Pg_201-_300_DRAWINGS_B452,_Schofield_Barracks.pdf

PDF 17 MB Posted

Attached to
FY17 Pkg A-007 Repair Building 452, Quad D, Schofield Barracks, Oahu, Hawaii
Solicitation number
W9128A-17-B-0002
Issued by

About this file

4 Drawings W9128A-17-B-0002

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNDN DN

A

B

D

E

F

G

10 11 12 13 14 15

16 17 18

20 21

C

PP406

A3

CONFERENCE RM

NBC STORAGE

SECURE

STORAGE

UNIT STORAGE

COMM STORAGE

342PLAT A

PLAT B

PLAT C

PLAT D

1SGT

CMD TOILET

COMMANDER

XO

1SGT

UNIT STORAGE

NBC STORAGE

COMM STORAGE

300E

SECURE

STORAGE

OPEN OFFICE

TRAINING RM

359PLAT A

PLAT B

361PLAT C

PLAT D

CONFERENCE RM

RECYCLE

STORAGE

ELEC

STORAGE

TELECOM

MECHANICAL

MEN'S LATRINE

WOMEN'S

LATRINE

STORAGE

STORAGE

CMD STORAGE

STORAGE

STORAGE

CORR

300C

CONF STOR

369A

CORR.

300D

CORR

300R

EXISTING LANAI

300Q

EXISTING LANAI

300F

EXISTING LANAI

300H

PASSAGE

300G

PASSAGE

300J

VEST

300PC

VEST

300QA

VEST

300QB VEST

300QC

VEST

300FA

VEST

300HAVEST

300HB

JANITOR

347A

P-7

1 1/4" VTR, LOCATE

NEAREST EXISTING VENT

PENE THRU ROOF ANC

CONNECT BELOW

2" SAN DN TO

2ND FLR

P-7

1/

4" V

2" S

2" S

FD-1

4" S

P-1

P-4

4" S

FD-1

4" SAN DN TO

2ND FLR

4" FCO

1 1/4" V2" VTR, LOCATE NEAREST

EXISTING VENT PENE THRU

ROOF ANC CONNECT BELOW

4" SAN STACK

IN MECH RM

2" VTR

A1

PW

A1

PW

FSK

VENT ABOVE

CLG, SAN

BELOW

SLAB, TYP

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PW106

TH

IR

D F

LO

O

R N

O R

T H D

W V

PL

A

N

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/8" = 1'-0"A1 THIRD FLOOR NORTH DWV PLAN

SCALE:

0 8' 16'

1/8" = 1' - 0"

8' 16'

M

AT

C H

LI

N

E

KEY PLAN

G

F

A

PLAN

NORTH

TRUE

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FDFD

FD

FD

F

G

5 6 7

2" HW, 1 1/2" HWR POC,

SEE CIVIL DWGS FOR

CONNECTION

1/

2" D

H W

R

2" D

H W

P-4

P-4

P-4

P-6

P-6P-6

P-6

P-6

P-2

P-1

P-1

P-3

P-3

P-3

P-5

P-1

P-1

P-1

P-2

P-6

P-6

P-6P-6

P-6

P-4

P-4

P-4

2" HW, 1 1/2" HWR

BELOW SLAB COORD

WITH SAN PIPING

2" D

H W

2" D

C W

CW, HW, PIPE DN

BELOW SLAB TO/FR

MECHANICAL ROOM

1" DCW

3/4" DHW

1/

2" D

H W 1

1/ 2"

D C

W

1" D

C W

1" D

C W

1/

2" D

H W

1/

2" D

C W

1" D

C W1/

2" D

C W

1/ 2"

D H

W

1/ 2"

D C

W 1/

2" D

H W

1/ 2"

D C

W

1/ 2"

D H

W

1/ 2"

D C

W

1/ 2"

D H

W

TMV-1

PROVIDE TRAP

PRIMER AND

PIPE TO FD

F

G

5 6 7

P-4

P-4

P-4

FD-1

FD-1

FD-1 FD-1

FD-1

FD-1

FD-1FD-1

FD-1 FD-1

P-4

P-4

P-4

P-2

P-1

P-1

P-1

P-5

P-3

P-3

P-3

P-1

P-1

P-2

PIPE BELOW

SLAB TO MECH

RM

SEE PW101 FOR

CONTINUATION

4" S

4" FCO

4" FCO

4" SAN

STACK

4" FCO

4" S

4" FCO

4" FCO

4" S

2" S

4" S

4" S

4" S 4" S

2" V

4" S 4" FCO

1/

4" V

4" S 1 1/2" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S4" S

4" S

4" S

4" S

4" S 4" S

1/

2" V

2" V

2" V

2" V

2" V

1/

2" V

2" S

2" V

FD-1 FD-1

FD-1FD-1

FD-1

HEADER VENT PIPE

BELOW WINDOW

SILL WITHIN CHASE

HEADER VENT PIPE

BELOW WINDOW

SILL WITHIN CHASE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP401

FI

R

ST

F

LO

O

R S

O U

T H P

LU

M

BI

N

G E

N L A

R G

E D P L

AN

S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/4" = 1'-0"A1 FIRST FLR SOUTH DOMW ENLARGED PLAN

1/4" = 1'-0"A3 FIRST FLR SOUTH DWV ENLARGED PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

FD FD

FD

FD FD

FD FD

FD

FD FD

FD FD

FD

F

G

16 17

P-2

P-1

P-1

P-2

P-1

P-1

P-1

P-5

P-3

P-3

P-3

P-4

P-4

P-4

P-6

1/ 2"

D C

W 1/

2" D

H W

P-6

P-6

P-6 P-6

P-6

P-6 P-6

P-6

P-4

P-4

P-4

1/ 2"

D H

W 1/

2" D

C W

1/2" DCW

1/2" DHW

1/ 2"

D C

W 1/

2" D

H W

1/ 2"

D H

W 1/

2" D

C W

1" DCW

3/4" DHW

2" D

C W

2" D

H W

CW, HW, PIPE DN BELOW

SLAB TO/FR MECHANICAL

ROOM

1/

2" D

H W

R

2" D

H W

2" HW, 1 1/2" HWR POC, SEE

CIVIL DWGS FOR

CONNECTION

1/

2" D

C W

1/

2" D

H W

1" D

C W

P-6

2" HW, 1 1/2" HWR

BELOW SLAB COORD

WITH SAN PIPING

TMV-2

PROVIDE TRAP

PRIMER AND

PIPE TO FD

F

G

16 17

P-4

P-4

P-4

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

P-4

P-4

P-4

P-1

P-1

P-1

P-2P-2

P-1

P-1

P-3

P-3

P-3

4" S

4" S

4" S

PIPE BELOW

SLAB TO MECH

RM

PIPE TO

LATERAL IN

LANAI. SEE

PW102

4" FCO

4" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S

1/

4" V

1/

4" V

2" V

2" V

1/

2" V

4" S

4" S

4" S

4" S

2" S

2" V

2" V

1/

4" V

4" S

4" FCO

4" FCO

4" FCO

4" FCO

1/

2" V

1/

2" V

2" V

4" SAN

STACK

4" FCO

FD-1FD-1

FD-1 FD-1

FD-1

HEADER VENT

PIPE BELOW

WINDOW SILL

WITHIN CHASE HEADER VENT

PIPE BELOW

WINDOW SILL

WITHIN CHASE

P-5

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP402

FI

R

ST

F

LO

O

R N

O R

T H P

LU

M

BI

N

G E

N L A

R G

E D P L

AN

S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/4" = 1'-0"A1 FIRST FLR NORTH DOMW ENLARGED PLAN

1/4" = 1'-0"A3 FIRST FLR NORTH DWV ENLARGED PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

FDFD

FD

FDFD

FD FD

FD

FDFD

FD FD

FD

F

G

5 6 7

CW, HW,

HWR RISERS

P-1

P-1

P-1

P-2 P-2

P-1

P-1

P-3

P-3

P-3

P-4

P-4

P-4

FD-1

P-6

FD-1 P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

P-4

P-4

P-4

1/

2" D

C W

1/

2" D

H W

1" D

C W

1/

2" D

H W

1/

2" D

C W

3/4" DHW

1" DCW

1/ 2"

D C

W 1/

2" D

H W

1/ 2"

D C

W

1/ 2"

D H

W

1/ 2"

D C

W

1/ 2"

D H

W 1/

2" D

C W

1/ 2"

D H

W

1/2" DCW

1/2" DHW

PROVIDE TRAP

PRIMER AND

PIPE TO FD

P-5

F

G

5 6 7

4" FCO

4" FCO4" STACK

4" FCO

4" FCO

4" FCO

4" FCO

P-4

P-4

P-4

FD-1

FD-1

4" S

4" S

4" S

FD-1

FD-1

FD-1

4" S

4" S

4" S

4" S

2" V

4" S

1 1/2" S4" S

4" S

1/

4" V

P-4

P-4

P-4

FD-1

FD-1

P-3

P-3P-3

P-1

P-1

P-2P-2

P-1

P-1

P-1

FD-1

FD-1

FD-1

4" S

4" S

4" S

4" S

2" V

4" S

1/

2" V

2" V

2" V

1/

2" V

1/

2" V

2" V

2" V

2" S 2" S

FD-1FD-1

FD-1 FD-1

FD-1

HEADER VENT PIPE

BELOW WINDOW

SILL WITHIN CHASE

HEADER VENT PIPE

BELOW WINDOW

SILL WITHIN CHASE

1/

4" V

1/

4" V

1/

4" V

P-5

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP403

SE

C

O N

D F

LO

O

R S

O U

TH

P

L U M

BI

N

G E N

LA

R

G

ED

P

LA

N S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/4" = 1'-0"A1

SECOND FLR SOUTH DOMW ENLARGED

PLAN

1/4" = 1'-0"A3

SECOND FLR SOUTH DWV ENLARGED

PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

FD

FD FD

FD FD

FD

FD FD

FD FD

FD

F

G

16 17

FD-1

P-6

FD-1P-6

P-4

P-4

P-4

P-1

P-1

P-2

P-6

FD-1

P-6

FD-1

P-6

FD-1 FD-1

P-6

FD-1

P-6

FD-1

P-6

P-2

P-1

P-1

P-1

P-4

P-4

P-4

FD-1 P-6

FD-1

P-6

CW, HW,

HWR RISERS

3/4" DHW

1" DCW

1/

2" D

H W

1/

2" D

C W

1" D

C W

1/

2" D

H W

1/

2" D

C W

1/ 2"

