Bldg452_SPECIFICATIONS_Am3_28Aug17.pdf

PDF 910 KB Posted

Attached to
FY17 Pkg A-007 Repair Building 452, Quad D, Schofield Barracks, Oahu, Hawaii
Solicitation number
W9128A-17-B-0002
Issued by

About this file

Amend 0003 W9128A17B0002 Specs

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 56 PAGES

FY17 BUILDING 452 REPAIR, QUAD D

01 32 00 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

SD-06 Test Reports

3.5.2Narrative Report

3.5.3Schedule Reports

Periodic Schedule Updates

01 33 00 SD-01 Preconstruction Submittals

3.1 GSubmittal Register

3.5.1Monthly Updates

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(Am-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 56 PAGES

01 35 26 1.14License Certificates

1.14.1Radiography Operation Planning

Work Sheet

01 45 04 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

01 45 35 SD-07 Certificates

1.5 GSpecial Inspector

1.4 GQuality Control Plan

01 57 20 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

1.8 GPest Management Plan

01 57 23 SD-07 Certificates

2.1.3Mill Certificate or Affidavit

01 74 19 SD-01 Preconstruction Submittals

1.4Material dismantling sequence plan

1.4Schedule of removal

1.4Estimated quantity of recyclable materials

SD-09 Manufacturer’s Field

Reports

1.1Solid Waste Disposal and

Diversion

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 56 PAGES

01 78 00 1.3.5.1Spare Parts Data

SD-06 Test Reports

1.3.1.4A/E/C compliance reports and electronic CADD and BIM files

SD-08 Manufacturer’s Instructions

1.4Preventative Maintenance

1.4Condition Monitoring (Predictive

Testing)

1.4Inspection

1.8.1Instructions

SD-10 Operation and Maintenance

Data

1.10.1Operation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1Record Drawings

1.5Certification of EPA Designated

Items

01 90 00 SD-01 Preconstruction Submittals

1.3.2 GOrganization Plan

1.13.5.1 GElectrical Outage Permit

1.13.5.2 GWater Outage Permit

1.13.3.2 GRequest for Temporary Water

Service

1.13.5.4 GExcavation and Traffic Control

Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 56 PAGES

01 90 00 1.13.5.3 GRoad Closure

1.15 GAlteration of the Original

Contractor's Operations or Storage

Area

1.15 GContractor's Operations or

Storage Area

SD-06 Test Reports

1.8Inspection

1.9 GDust Control

SD-07 Certificates

1.6Products Containing Recovered

Materials

02 41 00 SD-01 Preconstruction Submittals

1.9 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

1.6.1Notification of Demolition and

Renovation form

02 42 91 SD-03 Product Data

1.1Work Plan

02 82 14.00 10 SD-02 Shop Drawings

1.3 GDetailed Drawings

SD-03 Product Data

3.11.3.1 GAsbestos Waste Shipment

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 56 PAGES

02 82 14.00 10 2.1 GEncapsulants

1.8.1 GRespiratory Protection Program

3.11 GCleanup and Disposal

1.5.1 GQualifications

1.10Training Program

1.7.1Licenses, Permits and

Notifications

3.11.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.9Exposure Assessment and Air

Monitoring

1.6.3Local Exhaust System

SD-07 Certificates

1.6.3Local Exhaust System

2.1 GEncapsulants

1.8Medical Surveillance

Requirements

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.2 GLead Compliance Plan

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.8 Glead waste management plan

3.5.2.1 Gwritten evidence

1.5.2.4 GMedical Examinations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 56 PAGES

02 83 13.00 20 SD-06 Test Reports

1.5.2.3 Gsampling results

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3 GTesting laboratory

1.5.1.4 GThird party consultant

qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

3.5.2.1 Gturn-in documents or weight

tickets

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

02 85 00.00 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 56 PAGES

02 85 00.00 20 1.4.1.1Preliminary Visual Assessment

Report

1.4.1.2Microbial Remediation Plan

1.4.1.4Worker Records

1.4.1.3Respiratory Protection Program

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.17 GPersonal Protective Equipment

(PPE)

3.1.5Air Filtration Units

3.1.4Dehumidifiers

1.2.20Pressure Differential Measuring

Instrument

1.2.10 GFungicidal Agents, (EPA)

1.2.8 GDisinfectants or Biocide

Sanitizing Solutions

SD-06 Test Reports

1.4.3 GDaily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 01 30.71 SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 56 PAGES

03 01 30.71 2.1.3Crack sealer

1.3.1Repair Mortar

1.3.2Bonding Agent and Corrosion

Inhibitor

SD-08 Manufacturer’s Instructions

3.1.2Epoxy

03 30 00 SD-01 Preconstruction Submittals

Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation;

1.6.2.1 GForm Removal Schedule

SD-02 Shop Drawings

1.6.2.2 GReinforcing steel

SD-03 Product Data

2.4.6Vapor retarder and Vapor barrier

2.3.3Concrete Curing Materials

2.5Reinforcement

2.4.5Admixtures

SD-05 Design Data

2.3.1 Gmix design

SD-06 Test Reports

1.6.1.1 GConcrete mix design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 56 PAGES

03 30 00 2.4.3Aggregates

3.13.2.3 GCompressive strength tests

3.13.2.1Slump Tests

2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

1.6.3.2Material Safety Data Sheets

SD-08 Manufacturer’s Instructions

2.3.3Curing Compound

03 37 13 SD-06 Test Reports

2.2 GMixture Proportions

2.1.2Aggregates

2.1.4 GAccelerator Compatibility

SD-07 Certificates

2.1.1.1Portland Cement

2.1.4Accelerating Admixtures

2.1.5Curing Materials

1.4.1 GQualifications

03 80 00 SD-01 Preconstruction Submittals

3.4 GQuality Control

SD-02 Shop Drawings

1.2.1 GFRP Composite System

SD-03 Product Data

2.1Materials

2.2Tensile Properties

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 56 PAGES

03 80 00 1.4Material Safety Data Sheets

(MSDS)

SD-05 Design Data

1.2.1 GDesign Calculations

SD-06 Test Reports

3.6Field Testing

3.5Laboratory Testing

3.6.2.1Hardness Test

SD-07 Certificates

2.1 GMaterials

1.4.4Regulatory Requirements

1.4.1 GSystem Manufacturer

1.4.2 GContractor

1.4.2 GField Representative

1.4.3 GApplicators

SD-08 Manufacturer’s Instructions

1.2.1 GFRP Composite System

SD-10 Operation and Maintenance

Data

3.7.6 GRecord Retention

05 05 23 SD-03 Product Data

1.5 GWelding Procedure Qualifications

1.5.5Welder, Welding Operator, and

Tacker Qualification

1.5.6Inspector Qualification

1.5.2Previous Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 56 PAGES

05 05 23 SD-06 Test Reports

3.2Quality Control

3.3.1Nondestructive Examination

SD-07 Certificates

1.5Welding Procedure Specifications

05 12 00 SD-02 Shop Drawings

1.4.2 GFabrication drawings

SD-03 Product Data

2.5.2Shop primer

2.4.1Welding electrodes and rods

2.4.2Non-Shrink Grout

SD-06 Test Reports

3.6.1.2Weld Inspection Reports

SD-07 Certificates

2.2Steel

2.3Bolts, nuts, and washers

1.4.3.1Welding procedures and qualifications

2.4.1Welding electrodes and rods

05 30 00 SD-02 Shop Drawings

1.3.4 GFabrication Drawings

2.3Metal Floor Deck Units

SD-03 Product Data

2.2Accessories

Deck Units

2.1.3.1Galvanizing Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 56 PAGES

05 30 00 2.2.10Mechanical Fasteners

2.3Metal Floor Deck Units

1.3.2Powder-Actuated Tool Operator

Sound Absorbing Material

1.3.3Welder Qualifications

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.3Metal Floor Deck Units

2.2Accessories

SD-05 Design Data

2.3Metal Floor Deck Units

SD-07 Certificates

1.3.3Welding Procedures

05 40 00 SD-03 Product Data

2.1studs,joists

05 50 13 SD-02 Shop Drawings

2.3Access doors

2.4angles and plates

SD-03 Product Data

2.3Access doors

05 52 00 SD-02 Shop Drawings

1.2.1Fabrication Drawings

SD-03 Product Data

1.2.1Masonry Anchorage Devices

2.9Masonry Anchorage Devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 56 PAGES

05 52 00 1.2.1Steel Railings and Handrails

2.12Steel Railings and Handrails

1.2.1Anchorage and Fastening

Systems

SD-07 Certificates

1.4.1Welding Procedures

1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions

3.1Installation Instructions

06 10 00 SD-06 Test Reports

1.4.2Preservative-treated

SD-07 Certificates

1.7Preservative treatment

06 20 00 SD-02 Shop Drawings

1.3Detail Drawings

2.3.2Termite treatment plan

SD-03 Product Data

2.3.2Termiticide MSDS

SD-07 Certificates

1.4Certificates of grade

1.4Certificates of compliance

2.3.2licensed pesticide applicator

06 41 16.00 10 SD-02 Shop Drawings

2.9Shop Drawings

3.1Installation

2.1.3.2Termite treatment plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 56 PAGES

06 41 16.00 10 SD-03 Product Data

2.1Wood Materials

2.1.3.2Termiticide MSDS

SD-04 Samples

2.3Plastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.4Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2Detail Drawings

3.1Installation

SD-03 Product Data

2.1Solid polymer material

1.4.1Qualifications

2.3Fabrications

SD-04 Samples

2.1Material

SD-06 Test Reports

2.1Solid polymer material

SD-07 Certificates

2.3Fabrications

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 08 27.00 10 SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 56 PAGES

07 08 27.00 10 Thermography Test Firm

Thermography Test Technician

Air Barrier Leakage Test Firm

Air Barrier Leakage Test

Technician

SD-06 Test Reports

3.2.2 GThermography Test Procedures

3.3.1 GBuilding Air Barrier Leakage Test

Procedures

3.2.3 GThermographic Test Report

3.3.3 GAir Barrier Leakage Test Report

07 21 16 SD-03 Product Data

2.1Blanket insulation

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 24 00 SD-02 Shop Drawings

3.3Shop drawings

SD-03 Product Data

2.2Sheathing board

2.3Mechanical Fasteners

2.8Accessories

2.4Base coat

2.5Reinforcing fabric

2.6Finish coat

2.9Joint Sealant

2.7Sealant Primer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 56 PAGES

07 24 00 2.10Bond breaker

2.11Backer Rod

1.7Warranty

SD-04 Samples

1.2.3.6Sample Boards

SD-05 Design Data

1.2.1.2Wind load

1.2.4Moisture analysis

SD-06 Test Reports

1.2.3.1Abrasion resistance

1.2.3.2Accelerated weathering

1.2.2.2Impact resistance

1.2.3.3Mildew resistance

1.2.3.4Salt spray resistance

1.2.4vapor transmission

1.2.1.3Wall fire test

1.2.1.1Water penetration

1.2.3.5Water resistance

1.2.1.3Full scale or intermediate scale fire test

1.2.2.1Surface Burning Characteristics

3.1Substrate

1.2.1.2Wind load

SD-07 Certificates

1.4.1Qualifications of EFS

Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 56 PAGES

07 24 00 1.4.2Qualification of EFS Installer

1.4.3Qualification of Sealant Applicator

3.5.1Inspection Check List

SD-08 Manufacturer’s Instructions

3.3Installation

SD-10 Operation and Maintenance

Data

1.7EFS

07 26 27 SD-03 Product Data

2.1Membrane

07 62 10 SD-02 Shop Drawings

2.1.3Sheet Metal

07 84 00 SD-02 Shop Drawings

2.1Firestopping Materials

SD-07 Certificates

2.1Firestopping Materials

1.5Installer Qualifications

3.3Inspection

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond breakers

2.4Backstops

SD-07 Certificates

3.3.6Sealant

08 11 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 56 PAGES

08 11 13 2.1Doors

2.1Doors

2.6Frames

2.6Frames

2.4Accessories

SD-03 Product Data

2.1Doors

2.6Frames

2.4Accessories

SD-05 Design Data

GStructural Calculations for

Deflection

08 14 00 SD-02 Shop Drawings

2.1Doors

SD-03 Product Data

2.1Doors

2.2Accessories

2.3.7Water-resistant sealer

1.4warranty

STC rating

SD-04 Samples

2.1Doors

SD-06 Test Reports

2.4Cycle-slam

2.4Hinge loading resistance

08 34 59 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 56 PAGES

08 34 59 Vault Ddoor Unit

2.3Day gate

SD-03 Product Data

2.2Vault Door and Frame

SD-07 Certificates

2.2Vault Door and Frame

SD-08 Manufacturer’s Instructions

3.1Installation

08 34 73 SD-02 Shop Drawings

2.1Wood Sound Retardant Doors

2.1Door Frames

SD-03 Product Data

2.1Wood Sound Retardant Doors

2.1Door Frames

2.1Door Hardware

2.1Thresholds

SD-06 Test Reports

2.4.3Acoustical Tests

SD-07 Certificates

2.1Wood Sound Retardant Doors

2.1Door Frames

2.1Door Hardware

2.1Thresholds

08 51 13 SD-02 Shop Drawings

2.1Windows

1.9Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 56 PAGES

08 51 13 SD-03 Product Data

2.1Windows

2.2.5.1Hardware

2.2.3Fasteners

2.2.7Screens

2.2.2Weatherstripping

2.2.5Accessories

SD-04 Samples

1.4.2.1Finish Sample

SD-05 Design Data

2.1Structural calculations for deflection

1.4.3Design Analysis

SD-06 Test Reports

1.4.4Resistance to forced entry

1.10.2.3Standard Airblast Test

SD-07 Certificates

Exterior Windows

SD-10 Operation and Maintenance

Data

2.1Windows

08 71 00 SD-02 Shop Drawings

1.3Hardware schedule

2.3.5Keying system

SD-03 Product Data

2.3Hardware items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 56 PAGES

08 71 00 SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.3Hardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting

08 81 00 SD-03 Product Data

1.6.1Insulating Glass

1.3Glazing Accessories

SD-04 Samples

1.6.1Insulating Glass

Glazing Compound

2.3.3Tape

2.3.1.1Sealant

SD-07 Certificates

1.6.1Insulating Glass

1.3Glazing Accessories

SD-08 Manufacturer’s Instructions

2.3Setting and sealing materials

3.2Glass setting

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

1.5Wall louvers

SD-03 Product Data

2.2Metal Wall Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 56 PAGES

08 91 00 SD-04 Samples

1.4Wall louvers

1.5Wall louvers

09 22 00 SD-02 Shop Drawings

2.1Metal support systems

09 29 00 SD-03 Product Data

2.1.1Gypsum Board

2.1.5Cementitious backer units

2.1.8Accessories

SD-07 Certificates

2.1Asbestos Free Materials

SD-08 Manufacturer’s Instructions

Material Safety Data Sheets

09 30 13 SD-03 Product Data

2.1Tile

2.2Setting-Bed

2.4Mortar and Grout

SD-04 Samples

2.1Tile

2.1Transition Strips

2.5Transition Strips

Grout

SD-07 Certificates

2.1Tile

2.4Mortar and Grout

09 51 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 56 PAGES

09 51 00 Detail Drawings

SD-03 Product Data

2.1Acoustical Units

SD-04 Samples

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

SD-06 Test Reports

1.2.1Ceiling Attenuation Class and

Test

SD-07 Certificates

2.1.1Acoustic Ceiling Tiles

09 62 38 SD-03 Product Data

2.1Static-Control Flooring

2.1Accessories

2.1.1.2Adhesives

2.3Adhesives

1.8Warranty

SD-04 Samples

2.1Static-Control Flooring

2.1Accessories

SD-06 Test Reports

Fire Resistance

3.2Moisture, Alkalinity and Bond

3.5Testing

SD-07 Certificates

2.1Static-Control Flooring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 56 PAGES

09 62 38 2.1Accessories

2.1.1.2Adhesives

2.3Adhesives

1.5Qualifications of Applicator

SD-08 Manufacturer’s Instructions

2.1Static-Control Flooring

2.1Accessories

SD-10 Operation and Maintenance

Data

2.1Static-Control Flooring

2.1Accessories

09 65 00 SD-03 Product Data

2.7Resilient Flooring and

Accessories

2.4Adhesives

SD-04 Samples

2.7 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 56 PAGES

09 65 00 2.7Resilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4Installation

2.4Moldings

SD-03 Product Data

2.1Carpet

2.4Moldings

3.1Surface Preparation

3.4Installation

SD-04 Samples

2.1Carpet

2.4Moldings

SD-06 Test Reports

3.2Moisture and Alkalinity Tests

SD-07 Certificates

2.1Carpet

1.3Regulatory Requirements

SD-10 Operation and Maintenance

Data

2.1Carpet

3.5Cleaning and Protection

Maintenance Service

SD-11 Closeout Submittals

LEED Documentation

09 90 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 56 PAGES

09 90 00 2.1Coating

2.1Manufacturer's Technical Data

Sheets

SD-04 Samples

1.10 GColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2Qualification Testing

SD-08 Manufacturer’s Instructions

3.2.1Application instructions

3.6.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

10 10 00 SD-03 Product Data

1.2Visual Display Board

SD-04 Samples

2.1.3Aluminum

2.1.1Porcelain Enamel

2.1Materials

SD-07 Certificates

1.2Visual Display Board

10 11 00 SD-03 Product Data

1.2Visual Display Board

SD-04 Samples

2.1.3Aluminum

2.1.1Porcelain Enamel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 56 PAGES

10 11 00 2.1Materials

SD-07 Certificates

1.2Visual Display Board

10 14 00.10 SD-02 Shop Drawings

3.1Approved Detail Drawings

SD-03 Product Data

2.1Modular Exterior Signage System

3.1Installation

1.2Exterior Signage

SD-04 Samples

1.2Exterior Signage

SD-10 Operation and Maintenance

Data

3.1.2Protection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.3.2Detail Drawings

SD-03 Product Data

3.1Installation

1.5Warranty

SD-04 Samples

1.3.1Interior Signage

SD-10 Operation and Maintenance

Data

3.1.2Protection and Cleaning

10 14 01 SD-02 Shop Drawings

Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 56 PAGES

10 14 01 SD-03 Product Data

2.1Exterior Signage Panel

3.1Installation

SD-04 Samples

Exterior Signage

10 14 02 SD-02 Shop Drawings

1.4.2Detail Drawings

SD-03 Product Data

3.1Installation

1.6Warranty

SD-04 Samples

Interior Signage

SD-10 Operation and Maintenance

Data

3.1.2Protection and Cleaning

10 21 13 SD-02 Shop Drawings

1.2Fabrication Drawings

3.2Installation Drawings

SD-03 Product Data

1.2Cleaning and Maintenance

Instructions

2.6Colors And Finishes

2.1.1Anchoring Devices and Fasteners

2.1.3Hardware and Fittings

2.1.2Brackets

2.1.4Door Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 56 PAGES

10 21 13 2.4Pilaster Shoes

SD-04 Samples

2.6Colors and Finishes

2.1.3Hardware and Fittings

2.1.1Anchoring Devices and Fasteners

SD-07 Certificates

1.7Warranty

10 26 00 SD-02 Shop Drawings

2.2Corner Guards

SD-03 Product Data

2.2Corner Guards

SD-04 Samples

2.3Finish

SD-06 Test Reports

2.2Corner Guards

SD-07 Certificates

2.2Corner Guards

10 28 13 SD-03 Product Data

2.1.2Finishes

2.2Accessory Items

SD-04 Samples

2.1.2Finishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

10 44 16 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 56 PAGES

10 44 16 Manufacturer's Data

SD-02 Shop Drawings

Part 2Cabinets

SD-03 Product Data

Part 2Cabinets

SD-04 Samples

1.3.1Cabinet

10 51 13 SD-02 Shop Drawings

1.4Location

3.1Installation

3.2Numbering system

SD-03 Product Data

2.2 SMaterial

2.3.1 SLocking Devices

2.3.1Lock Control Chart

2.3.3 SHandles

2.2.3Finish

2.3components

3.1Assembly

SD-04 Samples

1.5.1Color chips

12 21 00 SD-02 Shop Drawings

3.3Installation

SD-03 Product Data

2.1Window Blinds

3.3Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 56 PAGES

12 21 00 SD-04 Samples

2.1Window Blinds

SD-06 Test Reports

2.1Window Blinds

SD-08 Manufacturer’s Instructions

2.1Window Blinds

SD-10 Operation and Maintenance

Data

2.1Window Blinds

13 48 00.00 10 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

1.3Equipment Requirements

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

SD-07 Certificates

2.2Flexible Ball Joints

13 48 00 SD-02 Shop Drawings

3.1 GBracing

3.4 GResilient Vibration Isolation

Devices

2.1 GEquipment Requirements

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 56 PAGES

13 48 00 3.1 GBracing

2.1 GEquipment Requirements

SD-06 Test Reports

3.3 GAnchor Bolts

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.9As-Built Drawings

SD-03 Product Data

1.4.1Fire Protection Related

Submittals

2.3 GMaterials and Equipment

1.6Spare Parts

3.8 GPreliminary Tests

3.9 GFinal Acceptance Test

3.10 GOnsite Training

1.4.1 GFire Protection Specialist

1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 GSway Bracing

1.2.1.3 GHydraulic Calculations

SD-06 Test Reports

3.8 GPreliminary Test Report

3.9 GFinal Acceptance Test Report

SD-07 Certificates

3.3 GInspection by Fire Protection

Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 56 PAGES

21 13 13.00 10 SD-10 Operation and Maintenance

Data

3.10 GOperating and Maintenance

Manuals

21 30 00 SD-01 Preconstruction Submittals

1.3Fire Pump Installation Related

Submittals

GFire Protection Specialist

SD-02 Shop Drawings

3.3.1Installation Drawings

3.11.2 GAs-Built Drawings

3.3.2Piping Layout

3.3.2Pump Room

SD-03 Product Data

2.1Catalog Data

1.6Spare Parts

3.8.2Preliminary Tests

3.8 GField Tests

1.7.5Manufacturer's Representative

3.11.1 GField Training

3.8.3Army Final Acceptance Test

SD-06 Test Reports

3.8.2Preliminary Tests

3.8.3 GArmy Final Acceptance Test

SD-07 Certificates

Fire Protection Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 56 PAGES

21 30 00 1.7.1Qualifications of Welders

1.7.2Qualifications of Installer

1.7.3Preliminary Test Certification

1.7.4Final Test Certification

SD-10 Operation and Maintenance

Data

3.11.1Operating and Maintenance

Instructions

2.16Flow Meter

22 00 00 SD-03 Product Data

2.4Fixtures

2.4.1Flush valve water closets

2.4.2Flush valve urinals

Flush tank water closets

Countertop lavatories

2.4.3Wall hung lavatories

Kitchen sinks

Precast Terrazzo Mop Sinks

2.4.6Shower and ADA Shower

Drinking Water Fountain, Accessories

Laundry Tray

1.5.1Welding

3.3Vibration-Absorbing Features

3.7.1Plumbing System

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 56 PAGES

22 00 00 3.7Tests, Flushing and Disinfection

3.7.1.1Test of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.7.1Plumbing System

23 00 00 SD-02 Shop Drawings

1.4.5Detail Drawings

SD-03 Product Data

2.9.1.2Duct Connectors

2.9.2Duct Access Doors

2.9.4Manual Balancing Dampers

2.9.7.1Diffusers

2.9.7.2Registers and Grilles

2.9.8Louvers

2.9.9Air Vents, Penthouses, and

Goosenecks

2.10.1.1In-Line Centrifugal Fans

2.12.1Room Fan-Coil Units

1.4.6Test Procedures

1.2.1.2Diagrams

Variable Air Volumne Terminal

Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 56 PAGES

23 00 00 2.11Air Handling Units

2.13Computer Room Air Conditioning

Units

SD-06 Test Reports

3.11Performance Tests

SD-07 Certificates

Bolts

1.4.7Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.13.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.13.1Operation and Maintenance

Manuals

2.9.4Manual Balancing Dampers

2.10.1.1In-Line Centrifugal Fans

Variable Air Volumne Terminal

Units

2.11Air Handling Units

2.13Computer Room Air Conditioning

Units

23 05 93 SD-01 Preconstruction Submittals

1.3Records of Existing Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 56 PAGES

23 05 93 1.3.3Records of Existing Conditions

1.5.3.1TAB Firm

1.2TAB team assistants

1.2TAB team engineer

1.5.3.2TAB Specialist

1.2TAB team field leader

SD-02 Shop Drawings

1.3.3TAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3Equipment and Performance

Data

1.5.3.4TAB Related HVAC Submittals

1.5.2TAB Procedures

1.5.2Calibration

1.3.3Systems Readiness Check

1.5.4TAB Execution

TAB Verification

SD-06 Test Reports

3.7DALT and TAB Work Execution

Schedule

3.7DALT and TAB Procedures

Summary

1.3.3Design review report

1.6.1.1Design review report

3.7Design review report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 56 PAGES

23 05 93 1.6.1Pre-Final DALT report

1.6.1Final DALT report

SD-07 Certificates

1.5.3.1TAB Firm

1.5.1Independent TAB Agency and

Personnel Qualifications

1.6.1DALT and TAB Submittal and

Work Schedule

1.3.3Design review report

1.6.1.1Design review report

3.7Design review report

Pre-field DALT preliminary notification

1.6.1.3Pre-field TAB engineering report

1.6.1Advanced notice for TAB field work

1.6.1Prerequisite HVAC Work Check

Out List

23 07 00 SD-02 Shop Drawings

3.2.2.4MICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SD-03 Product Data

1.4.2Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 56 PAGES

23 07 00 2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SD-04 Samples

2.2.1.3Thermal Insulation

3.1.1Display Samples

SD-08 Manufacturer’s Instructions

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2Commissioning Plan

SD-03 Product Data

3.2.1Pre-Functional Performance Test

Checklists

3.2.2Functional Performance Tests

SD-06 Test Reports

3.3Commissioning Report

SD-07 Certificates

1.5.1Commissioning Firm

1.5.2Commissioning Specialist

23 09 23.13 20 SD-02 Shop Drawings

1.3.1.1Control system drawings title sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 56 PAGES

23 09 23.13 20 1.3.1.2List of I/O Points

1.3.1.3Control System Components List

1.3.1.4Control system schematics

1.3.1.5HVAC Equipment Electrical

Ladder diagrams

1.3.1.6 GComponent wiring diagrams

1.3.1.7 GTerminal strip diagrams

1.3.1.8BACnet communication architecture schematic

SD-03 Product Data

2.1.1Direct Digital Controllers

BACnet Gateways

2.1.4BACnet Protocol Analyzer

2.1.2DDC Software

2.1.3BACnet Operator Workstation

2.1.3.3BACnet Operator Workstation

DDC Software

Notebook Computer

2.2Sensors and Input Hardware

2.3Output Hardware

2.4.2Surge and transient protection

2.6Indicators

SD-05 Design Data

3.4.2Performance Verification Testing

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 56 PAGES

23 09 23.13 20 3.4.4Pre-Performance Verification

Testing Checklist

SD-06 Test Reports

3.4.11Performance Verification Testing

Report

SD-07 Certificates

1.5.6Contractor's Qualifications

SD-09 Manufacturer’s Field

Reports

3.4.1Pre-PVT Checklist

SD-10 Operation and Maintenance

Data

1.3BACnet Direct Digital Control

Systems

3.3Controls System Operators

Manuals

VFD Service Manuals

SD-11 Closeout Submittals

3.5.1Training documentation

23 64 26 SD-03 Product Data

Grooved Mechanical Connections

For Steel

2.2.3Grooved Mechanical Connections

For Copper

2.3.8Calibrated Balancing Valves

2.3.9Automatic Flow Control Valves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 56 PAGES

23 64 26 Pump Discharge Valve

2.3.10Pressure Relief Valve

2.3.11Combination Pressure and

Temperature Relief Valves

2.4.7Expansion Joints

SD-06 Test Reports

3.1.1.3Piping welds NDE report

3.4.2Pressure tests reports

SD-07 Certificates

3.1.1.1Employer's Record Documents

(For Welding)

3.1.1.2Welding Procedures and

Qualifications

Fittings

Unions

Flanges

Gaskets

Bolting

SD-08 Manufacturer’s Instructions

3.5Lesson plan for the Instruction

Course

SD-10 Operation and Maintenance

Data

2.3.8Calibrated Balancing Valves

2.3.9Automatic Flow Control Valves

2.3.10Pressure Relief Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 56 PAGES

23 64 26 2.3.11Combination Pressure and

Temperature Relief Valves

2.4.7Expansion Joints

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

26 12 19.10 SD-02 Shop Drawings

1.5.1 GPad-mounted transformer

drawings

SD-03 Product Data

2.2 GPad-mounted transformers

SD-06 Test Reports

3.7.1 GAcceptance checks and tests

SD-07 Certificates

2.2.2.1 GTransformer Efficiencies

SD-09 Manufacturer’s Field

Reports

2.8.2 Gdesign tests

2.8.3 Groutine and other tests

SD-10 Operation and Maintenance

Data

1.6.1 GTransformer(s)

SD-11 Closeout Submittals

2.8.1 GTransformer test schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 56 PAGES

26 20 00 SD-02 Shop Drawings

2.18 GPanelboards

2.8 GCable trays

SD-03 Product Data

2.17 GReceptacles

2.18.2 GCircuit breakers

2.16 GSwitches

GCATV outlets

2.23.1 GGrounding Busbar

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

3.5.4 GGround-fault receptacle test

26 28 00.00 10 SD-02 Shop Drawings

2.6.2 GDrawings

2.4.1 GShop Drawings

2.7 GSwitchboards

SD-03 Product Data

1.4 GEquipment

2.8Factory Tests

SD-06 Test Reports

2.8Factory Tests

26 28 01.00 10 SD-03 Product Data

2.6Fault Current Analysis

2.6Protective Device Coordination

Study

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 56 PAGES

26 28 01.00 10 2.1Equipment

1.3.1System Coordinator

3.3.5Protective Relays

3.2Installation

SD-06 Test Reports

3.3Field Testing

SD-07 Certificates

Devices and Equipment

26 51 00 SD-03 Product Data

2.1 GFluorescent lighting fixtures

1.6.1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .