This is a bid schedule template for an IDIQ maintenance services contract at Millwood Lake, comprising a base year and option year 1 with identical line items. The schedule is organized into seven categories: Carpentry/Painting (items 1-44), Electrical (items 45-59), Plumbing and Septic Maintenance (items 60-72), Equipment (items 73-85), Buoys (items 86-88), Generator Maintenance (items 89-91), and HVAC Maintenance (items 92-94).
The schedule details specific quantities and units for various maintenance tasks including debris removal, timber replacement, installation of handrails, fencing, signs, and playground equipment, various material requirements (fill, sand, aggregate, rip rap stone), electrical work (solar lights, underground wiring), plumbing services (water lines, lift stations, septic maintenance), and equipment hours (dump trucks, tractors, excavators). Material costs are pre-priced at $1.00 per unit for several categories. All bidders must provide unit prices and total prices for each line item, with fields for base year total, option year total, and total contract price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No Carpentry/Painting Quantity Unit Unit Price Total Price 0001 Normal Service Call 25 EA 0002 Emergency Service Call 10 EA 0003 Emergency Debris Removal 5,000 EA 0004 Estimated Material Costs 30,000 EA 1.00$ 0005 Remove/Replace Existing Timbers 5,000 LF 0006 Remove/Replace Base Timbers 3,000 LF 0007 Install Timbers 500 LF 0008 Install Base Timbers 500 LF 0009 Handrails 2x4x16 Ground Contact 2,000 LF 0010 Handrails 2x6x16 Ground Contact 2,000 LF 0011 Handrails 4x4x10 Ground Contact Post 500 LF 0012 Handrails 4x4x16 Ground Contact Post 500 LF 0013 Campsite Marker Post 50 ea 0014 Replace/Install One Post Signs 30 EA 0015 Replace/Install Two Post Signs 30 EA 0016 Fill Material 2,000 TON 0017 Sand Material 400 Ton 0018 Pea Gravel 300 TON 0019 Aggregate Base Material 2,000 TON 0020 Aggregate Base Material 3/4" 2,000 TON 0021 Rip Rap Stone 6" and Smaller 2,000 TON 0022 Rip Rap Stone 6" - 12" 2,000 TON 0023 Rip Rap Stone 12" - 16" 2,000 TON 0024 Rip Rap Stone 18" - 24" 2,000 TON 0025 Pipe Rail Fence 2,000 LF 0026 Pipe Rail Gate 20 EA 0027 Chainlink Fence with Post 1,000 LF 0028 Replace Metal Entry Doors 10 EA 0029 Replace or Install Shower Bench 10 EA 0030 Replace/Install Utility Table Tops 50 EA 0031 Replace/Install Vinyl Coated Picnic Table 25 EA 0032 Culvert Replacement 18" 10 EA 0033 Culvert Replacement 24" 10 EA 0034 Culvert Replacement 36" 10 EA 0035 Culvert Replacement 48" 5 EA 0036 Concrete Headwall 13"-48" Culverts 20 EA 0037 Concrete 400 CY 0038 Asphalt 2,000 TON
Millwood- Base Year I.D.I.Q Maintenance
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement, at Millwood Lake.
1.00$
0039 Metal Picnic Shelter Canopy 10 EA 0040 Oil Base, Primer Coat 4,000 SF 0041 Oil Base, Intermediate or Finish Coat 5,000 SF 0042 Latex, Primer Coat 6,000 SF 0043 Latex, Intermediate or Finish Coat 5,000 SF 0044 Pavement Marking 9,000 LF
Quantity Unit 0045 Normal Service Call 10 EA 0046 Emergency Service Call 8 EA 0047 Estimated Material Costs 20,000 EA 1.00$ 0048 Replace or Install Camper Pedestal 25 EA 0049 Replace Security Light Fixture 10 EA 0050 Install/Replace Solar Lights 5 EA 0051 Install/Replace Solar Light Batteries 6 EA 0052 Install/Replace Solar Light Panel 4 EA 0053 Estimated Material Costs Solar Lights 10,000 EA 1.00$ 0054 Trenching (Electrical Lines) 2,500 LF 0055 Replace Underground Electrical #1 AWG 400 LF 0056 Replace Underground Electrical #2 AWG 400 LF 0057 Replace Underground Electrical #4 AWG 400 LF 0058 Replace Underground Electrical #6 AWG 400 LF 0059 Replace/Install Underground Primary 2,500 LF
Quantity Unit 0060 Normal Service Call 20 EA 0061 Emergency Service Call 15 EA 0062 Estimated Material Costs 15,000 EA 1.00$ 0063 Trenching and Backfilling (Water Lines) 1,500 LF 0064 Replace Lift Station Pump 6 EA 0065 Replace or Install Underground Water Line 3/4" - 2" 2,500 LF 0066 Replace or Install Underground Water Line 2" - 4" 2,500 LF 0067 Replace Water Heater 85 Gallon 6 EA 0068 Install Vermiculite 150 BAG 0069 Replace Frost Proof Water Hydrant 15 EA 0070 Replace or Install Hydrant Assembly 25 EA 0071 Replace Trailer Dump Station Water Tower 4 EA 0072 Septic Tank Pump Out Service 80 EA
Quantity Unit 0073 Dump Truck, 10 Yard 130 HRS 0074 Tractor W/Blade 40 HRS 0075 Skidsteer w/Attachments 250 HRS 0076 Tractor w/Front Loader 80 HRS 0077 Dozer Work 200 HRS 0078 Trackhoe w/30ft Boom 200 HRS 0079 Road Grader 50 HRS 0080 Mini Excavator 250 HRS
Equipment
Electrical
Plumbing and Septic Maintenance
0081 Bucket Truck 250 HRS 0082 Concrete Saw 60 HRS 0083 Side Boom Bushhog 200 HRS 0084 Compactor 120 HRS 0085 Rubber Tire Loader 250 HRS
Quantity Unit 0086 Bouy Installation/Removal 200 Each 0087 Buoy Line Inspection 5 Each 0088 Estimated Material Costs 10,000 Each 1.00$
Quantity Unit 0089 Yearly Maintenance 5 Each 0090 Emergency Service Call 5 Each 0091 Estimated Material Costs 12,000 Each 1.00$
Quantity Unit 0092 Yearly Maintenance 8 each 0093 Emergency Service Call 5 Each 0094 Estimated Material Costs 12,000 Each 1.00$
Base Year Total:
Provided By:
Buoys
Generator Maintenance
HVAC Maintenance
Item No Carpentry/Painting Quantity Unit Unit Price Total Price 1001 Normal Service Call 25 EA 1002 Emergency Service Call 10 EA 1003 Emergency Debris Removal 5,000 EA 1004 Estimated Material Costs 30,000 EA 1.00$ 1005 Remove/Replace Existing Timbers 5,000 LF 1006 Remove/Replace Base Timbers 3,000 LF 1007 Install Timbers 500 LF 1008 Install Base Timbers 500 LF 1009 Handrails 2x4x16 Ground Contact 2,000 LF 1010 Handrails 2x6x16 Ground Contact 2,000 LF 1011 Handrails 4x4x10 Ground Contact Post 500 LF 1012 Handrails 4x4x16 Ground Contact Post 500 LF 1013 Campsite Marker Post 50 EA 1014 Replace/Install One Post Signs 30 EA 1015 Replace/Install Two Post Signs 30 EA 1016 Fill Material 2,000 TON 1017 Sand Material 400 Ton 1018 Pea Gravel 300 TON 1019 Aggregate Base Material 2,000 TON 1020 Aggregate Base Material 3/4" 2,000 TON 1021 Rip Rap Stone 6" and Smaller 2,000 TON 1022 Rip Rap Stone 6" - 12" 2,000 TON 1023 Rip Rap Stone 12" - 16" 2,000 TON 1024 Rip Rap Stone 18" - 24" 2,000 TON 1025 Pipe Rail Fence 2,000 LF 1026 Pipe Rail Gate 20 EA 1027 Chainlink Fence with Post 1,000 LF 1028 Replace Metal Entry Doors 10 EA 1029 Replace or Install Shower Bench 10 EA 1030 Replace/Install Utility Table Tops 50 EA 1031 Replace/Install Vinyl Coated Picnic Table 25 EA 1032 Culvert Replacement 18" 10 EA 1033 Culvert Replacement 24" 10 EA 1034 Culvert Replacement 36" 10 EA 1035 Culvert Replacement 48" 5 EA 1036 Concrete Headwall 13"-48" Culverts 20 EA 1037 Concrete 400 CY 1038 Asphalt 2,000 TON
Millwood- Option 1 I.D.I.Q Maintenance
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement, at Millwood Lake.
1.00$
1039 Metal Picnic Shelter Canopy 10 EA 1040 Oil Base, Primer Coat 4,000 SF 1041 Oil Base, Intermediate or Finish Coat 5,000 SF 1042 Latex, Primer Coat 6,000 SF 1043 Latex, Intermediate or Finish Coat 5,000 SF 1044 Pavement Marking 9,000 LF
Quantity Unit 1045 Normal Service Call 10 EA 1046 Emergency Service Call 8 EA 1047 Estimated Material Costs 20,000 EA 1.00$ 1048 Replace or Install Camper Pedestal 25 EA 1049 Replace Security Light Fixture 10 EA 1050 Install/Replace Solar Lights 5 EA 1051 Install/Replace Solar Light Batteries 6 ea 1052 Install/Replace Solar Light Panel 4 ea 1053 Estimated Material Costs Solar Lights 10,000 ea 1.00$ 1054 Trenching (Electrical Lines) 2,500 LF 1055 Replace Underground Electrical #1 AWG 400 LF 1056 Replace Underground Electrical #2 AWG 400 LF 1057 Replace Underground Electrical #4 AWG 400 LF 1058 Replace Underground Electrical #6 AWG 400 LF 1059 Replace/Install Underground Primary 2,500 LF
Quantity Unit 1060 Normal Service Call 20 EA 1061 Emergency Service Call 15 EA 1062 Estimated Material Costs 15,000 EA 1.00$ 1063 Trenching and Backfilling (Water Lines) 1,500 LF 1064 Replace Lift Station Pump 6 EA 1065 Replace or Install Underground Water Line 3/4" - 2" 2,500 LF 1066 Replace or Install Underground Water Line 2" - 4" 2,500 LF 1067 Replace Water Heater 85 Gallon 6 EA 1068 Install Vermiculite 150 BAG 1069 Replace Frost Proof Water Hydrant 15 ea 1070 Replace or Install Hydrant Assembly 25 EA 1071 Replace Trailer Dump Station Water Tower 4 EA 1072 Septic Tank Pump Out Service 80 EA
Quantity Unit 1073 Dump Truck, 10 Yard 130 HRS 1074 Tractor W/Blade 40 HRS 1075 Skidsteer w/Attachments 250 HRS 1076 Tractor w/Front Loader 80 HRS 1077 Dozer Work 200 HRS 1078 Trackhoe w/30ft Boom 200 HRS 1079 Road Grader 50 HRS 1080 Mini Excavator 250 HRS
Equipment
Electrical
Plumbing and Septic Maintenance
1081 Bucket Truck 250 HRS 1082 Concrete Saw 60 HRS 1083 Side Boom Bushhog 200 HRS 1084 Compactor 120 HRS 1085 Rubber Tire Loader 250 HRS
Quantity Unit 1086 Bouy Installation/Removal 200 Each 1087 Buoy Line Inspection 5 Each 1088 Estimated Material Costs 10,000 Each 1.00$
Quantity Unit 1089 Yearly Maintenance 5 Each 1090 Emergency Service Call 5 Each 1091 Estimated Material Costs 12,000 Each 1.00$
Quantity Unit 1092 Yearly Maintenance 8 each 1093 Emergency Service Call 5 Each 1094 Estimated Material Costs 12,000 Each 1.00$
Option 1 Total:
Provided By:
Total Contract Price:
Buoys
Generator Maintenance
HVAC Maintenance
| Page 01 |
| Page 02 |
File details come from the government source that posted it. Updated .