D H

W

1/ 2"

D C

W

1/ 2"

D C

W

1/ 2"

D H

W

1/2" DCW

1/2" DHW

1/ 2"

D C

W 1/

2" D

H W

P-3

P-3

P-3

PROVIDE TRAP

PRIMER AND

PIPE TO FD

P-5

F

G

16 17

4" FCO

4" FCO

4" FCO

4" FCO

4" STACK

FD-1

FD-1

FD-1

FD-1

FD-1 FD-1

FD-1

FD-1

FD-1

FD-1

P-4

P-4

P-4P-4

P-4

P-4

P-1

P-1

P-2 P-2

P-1

P-1

P-1

4" S

4" S

4" S

4" S 2" V

4" S

1/

4" V

1/

4" V

4" S

4" S

1 1/2" S

4" S

4" S

4" S

4" S

4" S

2" V

2" V

1/

2" V

1/

2" V

1/

2" V4"

S

4" S

4" S

4" S

4" S

2" V

4" S

1/

4" V

1/

4" V

1 1/2" S 4" S

4" S

4" S

1/

4" V 1 1/

4" V

1/

4" V

4" S

4" S

4" FCO

2" S2" S

FD-1

FD-1 FD-1

FD-1

FD-1

HEADER VENT

PIPE BELOW

WINDOW SILL

WITHIN CHASE HEADER VENT

PIPE BELOW

WINDOW SILL

WITHIN CHASE

P-5

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP404

SE

C

O N

D F

LO

O

R N

O R

TH

P

L U M

BI

N

G E N

LA

R

G

ED

P

LA

N S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/4" = 1'-0"A1

SECOND FLR NORTH DOMW ENLARGED

PLAN

1/4" = 1'-0"A3

SECOND FLR NORTH DWV ENLARGED

PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

F

G

5 6 7

4" FCO

4" FCO

4" STACK

4" FCO

4" FCO

4" FCO

4" FCO

FD-1

FD-1

P-4

P-4

P-4

2" V

1/

4" V

1/

4" V

1/

4" V

4" S

4" S

4" S

4" S

4" S

4" S

4" S

4" S

FD-1

FD-1

FD-1

4" S 4" S

1/

4" V

1/

4" V

P-1

P-1

P-1

P-2 2" V

2" V

2" V

1/

2" V

P-3

P-3

P-3

1/

2" V

P-1

P-1

P-2

2" V

2" V

4" S 4" S

4"

SFD-1

FD-1

FD-1

4" S

4" S

1/

4" V

FD-1

4" S

4" S

4" S

FD-1

1 1/2" S

1/

4" V

1/

4" V

P-4

P-4

P-4

2" S 2" S

4" S

4" S

4" S

FD-1 FD-1

FD-1 FD-1

FD-1

HEADER VENT PIPE

BELOW WINDOW

SILL WITHIN CHASE

HEADER VENT PIPE

BELOW WINDOW

SILL WITHIN CHASE

P-5

F

G

5 6 7

FD-1

P-6

FD-1

P-6

FD-1

FD-1

P-6

P-6

P-6

FD-1 FD-1

FD-1

FD-1

P-6

P-6

P-6

P-6

FD-1

FD-1

P-6

P-4

P-4

P-4

P-2

P-1

P-1

P-1

P-2

P-1

P-1

P-4

P-4

P-4

P-3

P-3

P-3

3/4" DHW

1" DCW

1/ 2"

D H

W 1/

2" D

C W

1/ 2"

D C

W

1/ 2"

D H

W

1/ 2"

D H

W 1/

2" D

C W

1/2" DCW

1/2" DHW

1/ 2"

D C

W 1/ 2"

D H

W

1" D

C W

1/

2" D

H W

1/

2" D

C W

CW, HW,

HWR RISER

HWR CIRCUIT

SETTER, PROVIDE

ACCESS PANEL IN

JAN TO PLBG CHASE

PROVIDE TRAP

PRIMER AND

PIPE TO FD

P-5

1/

2" D

H W

1/

2" D

C W

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP405

TH

IR

D F

LO

O

R S

O U

T H P

LU

M

BI

N

G E

N L A

R G

E D P L

AN

S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/4" = 1'-0"A3

THIRD FLOOR SOUTH DWV ENLARGED

PLAN

1/4" = 1'-0"A1

THIRD FLOOR SOUTH DOMW ENLARGED

PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

F

G

16 17

4" FCO

4" FCO

4" FCO

4" FCO

4" SAN

STACK

4" FCO

FD-1

FD-1

P-4

P-4

P-4

P-2

P-1

P-1

P-3

P-3

P-3

P-1

P-1

P-1

P-2

P-4

P-4

P-4

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

4" S

4" S

4" S

4" S

4" S 4" S

4" S

2" S2" S

1/

4" V

1/

4" V

4" S

4" S

4" S

4" S

4" S 2" V

2" V

1/

4" V

1/

4" V

1/

4" V

4" S

4" S

4" S

4" S

4"

SFD-1 FD-1

FD-1FD-1

FD-1

HEADER VENT

PIPE BELOW

WINDOW SILL

WITHIN CHASE HEADER VENT

PIPE BELOW

WINDOW SILL

WITHIN CHASE

1/

4" V

1/

4" V

P-5

F

G

16 17

P-4

P-4

P-4

P-2

P-1

P-1

P-1

P-3

P-3

P-3

P-1

P-1

P-2

P-4

P-4

P-4

FD-1

P-6

FD-1

P-6

1/ 2"

D H

W 1/

2" D

C W

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1

P-6

FD-1P-6

CW, HW, HWR RISERS

3/4" DHW

1" DCW

1/

2" D

H W

1/

2" D

C W

1" D

C W

1/

2" D

H W

1/

2" D

C W

1/ 2"

D C

W

1/ 2"

D H

W

1/2" DCW

1/2" DHW

1/ 2"

D C

W 1/

2" D

H W

HWR CIRCUIT SETTER, PROVIDE

ACCESS PANEL IN JAN TO PLBG

CHASE

PROVIDE TRAP

PRIMER AND

PIPE TO FD

P-5

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP406

TH

IR

D F

LO

O

R N

O R

T H P

LU

M

BI

N

G E N

LA

R

G

ED

P

LA

N S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D

IS

TR

IC

T

BU

IL

D

IN

G

FT

S

H

AF

TE

R

, H

AW

AI

I 9

- 5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

1/4" = 1'-0"A3

THIRD FLOOR NORTH DWV ENLARGED

PLAN

1/4" = 1'-0"A1 THIRD FLR NORTH DOMW ENLARGED PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

TRUE

NORTH

PLAN

NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

SCORIATED COVER CLEANOUT PLUG

FINISHED FLOOR

COMBINATION WYE

& 1/8 BEND OR

SHORT SWEEP

BELOW GRADE PIPING

PROVIDE CAP/PLUG

AT END OF LINE

LOCATIONS

VA

R

IE

S

WEEP HOLES

SEEPAGE PAN

WASTE LINE

FINISHED FLOOR

WATERPROOF MEMBRANE

CONCRETE SLAB

ADJUSTABLE

STRAINER HEAD

FURNISH CLAMP FOR

ATTACHING WATERPROOFING

MEMBRANE OR METAL FLASHING

TO SEEPAGE PAN

P - TRAP (REQUIRED ONLY

ON DRAINS CONNECTED TO

SANITARY WASTE SYSTEM)

METAL JACKET

INSULATION

PIPE WITH

INSULATION

PIPE W/O

INSULATION

WOOD OR

GYP. BD. WALL

INTERIOREXTERIOR

FIRE RATED INTUMESCENT

SEALANT. INSTALL IN

ACCORDANCE W/

MANUFACTURER'S

RECOMMENDATION &

IN ACCORDANCE W/

APPROPRIATE UL

LISTING NUMBER.

CONC. OR

MASONRY WALL

GALV. UNI-STRUT,

ANCHOR TO CONC.

BLOCK

PIPE CLAMP

PROVIDE PIPE

PROTECTION AT

CLAMP

4"X8" CONC.

BLOCK PIPE

SUPPORT

PIPE

CONC. SLAB

HB-2 EXTERIOR

RISER ISOLATION

VALVE TYPICAL

3/ 4"

3/ 4"

3' -0

8' -0

PLUG IF END

CONDITION

CLEANOUT TEE

SANITARY LINE

COVER PLATE

1 / 4" MACHINE

SCREW

FINISHED WALL

(GYP. BOARD,

PLASTER, ETC.)

BRASS SCREW PLUG

WITH SQUARE HEAD

PIPE CHASE

3/4"

SQUARE HEAD VALVE

VACUUM

BREAKER

INTERIOR/EXTERIOR WALL

PIPE WALL SUPPORT

VACUUM

BREAKER

INTERIOR/EXTERIOR WALL

3/4"

SQUARE HEAD

VALVE

PIPE WALL

SUPPORT

HB W/ REMOVABLE

TEE HANDLE

18" ABV. FIN.

FLR./GRADE

HB W/ REMOVABLE

TEE HANDLE

FINISHED WALL

MIN.

4"

6"

FINISHED FLOOR

CHROME PLATED, HEX.

HD. LOOSE KEY VALVE

W/ WALL PLATE

1/2" POLISHED CHROME

W/LOOSE KEY W/

NON-REMOVABLE VACUUM

BREAKER & 3/4" HOSE

HOSE OUTLET

( * UNLESS SPECIFIED OTHERWISE )

12"

* 1 5"

* 1

/ 2

4" SOIL PIPE

BOLTS W /CHINA

BOLT CAPS

C.W. SUPPLY

FINISHED WALL

CHROME PLATED

ESCUTCHEON PLATE

SEAT

WATER CLOSET

WAX GASKET

CLOSET BEND

SEAL ALL AROUND

FLOOR FLANGE

SEAT COVER

( IF SPECIFIED )

4" SQ

. 24

2"

BASE DETAIL

MIN.

4"

8"

MIN.

C.W. SUPPLY

ADJUSTABLE

SLEEVE

4" SQ. x 3 / 8" THK.

WELDED STEEL BASE

FINISHED FLOOR

CONC. SLAB

SECURE TO

FLOOR W /

( 4 ) 1 / 2" EXP.

BOLTS

URINAL

HANGER PLATE

FURNISHED WITH

FIXTURE

SEALANT

ALL AROUND

FLUSH VALVE

CHROME PLATED

SUPPLY

CHROME PLATED

ESCUTCHEON

3 / 4" CHROME

PLATED

FINISHED WALL

(GYP. BD., PLASTER,

CERAMIC TILE, ETC.)

1 1 / 4" DIA. STD. WT.

STEEL PIPE SUPPORT

LEGS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

P-501

PL

U

M

BI

N G

D

ET

AI

L S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

NTSC1 FLOOR CLEANOUT DETAIL (FCO)

NTSC2 FLOOR DRAIN DETAIL (FD)

NTSC3 PIPE THRU WALL DETAIL

NTSB1 GROUND PIPE SUPPORT

NTSB2 HOSE BIBB DETAIL

NTSC5 WALL CLEANOUT DETAIL

NTSA1 TYPICAL HOSE BIBB DETAIL

NTSA2 HOSE BIBB-INTERIOR

NTSA3 WATER CLOSET - FLR MTD DETAIL

NTSA4 URINAL - FLR SUPPORTED DETAIL

M

AR

K D

ES

C

R

IP

TI

O

N D

CW PIPE

HW PIPING

TAPECOAT WRAP

PIPE AT CLAMP

PIPE CLAMP, TYP.

3/8" HANGER ROD

EXPANSION TYPE

CONC. ANCHOR, TYP.

CONC. SLAB

INSULATION, TYP.

HWR PIPING UNISTRUT CHANNEL

PIPE SADDLE

FOR INSULATED

PIPE, TYP.

PROVIDE DIELECTRIC

TAPE AT EACH

PIPE CLAMP

INSULATION INSERTS, TYP. PIPE PROTECTION SADDLE, TYP.

COLUMN A: STD. WT. STEEL PIPE

& CAST IRON PIPE

CONC. CEILING

NOMINAL ROD

DIAMETER

3/8" 1/2"

A

3/4" 1"

5/8"

PIPE SIZE

1/4" - 2" 2" - 3 1/2"

6" 8" - 12"

4" - 5"

PIPE SLEEVE W/ ID

1/4" LARGER THAN

OD OF BOLT

SOURCE:

CLEVIS TYPE HANGERHANGER ROD

EXPANSION CONC. ANCHOR

PIPE

MSS STANDARD SP-69

STRAINER, TYP

HWR FROM BUILDING SYSTEM

HW TO BUILDING SYSTEM

PRESSURE GAUGE, TYP

HIGH FLOW TEMPERING

VALVE 90 GPM@20 PSI

140°F HW SUPPLY

FROM LOOP

2"

2"

2"

HEAT TRAP HIGH/LOW PRESSURE

REDUCING STATION

ASSEMBLY BY VALVE

MANUFACTURER

(HIGH) (LOW)

PRESSURE REGULATING VALVE PRESSURE REGULATING VALVE

THERMOSTAT

UNION, TYP

LOW FLOW TEMPERING

VALVE, MIN 1 GPM

BV, TYP

CV, TYP

CW SUPPLY BRANCH

FROM LOOP

HWR FROM LOOP

2"

1 1/2"

NOTE: SET BUILDING HW SUPPLY AT 120°F.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

P-502

PL

U

M

BI

N G

D

ET

AI

L S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

6NTSC1 PIPE SUPPORT DETAIL

NTSC2 PIPE HANGER DETAIL

NTSA1 HIGH-LOW MIXING VALVE MANIFOLD SCHEMATIC

M

AR

K D

ES

C

R

IP

TI

O

N D

PLUMBING FIXTURE SCHEDULE

SYMBOL DESCRIPTION TYPICAL

LOCATION TRAP SIZE WASTE VENT HOT

WATER REMARKS

P-1

P-2

PUBLIC TOILETWATER CLOSET, FLOOR MOUNTED FLUSH

VALVE INTEGRAL 4"

COLD

WATER

P-3

P-4

P-5

FD-1

P-6

WATER CLOSET, FLOOR MOUNTED FLUSH

VALVE - ACCESSIBLE PUBLIC TOILET INTEGRAL

PUBLIC TOILET

PUBLIC TOILET

PUBLIC TOILET,

CMD TOILET

JANITOR'S

CLOSET

URINAL

WALL HUNG LAVATORY

SERVICE SINK

SHOWER, ACCESSIBLE

FSK FLOOR SINK

HB HOSE BIBB

2" - 1" 1.28 GPF LOW FLOW FLUSH VALVE TYPE. PER SPECIFICATIONS.

4" 2" - 1" 1.28 GPF LOW FLOW FLUSH VALVE TYPE. PER SPECIFICATIONS.

INTEGRAL 2" 1-1/4" - 3/4"

0.5 GPM FAUCET FLOW RATE. PER SPECIFICATIONS.1-1/4" 1-1/2" 1-1/4" 1/2" 1/2"

2" 2" 1 1/4" 3/4" 3/4" 1.5 GPM FAUCET FLOW RATE. PER SPECIFICATIONS.

2" 2" 1-1/4" 1/2" 1/2" COORDINATE SHOWER INSTALLATION WITH ARCH DWGS. PER SPECIFICATIONS.

2" 2" 2" - - PROVIDE NO/HALF GRATING AS INDICATED PLUMBING DRAWINGS. TRAP & WASTE SIZE AS INDICATED ON

PLUMBING DIAGRAMS. PER SPECIFICATIONS.

PROVIDE WITH NON-REMOVABLE VACUUM BREAKER FOR EXTERIOR HOSE BIBBS.- - - - 3/4"

0.125 GPF LOW FLOW FLUSH VALVE TYPE. PER SPECIFICATIONS.

P-7

FD-2

CORRIDORDRINKING WATER FOUNTAIN, ACCESSIBLE 1-1/2" 1-1/4" - 1/2" PROVIDE WITH INTEGRAL BOTTLE-FILLING STATION. PER SPECIFICATIONS.1-1/2"

FLOOR DRAIN PROVIDE TRAP PRIMER AS INDICATED. PER SPECIFICATIONS.4" 4" 2" - -

FLOOR DRAIN PROVIDE TRAP PRIMER AS INDICATED. PER SPECIFICATIONS.2" 2" 1 1/4" - -

COTG CLEANOUT TO GRADE - 6" - - -

FCO FLOOR CLEANOUT - 2" OR 4" - - -

P-8 BREAK ROOMKITCHEN SINK 2" 1-1/4" 1/2" 1/2" PER SPECIFICATIONS2"

COORDINATE WITH CIVIL DWGS. PER SPECIFICATIONS

PER SPECIFICATIONS

THERMOSTATIC MIXING VALVE SCHEDULE

SYMBOL DESCRIPTION TYPICAL

LOCATION MIN FLOW

(GPM)

DESIGN

FLOW

(GPM)

∆P @ DESIGN

FLOW

(PSI)

REMARKS

TMV-2 134 MECH 1AHIGH-LOW 1 90 20 ASSE 1017, 120°F INITIAL SETPOINT,

TMV-1 134 MECH 1AHIGH-LOW 1 90 20 ASSE 1017, 120°F INITIAL SETPOINT

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

P-601

PL

U

M

BI

N G

E Q

U

IP

M E N

T

SC

H

ED

U

LE

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

M

AR

K D

ES

C

R

IP

TI

O

N D

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/ 2"

D C

W

1" D

C W

1" DCW

1" DHW 1" DHW

2" DCW

2" DCW

3" DCW

3" DCW

3" DCW

2" DCW

2" DHW

2" DCW 2" DHW

1/2" DHW1/2" DCW

1/2" DHW

1/2" DCW

3/4" DCW

3/4" DHW

1 1/2" D

HW

1 1/2" DCW

1/2" DCW

1/2" DHW

1/2" DHW

1/2" DCW

CW TO NORTH BLDG

POC 3" DOMW CW,

SEE CIVIL DWGS

FOR CONNECTION

POC 2" HW, 1

1/2" HWR, SEE

CIVIL DWGS FOR

CONNECTION

CW, HW,

HWR RISERS

IN MECH RM

CW, HW,

HWR IN PLBG

CHASE

1" DCW

1 1/2" DHWR

2" D

H W

P-5

P-4 P-4

P-4

P-4 P-4

P-4

P-2 P-1

P-1 P-1

P-6 P-6

P-6

P-2 P-1

P-1

P-3 P-3

P-3

P-6

P-6 P-6

P-6P-6

P-6 P-6

P-2

P-4

P-6

P-7

BFP, WATER METER ALONG

HORIZONTAL PIPE IN MECH RM.

PROVIDE BLDG SHUTOFF VALVE

PENE THRU

SLAB IN

MECH RM

PIPE BELOW SLAB, PROVIDE

TERMITE BARRIER, SEE DETAIL

FOR REQUIREMENTS

1 1/2" DHWR

1/2" DHW

1/2" DCW

TMV-1

2" D

C W

2" DCW

2" DHW

2" DHW

2" DHW

1 1/2" DHWR

WHA TYPE A

WHA TYPE D

WHA TYPE D

WHA TYPE A

WHA TYPE A

WHA TYPE D

WHA TYPE AA

WHA TYPE A

120A - CMD TOILET

103 - WOMEN'S

LATRINE

106 - MEN'S LATRINE

103A - JANITOR

105 - MECHANICAL

100A - CORRIDOR

HW, HWR

STUBOUTS

FOR HVAC

POC

TRAP PRIMER

P-1

P-4

P-6

P-1 P-4

P-6

P-4 P-4

P-4

P-4 P-4

P-4

P-2 P-1

P-1 P-1 P-2

P-1 P-1

P-3 P-3

P-3

P-7

P-6 P-6

P-6 P-6

P-6 P-6

P-6 P-6

P-6 P-6

1/ 2"

D C

W 1/

2" D

H W

1" D

C W

1/2" DCW

1/2" DHW

1" DHW

1" DCW

1" DHW

1 1/2" DCW

3/4" DHW

1" DCW

1/2" DCW

1/2" DCW

1/2" DHW

1" D

C W

1/ 2"

D C

W 1/

2" D

H W

2" D

H W2" D

C W

1/2" DHW1/2" DCW

1" DCW

3/4" DHW

2" D

C W

1/

2" D

H W

R

2" D

H

W 1" DCW

1" DCW

1/2" DCW

1/2" DHW

1/2" DHW

1/2" DCW

1/ 2"

D H

W 1/

2" D

C W

1/ 2"

D C

W 1/

2" D

H W

1" DHW

1" DCW

3/4" DCW3/4" DHW

CW, HW, HWR

RISERS IN MECH

RM

CW, HW, HWR

RISERS IN PLBG

CHASE

1/

2" D

H W

R

WHA TYPE AA

WHA TYPE A

WHA TYPE A

WHA TYPE AA

1/2" DHW

1/2" DCW

WHA TYPE A

WHA TYPE D

WHA TYPE D

WHA TYPE A

WHA TYPE A

WHA TYPE D

231 - CMD TOILET

202 - CMD TOILET

223A - JANITOR

223 - WOMEN'S LATRINE

224 - MEN'S LATRINE

225 - MECHANICAL

HW, HWR STUBOUTS FOR

HVAC POC

TRAP

PRIMER

P-5

P-1 P-4

P-7

P-4 P-4

P-4

P-4 P-4

P-4

P-2 P-1

P-1 P-1 P-2

P-1 P-1

P-3 P-3

P-3

P-6

P-6

P-6 P-6

P-6 P-6

P-6 P-6

P-6 P-6

P-1

P-4

P-6

P-6

1/ 2"

D H

W 1/

2" D

C W

1" D

C W

1/2" DCW

1/2" DHW

1" DCW

1" DHW

1" DHW

1 1/2" DCW

2" D

H W

2" D

C W

1" DCW

3/4" DHW

1/2" DCW

1/2" DCW

1/2" DHW

1" D

C W

1/2" DCW3/4" DHW

1" DCW

3/4" DHW

1/2" DHW

1/2" DCW

1/ 2"

D H

W 1/

2" D

C W

1/ 2"

D C

W 1/

2" D

H W

1/2" DHW

1/2" DCW

1/2" DCW1/2" DHW

1" DCW

1" DCW

1 1/2" D

HW

1 1/2" DCW

2" D

C W 1 1/

2" D

H W

R

2" D

H W

1" DCW

CW, HW, HWR

RISERS IN

MECH RM

HW, CW, HWR IN

PLBG CHASE

1/2" DCW

1/2" DHW

1/

2" D

H W

R

1 1/2" DHWR

1 1/2" DHWR

HWR CIRCUIT

SETTER

1/2" DHW

1/2" DCW

WHA TYPE A

WHA TYPE D

WHA TYPE D

WHA TYPE A

WHA

TYPE A

WHA

TYPE D

WHA TYPE A

WHA TYPE AA

WHA TYPE AA

WHA TYPE A

1" DHW

1" DCW

320A - CMD TOILET

302 - CMD TOILET

323A - JANITOR

323 - WOMEN'S LATRINE

324 - MEN'S LATRINE

325 - MECHANICAL

HW, HWR

STUBOUTS

FOR HVAC

POC

TRAP PRIMER

P-5

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP901

SO

U

TH

P

L U M

BI

N

G D

O M

ES

T I

C W

A T

ER

D I A

G R

A M

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

SOUTH PLUMBING DOMESTIC WATER

DIAGRAM

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

2" DCW

1" DHW

1" DCW

2" DCW

1" DHW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DCW

1/2" DHW

1/ 2"

D H

W 1/

2" D

C W

1/2" DHW

1/2" DCW

1/2" DCW

1/2" DHW

2" HW, 1 1/2" HWR POC, SEE

CIVIL DWGS FOR

CONNECTION

2" CW CONTINUES TO

SOUTH BLDG

1/2" DHW

1/2" DCW

1" DCW

1/ 2"

D C

W

1/ 2"

D C

W 1/

2" D

H W

P-2 P-1

P-1 P-1

P-2P-1P-1

P-3 P-3

P-3

P-4 P-4

P-4

P-6 P-6

P-6

P-4 P-4

P-4

P-6

P-6 P-6 P-6

P-6

P-6 P-6

P-5

P-2

P-4 P-6

P-7

1 1/2" D

CW

1 1/2" DHW

2" D

C W 1 1/

2" D

H W

R 2"

D H

W

HW, HWR, CW

RISERS IN

PLBG CHASE

HW, CW, HWR

RISERS IN

MECH RM

HW, CW, HWR

BELOW SLAB

TMV-2

1/

2" D

H W

R

2" D

C W

2" D

H W

WHA TYPE A

WHA TYPE AA

1" DCW

WHA TYPE D

WHA TYPE D

WHA TYPE D

WHA TYPE A

WHA TYPE A

WHA TYPE A

155A - CMD TOILET

137 - WOMEN'S LATRINE

140 - MEN'S LATRINE

137A - JANITOR

139 - MECHANICAL

HW, HWR

STUBOUTS FOR

HVAC POC

TRAP PRIMER

P-8

155 - BREAK RM

1" DCW

3/4" DHW

P-7

P-7

P-6

P-1 P-4

P-4 P-4

P-4

P-4 P-4

P-4

P-2

P-1P-1 P-1

P-2P-1 P-1

P-3

P-3

P-3 P-6

P-6

P-6

P-6

P-6 P-6

P-6

P-6 P-6

P-6

1 1/2" DCW

1" DHW

1/2" DCW

1/ 2"

D C

W

3/4" DCW

1" DCW

1/2" DCW

3/4" DHW 3/4" DHW

1/ 2"

D H

W

1/2" DHW

1/2" DCW

1/2" DCW

2" D

H W

1" DCW

2" D

C W

1/2" DCW

1/2" DCW

1/2" DCW

1/ 2"

D C

W

1/2" DHW

1/2" DCW

1/ 2"

D H

W 1/

2" D

C W

1/ 2"

D H

W 1/

2" D

C W

3/ 4"

D H

W 3/

4" D

C W

1" DCW

1 1/2" D

CW

1 1/2" D

HW

2" D

C W 1

1/ 2"

D H

W R

1/

2" D

H W

1/ 2"

D C

W 1/

2" D

H W

1/ 2"

D C

W 1/

2" D

H W

1/2" DCW

1/2" DHW

CW, HW, HWR

RISERS IN

MECH RM

CW, HW, HWR

RISERS IN PLBG

CHASE

1" D

C W

1" DCW

1" DHW

2" D

H W

WHA TYPE A

WHA TYPE D

WHA TYPE A

WHA TYPE D

WHA TYPE A

WHA TYPE D

WHA TYPE AA

WHA TYPE AA

WHA TYPE AA

200C - CORRIDOR

246 - MEN'S LATRINE

247 - WOMEN'S LATRINE

251 - CMD TOILET

248 - MECHANICAL200D - CORRIDOR

HW, HWR

STUBOUTS

FOR HVAC

POC

TRAP PRIMER

P-5

P-7

P-1 P-4

P-7

P-4 P-4

P-4

P-4 P-4

P-4

P-2 P-1

P-1 P-1

P-2P-1 P-1

P-3

P-3

P-3 P-6

P-6

P-6

P-6

P-6 P-6

P-6

P-6 P-6

P-6

P-6

1/ 2"

D C

W

1/2" DCW

1/2" DCW

1/2" DCW

3/4" DCW

1 1/2" DCW

1" DHW

2" D

H W

2" D

C W

3/4" DHW

1" DCW

1/2" DCW

1/2" DHW

1/2" DCW3/4" DHW

1" D

C W

2" D

C W 1 1/

2" D

H W

R

1/ 2"

D H

W

1 1/2" D

CW

1 1/2" D

HW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/ 2"

D C

W 1/

2" D

H W

1" DCW

1" DHW

3/ 4"

D C

W 3/

4" D

H W

1/ 2"

D C

W 1/

2" D

H W

1/ 2"

D C

W 1/

2" D

H W

1/2" DCW

1/2" DHW

1/2" DCW

3/4" DHW1"

D C

W

1" DCW

CW, HW, HWR

RISERS IN

MECH RM

CW, HW, HWR IN

PLBG CHASE

1 1/2" DHWR

1 1/2" DHWR

HWR

CIRCUIT

SETTER

WHA TYPE A

WHA TYPE D WHA TYPE A

WHA TYPE D

WHA TYPE

A

WHA

TYPE D

WHA TYPE AA

WHA TYPE AA

WHA TYPE AA

351 - CMD TOILET

300D - CORRIDOR

300C - CORRIDOR

348 - MECHANICAL

347A - JANITOR

347 - WOMEN'S LATRINE

346 - MEN'S LATRINE

HW, HWR

STUBOUTS FOR

HVAC POC TRAP PRIMER

P-5

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP902

N O

R

TH

P L U

M

BI

N G

D O

M

ES

T I C

W A T

ER

D

I A G

R A M

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

A1

NORTH PLUMBING DOMESTIC WATER

DIAGRAM

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

P-5

P-4

P-4

P-4

P-4

P-4

P-4

P-2

P-1

P-1

P-1

P-2

P-1 P-1

P-3

P-3

P-3 P-5P-5

4" S

4" S

1 1/4" V

2" V

4" S

1 1/4" V

1 1/4" V

4" S

4" S

2" V

2" V

4" S

4" FCO

4" S

4" FCO

1 1/2" S

2" S

2" S

2" V

1/

4" V

3" S

3" S

3" S 4" S

2" S

4" S

4" S

4" S

4" S

2" S

2" S

2" S

4" FCO

4" SAN STACK UP TO 2ND

FLR LATRINE

2" V

2" VENT

STACK

4" FCO

4" FCO

3" S

2" S

2" S 4" FCO

4" FCO

4" FCO

POC CIVIL SAN, SEE

CIVIL DWGS FOR

CONNECTION

CONTINUES TO FIRE

PUMP RM

CONTINUES TO

MECH RM

106 - MEN'S LATRINE

103 - WOMEN'S LATRINE

103A - JANITOR

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

P-4

P-4

P-4

P-4

P-4

P-4

P-2

P-1

P-1

P-1 P-2

P-1 P-1

P-3

P-3

P-3

P-6

P-6

P-6

P-6

P-6

P-6

P-6 P-6

P-6

P-6

P-5

4" SAN STACK UP TO 3RD FLR LATRINE

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

1 1/4" V

2" V

1 1/2" S 1 1/2" S

4" S

4" S

4" S 4" S

1 1/2" S 1 1/2" S

4" S

1 1/4" V

2" V

4" S

4" S

1 1/4" V1 1/4" V

1 1/2" V

1 1/2" V

2" V

2" V

2" VENT STACK UP TO 2ND FLR LATRINE

4" S

4" SAN STACK

DN TO 1ST FLR

LATRINE

2" VENT

STACK DN TO

1ST FLR

LATRINE

223A - JANITOR

223 - WOMEN'S LATRINE

224 - MEN'S LATRINE

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

P-4

P-4

P-4

P-4

P-4

P-4

P-2

P-1

P-1

P-1 P-2P-1

P-1

P-3

P-3

P-3

P-6

P-6

P-6

P-6

P-6

P-6

P-6 P-6

P-6

P-6

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

2" V, CONNECT TO EXIST VTR

4" FCO

1 1/4" V

1 1/2" S

1 1/2" S

2" V

4" S

4" S

1 1/4" V

1 1/4" V

1 1/2" V 1 1/2" V

4" S

4" S

4" S 4" S

4" S

4" S

2" V

2" V

2" V 1 1/4" V

1 1/2" S 4" S

4" S

P-5

2" VENT

STACK DN

TO 2ND FLR

LATRINE

4" SAN STACK

DN TO 2ND FLR

LATRINE

324 - MEN'S LATRINE

323 - WOMEN'S LATRINE

323A - JANITOR FD-1

FD-1

FD-1

FD-1

FD-1

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP903

SO

U

TH

P

LU

M

B I N

G D

W V

D I A

G R

A M

LA

TR

IN

E S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

A1

SOUTH PLUMBING DWV DIAGRAM -

LATRINES

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

4" FCO

FD-1

P-2 P-4

P-7

FD-2

4" S

4" S

2" V

2" S

4" S

4" S

4" S

1 1/2" S

1 1/2" S4" S

4" S

4" S

4" SAN STACK

UP TO 2ND FLR

2" VENT STACK

UP TO 2ND FLR

2" V 2" V

2" VENT STACK

UP TO 2ND FLR

4" SAN STACK

UP TO 2ND FLR

4" HUB DRAIN FOR FIRE PUMP RM,

SEE FIRE DWGS FOR DETAILS

CONTINUES TO

SHEET PW101

CONTINUES

TO LATRINE

FSK

120A - CMD TOILET

120 - FIRE PUMP

105 - MECHANICAL

100C - EXISTING LANAI

FCO

2" S TO AIR GAP

FITTING

101A - ARMS VAULT 2

FD-1

FD-1

FD-1

P-1

P-4

P-6

P-1 P-4

P-6

P-7

2" VENT STACK

UP FR 1ST FLR

2" VENT

STACK UP TO

3RD FLR

4" SAN STACK

UP TO 3RD FLR

4" S

1 1/4" V

2" V

2" V

4" S

4" S

2" S

2" V

2" V

1 1/4" V

2" V

4" S

4" S

4" S

4" S

2" VENT STACK

UP TO 3RD FLR

4" SAN STACK

UP TO 3RD FLR

4" VENT STACK

DN TO 2ND FLR

4" FCO

4" SAN DN TO

2ND FLR

FSK

225 - MECHANICAL

231 - CMD TOILET

202 - CMD TOILET

FD-1

FD-1

FD-1

P-1 P-4

P-7

P-1

P-4

P-6

P-6

4" FCO

2" V, CONNECT TO EXIST VTR

4" SAN STACK DN

TO 2ND FLR

4" SAN STACK

DN TO 2ND FLR

1 1/4" V

2" V

2" V

4" S

4" S

4" S

2" V

2" VENT STACK

DN TO 2ND FLR

4" SAN STACK DN TO 2ND FLR

2" V, CONNECT TO EXIST VTR

1 1/4" V

2" V

2" V

2" VENT STACK DN TO 2ND FLR

4" FCO

4" S

4" S

FSK

331 - CMD TOILET

325 - MECHANICAL

302 - CMD TOILET

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP904

SO

U

TH

P

LU

M

BI

N

G D

W V

D

IA

G R

AM

C M

D

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

K.

M

O

LI

N A

K.

M

O

LI

N A

R . C

H U

N

S

EP

A1 SOUTH PLUMBING DWV DIAGRAM - CMD

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

FD-1 FD-1

FD-1

FD-1

FD-1FD-1

FD-1

FD-1

FD-1

P-2

P-1 P-1

P-1

P-2

P-1 P-1

P-3

P-3

P-3

P-4

P-4

P-4

P-6

P-6 P-6

P-4

P-4

P-4

P-6P-6

P-6

P-6

P-6

P-6

P-6

P-5

2" S

2" S

1 1/2" S

1 1/2" S

1/

4" V

1 1/4" V

1 1/4" V

1 1/4" V

2" V

1/

4" V

1 1/2" S

4" FCO

4" FCO

4" FCO

4" S

6" SAN POC, SEE

CIVIL DWGS FOR

CONNECTION

4" FCO

4" FCO

1 1/4" V

1 1/2" V

4" S 4" S

4" S

4" FCO

1 1/2" S

4" S

4" S

2" V

2" VENT STACK UP

TO 2ND FLR

LATRINE

4" SAN STACK UP TO

2ND FLR LATRINE

4" S

4" S

CONTINUES TO

MECH RM

CONTINUES TO

CMD TOILET

137A - JANITOR

137 - WOMEN'S LATRINE

140 - MEN'S LATRINE

FD-1

FD-1

FD-1

FD-1

FD-1

4" FCO

FD-1

FD-1 FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

P-4

P-4

P-4

P-4

P-4

P-4

P-2

P-1

P-1

P-1

P-2

P-1 P-1

P-3

P-3

P-3 P-6

P-6

P-6

P-6

P-6P-6

P-6

P-6 P-6

P-6

1 1/4" V 2" V

1 1/4" V

1 1/2" S 1 1/2" S

4" S

4" FCO

4" S

4" FCO

4" SAN STACK

UP TO 3RD FLR

2" VENT STACK

UP TO 3RD FLR

4" FCO

4" FCO

2" VENT

STACK DN

TO 1ST FLR 4" SAN STACK

DN TO 1ST FLR

4" FCO

4" S

4" S

4" S 4" S

1 1/2" S

4" S

4" FCO

4" S

4" S

1 1/2" V

1 1/4" V1 1/4" V

2" V

2" V 2" V

P-5

246 - MEN'S LATRINE

247 - WOMEN'S LATRINE

247A - JANITOR

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1 FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

P-4

P-4

P-4

P-4

P-4

P-4

P-2

P-1

P-1P-1

P-2

P-1

P-1

P-3

P-3

P-3 P-6

P-6

P-6

P-6

P-6

P-6 P-6

P-6 P-6

P-6

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

2" V, CONNECT TO EXIST VTR

2" VENT STACK

DN TO 2ND FLR

4" SAN STACK

DN TO 2ND FLR

1 1/2" S

4" S

1 1/2" S 4" S

4" S

4" S

4" S 4" S

4" S

1 1/2" S

4" S4" S

1 1/4" V 1 1/4" V

2" V

2" V

1 1/2" V 1 1/2" V

2" V

2" V

1 1/4" V

1 1/4" V

P-5

346 - MEN'S LATRINE

347 - WOMEN'S LATRINE

347A - JANITOR

FD-1

FD-1

FD-1

FD-1

FD-1

4" FCO

4" FCO

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP905

N O

R

TH

P

LU

M B I

N G

D W

V D

I A G

R A M

LA

TR

IN

E S

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D es ig ne r

Au th or

C he ck er

S

EP

A1

NORTH PLUMBING DWV DIAGRAM -

LATRINES

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

P-2

P-4

P-6

P-7

4" S

4" S

4" S

1 1/2" S

4" S

FCO

4" S

4" S2"

V

4" S

2" VENT STACK

UP TO 2ND FLR

4" SAN STACK

UP TO 2ND FLR

2" VENT STACK

UP TO 2ND FLR

4" SAN STACK

UP TO 2ND FLR

4" FCO

2" V 2" V

1 1/4" V

CONTINUES TO

LATRINE

CONTINUES

TO SHEET

PW102

FSK

139 - MECHANICAL

155A - CMD TOILET

100D - EXISTING LANAI

FCO

2" S TO AIR

GAP FITTING

135B - ARMS VAULT 7

155 - BREAK RM

P-8

FD-1

FD-1

P-7

P-7

P-6

P-1

P-4

2" FCO

2" VENT STACK

UP TO 3RD FLR

2" SAN STACK

UP TO 3RD FLR

2" S

2" S

2" S

4" S

4" S

1 1/4" V

2" V

2" VENT STACK

UP TO 3RD FLR

4" SAN STACK

UP TO 3RD FLR

4" SAN STACK

DN TO 2ND FLR

4" SAN STACK

DN TO 1ST FLR

4" SAN STACK

UP TO 3RD FLR

2" VENT STACK

UP TO 3RD FLR

4" S

1 1/4" V

2" V

2" V

2" VENT STACK

DN TO 2ND FLR

4" S

FSK

251 - CMD TOILET

248 - MECHANICAL

200D - CORRIDOR

200C - CORRIDOR

FD-1

FD-1

P-7

P-1

P-4

P-7

P-6

4" SAN STACK

DN TO 2ND FLR

4" FCO

2" V, CONNECT TO EXIST VTR

1 1/4" V

2" V

2" V

2" VENT STACK

DN TO 2ND FLR

4" SAN STACK

DN TO 2ND FLR

2" VENT STACK

DN TO 2ND FLR

2" V, CONNECT TO EXIST VTR

4" S

2" S

1 1/4" V

2" V

2" V, CONNECT TO EXIST VTR

2" VENT

STACK DN TO

2ND FLR

2" SAN STACK

DN TO 2ND FLR

1/

4" V

2" S

FSK

300C - CORRIDOR

348 - MECHANICAL

300D - CORRIDOR

351 - CMD TOILET

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

PP906

N O

R

TH

P

LU

M

BI

N G

D W

V D

IA

G

R

AM

C

M D

FY

1 7

P

KG

A -0

R

E P

AI

R B

LD

G

, Q U

AD

D

SC

H

O

FI

EL

D

B

AR

R

AC

KS

, O

AH

U

, H

AW

AI

I

H O

N O

L U

LU

D I S

TR

IC

T

BU

I L D

IN

G

FT

S

H

AF

TE

R

, H

AW

A I I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D es ig ne r

Au th or

C he ck er

S

EP

A1 NORTH PLUMBING DWV DIAGRAM - CMD

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H O

N O

L U

L U D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

H I

F Y P

K G A -0

R E

P A

IR

B

L D

G

Q U

A D D

S C

H O

F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W A

II

A N

S I

D

1 2 3 4

A

B

C

D

1 2 3 4 5

A

B

C

D

S

E P

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

9/28/2016 10:52:56 AM$MODELNAME$MODEL NAME:

FILE NAME: $FILES$

B U

IL

D

IN

G

F T S

H A

F T

E R

H A

W A

II

-5

MECHANICAL NOTES:

MECHANICAL LEGEND

FLOOR PENETRATION

AUTOMATIC 2-WAY CONTROL

VALVE

AUTOMATIC 3-WAY CONTROL

VALVE

SYMBOL ABBREV DESCRIPTION

ABOVE FINISHED FLOORAFF

AHU AIR HANDLING UNIT

AIRFLOW MEASURING STATIONAFM

CD CONDENSATE DRAIN

CHILLERCH

CDWS CONDENSER WATER SUPPLY

CDWR CONDENSER WATER RETURN

CONDENSER WATER PUMPCDWP

CHWP CHILLED WATER PUMP

CHW CHILLED WATER

CHILLED WATER RETURNCHWR

CHWS CHILLED WATER SUPPLY

CONTINUATIONCONT.

CT COOLING TOWER

DIRECT DIGITAL CONTROLDDC

DN DOWN

DUCT SMOKE DETECTORSD

EA EXHAUST AIR

EXHAUST AIR REGISTEREAR

EF EXHAUST FAN

ENERGY MANAGEMENT

EMCS

CONTROL SYSTEM

EXISTINGEXST

FCU FAN COIL UNIT

FIRE DAMPERFDR

GALVANIZEDGALV.

HWP HOT WATER PUMP

EMERGENCY HVAC

SHUTOFF SWITCH

DEMOLISH EXISTING

RETURN DUCT (UP & DN)

SUPPLY DUCT (UP & DN)

EXHAUST DUCT (UP & DN)

TEMPERATURE SENSOR

STATIC PRESSURE SENSOR

RATED LOAD AMPS

VARIABLE FREQUENCY DRIVE

VARIABLE AIR VOLUME

VOLUME DAMPER

TYPICAL

TURNING VANE

THERMOSTAT

SUPPLY AIR REGISTER

SUPPLY AIR DIFFUSER

SUPPLY AIR

RETURN AIR REGISTER

RETURN AIR

OUTSIDE AIR

NORMALLY OPEN

NORMALLY CLOSED

HOT WATER SUPPLY

HOT WATER RETURN

DESCRIPTIONABBREV.SYMBOL

HWRR

HWRS

N.C.

N.O.

OA

RA

RAR

SA

SAD

SAR

T-STAT

TYP

VD

VAV

VFD

RLA

SP

T

1. THE ENTIRE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE

REQUIREMENTS OF THE NATIONAL FIRE PROTECTION ASSOCIATION CODE,

NATIONAL ELECTRICAL CODE, AND ALL OTHER AGENCIES HAVING

JURISDICTION.

2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE

COMPLETE INSTALLATION OF SYSTEMS TO FUNCTION AS DESCRIBED AND

SPECIFIED. THE OMISSION OF REFERENCE TO ANY NECESSARY ITEM OF

LABOR OR MATERIAL SHALL NOT RELIEVE THE CONTRACTOR FROM

PROVIDING SUCH LABOR AND MATERIAL.

3. ALL EQUIPMENT SHALL BE CAPABLE OF FITTING INTO THE SPACES

ALLOCATED WHILE MEETING THE MANUFACTURER'S RECOMMENDED

ACCESS REQUIREMENTS. REVIEW ALL SPACES WHERE EQUIPMENT IS TO BE

INSTALLED PRIOR TO ORDERING OF EQUIPMENT AND NOTIFY THE

CONTRACTING OFFICER OF ANY INADEQUATE CLEARANCES OR CONDITIONS

THAT WILL PREVENT THE PROPER INSTALLATION, MAINTENANCE, OR

OPERATION OF THE EQUIPMENT.

4. COORDINATE WITH OTHER TRADES PRIOR TO COMMENCING AND DURING

CONSTRUCTION. OVERLAY PLANS AND CHECK FOR ANY DISCREPANCIES OR

CONFLICTS WITH OTHER TRADES.

5. VERIFY AND COORDINATE ALL ROOF, WALL, AND FLOOR PENETRATIONS

WITH THE STRUCTURAL AND ARCHITECTURAL DRAWINGS AND NOTIFY THE

GENERAL CONTRACTOR OF ANY CONFLICTS PRIOR TO START OF

CONSTRUCTION.

6. OBTAIN APPROVAL FROM THE STRUCTURAL ENGINEER BEFORE MAKING ANY

PENETRATIONS THROUGH STRUCTURAL MEMBERS, WALLS, OR SLABS.

7. VERIFY THE EXACT LOCATION, SIZE, AND INVERT OF ALL EXISTING SEWER

AND WATER LINES AT THE NEW POINT OF CONNECTION PRIOR TO THE

START OF CONSTRUCTION.

8. TONE AND LOCATE ALL UTILITY LINES OR OTHER INTERFERENCES IN AREAS

OF PROPOSED TRENCH WORK PRIOR TO START OF EXCAVATION. REPAIR OR

PAY FOR ALL DAMAGES TO EXISTING UTILITIES.

9. DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING AND

DUCTWORK. PROVIDE OFFSETS AS NECESSARY TO AVOID LOCAL

OBSTRUCTIONS OR INTERFERENCE WITH OTHER TRADES. REVIEW ALL

PIPING AND DUCT RUNS PRIOR TO FABRICATION AND IMMEDIATELY NOTIFY

THE CONTRACTING OFFICER OF ANY INTERFERENCE AND/OR LACK OF

ADEQUATE CLEARANCES.

10. SHOULD PROJECT CONDITIONS REQUIRE REARRANGEMENT OF WORK,

MARK SUCH CHANGES ON THE AS-BUILT DRAWINGS AND NOTIFY THE

CONTRACTING OFFICER. IF THESE CHANGES REQUIRE ALTERNATE

METHODS TO THOSE APPROVED BY THE CONTRACT DOCUMENTS, SUBMIT

SHOP DRAWINGS SHOWING THE PROPOSED ALTERNATE METHODS TO THE

GENERAL CONTRACTOR FOR REVIEW. DO NOT PROCEED UNTIL REVIEWED.

11. PATCH AND PAINT ALL EXPOSED MATERIAL, INCLUDING DUCTWORK, TO

MATCH ADJACENT SURFACES OR AS INDICATED.

12. REPAIR ANY DAMAGE TO EXISTING CONSTRUCTION RESULTING FROM THE

INSTALLATION OF MECHANICAL ITEMS. THE AREAS REPAIRED SHALL MATCH

THE ADJACENT SURFACES IN TEXTURE AND COLOR.

13. PROPERLY FIRESTOP ALL PENETRATIONS THROUGH FIRE RATED WALLS,

FLOORS, OR PARTITIONS WITH A UL APPROVED SYSTEM APPROPRIATE FOR

THE PENETRATION TYPE AND FIRE RATING IN ACCORDANCE WITH

MANUFACTURER'S INSTALLATION INSTRUCTIONS. FIRESTOP ALL

PENETRATIONS BETWEEN FLOORS.

14. THE HVAC CONTRACTOR SHALL PROVIDE AND INSTALL ACCESS PANELS TO

ALL VAV BOXES, CONCEALED VALVES, DAMPERS, AND EQUIPMENT.

COORDINATE THE SIZE AND LOCATION OF ACCESS PANELS TO INSTURE

THAT THE EQUIPMENT CAN BE MAINTAINED ADEQUATELY. ACCESS PANELS

SHALL MATCH THE FIRE RATING OF ALL THE WALLS OR CEILINGS THAT ARE

BEING PENETRATED. ACCESS PANELS TO FIRE DAMPERS SHALL ALLOW

RESETTING OF DAMPERS THAT HAVE SLAMMED SHUT. ACCESS PANELS FOR

VAV BOXES SHALL BE COORDINATED WITH THE EQUIPMENT ORDERED TO

ENSURE SUFFICIENT ACCESS IS AVAILABLE TO THE VAV CONTROLLER. ALL

ACCESS PANEL LOCATIONS SHALL BE APPROVED BY THE GENERAL

CONTRACTOR PRIOR TO INSTALLATION.

15. PROVIDE VOLUME DAMPERS ON DUCTWORK BRANCH LINES WHETHER

SHOWN ON THE DRAWINGS OR NOT. PROVIDE REMOTELY ACTUATED

DAMPERS IN AREAS WITH GYPBOARD OR CONCEALED CEILINGS.

16. SEISMICALLY BRACE ALL EQUIPMENT, PIPING, AND DUCTWORK IN

ACCORDANCE WITH THE IBC.

17. INSTALL CONDENSATE DRAINS AT A MINIMUM SLOPE OF 1/4 INCH PER 1

FOOT. INDIVIDUAL UNIT CONDENSATE DRAINS SHALL BE 1 INCH DIAMETER.

PIPING RECEIVING CONDENSATE FROM MORE THAN 1 UNIT SHALL BE 1-1/4

INCH DIAMETER.

18. INSULATE ALL SEWER PIPING RECEIVING AIR CONDITIONING CONDENSATE

OR ANY OTHER COLD LIQUID WHICH MAY CREATE CONDENSATION FROM

THE POINT OF CONNECTION TO THE TOP OF CONCRETE SLAB ON GRADE.

INSULATE FLOOR DRAIN AND SINK BODIES EXPOSED TO AIR BELOW THE

FLOOR.

19. ROUTE ALL CONTROL AND MOTOR STARTER WIRING IN CONDUIT IN ALL

EXPOSED AREAS. PLENUM RATED CABLE MAY BE USED IN CONCEALED

AREAS. CABLE SHALL BE PROPERLY TIED AND SUPPORTED.

20. MOUNT ALL ROOM THERMOSTATS AT 4 FEET ABOVE FINISHED FLOOR

UNLESS OTHERWISE INDICATED.

21. ALL DUCT DIMENSIONS SHOWN ARE INTERIOR NET DIMENSIONS.

22. FOR DOOR LOUVER AND WALL LOUVER SIZES, SEE ARCHITECTURAL

DRAWINGS. THE HVAC CONTRACTOR SHALL PROVIDE AND INSTALL ALL

WALL LOUVERS.

23. AT/FP EMERGENCY HVAC SHUT DOWN SWITCHES SHALL BE INSTALLED AS

INDICATED. COORDINATE LOCATION WITH GENERALL CONTRACTOR AND

DESIGNER OF RECORD PRIOR TO INSTALLATION.

24. PROVIDE BALANCING VALVES AND TEST PORTS ON EITHER SIDE OF THE

VALVE ON PIPING FOR ALL COILS WHETHER SHOWN IN THE DRAWINGS OR

NOT. TEST PORTS MUST BE ACCESSIBLE WITH INSULATION INSTALLED.

25. SUBMIT THE FOLLOWING INFORMATION FOR ALL EQUIPMENT CONTAINING

REFRIGERANTS TO DPW CLEAN AIR/SAFE DRINKING WATER PROGRAM

(LIANA LEE, 656-7221): NUMBER AND TYPE OF EQUIPMENT, MANUFACTURER,

MODEL NUMBER, SERIAL NUMBER, TYPE OF REFRIGERANT, AND

REFRIGERANT CHARGE.

26. GFCI AIR HANDLING UNITS ARE BEING STORED IN SCHOFIELD BARRACKS,

BUILDING 2061. ASSOCIATED GFCI DDC EQUIPMENT IS BEING STORED IN

BUILDING 2624. CONTRACTOR SHALL CONTACT MARC LAWTON

(808-656-3058, MARC.R.LAWTON.CIV@MAIL.MIL), DPW POINT OF CONTACT TO

TAKE POSSESSION OF AHUs AND DDC EQUIPMENT. CONTRACTOR SHALL BE

RESPONSIBLE FOR MOVING EQUIPMENT FROM STORAGE LOCATION TO

JOBSITE.

A N

S I

D

M-001

C

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

H

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

A N

D N

O T

E S

L E

G E

N D

A B

B R

E V

IA

T

IO

N S

M E

C H

A N

IC

A L

R

C H

U N

K

N

IS

H

IM

O T

O

K

N

IS

H

IM

O T

O

W

M U

R A

O K

A

T

SP

T

SD

ESO

CDWR

CDWS

CD

CHW

CWR

CWS

HWRR

HWRS

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H O

N O

L U

L U D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

H I

F Y P

K G A -0

R E

P A

IR

B

L D

G

Q U

A D D

S C

H O

F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W A

II

A N

S I

D

1 2 3 4

A

B

C

D

1 2 3 4 5

A

B

C

D

S

E P

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

9/28/2016 10:53:03 AM$MODELNAME$MODEL NAME:

FILE NAME: $FILES$

B U

IL

D

IN

G

F T S

H A

F T

E R

H A

W A

II

-5

CH

P

CH

P

P P

P

P P

P P

CHCH

CH

C H

C H

CH

CH

C H

C H

CH

C H

C H

C H

CH

G G

S S

SS SS SS

F

P

C H

C H

EXST BLD 449

BLD 452BLD 451

EXST

EXST BLD 450

SEE EXISTING SITE CHILLED WATER

PIPING DIAGRAM SHEET A1/M-003

AND CIVIL DRAWINGS

EXST GEARWASH

BUILDING

5" CW, 4"HW, & 1-1/2"

HWR DISTRIBUTION

LOOP

6" CHWS/R LOOP

EXST MECH

ENCLOSURE

SEE MECHANICAL PLANS

SHEETS A1/MH101 & A1/MH102

GENERAL NOTES:

SITE PIPING LEGEND

CHWS/CHWR PIPING IN SAME TRENCH

(SEE PLUMBING DRAWINGS)

CW, HW, HWR PIPING IN THE SAME TRENCH

(SEE PLUMBING DRAWINGS)

SOIL OR WASTE PIPING IN TRENCH

FIRE MAIN (SEE FIRE PROTECTION DRAWINGS)

CH

P

SS

F

SEE SHEET M-003 FOR PIPING DIAGRAM.13.

THAN 18 INCHES DEEP. SEE CIVIL DRAWINGS FOR JACKET DETAILS.

PROVIDE CONCRETE JACKET AROUND PIPING IN TRAFFIC AREAS LESS

PROVIDE CONCRETE JACKET AROUND PIPING LESS THAN 3 FEET DEEP. 12.

THE ROUTING AND INVERTS OF THE PIPELINES.

REFER TO CIVIL UTILITY DRAWINGS FOR ADDITIONAL INFORMATION ON 11.

PROVIDE HGH POINT RELIEF VENTS AT ALL HIGH POINTS IN THE SYSTEM.10.

PROVIDE LOW POINT DRAIN VALVES AT ALL LOW POINTS IN THE SYSTEM.9.

THE CONTRACTING OFFICER FOR APPROVAL.

LOCATIONS ALONG WITH THERMAL STRESS ANALYSIS CALCULATIONS TO

THE PIPE MANUFACTURER. SUBMIT PROPOSED EXPANSION JOINT

PROVIDE EXPANSION JOINTS AT ALL LOCATIONS WHERE REQUIRED BY 8.

SPECIFIED BY THE MANUFACTURER.

BE PROVIDED AT ALL CHANGES IN PIPE DIRECTION UNLESS OTHERWISE

SHOW ALL REQUIRED THRUST BLOCK LOCATIONS. THRUST BLOCKS SHALL

INSTRUCTION. LOCATIONS SHOWN ON SITE PLAN DO NOT NECESSARILY

PRE-INSULATED PIPING AS PER MANUFACTURER'S INSTALLATION

PROVIDE CONCRETE THRUST BLOCKS FOR UNDERGROUND 7.

INSTALLATION.

SHALL BE CLEARED BY THE CONTRACTING OFFICER PRIOR TO

ALL CHANGES IN THE ROUTING AND LOCATION OF APPURTENANCES

COORDINATED WITH THE ROUTING OF UTILITIES FOR ALL OTHER TRADES.

CONTRACTING OFFICER PRIOR TO INSTALLATION. ALL WORK SHALL BE

LOCATIONS OF ALL APPURTENANCES FOR APPROVAL BY THE

SYSTEM SHOWING THE EXACT ROUTING OF THE PIPELINES AND

CONTRACTOR SHALL PROVIDE COMPLETE LAYOUT DRAWINGS OF THE

SEE SHEET M-003 FOR GENERAL PIPING SYSTEM LAYOUT REQUIREMENTS. 6.

REQUIREMENTS.

SEE FIRE PROTECTION DRAWINGS FOR FIRE MAIN INSTALLATION 5.

SEE PLUMBING SITE PLAN FOR CW, SANITARY, HW, AND HWR PIPING.4.

BUILDING.

MECHANICAL CONTRACTOR SHALL INSTALL CHWS AND CHWR LOOP UP TO 3.

PLANS. SEE CIVIL FOR ACTUAL ALIGNMENT OF PIPING.

COORDINATE ALIGNMENT OF CHW PIPING WITH CIVIL & LANDSCAPING 2.

MANUFACTURER'S RECOMMENDATION.

PREFABRICATED PIPING. INSTALL IN ACCORDANCE WITH

ALL NEW UNDERGROUND PIPING CHWS/CHWR SHALL BE PRE-INSULATED, 1.

STUBOUT

EXST

STUBOUT

EXST

NTS

A1

EXISTING SITE UTILITY PLAN

A N

S

M-002

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

S

IT

E P

L A

N

Q U

A D D

M E

C H

A N

IC

A L

R

C H

U N

K

N

IS

H

IM

O T

O

K

N

IS

H

IM

O T

O

W

M U

R A

O K

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H O

N O

L U

L U D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

H I

F Y P

K G A -0

R E

P A

IR

B

L D

G

Q U

A D D

S C

H O

F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W A

II

A N

S I

D

1 2 3 4

A

B

C

D

1 2 3 4 5

A

B

C

D

S

E P

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

9/28/2016 10:53:09 AM$MODELNAME$MODEL NAME:

FILE NAME: $FILES$

B U

IL

D

IN

G

F T S

H A

F T

E R

H A

W A

II

-5

CHW

RCHW

S

3"

3"

CHW

R

CHW

S

3"

6"

CHW

RCHW

S

CHW

RCHW

S

CHW

SCHW

R

CHW

S

CHW

R

R-1CHW

RCHW

S

CHW

R

CHW

S

6"

CHW

RCHW

S

R-1

2- 1/ 2"

4"

4" 5"

HP6"

LP

R-1

CHW

RCHW

S

CHW

R

CHW

S

R-

CHW

R

CHW

S

VALVE BOX

PIPE TO BLDG 451

MECHANICAL ROOM

PIPE TO BLDG 451

MECHANICAL ROOM

VALVE BOX

3"

2" HWR

4" HW

3-1/2"

5"CW

VALVE BOX

PIPE TO BLDG 451

MECHANICAL ROOM

6"

3"

VALVE BOX

4" CW

3" HW

2" HWR

VALVE BOX

3" CW

2" HW

1-1/2" HWR

VALVE BOX

3"

3" HW

4" CW

2" HWR

1-1/2" HWR

2" HW

3" CW

VALVE BOX

3" 3"

6"

5" CW

4" HW

2-1/2" HWR

VALVE BOX

CENTRAL PLANT

BUILDING 450

TO & FROM 6"

6" CHWS/R

2-1/2" HWR

4" HW

5" CW

6" CW FROM CIVIL

VALVE BOX

TO & FROM

BUILDING 450

CENTRAL PLANT

BLDG.

BLDG. 449

BLDG.

BLDG. 450

POINT OF

CONNECTION

POINT OF

CONNECTION

CONNECTION

POINT OF

NOTE:

ADJUSTMENTS IN THE FIELD TO ACCOMMODATE ACTUAL PIPING LAYOUT.

VERIFY PIPING USING THE NECESSARY MEANS AND MAKE NECESSARY

INVERTS AND PIPE LOCATIONS. SEQUENCE AND POC. CONTRACTOR TO

SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION TO INCLUDE EXISTING 2.

PIPING DIAGRAM SHOWN FOR INFORMATION ONLY.1.

CONTROLLER.

PLANT AND QUAD D DDC CENTRAL

DDC WIRING BACK TO B450 CENTRAL

AND DDC CONDUIT (NO WIRE). ROUTE

VALVE BOX. CHWS PIPE, CHWR PIPE,

NTS

A1

EXISTING SITE UTILITY PIPING DIAGRAM

A N

S

M-003

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

W A

T E

R P

IP

IN

G D

IA

G R

A M

E X

IS

T

IN

G S

IT

E U

T

IL

IT

Y

M E

C H

A N

IC

A L

R

C H

U N

K

N

IS

H

IM

O T

O

K

N

IS

H

IM

O T

O

W

M U

R A

O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H O

N O

L U

L U D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

H I

F Y P

K G A -0

R E

P A

IR

B

L D

G

Q U

A D D

S C

H O

F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W A

II

A N

S I

D

1 2 3 4

A

B

C

D

1 2 3 4 5

A

B

C

D

S

E P

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

9/28/2016 10:53:16 AM$MODELNAME$MODEL NAME:

FILE NAME: $FILES$

B U

IL

D

IN

G

F T S

H A

F T

E R

H A

W A

II

-5

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

N S

M-601

O

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R S

C H

E D

U L E

S

M E

C H

A N

IC

A L

K N

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T

R

H E

D U

L E

S

M E

C H

A N

IC

A L

R

C H

U N

K

N

IS

H

IM

O T

O

K

N

IS

H

IM

O T

O

W

M U

R A

O K

A W

M U

R A

O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H O

N O

L U

L U D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

H I

F Y P

K G A -0

R E

P A

IR

B

L D

G

Q U

A D D

S C

H O

F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W A

II

A N

S I

D

1 2 3 4

A

B

C

D

1 2 3 4 5

A

B

C

D

S

E P

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

9/28/2016 10:53:42 AM$MODELNAME$MODEL NAME:

FILE NAME: $FILES$

B U

IL

D

IN

G

F T S

H A

F T

E R

H A

W A

II

-5

DIFFUSER TYPE

AIRFLOW (CFM)

DIFFUSER AND REGISTER KEY

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

S

M-602

O

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R S

C H

E D

U L E

S

M E

C H

A N

IC

A L

K N

H O

F

IE

L D B

A R

R A

C K

S

H A

W A

II

R E

P A

IR

B

L D

G

Q U

A D D

F Y

P

K G A -0

N O

L U

L U

H I

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T

H E

D U

L E

S

M E

C H

A N

IC

A L

R

C H

U N

K

N

IS

H

IM

O T

O

K

N

IS

H

IM

O T

O

W

M U

R A

O K

A W

M U

R A

O K

A 300

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

H O

N O

L U

L U D

IS

T R

IC

T

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

H I

F Y P

K G A -0

R E

P A

IR

B

L D

G

Q U

A D D

S C

H O

F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W A

II

A N

S I

D

1 2 3 4

A

B

C

D

1 2 3 4 5

A

B

C

D

S

E P

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

9/28/2016 10:54:10 AM$MODELNAME$MODEL NAME:

FILE NAME: $FILES$

B U

IL

D

IN

G

F T S

H A

F T

E R

H A

W A

II

-5

B1

DDC SYSTEM ARCHITECTURE SCHEMATIC

NTS

CHILLER

UCP

CHILLER

UCP

HP

UCP

HTR

UCP

HTR

UCP

MAIN

CPU

TYP.

FIELD

PANELS

BOOSTER

PUMPS UCP

LAN CONNECTION

COOLING TOWER

MONITORING &

CONTROL POINTS

COOLING TOWER

MONITORING &

CONTROL POINTS

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

TO OTHER BUILDING,

FIELD PANEL, TYP.

BLDG. 450 BLDG. 450

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

BLDG. 451 BLDG. 451

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

BLDG. 449 BLDG. 449

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

TYPICAL

FIELD

PANEL

TO DDC

POINTS (TYP.)

BLDG. 452 BLDG. 452

LAN CONNECTION, TYP.

LOCATE IN MAIN

CENTRAL CHILLER

PLANT AT BLDG 450

COOLING TOWER

MONITORING &

CONTROL POINTS

TYP.

FIELD

PANELS

TYP.

FIELD

PANELS

NOTE: SEE FLOOR PLANS FOR SUGGESTED PANEL LOCATIONS

ENERGY MANAGEMENT SYSTEM INCLUDING ALL HARDWARE, SOFTWARE, SENSORS, CONDUIT, AND WIRING.

THE DDC SYSTEMS VENDOR SHALL BE COMPLETELY RESPONSIBLE FOR COORDINATING INSTALLATION OF 3.

ELECTRICIAN AND CONTROL WIRING CONTRACTOR.

REQUIREMENTS AND CONTROL WIRING/CONDUIT REQUIREMENTS SHALL BE COORDINATED WITH THE CONTRACTOR SHALL PROVIDE POWER TO ALL NEW CONTROL PANELS WHETHER INDICATED OR NOT. ALL POWER 2.

PERFORM FUNCTIONS AND PROVIDE POINTS INDICATED AND SPECIFIED.

CONTRACTOR SHALL PROVIDE REQUIRED NUMBER OF FIELD PANELS INCLUDING ALL CONDUIT AND WIRING TO 1.

NOTES:

NOTES:

CHILLED WATER DISTRIBUTION

CONTROLS (DDC) NOTES:

(BAS) AND DIRECT DIGITAL

BUILDING AUTOMATION SYSTEM

VALVE OPERATES AS DESCRIBED IN THE SEQUENCE OF OPERATIONS BELOW.

CENTRAL PLANT IN TAB AND COMMISSIONING ACTIVITIES TO ENSURE THAT THE

CONTRACTOR SHALL INCLUDE THE MODULATING BYPASS VALVE (CV-1) IN THE

OPERATE AS DESCRIBED IN THE SEQUENCE OF OPERATIONS BELOW.

ACTIVITIES TO ENSURE THAT THE VARIABLE FLOW CHILLED WATER PUMPS

THE DIFFERENTIAL PRESSURE SENSOR AT AHU-6 IN BUILDING 449 IN TAB

BALANCING AND COMMISSIONING ACTIVITIES, THE CONTRACTOR SHALL INCLUDE

THE CHILLED WATER LOOP IS AHU-6 IN BUILDING 449. DURING TESTING AND

LOCATED IN THE CENTRAL PLANT. THE HYDRAULICALLY MOST DEMANDING AHU IN

MOST REMOTE AIR HANDLING UNIT IN BUILDING 450 AND 451. THE PUMPS ARE

AS MEASURED BY A DIFFERENTIAL PRESSURE SENSOR AT THE HYDRAULICALLY

FLOW CHILLED WATER PUMPS CONTROLLED TO MAINTAIN A MINIMUM PRESSURE

THE EXISTING CHILLED WATER DISTRIBUTION SYSTEM CONSISTS OF VARIABLE

OPERATIONS:

PUMPS SEQUENCE OF

VARIABLE FLOW CHILLED WATER

CHILLER MANUFACTURER.

CHANGE IN FLOW THROUGH THE OPERATING CHILLER AS RECOMMENDED BY THE

MODULATING VALVE SHALL ALSO MODULATE OPEN TO MINIMIZE THE RATE OF

RAMP UP TO MINIMIZE ITS EFFECT ON CH-1'S EVAPORATOR FLOW. THE BYPASS

ACCOMMODATE THE LOAD. PRIOR TO STARTING CH-2, CHWP-2 SHALL SLOWLY

OPERATION AND ITS ASSOCIATED CHWP-2 AND CDWP-2 SHALL BE STARTED TO

THAN 2°F ABOVE THE SETPOINT, THE SECOND CHILLER (CH-2) SHALL COMMENCE

AT 100% AND THE CHILLED WATER SUPPLY TEMPERATURE INCREASES TO MORE

TWO-WAY VALVES IN THE SYSTEM OPEN. IF THE SINGLE OPERATING CHWP VFD IS

AS THE LOAD INCREASES, FLOW REQUIREMENTS WILL ALSO INCREASE AS THE

FLOWS.

THE MINIMUM FLOW RATE IN THE SYSTEM IS ABOVE THE RECOMMENDED MINIMUM

CHILLER AT ALL TIMES. THE MODULATING VALVE CV-1 SHALL REMAIN CLOSED IF

MANUFACTURER'S RECOMMENDATIONS ARE MAINTAINED THROUGH THE SINGLE

SHALL OPEN TO ENSURE MINIMUM FLOWS IN ACCORDANCE WITH

CLOSING OF TWO-WAY VALVES IN THE SYSTEM. AT THE LOW END FLOW, CV-1

DECREASE TO A MINIMUM, FLOW WILL ALSO CONTINUE TO DECREASE DUE TO

THAT 10 PSI IS AVAILABLE AT AHU-6 IN B449. AS THE LOAD CONTINUES TO

PRESSURE SENSOR AT AHU-6 IN BUILDING 449. THE DDC SYSTEM SHALL ENSURE

A MINIMUM DIFFERENTIAL PRESSURE OF 10 PSI AS MEASURED BY A DIFFERENTIAL

CT-2 OPERATING. THE VFD ON CHWP-1 SHALL VARY THE PUMP FLOW TO MAINTAIN

PLANT SHALL BE OPERATING WITH ONLY CH-1, CHWP-1, CDWP-1, AND CT-1 AND

MANUFACTURER'S RECOMMENDED MINIMUM. AT MINIMUM LOAD, THE CHILLER

CHWP AND CDWP VFD'S SHALL ALSO NOT DECREASE FLOW TO LESS THAN THE

ADEQUATE FLOW THROUGH THE CHILLERS AT ALL LOADING CONDITIONS. THE

MODULATING BYPASS VALVE (CV-1) SHALL MODULATE TO ENSURE THAT THERE IS

PUMPS AND SHALL OPERATE INDEPENDENTLY OF THE CHILLERS. THE

THE CHILLED WATER PUMPS SHALL OPERATE AS PRIMARY VARIABLE FLOW

AND DEVICES SHALL BE UL LISTED.

CONTROLLER CAPACITY IS AT 80% OR LESS. ALL BAS CONTROLLERS, SENSORS,

MECHANICAL EQUIPMENT CAN BE PERFORMED BY MULTIPLE CONTROLLERS IF

EQUIPMENT. DISTRIBUTED CONTROL OF ONE (1) SINGLE PIECE OF MAJOR

DEVICES AND SENSORS ASSOCIATED WITH THAT SYSTEM AND/OR PIECE OF

WITH SUFFICIENT I/O CAPACITY SUCH THAT IT SHALL BE CONNECTED TO ALL FIELD

MECHANICAL EQUIPMENT SHALL HAVE ONE (1) DEDICATED DDC CONTROLLER

WORKSTATION SOFTWARE. EACH MECHANICAL SYSTEM AND/OR MAJOR PIECE OF

CONTROL. ALL DEVICES ARE TO BE MONITORED BY THE OPERATOR

FULLY PROGRAMMABLE AS REQUIRED TO ACHIEVE THE POINT MONITORING AND

FIELD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .