This announcement solicits proposals for indefinite delivery contracts to provide professional land survey services primarily supporting border infrastructure projects for the U.S. Army Corps of Engineers. The Corps intends to award approximately ten contracts as a total small business set-aside with a shared $240 million capacity. Services include boundary surveys, topographic mapping, control surveys, research of historic land records, and other professional land surveying tasks. Proposals are due by June 25, 2019. Selection will be based on professional qualifications and licenses in relevant states, technical experience including equipment and procedures, capacity to support multiple field teams, past performance, and location or knowledge of the project area. Submissions should follow Standard Form 330 requirements and include resumes, examples of previous survey projects, and a quality control plan.

Amendment A0002

View the file

Other files

File Type Posted
W9127S-18-R-6016_A00001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127S19R6016

X 9B. DATED (SEE ITEM 11)

12-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE FOLLOWING PAGES

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION

NO.

A0002

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19 June 2019 CODE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X

SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES

1. Questions and Answers:

Q: Where should we include the additional party chiefs, CAD Techs, and survey techs lists?

Should this list go in Section E right after the required resumes?

A: Yes, the additional party chiefs, CAD Techs and survey techs list should go in Section E after the required resumes.

Q: Noticed that in the selection criteria, items C & F have the same title (although different information is required). Will the USACE be amending the titles or should we address them as they are?

A: Section F title, "Capacity to accomplish the work in the required time" is removed and deleted. Section F is revised to read as follows:

F. Volume of DOD contract awards in the last 12 months: Considerations may include: (1) Equitable distribution of contracts among qualified A-E firms (2) CPARS retrievals; and (3) Current workload. In Section H of the SF 330, prime firms must show their last 12 months of Federal contract awards, including contract number, dollar amounts, and numbers of separate contracts or task orders.

All work under this contract is subject to satisfactory negotiation of individual task orders. The evaluation will consider the experience of the firm and the availability of an adequate number of personnel in key disciplines to insure that the selected A-E firm can meet the potential of working on multiple tasks. The evaluation will consider education, training, registration, overall and relevant experience, and longevity with the firm.

Q: In reference to total page count, are dividers in the hard copy submittal counted as pages (e.g.

1 divider ~ 8 x 11 ½ sheet = 2 pages)?

A: Dividers in the hard copy is not included in the overall page count.

Q: If a page is blank, does it count toward the total count (e.g. submittal limited to 85 pages = 42 ½ ~ 8 x 11 ½ sheets = actual 43 ~ 8 x 11 ½ sheets or 86 pages)?

A: Blank pages do not count toward the overall page count.

Q: Do front/back covers and section tabs count in our 85 page limit? If so, even as a section tab is slightly larger than a standard page, can it still be considered one page?

A: Front/back covers and section tabs are not included the overall page count.

W9127S19R6016

Q: Is the reference to font and size (e.g. Arial/12+) a hard rule? In some cases a 10 or 11 size font may be best, as long as its legible, in order to better present a resume, a project description, an equipment list, etc.

A: No, font and size is not a hard rule as long as the submittal is legible.

Q: Can submittals be hand-delivered to the contracting office?

A: Yes, submittals can be hand-delivered the contracting office.

(End of Summary of Changes)