15-B-0003-AM-0001.pdf

PDF 22 MB Posted

Attached to
FY15 PKG A-005 Repair Building 449, Quad D, Schofield Barracks, Hawaii
Solicitation number
W9128A-15-B-0003
Issued by

About this file

Am-0001

View the file

Other files

File Type Posted
15-B-0003_Bid_Abstract.pdf PDF
15-B-0003-AM-0002.pdf PDF
08_DwgsQuadD_05-F_1of1.pdf PDF
01_DwgsQuadD-G-L_1of1.pdf PDF
15b0003b_QuadD_Tech_Specs.pdf PDF
07_DwgsQuadD_04b-A_2of2.pdf PDF
06_DwgsQuadD_04a-A_1of2.pdf PDF
05_DwgsQuadD_03b-S_2of2.pdf PDF
04_DwgsQuadD_03a-S_1of2.pdf PDF
09_DwgsQuadD_06-P-M-E-T_1of1.pdf PDF
15b0003a_QuadD_Solicitation.pdf PDF
03_DwgsQuadD_02b-C_2of2.pdf PDF
02_DwgsQuadD_02a-C_1of2.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY15 PKG A-005 Repair Building 449, Quad D, Schofield Barracks, Hawaii

See page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A-15-B-0003

X 9B. DATED (SEE ITEM 11)

27-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

Am-0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 230 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

x

Am-0001

10 Sep 2015

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AM-0001

1. CHANGES TO SPECIFICATIONS. Attached are new, revised, and deleted sections to the specifications. Revised pages replace like-numbered pages. The revision mark “(Am- 0001)” is shown on each page.

a. New Sections: The following sections were added to the solicitation:

Section 00 10 00, Bid Schedule Section 00 60 00, Appendix A – Request for Information Section 00 60 00, Appendix B – Site visit sign in sheet Section 09 62 38, pages 1 through 7 Section 09 68 00, pages 1 through 8

b. Replaced Section: The following section was replaced:

Section 00 10 00, SF1442 Section 00 72 00, Appendix A – Davis Bacon Wage Determination Dated 07/10/2015 is replaced by Section 00 72 00, Appendix A – Davis Bacon Wage Determination Dated 09/04/2015 Section 01 00 00, Project Table of Contents Section 01 00 00, Submittal Register

c. Revised Section: The following sections are revised paragraphs to the specifications and indicated in bold:

Section 00 10 00, Main Table of Contents Section 00 72 00, Added Clause 52.211-18, Variation in Estimated Quantity (APR 1984). Added Clause S-10, Little Fire Ant Avoidance (SEP 2015). Added Clause S-11, Hawaiian Hoary Bat Pupping Season (SEP 2015).

Section 08 71 00, Hardware Sets, Hardware Group No. 24 Section 09 30 13, paragraphs 2.1.1 through 2.1.6 Section 09 65 00, paragraph 2.1 Section 10 28 13, paragraphs 2.2.8, 2.2.11, 2.2.15 and 2.2.16 Section 22 00 00, paragraph 3.10, Table II Section 27 05 14.00 10, paragraph 2.1.1

2. CHANGES TO DRAWINGS

a. Revised Drawings: The following revised drawings replace-like numbered drawings and are issued herewith:

Sheet ID Sheet Number: Mark: Revision Date:

G-002 2 of 3 1 08/27/15 G-003 3 of 3 1 08/27/15

Sheet ID Sheet Number: Mark: Revision Date:

SB101 10 of 64 1 08/27/15 SB102 11 of 64 1 08/27/15 SF101 12 of 64 1 08/27/15 SF102 13 of 64 1 08/27/15 SF103 14 of 64 1 08/27/15 SF104 15 of 64 1 08/27/15 SF108 19 of 64 1 08/27/15 SF109 20 of 64 1 08/27/15 SB202 22 of 64 1 08/27/15 SB502 26 of 64 1 08/27/15 SB505 29 of 64 1 08/27/15 SF401 31 of 64 1 08/27/15 SF501 32 of 64 1 08/27/15 SF505 36 of 64 1 08/27/15 SF508 39 of 64 1 08/27/15 SF509 40 of 64 1 08/27/15 SF510 41 of 64 1 08/27/15 SF511 42 of 64 1 08/27/15 SF513 44 of 64 1 08/27/15 SF514 45 of 64 1 08/27/15 SF701 53 of 64 1 08/27/15 SF702 54 of 64 1 08/27/15 SF703 55 of 64 1 08/27/15 SF704 56 of 64 1 08/27/15 SF705 57 of 64 1 08/27/15 SF706 58 of 64 1 08/27/15 SF707 59 of 64 1 08/27/15 AD101 3 of 85 1 08/27/15 AD102 4 of 85 1 08/27/15 AD104 6 of 85 1 08/27/15 AD107 9 of 85 1 08/27/15 AD201 13 of 85 1 08/27/15 AD202 14 of 85 1 08/27/15 A-101 15 of 85 1 08/27/15 A-102 16 of 85 1 08/27/15 A-103 17 of 85 1 08/27/15 A-104 18 of 85 1 08/27/15 A-109 23 of 85 1 08/27/15 A-110 24 of 85 1 08/27/15 A-112 26 of 85 1 08/27/15 A-113 27 of 85 1 08/27/15 A-201 33 of 85 1 08/27/15 A-202 34 of 85 1 08/27/15 A-203 35 of 85 1 08/27/15 A-204 36 of 85 1 08/27/15 A-402 43 of 85 1 08/27/15 A-403 44 of 85 1 08/27/15 A-407 48 of 85 1 08/27/15 A-540 59 of 85 1 08/27/15 A-601 61 of 85 1 08/27/15

Sheet ID Sheet Number: Mark: Revision Date:

A-602 62 of 85 1 08/27/15 A-603 63 of 85 1 08/27/15 A-605 65 of 85 1 08/27/15 AF601 66 of 85 1 08/27/15 AF603 68 of 85 1 08/27/15 AG101 69 of 85 1 08/27/15 AG102 70 of 85 1 08/27/15 AG502 76 of 85 1 08/27/15 F-101 4 of 23 1 08/27/15 FA101 7 of 23 1 08/27/15 FA102 8 of 23 1 08/27/15 FA602 15 of 23 1 08/27/15 FX101 21 of 23 1 08/27/15 MH101 13 of 32 1 08/27/15 MH102 14 of 32 1 08/27/15 MH503 27 of 32 1 08/27/15 EL101 18 of 58 1 08/27/15 EL102 19 of 58 1 08/27/15 EP101 27 of 58 1 08/27/15 EP102 28 of 58 1 08/27/15 EP107 33 of 58 1 08/27/15 EP108 34 of 58 1 08/27/15 EP602 45 of 58 1 08/27/15 EP603 46 of 58 1 08/27/15 EP604 47 of 58 1 08/27/15 EY101 56 of 58 1 08/27/15 EY102 57 of 58 1 08/27/15 T-101 9 of 37 1 08/27/15 T-102 10 of 37 1 08/27/15 T-107 15 of 37 1 08/27/15 T-108 16 of 37 1 08/27/15 T-113 21 of 37 1 08/27/15 T-114 22 of 37 1 08/27/15 T-602 37 of 37 1 08/27/15

3. The Invitation for Bid date has been changed to 24 September 2015, 1400 hours Hawaii Standard Time.

FY15 PKG-A005, Repair Building 449, Quad D, Schofield Barracks, Hawaii

SUBJECT TO AVAILABILITY OF FUNDS. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available to the Contracting Officer

X

GRAEME L SILVA 808-835-4380

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

27-Jul-2015

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ 7 calendar days and complete it within ________ 730 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 24 Sep 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required. (See Section 00 72 00, Clause 52. 228-1) C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 230 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

808-835-4396 FAX: TEL: 808-835-4386 TEL: FAX:

W9128A-15-B-0003 2

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

MAIN TABLE OF CONTENTS

Invitation for Bids (IFB) No. W9128A-15-B-0003, FY15 OMA Pkg A-005 Repair Building 449, Quad D, Schofield Barracks, Oahu, Hawaii

SF 1442 and Bid Schedule

Instructions, Conditions and Notices to Bidders

Section 00 10 00

Section 00 21 13

Section 00 45 00 Representations and Certifications Appendix A, SF LLL, Disclosure of Lobbying Activities

Section 00 60 00 Project Forms Appendix A, Request for Information Appendix B, Site visit sign in sheet

Section 00 72 00 Contract Clauses Appendix A, Davis Bacon Wage Determination

Section 00 73 00 Special Contract Requirements Appendix A, Project Signs Appendix B, USAG-HI Pamphlet 420-2

Division 1 General Requirements

Division 2 through 33 Technical Requirements

Any reference to Section 00 10 00 in the technical specifications or drawings refers to Section 00010.

Any reference to Section 00 21 13 in the technical specifications or drawings refers to Section 00100.

Any reference to Section 00 45 00 in the technical specifications or drawings refers to Section 00600.

Any reference to Section 00 72 00 in the technical specifications or drawings refers to Section 00700.

Any reference to Section 00 73 00 in the technical specifications or drawings refers to Section 00800.

INSTRUCTIONS TO BIDDERS:

1. This procurement method is a small business set-aside design-bid-build procurement.

2. The Bidder is REQUIRED to COMPLETE AND RETURN one (1) hard copy and (1) CD with pdf versions for the following sections of this solicitation: SECTION 00 10 00 (ALL), SECTION 00 45 00 (ALL) including all Appendices, and Bid Bond (See Section 00 72 00, Clause 52.228-1). Please note that the representations and certifications must also be completed electronically via the Online Representations and Certifications Application (ORCA) website at https://www.sam.gov.

3. Bidders must have and/or maintain an active registration with the System for Award Management (SAM) website. To register in SAM, go to https://www.sam.gov.

Am-0001 https://www.sam.gov/ https://www.sam.gov/

4. Submit all Request for Information (RFIs) to Graeme.l.silva@usace.army.mil and jennifer.i.ko@usace.army.mil. The last day to submit Request for Information (RFIs) is August 24, 2015 at 10:00 a.m., Hawaiian Standard Time.

4. Submittal of Bids. Bids may be submitted via U.S. Postal Service, Courier Service, or personally delivered as follows:

a. Bids submitted via U.S. Postal Services should be mailed to:

U.S. Army Corps of Engineers, Honolulu District Contracting Division, ATTN: Graeme Silva/Jennifer Ko Building 230, Otake Street Fort Shafter, Hawaii 96858-5440

b. Bids submitted via courier service or hand delivered shall be to:

U.S. Army Corps of Engineers, Honolulu District Contracting Division, ATTN: Graeme Silva/Jennifer Ko Building 252, Walker Drive

Fort Shafter, Hawaii 96858-5440 mailto:Graeme.l.silva@usace.army.mil mailto:jennifer.i.ko@usace.army.mil

Invitation for Bids No. W9128A-15-B-0003

SECTION 00010

BIDDING SCHEDULE

FY15 PKG A-005 REPAIR BLDG 449, QUAD D

SCHOFIELD BARRACKS, OAHU, HAWAII

UNIT

CLIN. DESCRIPTION QUANTITY UNIT PRICE AMOUNT

BASE SCHEDULE

0001 Building Repair 1 JOB LS $___________

0002 Concrete Spall Repair 200 SF $_________ $___________

0003 Concrete Crack Repair 1000 LF $_________ $___________ With Epoxy Injection

0004 Contractor Manpower Reporting 1 JOB LS $___________

TOTAL BIDDING SCHEDULE $___________

NOTES:

1. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so may result in the bidder to be considered non-responsive.

PAYMENT(S)

Compensation for all work to be performed under this contract will be made under the payment items(s) listed herein. The principal features of the work to be included under the payment item(s) are noted.

Work required by the drawings and specifications and not particularly mentioned shall be included in and be paid for under the contract price for the item to which the work pertains. Price(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with the specifications, schedules, and drawings, and shall be full compensation for all work in connection therewith, including quality control and cost of performance-and payment-bond premiums as specified in the CONTRACT CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision, labor, transportation, fuel, power, water, and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the Government. For the purpose of CONTRACT CLAUSE entitled “PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS”, the term “designated billing office” and “designated payment office” are as follows:

a. Billing Office U.S. Army Corps of Engineers, Honolulu District Schofield Barracks Area Office, Bldg 230 Fort Shafter, HI 96858-5440

b. Payment Office USACE Finance Center Attn: CEFC-FP 5722 Integrity Drive Millington, TN 38054-5005

Item numbers mentioned herein after correspond to the item numbers in the BIDDING SCHEDULE.

a. CLIN 0001, Building Repair will be paid for at the contract price, complete and ready for use, including abatement, demolition, blast windows, arms vaults, structural, architectural, mechanical work, electrical work, fire alarm systems, communication, testing, cleanup, and all incidental items necessary to complete the work.

b. CLIN 0002, Concrete Spall Repair, will be paid for at the contract price, complete and ready for use, including removal work, concrete patching, cleanup, and all incidental items necessary to complete the work.

c. CLIN 0003, Concrete Crack Repair with Epoxy Injection, will be paid for at the contract price, complete in place and ready for use, including installation of epoxy resin, cleanup, and all incidental items necessary to complete the work.

d. CLIN 0004, Contractor Manpower Reporting. “The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for “FY15 PKG A-005 Repair Bldg 449, Quad D, Schofield Barracks, Oahu, Hawaii” via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://cmra.army.mil/default.aspx?ReturnUrl=%2f.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be included in the reporting structure that is hosted at http://www.ecmra.mil/.” If the contractor does not separately price this requirement, they shall enter zero ($0).

--End of Section--http://www.ecmra.mil/

Section 00 60 00, Appendix A

RFI # Question Answer

1 Can Nu-Age Plastic Sheeting be used instead of the plastic sheeting in the specifications? No. Bid in accordance with the plans and specs.

Please confirm that structural sheets SF108 and SF109 represent a structural reflected ceiling plan of the low roof after all required demolition has been completed. Confirm that all new structural steel elements are in a flat horizontal plane at or near the uppermost limit of the ceiling.

Reference revised sheets SF108 and SF109. SF108 and SF109 represents a grid of concrete beams approximately 5' below the low roof level. New tube steel and pipe struts are oriented in the horizontal plane and either sit on top of the top horizontal face or frame into the vertical face of the existing concrete beams as shown on sheets SF515 thru SF517.

Detail B3/SF510 – There is a ¼” dimension just above the W14X reference. Please advise what this dimension represents and if it is typical to longitudinal beams.

Reference revised sheet SF510. 1/4" dimension non-applicable. All transverse beams shall be framed flush with the underside of the slab above. All longitudinal beams shall have a 1/2" gap between the top surface of top flange and the bottom surface of the concrete slab above per detail B3/SF504.

Sheets SF101 through SF104. Please confirm that at all W12X and W14X beams at 2nd and 3rd floor framing, the top flange is not connected to the slab in any way except for page note #2 detail D3/SF508. Confirmed. Note that mid-span bracing detail for longitudinal beams only.

5 Carpet tile specification is not included in project specification. Please provide carpet specification. Added Spec Section 09 68 00, See AM-0001

Static Dissipative Tile is not included in project specification. Please provide static dissipative tile specification or include in section 096500 Resilient Flooring. Added Spec Section 09 62 38 Static-Control Flooring, See AM-0001.

Section 096500 Resilient Flooring indicates vinyl composition tile instead of linoleum tile per finish material.

Is the intent to provide linoleum tile (Forbo Marmoleum Dual Tile) per finish material? Please advise. Revised Spec Section Para. 2.1 to reflect linoleum tiles, See AM-0001.

Per Finish schedule, Telecom (135/138/262/263/328) floor finish shows RFT-3 (static dissipative). Room 325 Telecom Room 3A indicates RFT-1 (marmoleum dual), is the intent to provide RFT-3 (static dissipative) for room 325 Telecom also? Please advise.

Revised Telecom Room 3A floor finish to RFT-3 in lieu of RFT-1. See AM-0001 drawings, Sheet AF603.

Section 00 60 00, Appendix B

Section 00 60 00, Appendix B

SECTION 00 72 00 - CONTRACT CLAUSES

The following have been added by reference:

52.211-18 Variation in Estimated Quantity APR 1984

The following have been added by full text:

S-10 Little Fire Ant Avoidance

USAG-HI aims to ensure that the Little Fire Ant (LFA), Wasmannia punctata, an invasive species that was recently introduced to the State of Hawaii, does not become established on U.S. Army installations. LFA has the potential to infest homes and cause painful stings on both adults and children. The LFA also stings pets, such as dogs or cats on their eyes, which has the potential to cause blindness.

All new USAG-HI landscaping projects must be sourced from LFA free nurseries. For confidentiality reasons, the Hawaii Department of Health has not published a formal list of nurseries that are not fire ant free. However, the agency has disclosed that these nurseries are located in the Waimanalo area on the Windward coast of Oahu. Therefore, it is strongly recommended that the covered persons not purchase or install any landscaping products purchased from the Waimanalo area until further notice.

Prior to purchasing the landscaping materials required for this contract, contact the Directorate of Public Works Natural Resource Program (NRP), at 655-9189 or 655-9191, to obtain an approval certificate for the project.

Once the landscaping materials are installed, provide NRP personnel access to survey and inspect the newly landscaped sites. The purpose of the inspection is to look for LFA. If LFA are found, the contractor who installed the plants must provide the labor and funding to remove the LFA. Under these circumstances, the responsible party may only use pest management controls that comply with the current USAG-HI Pest Management Plan and obtain approval from the Installation Pest Management Coordinator (IPMC) prior to any treatment. A copy of the Pest Management Plan may be obtained at Building 104 on Wheeler Army Airfield from the Pest Management Program Manager, 656-3093. The IPMC can provide guidance on how to comply with the Pest Management Plan.

S-11 - Hawaiian Hoary Bat Pupping Season

During the bat pupping season, 1 June to 15 September, there shall be no cutting or trimming of any tree over 15 feet tall.

End of Clause

General Decision Number: HI150001 09/04/2015 HI1

Superseded General Decision Number: HI20140001

State: Hawaii

Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential

Counties: Hawaii Statewide.

BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION

PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS AND DREDGING

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015 1 01/16/2015 2 01/23/2015 3 02/06/2015 4 02/27/2015 5 03/06/2015 6 03/13/2015 7 03/27/2015 8 05/29/2015 9 07/03/2015 10 07/10/2015 11 08/07/2015 12 08/21/2015 13 08/28/2015 14 09/04/2015

ASBE0132-001 08/29/2010

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical

9/8/2015file:///C:/Users/j3ct9gls/AppData/Local/Temp/1/Low/FO98JZG3.htm systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 36.65 22.24

BOIL0627-005 01/01/2013

Rates Fringes

BOILERMAKER......................$ 35.20 27.35

BRHI0001-001 09/03/2012

Rates Fringes

BRICKLAYER

Bricklayers and Stonemasons.$ 35.35 22.92 Pointers, Caulkers and Weatherproofers.............$ 35.60 22.92

BRHI0001-002 09/02/2013

Rates Fringes

Tile, Marble & Terrazzo Worker Terrazzo Base Grinders......$ 35.29 23.22 Terrazzo Floor Grinders and Tenders.................$ 32.24 23.22 Tile, Marble and Terrazzo Workers.....................$ 37.10 23.22

CARP0745-001 09/01/2014

Rates Fringes

Carpenters:

Carpenters; Hardwood Floor Layers; Patent Scaffold Erectors (14 ft. and over); Piledrivers;

Pneumatic Nailers; Wood Shinglers and Transit and/or Layout Man...........$ 42.25 20.71 Millwrights and Machine Erectors....................$ 42.50 20.71 Power Saw Operators (2 h.p. and over)..............$ 42.40 20.71

CARP0745-002 09/01/2014

Rates Fringes

Drywall and Acoustical Workers and Lathers..............$ 42.50 20.71

ELEC1186-001 08/22/2015

Rates Fringes

Electricians:

Cable Splicers..............$ 47.36 28.53 Electricians................$ 43.05 27.22 Telecommunication worker....$ 26.30 11.58

ELEC1186-002 08/22/2015

Rates Fringes

Line Construction:

Cable Splicers..............$ 47.36 28.53 Groundmen/Truck Drivers.....$ 32.29 23.93 Heavy Equipment Operators...$ 38.75 25.91 Linemen.....................$ 43.05 27.22 Telecommunication worker....$ 26.30 11.58

ELEV0126-001 01/01/2015

Rates Fringes

ELEVATOR MECHANIC................$ 53.07 28.38

a. VACATION: Employer contributes 8% of basic hourly rate for 5 years service and 6% of basic hourly rate for 6 months to 5 years service as vacation pay credit.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0003-002 09/01/2014

Rates Fringes

Diver (Aqua Lung) (Scuba)) Diver (Aqua Lung) (Scuba) (over a depth of 30 feet)...$ 61.50 27.06 Diver (Aqua Lung) (Scuba) (up to a depth of 30 feet)..$ 52.13 27.06 Stand-by Diver (Aqua Lung) (Scuba)....................$ 42.75 27.06

Diver (Other than Aqua Lung) Diver (Other than Aqua Lung).......................$ 61.50 27.06 Diver Tender (Other than Aqua Lung)..................$ 39.72 27.06 Stand-by Diver (Other than Aqua Lung)..................$ 42.75 27.06

Helicopter Work Airborne Hoist Operator for Helicopter..............$ 41.30 27.06 Co-Pilot of Helicopter......$ 41.44 27.06 Pilot of Helicopter.........$ 41.61 27.06

Power equipment operator -tunnel work

GROUP 1....................$ 37.74 27.06

GROUP 2....................$ 37.85 27.06

GROUP 3....................$ 38.02 27.06

GROUP 4....................$ 38.29 27.06

GROUP 5....................$ 38.60 27.06

GROUP 6....................$ 39.25 27.06

GROUP 7....................$ 39.57 27.06

GROUP 8....................$ 39.68 27.06

GROUP 9....................$ 39.79 27.06

GROUP 9A...................$ 40.02 27.06

GROUP 10....................$ 40.08 27.06

GROUP 10A...................$ 40.23 27.06

GROUP 11....................$ 40.38 27.06

GROUP 12....................$ 40.74 27.06

GROUP 12A...................$ 41.10 27.06

Power equipment operators:

GROUP 1....................$ 37.44 27.06

GROUP 2....................$ 37.55 27.06

GROUP 3....................$ 37.72 27.06

GROUP 4....................$ 37.99 27.06

GROUP 5....................$ 38.30 27.06

GROUP 6....................$ 38.95 27.06

GROUP 7....................$ 39.27 27.06

GROUP 8....................$ 39.38 27.06

GROUP 9....................$ 39.49 27.06

GROUP 9A...................$ 39.72 27.06

GROUP 10....................$ 39.78 27.06

GROUP 10A...................$ 39.93 27.06

GROUP 11....................$ 40.08 27.06

GROUP 12....................$ 40.44 27.06

GROUP 12A...................$ 40.80 27.06

GROUP 13....................$ 37.72 27.06

GROUP 13A...................$ 37.99 27.06

GROUP 13B...................$ 38.30 27.06

GROUP 13C...................$ 38.95 27.06

GROUP 13D...................$ 39.27 27.06

GROUP 13E...................$ 39.38 27.06

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Fork Lift (up to and including 10 tons); Partsman (heavy duty repair shop parts room when needed).

GROUP 2: Conveyor Operator (Handling building material);

Hydraulic Monitor; Mixer Box Operator (Concrete Plant).

GROUP 3: Brakeman; Deckhand; Fireman; Oiler;

Oiler/Gradechecker; Signalman; Switchman; Highline Cableway Signalman; Bargeman; Bunkerman; Concrete Curing Machine (self-propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.

GROUP 4: Boom Truck or dual purpose "A" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);

Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).

GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines ("Bank" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete Guns; Lubrication and Service Engineer (Grease Rack);

Screedman.

GROUP 6: Boom Truck or Dual Purpose "A"Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4

cu. yd.); Concrete Batch Plants (wet or dry); Concrete Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals); Conveyor or Concrete Pump (Truck or Equipment Mounted); Drilling Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo Operator (setting slip forms, etc., in tunnels); Rollers (over 5 tons); Self-propelled Compactor (single engine);

Self-propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform (50 feet of platform or less).

GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John Deere 450, and similar); Dual Drum Mixer, Extend Lift;

Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.

yds. up to and including 6 yards.); Mechanical Finisher or Spreader Machine (asphalt), (Barber Greene and similar) (Screedman required); Mine or Shaft Hoist; Mobile Concrete Mixer (over 5 tons); Pipe Bending Machine (pipelines only);

Pipe Cleaning Machine (tractor propelled and supported);

Pipe Wrapping Machine (tractor propelled and supported);

Roller Operator (Asphalt); Self-Propelled Elevating Grade Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.);

Water Tanker (pulled by Euclids, T-Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).

GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);

Cast-in-Place Pipe Laying Machine; Concrete Batch Plant (multiple units); Conveyor Operator (tunnel); Deckmate;

Dozer (D-6 and similar); Finishing Machine Operator (airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine (Conveyor-type); No-Joint Pipe Laying Machine; Portable Crushing and Screening Plant; Power Blade Operator (under 12); Saurman Type Dragline (up to and including 5 yds.);

Stationary Pipe Wrapping, Cleaning and Bending Machine;

Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial Platform (over 50 feet of platform).

GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor Loaderand Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).

GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including 20 cu. yds); Self-propelled Compactor with Dozer;

Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).

GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper (Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.

yds.); Self-propelled, rubber-tired Earthmoving Equipment (over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub-Grader (Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper);

Watch Engineer.

GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.

yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.);

Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2

cu. yds.); Mobile Truck Crane Operator (up to and including 25 tons) (Mobile Truck Crane Driver Required);

Self-propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more); Watch Engineer (steam or electric).

GROUP 11: Automatic Slip Form Paver (concrete or asphalt);

Band Wagon (in conjunction with Wheel Excavator);

Cable-operated Crawler Cranes (over 25 tons but less than 50 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu. yds.); Gradall (over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, etc.

(Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.

yds.," struck" m.r.c.); Highline Cableway; Hydraulic Backhoe (over 2 cu. yds. up to and including 4 cu. yds.);

Leverman; Lift Slab Machine; Loader (over 12 cu. yds);

Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre-stress Wire Wrapping Machine; Self-propelled Boom-type Lifting Device (Center Mount) (over 25 tons m.r.c); Self-propelled Compactor (with multiple-propulsion power units); Single Engine Rubber Tired Earthmoving Machine (with Tandem Scraper); Tandem Cats; Trencher (pulling attached shield).

GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs;

Multi-Propulsion Earthmoving Machines (2 or more Scrapers) (over 35 cu. yds "struck"m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu.

yds. m.r.c. and over); Self-propelled rubber-tired

Earthmoving equipment (over 31 cu. yds.) (657B and similar); Wheel Excavator (up to and including 750 cu. yds.

per hour); Wheel Excavator (over 750 cu. yds. per hour).

GROUP 12A: Dozer (D-11 or similar or larger); Hydraulic Excavators (over 4 cu. yds.); Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1-to-1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons); Tower Crane, Mobile;

Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman);

Yo-Yo Cat or Dozer.

GROUP 13: Truck Driver (Utility, Flatbed, etc.)

GROUP 13A: Dump Truck, 8 cu.yds. and under (water level);

Water Truck (up to and including 2,000 gallons).

GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump Truck, over 8 cu. yds. (water level).

GROUP 13C: Truck Driver (Semi-trailer. Rock Cans, Semi-Dump or Roll-Offs).

GROUP 13D: Truck Driver (Slip-In or Pup).

GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem Trucks hooked up to Trailer (Hauling Equipment)

BOOMS AND/OR LEADS (HOURLY PREMIUMS):

The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:

Booms of 80 feet up to but not including 130 feet or Leads of 100 feet up to but not including 130 feet 0.50 Booms and/or Leads of 130 feet up to but not including 180 feet 0.75 Booms and/or Leads of 180 feet up to and including 250 feet 1.15 Booms and/or Leads over 250 feet 1.50

The Operator of a crane (50 tons and over) with a boom of 180 feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:

Booms of 180 feet up to and including 250 feet 1.25 Booms over 250 feet 1.75

ENGI0003-004 09/01/2014

Rates Fringes

Dredging: (Boat Operators) Boat Deckhand...............$ 37.72 27.06 Boat Operator...............$ 39.93 27.06 Master Boat Operator........$ 40.08 27.06

Dredging: (Clamshell or Dipper Dredging)

GROUP 1.....................$ 40.44 27.06

GROUP 2.....................$ 39.78 27.06

GROUP 3.....................$ 39.38 27.06

GROUP 4.....................$ 37.72 27.06

Dredging: (Derricks)

GROUP 1.....................$ 40.44 27.06

GROUP 2.....................$ 39.78 27.06

GROUP 3.....................$ 39.38 27.06

GROUP 4.....................$ 37.72 27.06

Dredging: (Hydraulic Suction Dredges)

GROUP 1.....................$ 40.08 27.06

GROUP 2.....................$ 39.93 27.06

GROUP 3.....................$ 39.78 27.06

GROUP 4.....................$ 39.72 27.06

GROUP 5.....................$ 37.88 26.76

Group 5.....................$ 39.38 27.06

GROUP 6.....................$ 37.77 26.76

Group 6.....................$ 39.27 27.06

GROUP 7.....................$ 36.22 26.76

Group 7.....................$ 37.72 27.06

CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS

GROUP 1: Clamshell or Dipper Operator.

GROUP 2: Mechanic or Welder; Watch Engineer.

GROUP 3: Barge Mate; Deckmate.

GROUP 4: Bargeman; Deckhand; Fireman; Oiler.

HYDRAULIC SUCTION DREDGING CLASSIFICATIONS

GROUP 1: Leverman.

GROUP 2: Watch Engineer (steam or electric).

GROUP 3: Mechanic or Welder.

GROUP 4: Dozer Operator.

GROUP 5: Deckmate.

GROUP 6: Winchman (Stern Winch on Dredge) GROUP 7: Deckhand (can operate anchor scow under direction of Deckmate); Fireman; Leveeman; Oiler.

DERRICK CLASSIFICATIONS

GROUP 1: Operators (Derricks, Piledrivers and Cranes).

GROUP 2: Saurman Type Dragline (over 5 cubic yards).

GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).

GROUP 4: Deckhand, Fireman, Oiler.

ENGI0003-044 09/02/2013

Rates Fringes

Power Equipment Operators

(PAVING)

(10) Cold Planer............$ 38.25 26.98 (10)Loader (2 1/2 cu. yds.

and under)..................$ 37.42 26.98 (10)Soil Stabilizer.........$ 38.25 26.98 (11)Loader (over 2 1/2 cu.

yds. to and including 5

cu. yds.)...................$ 37.74 26.98 (3)Roller Operator (five tons and under).............$ 36.19 26.98 (5)Screed Person............$ 37.42 26.98 (6)Combination Loader/Backhoe (up to 3/4 cu.yd.).....................$ 35.48 26.98 (6)Concrete Saws and/or Grinder (self-propelled unit on streets, highways, airports and canals)........$ 37.42 26.98 (6)Roller Operator (over five tons)..................$ 37.62 26.98 (7)Combination Loader/Backhoe (over 3/4 cu.yd.).....................$ 36.46 26.98

(8) Asphalt Plant Operator..$ 37.89 26.98 Asphalt Concrete Material Transfer....................$ 37.42 26.98 Asphalt Raker...............$ 36.46 26.98 Asphalt Spreader Operator...$ 37.94 26.98 Grader......................$ 38.25 26.98 Laborer, Hand Roller........$ 35.96 26.98

IRON0625-001 09/01/2014

Rates Fringes

Ironworkers:.....................$ 35.75 29.01

a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or Haleakala.

* LABO0368-001 08/31/2015

Rates Fringes

Laborers:

Driller.....................$ 35.35 17.51 Final Clean Up..............$ 25.75 13.34 Gunite/Shotcrete Operator and High Scaler.............$ 34.85 17.51 Laborer I...................$ 34.35 17.51 Laborer II..................$ 31.75 17.51 Mason Tender/Hod Carrier....$ 34.85 17.51 Powderman...................$ 35.35 17.51 Window Washer (bosun chair).$ 33.85 17.51

LABORERS CLASSIFICATIONS

Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and Handroller, and all types of Asphalt Spreader Boxes;

Asphalt Shoveler; Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks); Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping Jack and similar); Concrete Bucket Dumpman; Concrete Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready-mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks); Concrete Core Cutter (Walls, Floors, and Ceiling); Concrete Grinding or Sanding;

Concrete: Hooking on, signaling, dumping of concrete for treme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine (laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw (Walking or Handtype) (cutting walls or flatwork) (scoring old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes); Concrete Shovelers/Laborers (Wet or Dry); Concrete Screeding for Rough Strike-Off: Rodding or striking-off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator; Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and Trench Jacking and Bracing, Hand-Guided Lagging Hammer Whaling Bracing; Curbing (Concrete and Asphalt); Curing of Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch (demolition); Dri Pak-It Machine; Environmental Abatement:

removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site;

Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes;

Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:

Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation;

Headerboard Man (Asphalt or Concrete); Heat Welder of Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre-cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman - Hydraulic Monitor (over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected therewithin;

Laying of all multi-cell conduit or multi-purpose pipe;

Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water Blasting): handling, placing and operation of nozzle;

Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary;

Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conveying of any substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar-type materials (6-inch) pipe and over); Piping: resurfacing and paving of all ditches in preparation for laying of all pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill Operation: Choker setters, off bearers, and lumber handlers connected with clearing; Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers (Small); Preparation and Compaction of roadbeds for railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross-country transmission by pipelines, electrical transmission or underground lines or cables (by mechanical means); Raising of structure by manual or hydraulic jacks or other methods and resetting of structure in new locations, including all concrete work; Ramming or compaction; Rigging in connection with Laborers' work (except demolition), Signaling (including the use of walkie talkie) Choke Setting, tag line usage; Tagging and Signaling of building materials into high rise units; Riprap, Stonepaver, and Rock Slinger (includes placement of stacked concrete, wet or dry and loading, unloading, signaling, slinging and setting of other similar materials); Rotary Scarifier (including multiple head concrete chipping Scarifier); Salamander Heater, Drying of plaster, concrete mortar or other aggregate; Scaffold Erector Leadman; Scaffolds: (Swing and hanging) including maintenance thereof; Scaler; Septic Tank/Cesspool and Drain Fields Digger and Installer;

Shredder/Chipper (tree branches, brush, etc.); Stripping and Setting Forms; Stripping of Forms: Other than panel forms which are to be re-used in their original form, and stripping of…