This document is an amendment to a solicitation for the rehabilitation of the excitation system retrofit at Dardanelle Dam Power Plant. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Little Rock for the rehabilitation work. The amendment provides responses to contractor questions about requirements for backflow preventers, utilities provision, field office specifications, and concrete work details. It clarifies that backflow preventers are not required, electricity will be provided by the government with other facilities the contractor's responsibility, a site trailer must be provided for the field office, and section 03 60 00.01 26 describes potential concrete work to remove existing embedded channels if needed. The retainage percentage is confirmed to be 10% until final documentation is approved.
Amendment 0003
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PN464721
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 provides Government response to additional inquiries.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Oct-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S19R0013
X 9B. DATED (SEE ITEM 11)
09-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Oct-2019
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S19R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
GOVERNMENT RESPONSE TO INQUIRIES:
Question: Section 01 22 00.00 26 (Price and Payment Procedures) Paragraph 1.1 (Retainage of Payment), requires 10% of overall payment withheld until final submittals, O&Ms and final drawings, are approved by the Government. However, Section 01 33 00 (Submittal Procedures) Paragraph 1.16 (Withholding of Payment) sets these percentages at 0.5% for final O&Ms and 1% for final Drawings. Which is correct? Considering this solicitation is a Small Business set-aside, we would assume the latter.
Government Response: 10% retainage will be withheld.
Question: Section 01 50 00 Paragraphs 1.5 and 2.2.4 require backflow preventers. Are these required? If so, what are they to be used for?
Government Response: There is no requirement for backflow preventers.
Question: Section 01 50 00 Paragraph 3.2 contradicts Section 01 14 00 Paragraph 1.6 regarding utilities. Will water, electricity and the use of government sanitary facilities be made available to the contractor free of charge?
Government Response: Government will provide electricity; the contractor will be responsible for all other facilities.
Question: Section 01 50 00 Paragraph 3.4.2 requires administrative field offices. Can the contractor setup a small area inside with a desk and computer close to the work instead of a site trailer?
Government Response: No; contractor will have to provide a site trailer for a field office.
Question: Section 03 60 00.01 26 is included in this solicitation for concrete work. However, it is not clear what concrete work is required. The only possible work would be removing existing channels beneath the existing equipment specified in Paragraph 1.4.b. The contractor needs details of this embedded channel to determine method and scope of removal. Additionally, all provided equipment is intended to be anchored directly to the concrete floor and does not require additional channels to be installed.
Government Response: Section 03 60 00.01 26, Paragraph 1.4 (more specifically), describes what to do in the event that concrete work needs to be done.