the Contractor include in his bid price?

See Am-0002, answer to RFI #3

In reference to Section 35 20 23 Section 3.3.1, Specification states “The material removed will be measured by the cubic yard in place, by means of soundings taken by the Contractor before and after dredging.” Is this required for a LS bid item?

The Government intends to award a firm fixed price contract.

(Am‐0003) Section 00 73 00, Appendix D, Requests for Information ‐ 1

W9128A‐18‐B‐0004

RFI # Question Response

31 How will the dredge volumes be measured and paid given that the payment quantities are Lump Sum? The Government intends to award a firm fixed price contract.

In reference to Section 35 20 23 Section 1.6, Specification states “A 1.5 to 1 slope (horizontal to vertical) can be used to estimate the slope quantities.” If additional sloughing occurs, how will the additional volume be paid?

The Government intends to award a firm fixed price contract.

33 What are the Engineer’s quantity estimates for the various dredge zones? The Government will not release any quantities. It is the bidder's responsibility to determine the quantity based on the information provided

Please advise if the U.S. Army Corps of Engineers (USACE) Permit has been issued for this dredging project. If yes, please provide copy of the permit. If no, please advise when the permit will be issued.

See Am-0002, answer to RFI #7

35 Is a State of Hawaii 401 Water Quality Certification (410 WQC) required for this project? See Am-0002, answer to RFI #6

In reference to Section 01 90 00 Section S-36.2, Specification states “The estimated price range of the work is: $5,000,000 to $10,000,000” but references a breakwater rehabilitation project. Please clarify the estimated price range for the current Phase II Maintenance Dredging Project

See Am-0002, Section 01 90 00, paragraph S-36.2.

In reference to Section 35 20 23 Section 3.2.2.1, Specification states The Contracting Officer will notify the Contractor 7 days prior to ship movements that will affect dredging operations.”

How will the Contractor be compensated for interruptions to dredging operations?

The Government intends to award a firm fixed price contract.

In reference to Section 35 20 23 Section 3.2.2.1, Specification states The Contracting Officer will notify the Contractor 7 days prior to ship movements that will affect dredging operations.”

How many hours of interruptions shall the Contractor include in his bid price for dredging?

The Government intends to award a firm fixed price contract.

39 Please confirm that the Site Safety and Health Officer (SSHO) must be on site whenever work is occurring and that he/she cannot have any other collateral duties. See Section 01 35 26, para 1.6.1.1

40 Please confirm that the Contractor Quality Control (CQC) Systems Manager must be on site whenever work is occurring and that he/she cannot have any other collateral duties. See Section 01 45 04, para 3.4.2

Section 00 73 00, Appendix D, Requests for Information ‐ 2

W9128A‐18‐B‐0004

RFI # Question Response

Please confirm that this project is not exempt from the Hawaii General Excise Tax requirement and that the contractor shall pay the State of Hawaii the 4% General Excise Tax based on the full contract value

The contractor shall comply with the State of Hawaii Tax laws. The contractor shall contact the State of Hawaii Department of Taxation for any questions.

The solicitation states “All Bidders shall provide one (1) copy of its entire bid on a CD within five (5) calendar days after the date of bid opening.” Please confirm that this CD does not need to include the Small Business Subcontracting plan.

See Section 00 10 00, Bid Schedule, Note 5.

43 Please advise if the Small Business Subcontracting Plan can be submitted via email rather than by fax. See Section 00 10 00, Bid Schedule, Note 5.

Section 00 73 00, Appendix D, Requests for Information ‐ 3

Section 00 72 00, Appendix A

General Decision Number: HI180001 09/07/2018 HI1

Superseded General Decision Number: HI20170001

State: Hawaii

Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential

Counties: Hawaii Statewide.

BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION

PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS AND DREDGING

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2018

1 01/26/2018

2 02/23/2018

3 03/09/2018

4 04/27/2018

5 07/06/2018

6 07/20/2018

7 08/03/2018

8 08/24/2018

9 08/31/2018

10 09/07/2018

ASBE0132-001 08/31/2015

Rates Fringes

Section 00 72 00, Appendix A

Asbestos Workers/Insulator

Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 39.65 23.50

BOIL0627-005 01/01/2013

BOILERMAKER......................$ 35.20 27.35

BRHI0001-001 09/04/2017

BRICKLAYER

Bricklayers and Stonemasons.$ 44.55 23.22

Pointers, Caulkers and

Weatherproofers.............$ 45.01 23.22

BRHI0001-002 09/04/2017

Tile, Marble & Terrazzo Worker

Terrazzo Base Grinders......$ 44.54 22.72

Terrazzo Floor Grinders and Tenders.................$ 42.99 22.72

Tile, Marble and Terrazzo

Workers.....................$ 46.35 22.72

* CARP0745-001 09/03/2018

Carpenters:

Carpenters; Hardwood Floor

Layers; Patent Scaffold

Erectors (14 ft. and over); Piledrivers;

Pneumatic Nailers; Wood

Shinglers and Transit

Section 00 72 00, Appendix A and/or Layout Man...........$ 49.45 21.75

Millwrights and Machine

Erectors....................$ 49.70 21.75

Power Saw Operators (2 h.p. and over)..............$ 49.60 21.75

* CARP0745-002 09/03/2018

Drywall and Acoustical

Workers and Lathers..............$ 49.70 21.75

ELEC1186-001 08/26/2018

Electricians:

Cable Splicers..............$ 54.78 29.20

Electricians................$ 49.80 27.85

Telecommunication worker....$ 28.44 11.94

ELEC1186-002 08/26/2018

Line Construction:

Cable Splicers..............$ 54.78 29.20

Groundmen/Truck Drivers.....$ 37.75 24.48

Heavy Equipment Operators...$ 44.82 26.49

Linemen.....................$ 49.80 27.85

Telecommunication worker....$ 28.44 11.94

ELEV0126-001 01/01/2018

ELEVATOR MECHANIC................$ 57.36 32.65

a. VACATION: Employer contributes 8% of basic hourly rate for

5 years service and 6% of basic hourly rate for 6 months to

5 years service as vacation pay credit.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

* ENGI0003-002 09/03/2018

Section 00 72 00, Appendix A

Diver (Aqua Lung) (Scuba))

Diver (Aqua Lung) (Scuba)

(over a depth of 30 feet)...$ 66.00 31.26

Diver (Aqua Lung) (Scuba)

(up to a depth of 30 feet)..$ 56.63 31.26

Stand-by Diver (Aqua Lung)

(Scuba)....................$ 47.25 31.26

Diver (Other than Aqua Lung)

Diver (Other than Aqua

Lung).......................$ 66.00 31.26

Diver Tender (Other than

Aqua Lung)..................$ 44.22 31.26

Stand-by Diver (Other than

Aqua Lung)..................$ 47.25 31.26

Helicopter Work

Airborne Hoist Operator for Helicopter..............$ 45.80 31.26

Co-Pilot of Helicopter......$ 45.98 31.26

Pilot of Helicopter.........$ 46.11 31.26

Power equipment operator -tunnel work

GROUP 1....................$ 42.24 31.26

GROUP 2....................$ 42.35 31.26

GROUP 3....................$ 42.52 31.26

GROUP 4....................$ 42.79 31.26

GROUP 5....................$ 43.10 31.26

GROUP 6....................$ 43.75 31.26

GROUP 7....................$ 44.07 31.26

GROUP 8....................$ 44.18 31.26

GROUP 9....................$ 44.29 31.26

GROUP 9A...................$ 44.52 31.26

GROUP 10....................$ 44.58 31.26

GROUP 10A...................$ 44.73 31.26

GROUP 11....................$ 44.88 31.26

GROUP 12....................$ 45.24 31.26

GROUP 12A...................$ 45.60 31.26

Power equipment operators:

GROUP 1....................$ 41.94 31.26

GROUP 2....................$ 42.05 31.26

GROUP 3....................$ 42.22 31.26

GROUP 4....................$ 42.49 31.26

GROUP 5....................$ 42.80 31.26

GROUP 6....................$ 43.45 31.26

GROUP 7....................$ 43.77 31.26

GROUP 8....................$ 43.88 31.26

GROUP 9....................$ 43.99 31.26

GROUP 9A...................$ 44.22 31.26

GROUP 10....................$ 44.28 31.26

GROUP 10A...................$ 44.43 31.26

GROUP 11....................$ 44.58 31.26

GROUP 12....................$ 44.94 31.26

GROUP 12A...................$ 45.30 31.26

Section 00 72 00, Appendix A

GROUP 13....................$ 42.22 31.26

GROUP 13A...................$ 42.49 31.26

GROUP 13B...................$ 42.80 31.26

GROUP 13C...................$ 43.45 31.26

GROUP 13D...................$ 43.77 31.26

GROUP 13E...................$ 43.88 31.26

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Fork Lift (up to and including 10 tons); Partsman

(heavy duty repair shop parts room when needed).

GROUP 2: Conveyor Operator (Handling building material);

Hydraulic Monitor; Mixer Box Operator (Concrete Plant).

GROUP 3: Brakeman; Deckhand; Fireman; Oiler;

Oiler/Gradechecker; Signalman; Switchman; Highline Cableway

Signalman; Bargeman; Bunkerman; Concrete Curing Machine

(self-propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.

GROUP 4: Boom Truck or dual purpose "A" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);

Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).

GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines ("Bank" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete

Guns; Lubrication and Service Engineer (Grease Rack);

Screedman.

GROUP 6: Boom Truck or Dual Purpose "A" Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4

cu. yd.); Concrete Batch Plants (wet or dry); Concrete

Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals); Conveyor or

Concrete Pump (Truck or Equipment Mounted); Drilling

Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis

Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete

Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast

Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo

Operator (setting slip forms, etc., in tunnels); Rollers

(over 5 tons); Self-propelled Compactor (single engine);

Self-propelled Pavement Breaker; Skidsteer Loader with

Section 00 72 00, Appendix A attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform

(50 feet of platform or less).

GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John

Deere 450, and similar); Dual Drum Mixer, Extend Lift;

Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.

yds. up to and including 6 yards.); Mechanical Finisher or

Spreader Machine (asphalt), (Barber Greene and similar)

(Screedman required); Mine or Shaft Hoist; Mobile Concrete

Mixer (over 5 tons); Pipe Bending Machine (pipelines only);

Pipe Cleaning Machine (tractor propelled and supported);

Pipe Wrapping Machine (tractor propelled and supported);

Roller Operator (Asphalt); Self-Propelled Elevating Grade

Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.);

Water Tanker (pulled by Euclids, T-Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).

GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);

Cast-in-Place Pipe Laying Machine; Concrete Batch Plant

(multiple units); Conveyor Operator (tunnel); Deckmate;

Dozer (D-6 and similar); Finishing Machine Operator

(airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine

(Conveyor-type); No-Joint Pipe Laying Machine; Portable

Crushing and Screening Plant; Power Blade Operator (under

12); Saurman Type Dragline (up to and including 5 yds.);

Stationary Pipe Wrapping, Cleaning and Bending Machine;

Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial

Platform (over 50 feet of platform).

GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor

Loader and Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).

GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including

20 cu. yds); Self-propelled Compactor with Dozer;

Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's

Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).

GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or

Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper

Section 00 72 00, Appendix A

(Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.

yds.); Self-propelled, rubber-tired Earthmoving Equipment

(over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub-Grader

(Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper);

Watch Engineer.

GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.

yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.);

Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2

cu. yds.); Mobile Truck Crane Operator (up to and including

25 tons) (Mobile Truck Crane Driver Required);

Self-propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more); Watch

Engineer (steam or electric).

GROUP 11: Automatic Slip Form Paver (concrete or asphalt);

Band Wagon (in conjunction with Wheel Excavator);

Cable-operated Crawler Cranes (over 25 tons but less than

50 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu. yds.); Gradall

(over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, etc.

(Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.

yds.," struck" m.r.c.); Highline Cableway; Hydraulic

Backhoe (over 2 cu. yds. up to and including 4 cu. yds.);

Leverman; Lift Slab Machine; Loader (over 12 cu. yds);

Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre-stress Wire Wrapping Machine; Self-propelled

Boom-type Lifting Device (Center Mount) (over 25 tons m.r.c); Self-propelled Compactor (with multiple-propulsion power units); Single Engine Rubber Tired Earthmoving

Machine (with Tandem Scraper); Tandem Cats; Trencher

(pulling attached shield).

GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs;

Multi-Propulsion Earthmoving Machines (2 or more Scrapers)

(over 35 cu. yds "struck" m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu.

yds. m.r.c. and over); Self-propelled rubber-tired

Earthmoving equipment (over 31 cu. yds.) (657B and similar); Wheel Excavator (up to and including 750 cu. yds.

per hour); Wheel Excavator (over 750 cu. yds. per hour).

GROUP 12A: Dozer (D-11 or similar or larger); Hydraulic

Section 00 72 00, Appendix A

Excavators (over 4 cu. yds.); Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1-to-1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons); Tower Crane, Mobile;

Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman);

Yo-Yo Cat or Dozer.

GROUP 13: Truck Driver (Utility, Flatbed, etc.)

GROUP 13A: Dump Truck, 8 cu. yds. and under (water level);

Water Truck (up to and including 2,000 gallons).

GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump

Truck, over 8 cu. yds. (water level).

GROUP 13C: Truck Driver (Semi-trailer. Rock Cans, Semi-Dump or Roll-Offs).

GROUP 13D: Truck Driver (Slip-In or Pup).

GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem

Trucks hooked up to Trailer (Hauling Equipment)

BOOMS AND/OR LEADS (HOURLY PREMIUMS):

The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:

Booms of 80 feet up to but not including 130 feet or

Leads of 100 feet up to but not including 130 feet 0.50

Booms and/or Leads of 130 feet up to but not including 180 feet 0.75

Booms and/or Leads of 180 feet up to and including 250 feet 1.15

Booms and/or Leads over 250 feet 1.50

The Operator of a crane (50 tons and over) with a boom of 180

Section 00 72 00, Appendix A feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:

Booms of 180 feet up to and including 250 feet 1.25

Booms over 250 feet 1.75

ENGI0003-004 09/04/2017

Dredging: (Boat Operators)

Boat Deckhand...............$ 41.22 30.93

Boat Operator...............$ 43.43 30.93

Master Boat Operator........$ 43.58 30.93

Dredging: (Clamshell or

Dipper Dredging)

GROUP 1.....................$ 43.94 30.93

GROUP 2.....................$ 43.28 30.93

GROUP 3.....................$ 42.88 30.93

GROUP 4.....................$ 41.22 30.93

Dredging: (Derricks)

GROUP 1.....................$ 43.94 30.93

GROUP 2.....................$ 43.28 30.93

GROUP 3.....................$ 42.88 30.93

GROUP 4.....................$ 41.22 30.93

Dredging: (Hydraulic Suction

Dredges)

GROUP 1.....................$ 43.58 30.93

GROUP 2.....................$ 43.43 30.93

GROUP 3.....................$ 43.28 30.93

GROUP 4.....................$ 43.22 30.93

GROUP 5.....................$ 37.88 26.76

Group 5.....................$ 42.88 30.93

GROUP 6.....................$ 37.77 26.76

Group 6.....................$ 42.77 30.93

GROUP 7.....................$ 36.22 26.76

Group 7.....................$ 41.22 30.93

CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS

GROUP 1: Clamshell or Dipper Operator.

GROUP 2: Mechanic or Welder; Watch Engineer.

GROUP 3: Barge Mate; Deckmate.

GROUP 4: Bargeman; Deckhand; Fireman; Oiler.

HYDRAULIC SUCTION DREDGING CLASSIFICATIONS

GROUP 1: Leverman.

GROUP 2: Watch Engineer (steam or electric).

Section 00 72 00, Appendix A

GROUP 3: Mechanic or Welder.

GROUP 4: Dozer Operator.

GROUP 5: Deckmate.

GROUP 6: Winchman (Stern Winch on Dredge)

GROUP 7: Deckhand (can operate anchor scow under direction of

Deckmate); Fireman; Leveeman; Oiler.

DERRICK CLASSIFICATIONS

GROUP 1: Operators (Derricks, Piledrivers and Cranes).

GROUP 2: Saurman Type Dragline (over 5 cubic yards).

GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).

GROUP 4: Deckhand, Fireman, Oiler.

* ENGI0003-044 09/03/2018

Power Equipment Operators

(PAVING)

Asphalt Concrete Material

Transfer....................$ 42.92 32.08

Asphalt Plant Operator......$ 43.35 32.08

Asphalt Raker...............$ 41.96 32.08

Asphalt Spreader Operator...$ 43.44 32.08

Cold Planer.................$ 43.75 32.08

Combination Loader/Backhoe

(over 3/4 cu.yd.)...........$ 41.96 32.08

Combination Loader/Backhoe

(up to 3/4 cu.yd.)..........$ 40.98 32.08

Concrete Saws and/or

Grinder (self-propelled unit on streets, highways, airports and canals)........$ 42.92 32.08

Grader......................$ 43.75 32.08

Laborer, Hand Roller........$ 41.46 32.08

Loader (2 1/2 cu. yds. and under)......................$ 42.92 32.08

Loader (over 2 1/2 cu.

yds. to and including 5

cu. yds.)...................$ 43.24 32.08

Roller Operator (five tons and under)..................$ 41.69 32.08

Roller Operator (over five tons).......................$ 43.12 32.08

Screed Person...............$ 42.92 32.08

Soil Stabilizer.............$ 43.75 32.08

* IRON0625-001 09/01/2018

Section 00 72 00, Appendix A

Ironworkers:.....................$ 40.25 35.79

a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or

Haleakala.

* LABO0368-001 09/03/2018

Laborers:

Driller.....................$ 38.40 20.26

Final Clean Up..............$ 28.80 16.12

Gunite/Shotcrete Operator and High Scaler.............$ 37.90 20.26

Laborer I...................$ 37.40 20.26

Laborer II..................$ 34.80 20.26

Mason Tender/Hod Carrier....$ 37.90 20.26

Powderman...................$ 38.40 20.26

Window Washer (bosun chair).$ 36.90 20.26

LABORERS CLASSIFICATIONS

Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and

Handroller, and all types of Asphalt Spreader Boxes;

Asphalt Shoveler; Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks); Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping

Jack and similar); Concrete Bucket Dumpman; Concrete

Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready-mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks); Concrete Core Cutter

(Walls, Floors, and Ceiling); Concrete Grinding or Sanding;

Concrete: Hooking on, signaling, dumping of concrete for extreme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete

Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine

(laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw

(Walking or Handtype) (cutting walls or flatwork) (scoring

Section 00 72 00, Appendix A old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes); Concrete Shovelers/Laborers (Wet or Dry); Concrete Screeding for Rough Strike-Off: Rodding or striking-off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator; Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and

Trench Jacking and Bracing, Hand-Guided Lagging Hammer

Whaling Bracing; Curbing (Concrete and Asphalt); Curing of

Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb

Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch

(demolition); Dri Pak-It Machine; Environmental Abatement:

removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site;

Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes;

Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:

Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation;

Headerboard Man (Asphalt or Concrete); Heat Welder of

Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre-cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman - Hydraulic Monitor

(over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected therewithin;

Laying of all multi-cell conduit or multi-purpose pipe;

Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water

Blasting): handling, placing and operation of nozzle;

Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary;

Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conveying of any

Section 00 72 00, Appendix A substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar-type materials (6-inch) pipe and over); Piping: resurfacing and paving of all ditches in preparation for laying of all pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar

Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill

Operation: Choker setters, off bearers, and lumber handlers connected with clearing; Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers

(Small); Preparation and Compaction of roadbeds for railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross-country transmission by pipelines, electrical transmission or underground lines or cables (by mechanical means); Raising of structure by manual or hydraulic jacks or other methods and resetting of structure in new locations, including all concrete work; Ramming or compaction; Rigging in connection with Laborers' work (except demolition), Signaling

(including the use of walkie talkie) Choke Setting, tag line usage; Tagging and Signaling of building materials into high rise units; Riprap, Stonepaver, and Rock Slinger

(includes placement of stacked concrete, wet or dry and loading, unloading, signaling, slinging and setting of other similar materials); Rotary Scarifier (including multiple head concrete chipping Scarifier); Salamander

Heater, Drying of plaster, concrete mortar or other aggregate; Scaffold Erector Leadman; Scaffolds: (Swing and hanging) including maintenance thereof; Scaler; Septic

Tank/Cesspool and Drain Fields Digger and Installer;

Shredder/Chipper (tree branches, brush, etc.); Stripping and Setting Forms; Stripping of Forms: Other than panel forms which are to be re-used in their original form, and stripping of forms on all flat arch work; Tampers (Barko, Wacker, and similar type); Tank Scaler and Cleaners;

Tarman; Tree Climbers and Trimmers; Trencher (includes hand-held, Davis T-66 and similar type); Trucks (flatbed up to and including 2 1/2 tons when used in connection with on-site Laborers' work; Trucks (Refuse and Garbage Disposal)

(from job site to dump); Vibra-Screed (Bull Float in connection with Laborers' work); Well Points, Installation of or any other dewatering system.

Laborer II: Asphalt Plant Laborer; Boring Machine Tender;

Bridge Laborer; Burning of all debris (crates, boxes, packaging waste materials); Chainman, Rodmen, and Grade

Markers; Cleaning, clearing, grading and/or removal for streets, highways, roadways, aprons, runways, sidewalks, parking areas, airports, approaches, and other similar installations; Cleaning or reconditioning of streets, ways, sewers and waterlines, all maintenance work and work of an unskilled and semi-skilled nature; Concrete Bucket Tender

(Groundman) hooking and unhooking of bucket; Concrete

Forms; moving, cleaning, oiling and carrying to the next point of erection of all forms; Concrete Products Plant

Laborers; Conveyor Tender (conveying of building materials); Crushed Stone Yards and Gravel and Sand Pit

Laborers and all other similar plants; Demolition, Wrecking and Salvage Laborers: Wrecking and dismantling of buildings and all structures, with use of cutting or wrecking tools, breaking away, cleaning and removal of all fixtures, All hooking, unhooking, signaling of materials for salvage or scrap removed by crane or derrick; Digging under streets, roadways, aprons or other paved surfaces; Driller's Tender;

Chuck Tender, Outside Nipper; Dry-packing of concrete

(plugging and filling of she-bolt holes); Fence and/or

Guardrail Erector: Dismantling and/or re-installation of all fence; Finegrader; Firewatcher; Flagman (Coning, preparing, establishing and removing portable roadway barricade devices); Signal Men on all construction work defined herein, including Traffic Control Signal Men at construction site; General Excavation; Backfilling, Grading and all other labor connected therewith; Digging of trenches, ditches and manholes and the leveling, grading and other preparation prior to laying pipe or conduit for any purpose; Excavations and foundations for buildings, piers, foundations and holes, and all other construction.

Preparation of street ways and bridges; General Laborer:

Cleaning and Clearing of all debris and surplus material.

Clean-up of right-of-way. Clearing and slashing of brush or trees by hand or mechanical cutting. General Clean up:

sweeping, cleaning, wash-down, wiping of construction facility and equipment (other than "Light Clean up

(Janitorial) Laborer. Garbage and Debris Handlers and

Cleaners. Appliance Handling (job site) (after delivery unlading in storage area); Ground and Soil Treatment Work

(Pest Control); Gunite/Shotcrete Operator Tender; Junk Yard

Laborers (same as Salvage Yard); Laser Beam "Target Man" in connection with Laborers' work; Layout Person for Plastic

(when work involves waterproofing for waterponds, artificial lakes and reservoirs); Limbers, Brush Loaders, and Pilers; Loading, Unloading, carrying, distributing and handling of all rods and material for use in reinforcing concrete construction (except when a derrick or outrigger

Section 00 72 00, Appendix A operated by other than hand power is used); Loading, unloading, sorting, stockpiling, handling and distribution of water mains, gas mains and all pipes; Loading and unloading of all materials, fixtures, furnishings and appliances from point of delivery to stockpile to point of installation; hooking and signaling from truck, conveyance or stockpile; Material Yard Laborers; Pipelayer Tender;

Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, Creosote, and similar-type materials

(pipe under 6 inches); Plasterer Laborer; Preparation, construction and maintenance of roadbeds and sub-grade for all paving, including excavation, dumping, and spreading of sub-grade material; Prestressed or precast concrete slabs, walls, or sections: all loading, unloading, stockpiling, hooking on of such slabs, walls or sections; Quarry

Laborers; Railroad, Streetcar, and Rail Transit Maintenance and Repair; Roustabout; Rubbish Trucks in connection with

Building Construction Projects (excluding clearing, grubbing, and excavating); Salvage Yard: All work connected with cutting, cleaning, storing, stockpiling or handling of materials, all cleanup, removal of debris, burning, back-filling and landscaping of the site; Sandblasting

Tender (Pot Tender): Hoses and pots or markers; Scaffolds:

Erection, planking and removal of all scaffolds used for support for lathers, plasters, brick layers, masons, and other construction trades crafts; Scaffolds: (Specially designed by carpenters) laborers shall tend said carpenter on erection and dismantling thereof, preparation for foundation or mudsills, maintenance; Scraping of floors;

Screeds: Handling of all screeds to be reused; handling, dismantling and conveyance of screeds; Setting, leveling and securing or bracing of metal or other road forms and expansion joints; Sheeting Piling/trench shoring (handling and placing of skip sheet or wood plank trench shoring);

Ship Scalers; Shipwright Tender; Sign Erector (subdivision traffic, regulatory, and street-name signs); Sloper; Slurry

Seal Crews (Mixer Operator, Applicator, Squeegee Man, Shuttle Man, Top Man); Snapping of wall ties and removal of tie rods; Soil Test operations of semi and unskilled labor such as filling sand bags; Striper (Asphalt, Concrete or other Paved Surfaces); Tool Room Attendant (Job Site);

Traffic Delineating Device Applicator; Underpinning, lagging, bracing, propping and shoring, loading, signaling, right-of-way clearance along the route of movement, The clearance of new site, excavation of foundation when moving a house or structure from old site to new site; Utilities employees; Water Man; Waterscape/Hardscape Laborers; Wire

Mesh Pulling (all concrete pouring operations); Wrecking, stripping, dismantling and handling concrete forms an false work.

Section 00 72 00, Appendix A

* LABO0368-002 09/03/2018

Landscape & Irrigation

Laborers

GROUP 1.....................$ 25.50 12.68

GROUP 2.....................$ 26.40 12.68

GROUP 3.....................$ 21.10 12.68

LABORERS CLASSIFICATIONS

GROUP 1: Installation of non-potable permanent or temporary irrigation water systems performed for the purposes of

Landscaping and Irrigation architectural horticultural work; the installation of drinking fountains and permanent or temporary irrigation systems using potable water for

Landscaping and Irrigation architectural horticultural purposes only. This work includes (a) the installation of all heads, risers, valves, valve boxes, vacuum breakers

(pressure and non-pressure), low voltage electrical lines and, provided such work involves electrical wiring that will carry 24 volts or less, the installation of sensors, master control panels, display boards, junction boxes, conductors, including all other components for controllers,

(b) and metallic (copper, brass, galvanized, or similar) pipe, as well as PVC or other plastic pipe including all work incidental thereto, i.e., unloading, handling and distribution of all pipes fittings, tools, materials and equipment, (c) all soldering work in connection with the above whether done by torch, soldering iron, or other means; (d) tie-in to main lines, thrust blocks (both precast and poured in place), pipe hangers and supports incidental to installation of the entire irrigation system,

(e) making of pressure tests, start-up testing, flushing, purging, water balancing, placing into operation all irrigation equipment, fixtures and appurtenances installed under this agreement, and (f) the fabrication, replacement, repair and servicing of landscaping and irrigation systems.

Operation of hand-held gas, air, electric, or self-powered tools and equipment used in the performance of Landscape and Irrigation work in connection with architectural horticulture; Choke-setting, signaling, and rigging for equipment operators on job-site in the performance of such

Landscaping and Irrigation work; Concrete work (wet or dry) performed in connection with such Landscaping and

Irrigation work. This work shall also include the setting of rock, stone, or riprap in connection with such

Landscape, Waterscape, Rockscape, and Irrigation work;

Grubbing, pick and shovel excavation, and hand rolling or tamping in connection with the performance of such

Landscaping and Irrigation work; Sprigging, handseeding, Section 00 72 00, Appendix A and planting of trees, shrubs, ground covers, and other plantings and the performance of all types of gardening and horticultural work relating to said planting; Operation of flat bed trucks (up to and including 2 1/2 tons).:

GROUP 2. Layout of irrigation and other non-potable irrigation water systems and the layout of drinking fountains and other potable irrigation water systems in connection with such Landscaping and Irrigation work. This includes the layout of all heads, risers, valves, valve boxes, vacuum breakers, low voltage electrical lines, hydraulic and electrical controllers, and metallic

(coppers, brass, galvanized, or similar) pipe, as well as

PVC or other plastic pipe. This work also includes the reading and interpretation of plans and specifications in connection with the layout of Landscaping, Rockscape, Waterscape, and Irrigation work; Operation of

Hydro-Mulching machines (sprayman and driver), Drillers, Trenchers (riding type, Davis T-66, and similar) and fork lifts used in connection with the performance of such

Landscaping and Irrigation work; Tree climbers and chain saw tree trimmers, Sporadic operation (when used in connection with Landscaping, Rockscape, Waterscape, and

Irrigation work) of Skid-Steer Loaders (Bobcat and similar), Cranes (Bantam, Grove, and similar), Hoptos, Backhoes, Loaders, Rollers, and Dozers (Case, John Deere, and similar), Water Trucks, Trucks requiring a State of

Hawaii Public Utilities Commission Type 5 and/or type 7 license, sit-down type and "gang" mowers, and other self-propelled, sit-down operated machines not listed under

Landscape & Irrigation Maintenance Laborer; Chemical spraying using self-propelled power spraying equipment (200 gallon capacity or more).

GROUP 3: Maintenance of trees, shrubs, ground covers, lawns and other planted areas, including the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.