R3MS_PWS--Attachment_J-1503010-02_Janitorial_Services_Task_List_native_file.xlsx
XLSX spreadsheet 306 KB Posted
- Solicitation number
- W9127S22Q0030
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TX011
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX011 | entrance to building | Foyer | Ceramic Tile - 6" | FT | 2W | 2M | 2Y | Y | Y | M | W | W | M | 2M | 2M | |||||||||||||
| Building ID: | P1001 | A11 | Office | VCT - 12" | 296 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||
| A12 | Office | VCT - 12" | 228 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A13 | Office | Carpet | 393 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| A14 | Office | VCT - 12" | 266 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A15 | Office | VCT - 12" | 264 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A19 A and A19 | Cafeteria | VCT - 12" | 3237 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| a20 | Electrical | Concrete | 98 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| A21A | Mechanical | Concrete | 405 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| A21B | Mechanical | Concrete | 97 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| A22 | Kitchen Supply | Ceramic Tile - 6" | 201 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| A23 | Kitchen Galley | Ceramic Tile - 6" | 2837 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| A24 | Can Storage | Ceramic Tile - 6" | 144 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| A25 | Restroom, Men's | Ceramic Tile - 2" | 937 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| A25 | RIFLE RANGE | VCT - 12" | 937 | PT | |||||||||||||||||||||||||
| A25A | Storage | Concrete | 58 | PT | |||||||||||||||||||||||||
| A26 | Restroom, Women's | Ceramic Tile - 2" | 191 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| A27 Janitor closet | Janitor's Closet | VCT - 12" | 43 | PT | |||||||||||||||||||||||||
| A28 | Restroom, Men's | Ceramic Tile - 2" | 394 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| A3 | Office | VCT - 12" | 700 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A30 | Restroom, Women's | Ceramic Tile - 2" | 266 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| A32 | Office | VCT - 12" | 160 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A33 | Office | VCT - 12" | 287 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A34 | Arms Vault | Concrete | 468 | PT | |||||||||||||||||||||||||
| A4 | Office | VCT - 12" | 128 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| A5 | Storage | VCT - 12" | 100 | PT | |||||||||||||||||||||||||
| A9/A8/A7 | Classroom | VCT - 12" | 912 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B 36 | Office | VCT - 12" | 88 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B02A | Electrical | Concrete | 36 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| B05 | Office | VCT - 12" | 202 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B06 | Office | VCT - 12" | 83 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B07 | Office | VCT - 12" | 130 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B08 | Office | VCT - 12" | 130 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B09 | Office | VCT - 12" | 132 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B10 | Office | VCT - 12" | 110 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B11 | Office | VCT - 12" | 92 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B12 | Office | VCT - 12" | 140 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B13 | Office | VCT - 12" | 92 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B14 | Office | VCT - 12" | 140 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B15/16 | Office | VCT - 12" | 4270 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B17 | Office | VCT - 12" | 91 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B18 | Office | VCT - 12" | 140 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B19 | Office | VCT - 12" | 92 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B2 | Office | VCT - 12" | 3432 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B20 | Office | VCT - 12" | 140 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B22 | Office | VCT - 12" | 95 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B23 | Office | VCT - 12" | 145 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B24 | Office | VCT - 12" | 143 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B25 | Office | VCT - 12" | 94 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B26 | Office | VCT - 12" | 193 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B27 | Office | VCT - 12" | 143 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| b28 | Office | VCT - 12" | 126 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B3 | Mail room | VCT - 12" | 98 | PT | |||||||||||||||||||||||||
| B30 | Mechanical | Concrete | 248 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| B31 | Storage | Concrete | 9633 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| B32 | Office | VCT - 12" | 88 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B33 | Office | VCT - 12" | 88 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B34 | Office | VCT - 12" | 88 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B35 | Office | VCT - 12" | 88 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B37 | Office | VCT - 12" | 87 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| B4 | Office | VCT - 12" | 141 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| corridor 1 | Hallway | VCT - 12" | 2082 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| corridor 2 | Corridor | VCT - 12" | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||||
| Corridor 3 | Corridor | VCT - 12" | 606 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| corridor c4 | Office | VCT - 12" | 98 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y |
| Facility ID: | TX011 | C9 | Mechanical | Concrete | 236 | PT | 2Y | 2Y | M | M | 2M | 2M | |||||||||
| Building ID: | P1002 | C8 | Storage | Concrete | 738 | PT | |||||||||||||||
| C7 | AMSA TOOLS/SUPPLY | Concrete | 987 | PT | |||||||||||||||||
| C5 | Battery Storage | Concrete | 255 | PT | |||||||||||||||||
| C3 | Office | VCT - 12" | 200 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| C2 | Office | VCT - 12" | 297 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| C15 | Maintenance Bay | Concrete | 4866 | FT | |||||||||||||||||
| C14 | Tire repair | Concrete | 403 | FT | |||||||||||||||||
| C13 | Restroom, Women's | Ceramic Tile - 2" | 209 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||
| C12 | Restroom, Men's | Ceramic Tile - 2" | 235 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||
| C11 | Janitor's Closet | VCT - 12" | 27 | PT | |||||||||||||||||
| C11 | Corridor | VCT - 12" | 291 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| C10 | Break Room | VCT - 12" | 295 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| Frequency of Services | |||||||||||||||||||||
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. | ||||||||||||||||||||
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. | ||||||||||||||||||||
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. | ||||||||||||||||||||
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. | ||||||||||||||||||||
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. | ||||||||||||||||||||
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. | ||||||||||||||||||||
| 2M | Semimonthly (SM) or two per month (2M). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days. | ||||||||||||||||||||
| 6M | Six times per month (6M). Service performed six times per month. | ||||||||||||||||||||
| B | Biennial (B). Services performed once during each 24-month period of the contract at intervals of 670 to 790 days. | ||||||||||||||||||||
| Y | Annual (A) or Yearly (Y). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. | ||||||||||||||||||||
| 2Y | Semiannual (SA) or two per year (2Y). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days. | ||||||||||||||||||||
| 3Y | Three times yearly (3Y). Services performed three times per year, such as in January, May, and September. | ||||||||||||||||||||
| Q | Quarterly (Q) or four per year (4Y). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days. | ||||||||||||||||||||
| 6Y | Six times yearly (6Y). Services performed six times per year, such as in January, March, May, July, September, and November. | ||||||||||||||||||||
| 13Y | Every four weeks. Services performed once every four weeks, or 13 times during each 12-month period of the contract. |
TX018
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX018 | 101 | Lobby | Ceramic Tile - 6" | 457 | FT | 2W | 2M | 2Y | Y | Y | M | 2M | 2M | |||||||||||||||
| Building ID: | P0100 | 102 | ENTRYWAY | VCT - 12" | 120 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||
| 103 | Office | Carpet | 275 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 104 | Storage | VCT - 12" | 81 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 105 | Office | Carpet | 289 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 106 | Office | Carpet | 189 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 107 | Office | Carpet | 196 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 108 | Office | Carpet | 216 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 109 | Office | Carpet | 106 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 110 | Office | Carpet | 106 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 111 | Office | Carpet | 180 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 112 | Flight ops | VCT - 12" | 337 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 113 | Electrical | VCT - 12" | 59 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 114 | Break Room/copy room | Carpet | 89 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 115 | Office | Carpet | 89 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 116 | Office | Carpet | 89 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 117 | Corridor | Carpet | 132 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 118 | Storage | VCT - 12" | 15 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 119 | Restroom, Women's | Ceramic Tile - 2" | 76 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 120 | Janitor's Closet | VCT - 12" | 22 | PT | |||||||||||||||||||||||||
| 121 | Restroom, Men's | Ceramic Tile - 2" | 92 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 122 | Vestibule | VCT - 12" | 38 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 123 | Conference Room | Carpet | 1096 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 124 | MaiL ROOM | VCT - 12" | 131 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 125 | wat heater room | Concrete | 18 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 126 | Restroom, Men's | VCT - 12" | 34 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||||||||||
| 127 | Restroom, Women's | VCT - 12" | 34 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||||||||||
| 128 | Security room | VCT - 12" | 18 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 128 | Corridor | VCT - 12" | 189 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 129 | Corridor | VCT - 12" | 214 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 130 | Office | VCT - 12" | 369 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 131 | Corridor | VCT - 12" | 439 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 132 | Office | VCT - 12" | 89 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 133 | Flight GEAR ROOM LOCKERS | VCT - 12" | 1302 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 134 | Cafeteria | VCT - 12" | 2764 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||
| 135 | Corridor | VCT - 12" | 673 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 136 | Storage | VCT - 12" | 185 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 137 | Food Storage | Ceramic Tile - 6" | 137 | PT | |||||||||||||||||||||||||
| 138 | Kitchen | Ceramic Tile - 6" | 285 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| 139 | Kitchen | Ceramic Tile - 6" | 189 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| 140 | Arms Room | Concrete | 459 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 141 | Arms Vault | Concrete | 1151 | FT | |||||||||||||||||||||||||
| 142 | Arms Room | Concrete | 94 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 143 | Corridor | VCT - 12" | 877 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 144 | Office | VCT - 12" | 115 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 145 | Office | VCT - 12" | 115 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 146 | Office | VCT - 12" | 114 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 147 | Storage | Concrete | 1154 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 148 | Storage | Concrete | 2166 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 149 | Stage | Concrete | 473 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 150 | Storage | Concrete | 956 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 151 | Corridor | VCT - 12" | 239 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 152 | Stairs | VCT - 12" | 155 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 153 | SUPPLY/TOOLS/PARTS | Concrete | 2625 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 154 | Office | VCT - 12" | 438 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 155 | Storage | Concrete | 230 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 156 | Storage | Concrete, Painted | 444 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 157 | Restroom, Men's | Ceramic Tile - 2" | 239 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 158 | Restroom, Women's | Ceramic Tile - 2" | 107 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 159 | Vestibule | VCT - 12" | 25 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 160 | Vestibule | VCT - 12" | 22 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 161 | Mechanical | Concrete | 168 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 162 | Janitor's Closet | VCT - 12" | 33 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 163 | Corridor | Concrete, Painted | 390 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 164 | Hallway | VCT - 12" | 306 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 165 | Office | VCT - 12" | 95 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 166 | Office | VCT - 12" | 97 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 167 | Office | VCT - 12" | 97 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 168 | Office | VCT - 12" | 96 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 169 | Office | VCT - 12" | 96 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 170 | Office | VCT - 12" | 96 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 171 | Office | VCT - 12" | 97 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 172 | Hallway | VCT - 12" | 119 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 174 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 175 | Office | VCT - 12" | 232 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 176 | Office | VCT - 12" | 115 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 177 | Office | VCT - 12" | 470 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 182 | Hangar | Concrete, Painted | 14582 | FT | |||||||||||||||||||||||||
| 183 | Storage | VCT - 12" | 163 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 184 | Office | VCT - 12" | 868 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 186 | TOOL ROOM | Concrete, Painted | 984 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 187 | Break Room | VCT - 12" | 587 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 188 | Mechanical | Concrete, Painted | 264 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 189 | ClEANING | VCT - 12" | 194 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 190 | Storage | Concrete, Painted | 461 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 191 | Storage | Concrete, Painted | 234 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 192 | Storage | Concrete, Painted | 1427 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 193 | Storage | Concrete, Painted | 385 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 194 | north hangar | Concrete, Painted | 14404 | FT | |||||||||||||||||||||||||
| 200 | Corridor | VCT - 12" | 477 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 201 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 202 | TACTICAL OPS | VCT - 12" | 182 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 203 | Office | VCT - 12" | 142 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 204 | Office | VCT - 12" | 143 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 205 | Office | VCT - 12" | 142 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 206 | Office | VCT - 12" | 142 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 207 | Office | VCT - 12" | 113 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 208 | Office | VCT - 12" | 113 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 210 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 211 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 212 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 213 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 214 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 215 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 216 | Office | VCT - 12" | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 217 | Office | VCT - 12" | 113 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 218 | Office | VCT - 12" | 131 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 219 | Office | VCT - 12" | 126 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 220 | Office | VCT - 12" | 126 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 221 | Office | VCT - 12" | 126 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 222 | Office | Carpet | 321 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 223 | Office | Carpet | 304 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 224 | Mechanical | Concrete | 625 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 225 | Office | VCT - 12" | 108 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 226 | Office | VCT - 12" | 156 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 227 | Conference Room | VCT - 12" | 303 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 228 | Office | VCT - 12" | 124 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 229 | Office | VCT - 12" | 110 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 230 | Office | Carpet | 323 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 231 | Office | Carpet | 434 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 232 | Office | Carpet | 323 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 233 | Office | Carpet | 323 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 234 | Office | Carpet | 101 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 235 | Office | Carpet | 107 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 236 | Corridor | VCT - 12" | 829 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 237 | Office | Carpet | 3807 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 240 | Office | Carpet | 473 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 241 | Office | VCT - 12" | 431 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 242 | MaiL ROOM AND COPY | VCT - 12" | 74 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 243 | Server Room | VCT - 12" | 74 | PT | |||||||||||||||||||||||||
| 244 | Office | VCT - 12" | 128 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 245 | Office | VCT - 12" | 294 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 246 | Office | VCT - 12" | 122 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 247 | Office | VCT - 12" | 235 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 248 | Office | VCT - 12" | 122 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 249 | Corridor | VCT - 12" | 588 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 250 | Office | VCT - 12" | 224 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 251 | Office | VCT - 12" | 122 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 252 | Office | VCT - 12" | 224 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 253 | Office | VCT - 12" | 122 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 254 | Office | VCT - 12" | 122 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 255 | Office | VCT - 12" | 177 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 256 | VeRANDA | Concrete | 92 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 257 | Corridor | VCT - 12" | 259 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 259 | Restroom, Men's | Ceramic Tile - 2" | 345 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 261 | Restroom, Women's | Ceramic Tile - 2" | 168 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 262 | Classroom | VCT - 12" | 737 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 266 | Classroom | VCT - 12" | 404 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 267 | Storage | VCT - 12" | 224 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 268 | Office | VCT - 12" | 119 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 269 | Office | VCT - 12" | 119 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 270 | Office | VCT - 12" | 119 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 271 | Office | VCT - 12" | 395 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 272 | Office | VCT - 12" | 114 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 273 | Office | VCT - 12" | 114 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 274 | Office | VCT - 12" | 94 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 275 | Office | VCT - 12" | 94 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 276 | Office | VCT - 12" | 94 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 277 | Electrical | Concrete | 29 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 278 | Stairs | VCT - 12" covered with rubber | 121 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 279 | Corridor | VCT - 12" | 457 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 180/181 | Blade room | Concrete, Painted | 666 | FT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 136A | water heater | Concrete | 70 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 143A | Mechanical | Concrete | 121 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 161A | Mechanical | Concrete | 192 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 179/178 | MaCHINE SHOP | Concrete | 1025 | PT | |||||||||||||||||||||||||
| 182A | Electrical | Concrete | 206 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 182C | Air lock | VCT - 12" | 80 | FT | |||||||||||||||||||||||||
| 187A | AIR LOCK | VCT - 12" | 18 | FT | |||||||||||||||||||||||||
| 193A | Mechanical | Concrete | 99 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 194A | Mechanical | Concrete | 309 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 222A | Storage | VCT - 12" | 108 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 223A | Storage | VCT - 12" | 140 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 236-1 | Office | Carpet | 114 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 236A | Janitor's Closet | VCT - 12" | 38 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 263-A | Storage | Carpet | PART OF 262 SF | PT | Y | Y | Y | Y | |||||||||||||||||||||
| 265-1 | Classroom | VCT - 12" | 703 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| NEXT TO VERANDA | Electrical ROOM SECOND FLOOR | Concrete | 81 | PT | 2Y | 2Y | M | M |
| Facility ID: | TX018 | 36 | Mechanical | Concrete | 44 | PT | 2Y | 2Y | M | M | 2M | 2M | |||||||||||
| Building ID: | P0101 | 41 | Mechanical | Concrete | 44 | PT | 2Y | 2Y | M | M | |||||||||||||
| 301 | Office | Carpet | 321 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||
| 302 | Storage | Concrete | 69 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||
| 303 | Storage | Concrete | 93 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||
| 305 | Restroom, Unisex | Ceramic Tile - 1" | 52 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||
| 306 | Janitor's Closet | Carpet | 25 | PT | 2W | 2W | 2M | 2Y | Y | Y | M | W | Y | ||||||||||
| 307 | WELD SHOP | Concrete | 164 | FT | |||||||||||||||||||
| 308 | Corridor | Concrete | 116 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||
| 309 | Storage | Concrete | 919 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||
| 310 | WORKBAY | Concrete | 2750 | FT |
| Facility ID: | TX018 | 401 | Office | VCT - 12" | 141 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2M | 2M | |
| Building ID: | P0102 | 402 | Storage | Concrete | 4919 | PT | Y | Y | Y | Y | Y | Y |
| Facility ID: | TX018 | 500 | Storage | Concrete | 1048 | PT | Y | Y | Y | Y | Y | Y | 2M | 2M | |||||||
| Building ID: | P0103 | 501 | Office | Concrete | 150 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||
| 502 | Restroom, Unisex | Ceramic Tile - 6" | 28 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||
| Frequency of Services | |||||||||||||||||||||
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. | ||||||||||||||||||||
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. | ||||||||||||||||||||
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. | ||||||||||||||||||||
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. | ||||||||||||||||||||
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. | ||||||||||||||||||||
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. | ||||||||||||||||||||
| 2M | Semimonthly (SM) or two per month (2M). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days. | ||||||||||||||||||||
| 6M | Six times per month (6M). Service performed six times per month. | ||||||||||||||||||||
| B | Biennial (B). Services performed once during each 24-month period of the contract at intervals of 670 to 790 days. | ||||||||||||||||||||
| Y | Annual (A) or Yearly (Y). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. | ||||||||||||||||||||
| 2Y | Semiannual (SA) or two per year (2Y). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days. | ||||||||||||||||||||
| 3Y | Three times yearly (3Y). Services performed three times per year, such as in January, May, and September. | ||||||||||||||||||||
| Q | Quarterly (Q) or four per year (4Y). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days. | ||||||||||||||||||||
| 6Y | Six times yearly (6Y). Services performed six times per year, such as in January, March, May, July, September, and November. | ||||||||||||||||||||
| 13Y | Every four weeks. Services performed once every four weeks, or 13 times during each 12-month period of the contract. |
TX019
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX019 | 001 | Office | Linoleum Tile 12" | 143 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | 2M | 2M | |||||||||||||
| Building ID: | P1001 | 002 | Office | Carpet | 247 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||
| 003 | Office | Carpet | 316 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 004 | Admin | VCT-12" | 586 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 005 | Storage | Concrete | 150 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 006 | Physical Fit | Painted Concrete | 1312 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 007 | Storage | Concrete | 361 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 008 | Storage | 475 | PT | Y | Y | Y | Y | Y | Y | ||||||||||||||||||||
| 009 | Office | VCT - 12" | 391 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 010 | Mens Restroom | Ceramic Tile 4" | 231 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 011 | Mechanical | Concrete | 471 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 012 | Telecom | Concrete | 79 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 013 | Mail Room | VCT - 12" | 126 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 015 | Assembly Hall | Concrete | 3500 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 016 | Kitchen | VCT-12" | 239 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 017 | Womens Restroom | Ceramic Tile 4" | 138 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | |||||||||||||||
| 017A | Locker Room | VCT - 12" | 64 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 018 | Arms Room | VCT - 12" | 151 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 018A | Vault | Concrete | 565 | PT | |||||||||||||||||||||||||
| 019 | CMD Sgt. Major | VCT-12" | 184 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 020 | Classroom | VCT-12" | 184 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 021 | Classroom | VCT-12" | 1186 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 022 | Classroom | VCT-12" | 1186 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 023 | Office | Ceramic Tile 4" | 587 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 024 | Office | VCT-12" | 335 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 025 | JAG | VCT - 12" | 480 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 026 | Admin | VCT-12" | 759 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 028 | Latrine | Ceramic Tile 4" | 339 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 029 | Janitors Closet | Concrete | 40 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 030 | Logistics | VCT - 12" | 589 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 031 | Mechanical | Concrete | 164 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 032 | Admin | VCT - 12" | 246 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 033 | EXEC OFFICER | VCT-12" | 246 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 034 | BAT CMDR | VCT-12" | 219 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 06A | Storage | VCT-12" | 152 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| C001 | Corridor | VCT-12" | 643 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| C002 | Corridor | VCT-12" | 160 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| C004 | Corridor | VCT-12" | 758 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| C005 | Corridor | VCT-12" | 575 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| S001 | Stairs | VCT-12" | 120 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| S002 | Stairs | VCT-12" | 120 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| S003 | Stairs | VCT-12" | 120 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| S004 | Stairs | VCT-12" | 120 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| V001 | Vestible | VCT-12" | 67 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| V002 | Vestible | VCT-12" | 27 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| V003 | Vestible | VCT-12" | 113 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| V004 | Vestible | VCT-12" | 66 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| V005 | Vestible | VCT-12" | 23 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y |
| Facility ID: | TX019 | 100 | Maintenance Bay | Concrete | 3828 | FT | 2M | 2M | ||||||||||
| Building ID: | P1002 | 101 | Office | Carpet | 136 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | ||||
| 102 | Battery Storage | Concrete | 36 | PT | 2Y | 2Y | M | M |
| Frequency of Services | |
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. |
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. |
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. |
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. |
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. |
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. |
| 2M | Semimonthly (SM) or two per month (2M). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days. |
| 6M | Six times per month (6M). Service performed six times per month. |
| B | Biennial (B). Services performed once during each 24-month period of the contract at intervals of 670 to 790 days. |
| Y | Annual (A) or Yearly (Y). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. |
| 2Y | Semiannual (SA) or two per year (2Y). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days. |
| 3Y | Three times yearly (3Y). Services performed three times per year, such as in January, May, and September. |
| Q | Quarterly (Q) or four per year (4Y). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days. |
| 6Y | Six times yearly (6Y). Services performed six times per year, such as in January, March, May, July, September, and November. |
| 13Y | Every four weeks. Services performed once every four weeks, or 13 times during each 12-month period of the contract. |
TX046
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX046 | 1 | Classroom | VCT - 12" | 583 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2M | 2M | |||||||||||
| Building ID: | P1001 | 2 | Retention Office | VCT - 12" | 386 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||
| 3 | Classroom | VCT - 12" | 583 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 5 | Classroom | VCT - 12" | 566 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 6 | Guidance | VCT - 12" | 193 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 7 | Office | VCT - 12" | 387 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 8 | Restroom, Women's | Ceramic Tile - Mosaic | 156 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 9 | Admin | VCT - 12" | 198 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 10 | Restroom, Men's | Ceramic Tile - Mosaic | 186 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 11 | Admin | VCT - 12" | 193 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 12 | Library | VCT - 12" | 449 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 13 | Storage | VCT - 12" | 153 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 14 | NBC Storage | VCT - 12" | 438 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 15 | Supply | VCT - 12" | 498 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 16 | Supply Storage | VCT - 12" | 372 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 17 | Janitor's Closet | Concrete | 31 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 18 | Restroom, Unisex | Ceramic Tile - Mosaic | 112 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 19 | Family Readiness | Carpet | 213 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 20 | Comm | Concrete | 73 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 21 | Training Room | Carpet | 258 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 22 | Admin | Carpet | 250 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 23 | Admin | Carpet | 249 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 24 | Server Room | Carpet | 284 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| 25 | Supply Office | Carpet | 286 | FT | 2W | 2M | 2Y | Y | Y | M | W | Y | |||||||||||||||||
| Boiler | Concrete | 140 | PT | 2Y | 2Y | M | M | ||||||||||||||||||||||
| Mechanical | Concrete | 53 | PT | 2Y | 2Y | M | M | ||||||||||||||||||||||
| Arms Room | Concrete | 156 | PT | 2Y | 2Y | M | M | ||||||||||||||||||||||
| Assembly Hall | Concrete | 3,500 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||||
| Corridor 1 | VCT - 12" | 253 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||||
| Corridor 2 | VCT - 12" | 853 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||||
| Corridor 3 | VCT - 12" | 250 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||||
| Vestibule | VCT - 12" | 47 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y |
| Facility ID: | TX046 | 100 | Maintenance Bay | Concrete | 2321 | FT | 2M | 2M |
| Building ID: | P1002 | 101 | Battery Storage | Concrete | 41 | PT |
| Facility ID: | TX046 | 100 | Maintenance Bay | Concrete | 3500 | FT | 2M | 2M |
| Building ID: | P1003 |
| Facility ID: | TX046 | 100 | Storage | Concrete | 2228 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2M | 2M |
| Building ID: | P1005 | 101 | Admin | Concrete | 124 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | ||
| Frequency of Services | ||||||||||||||||||
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. | |||||||||||||||||
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. | |||||||||||||||||
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. | |||||||||||||||||
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. | |||||||||||||||||
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. | |||||||||||||||||
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. | |||||||||||||||||
| 2M | Semimonthly (SM) or two per month (2M). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days. | |||||||||||||||||
| 6M | Six times per month (6M). Service performed six times per month. | |||||||||||||||||
| B | Biennial (B). Services performed once during each 24-month period of the contract at intervals of 670 to 790 days. | |||||||||||||||||
| Y | Annual (A) or Yearly (Y). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. | |||||||||||||||||
| 2Y | Semiannual (SA) or two per year (2Y). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days. | |||||||||||||||||
| 3Y | Three times yearly (3Y). Services performed three times per year, such as in January, May, and September. | |||||||||||||||||
| Q | Quarterly (Q) or four per year (4Y). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days. | |||||||||||||||||
| 6Y | Six times yearly (6Y). Services performed six times per year, such as in January, March, May, July, September, and November. | |||||||||||||||||
| 13Y | Every four weeks. Services performed once every four weeks, or 13 times during each 12-month period of the contract. |
TX054
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX054 | 001 | Classroom | VCT - 12" | 475 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2M | 2M | |||||||||||
| Building ID: | P1001 | 002 | Office | VCT - 12" | 476 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||
| L2 | Women's Restroom | Ceramic Tile - Mosaic | 116 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 004 | Office | VCT - 12" | 288 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 005 | Post | VCT - 12" | 195 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 006 | Retention | Concrete | 149 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 007 | Commander | VCT - 12" | 265 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 008 | Unit Admin | VCT - 12" | 246 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 009 | Office | VCT - 12" | 77 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 010 | Office | VCT - 12" | 80 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 011 | Kitchen | VCT - 12" | 84 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||
| 012 | Janitor's Closet | Concrete | 21 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 013 | Storage | VCT - 12" | 188 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 014 | Mechanical | Concrete | 297 | FT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 015 | Classroom | VCT - 12" | 472 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 016 | Men's Restroom | Ceramic Tile - Mosaic | 211 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 017 | Classroom | VCT - 12" | 363 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 018 | Storage | VCT - 12" | 193 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 019 | Classroom | VCT - 12" | 363 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 020 | Supply | Concrete | 321 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 021 | NBC | Concrete | 271 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 022 | Arms Room | Concrete | 153 | FT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 023 | Assembly Hall | Concrete | 3,515 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 024 | Corridor | VCT - 12" | 1,240 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 025 | Vestibule | VCT - 12" | 65 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y |
| Facility ID: | TX054 | 100 | Admin | VCT - 12" | 145 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2M | 2M | |||
| Building ID: | P1002 | 101 | Men's Restroom | Concrete | 47 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||
| 102 | Janitor Closet | Concrete | 19 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| 103 | Women's Restroom | Concrete | 35 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||
| 104 | Shower | Concrete | 24 | PT | Y | Y | Y | Y | Y | Y | 2W | 2W | |||||||||
| 105 | Parts Room | Concrete | 157 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| 106 | Common | Concrete | 193 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| 107 | Library | Concrete | 117 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| 108 | Storage | Concrete | 114 | PT | Y | Y | Y | Y | Y | Y | |||||||||||
| 109 | Maintenance Bay | Concrete | 1,920 | FT | |||||||||||||||||
| Frequency of Services | |||||||||||||||||||||
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. | ||||||||||||||||||||
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. | ||||||||||||||||||||
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. | ||||||||||||||||||||
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. | ||||||||||||||||||||
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. | ||||||||||||||||||||
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. | ||||||||||||||||||||
| 2M | Semimonthly (SM) or two per month (2M). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days. | ||||||||||||||||||||
| 6M | Six times per month (6M). Service performed six times per month. | ||||||||||||||||||||
| B | Biennial (B). Services performed once during each 24-month period of the contract at intervals of 670 to 790 days. | ||||||||||||||||||||
| Y | Annual (A) or Yearly (Y). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. | ||||||||||||||||||||
| 2Y | Semiannual (SA) or two per year (2Y). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days. | ||||||||||||||||||||
| 3Y | Three times yearly (3Y). Services performed three times per year, such as in January, May, and September. | ||||||||||||||||||||
| Q | Quarterly (Q) or four per year (4Y). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days. | ||||||||||||||||||||
| 6Y | Six times yearly (6Y). Services performed six times per year, such as in January, March, May, July, September, and November. | ||||||||||||||||||||
| 13Y | Every four weeks. Services performed once every four weeks, or 13 times during each 12-month period of the contract. |
TX075
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX075 | 100 | Lobby | Tile | 350 | FT | 2W | 2M | 2Y | Y | Y | M | W | W | M | 2M | 2M | ||||||||||||
| Building ID: | P1001 | 101 | Communication | Tile | 163 | FT | Y | Y | Y | Y | Y | Y | |||||||||||||||||
| 102 | Armorer | Concrete | 93 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 103 | Assembly | Concrete | 3,461 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 104 | Storage | Concrete | 1,667 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 105 | Men's Restroom | Ceramic Tile | 282 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 106 | Break Room | Tile | 100 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | M | Y | ||||||||||||||
| 107 | ADA Toilet | Ceramic Tile | 72 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||||||||||||
| 108 | Janitor Closet | Concrete | 36 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 109 | Office | Tile | 211 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 110 | Storage | Concrete | 1,158 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 111 | Retention | Tile | 230 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 112 | Women's Restroom | Ceramic Tile | 220 | FT | 2W | 2M | 2Y | Y | Y | M | M | M | 2W | 2W | |||||||||||||||
| 113 | Classroom | Tile | 642 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 114 | Mechanical | Concrete | 479 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 116 | Office | Concrete | 195 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 117 | Office | Concrete | 195 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 118 | Office | Tile | 192 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 119 | Office | Tile | 192 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 120 | Office | Tile | 345 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 121 | Office | Tile | 345 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 103A | Dishroom | Tile | 200 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| 103B | Kitchen | Tile | 293 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| 103C | Freezer | Tile | 143 | FT | 2W | 2M | 2W | 2Y | Y | Y | M | W | M | ||||||||||||||||
| 105A | Vestibule | Tile | 20 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 110A | Vestibule | Concrete | 39 | PT | |||||||||||||||||||||||||
| 112A | Vestibule | Tile | 28 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 115A | Classroom | Tile | 418 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 115B | Classroom | Tile | 447 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| 102A | Vault | Concrete | 284 | PT | |||||||||||||||||||||||||
| c | Vestibule | Tile | 50 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| C101 | Corridor | Tile | 215 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | |||||||||||||||||
| C102 | Corridor | Tile | 898 | FT | 2W | 2M | 2Y | Y | Y | M | W | M |
| Facility ID: | TX075 | 100 | Maint. Bay | Concrete | 1,751 | FT | 2M | 2M | ||||||||||
| Building ID: | P1002 | 101 | Office | Tile | 141 | PT | Y | Y | Y | Y | ||||||||
| 103 | Women's Latrine | Tile | 43 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||
| 104 | Men's Latrine | Tile | 36 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | 2W | 2W | ||||
| 102 | Janitor's Closet | Tile | 24 | PT | 2W | 2M | 2Y | Y | Y | M | W | M | ||||||
| 105 | Mechanical Rm | Concrete | 19 | FT | 2Y | 2Y | M | M | ||||||||||
| 106 | Tool Room | Concrete | 198 | PT | Y | Y | Y | Y | ||||||||||
| 107 | Storage | Concrete | 193 | PT | Y | Y | Y | Y | ||||||||||
| 108 | Dispatch | Tile | 123 | PT | Y | Y | Y | Y | ||||||||||
| 109 | Battery | Concrete | 103 | PT | Y | Y | Y | Y |
| Frequency of Services | |
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. |
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. |
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. |
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. |
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. |
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. |
| 2M | Semimonthly (SM) or two per month (2M). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days. |
| 6M | Six times per month (6M). Service performed six times per month. |
| B | Biennial (B). Services performed once during each 24-month period of the contract at intervals of 670 to 790 days. |
| Y | Annual (A) or Yearly (Y). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. |
| 2Y | Semiannual (SA) or two per year (2Y). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days. |
| 3Y | Three times yearly (3Y). Services performed three times per year, such as in January, May, and September. |
| Q | Quarterly (Q) or four per year (4Y). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days. |
| 6Y | Six times yearly (6Y). Services performed six times per year, such as in January, March, May, July, September, and November. |
| 13Y | Every four weeks. Services performed once every four weeks, or 13 times during each 12-month period of the contract. |
TX078
| Janitorial Services Task List | |||||||||||||||||||||||||||||
| Facility Information | Room # | Description | Floor Finish | Area (SF) | FT/PT | 3.1.1 SPACE CLEANING | 3.1.1.1 Emptying Waste Containers (Interior) | 3.1.1.2 Emptying Recycling Containers | 3.1.1.3 Low Area Cleaning (Room Cleaning) | 3.1.1.4 Special Cleaning (Fountains/Sinks/Kitchens/Coffee Mess) | 3.1.1.5 High Area Cleaning | 3.1.1.6 Interior Window Cleaning | 3.1.1.7 Exterior Window Cleaning | 3.1.1.8 Window Blinds Cleaning | 3.1.2 FLOOR CARE | 3.1.2.1 Sweeping/Dust Mopping | 3.1.2.2 Vacuum Carpets and Rugs | 3.1.2.3 Cleaning Walk-off Mats | 3.1.2.4 Spray Cleaning and Buffing | 3.1.2.5 Damp Mopping | 3.1.2.6 Stripping and Waxing | 3.1.2.7 Carpet and Rug Deep Cleaning (Shampoo Carpet) | 3.1.3 RESTROOM SERVICES | 3.1.3.1 Restroom Cleaning | 3.1.3.2 Restroom Supplies (Service Restrooms) | 3.1.4 Perimeter Cleaning and Waste Removal | 3.1.4.1 Policing Perimeters | 3.1.4.2 Emptying Perimeter Waste and Recycling | |
| Facility ID: | TX078 | 101 | Admin | VCT | 244 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2M | 2M | |||||||||||
| Building ID: | P1001 | 102 | Server | VCT | 184 | PT | |||||||||||||||||||||||
| 103 | Mech | Concrete | 297 | PT | 2Y | 2Y | M | M | |||||||||||||||||||||
| 104 | Janitor | Concrete | 23 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 105 | Kitchen | VCT | 87 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 106 | Unit Storage | VCT | 329 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 107 | Locker | VCT | 204 | PT | Y | Y | Y | Y | Y | Y | |||||||||||||||||||
| 108 | Men's Restroom | Tile | 150 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||||||||||
| 109 | Women's Restroom | Tile | 78 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||||||||||
| 111 | Vault | VCT | 364 | PT | |||||||||||||||||||||||||
| 112 | Admin | VCT | 262 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 110A | Fitness | VCT | 480 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| 110B | Classroom | VCT | 481 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| C113 | Corridor | VCT | 728 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||||||||||
| V100 | Vestibule | Tile | 64 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y |
| Facility ID: | TX078 | 100 | Shop | Concrete | 973 | FT | 2M | 2M | |||||||||||||
| Building ID: | P1002 | 101 | Flam Stor | Concrete | 108 | PT | |||||||||||||||
| 102 | Battery | Concrete | 77 | PT | Y | Y | Y | Y | Y | Y | |||||||||||
| 103 | Tool | Concrete | 103 | PT | Y | Y | Y | Y | Y | Y | |||||||||||
| 104 | Storage | Concrete | 80 | PT | Y | Y | Y | Y | Y | Y | |||||||||||
| 106 | Female Restroom | Concrete | 31 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||
| 107 | Shower | Tile | 17 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | |||||||
| 108 | Men's Restroom | Concrete | 50 | FT | 2W | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y | 2W | 2W | ||||
| 109 | Office | VCT | 80 | PT | Y | Y | Y | Y | Y | Y | |||||||||||
| 110 | Mech | Concrete | 23 | PT | 2Y | 2Y | M | M | |||||||||||||
| C105 | Corridor | Concrete | 33 | FT | 2W | 2M | 2Y | Y | Y | M | W | M | M | Y |
| Frequency of Services | |
| W | Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days. |
| 2W | Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. |
| 3W | Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday. |
| 5W | Daily (D5) or 5W. Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted. |
| W2 | Every two weeks. Services performed once every two weeks, or 26 times during each 12-month period of the contract. |
| M | Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .