08_T1.10_-_TELECOM_SITE_PLAN_-_CONSTRUCTION_PHASE.pdf

PDF 678 KB Posted

Attached to
Tyndall AFB Temporary Modular Medical Facility Federal contract opportunity
Solicitation number
W9127S19Q6039
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

Part of Attachment B1 - Additional Utility Plans

View the file

Other files for this federal contract opportunity

Other files attached to Tyndall AFB Temporary Modular Medical Facility, newest first.
File Type Posted
49_22__TLV2.0_Combined_Clinic_TPF_Low_Voltage_Systems_Notes_&_Details.pdf PDF
1-V1.07_SURVEY_PLAN.pdf PDF
1-V1.02_SURVEY_PLAN.pdf PDF
49_24__TPF2.0_Full_Building_Plan.pdf PDF
49_23__TCP1.4-PII_Combined_Clinic_TPF_RCP-PHASE_II.PDF PDF
1-V1.06_SURVEY_PLAN.pdf PDF
49_24__TPF6.0_Overall_Plumbing_Plan_-_Supply.pdf PDF
49_21__TFP3.1_Combined_Clinic_TPF_Fire_Suppression_Plan_Phase_1.pdf PDF
49_23__TCP1.1_Combined_Clinic_TPF_RCP.pdf PDF
49_25__TPFV1.0_COVER_SHEET_STAMPED.pdf PDF
49_25__TPFV8.0_CANOPY_ASSEMBLY_AND_FOOTING_DETAILS_STAMPED.pdf PDF
55_TQ3.11D_-_FFE_PLAN_-_TPF_PHASE_1,_AREA_D.pdf PDF
55_TQ4.11_-_FFE_PLAN_-_TPF_PHASE_2.pdf PDF
49_21__TFP1.0_Combined_Clinic_TPF_Life_Safety_Narrative.pdf PDF
49_25__TPFV7.0_RAMP_STEP_AND_PLATFORM_CONNECTION_DETAILS_STAMPED.pdf PDF
1-V1.03_SURVEY_PLAN.pdf PDF
49_23__TCP1.4_Combined_Clinic_TPF_RCP.pdf PDF
1-V1.08_SURVEY_PLAN.pdf PDF
49_21__TFP4.2_Combined_Clinic_TPF_Fire_Alarm_Plan_Phase_2.pdf PDF
49_24__TPF4.0_Overall_Supply_Plumbing_Schematic.pdf PDF
49_24__TPF5.0_Overall_DWV_&_Waste_Schematic.pdf PDF
36_12_TSM1.0_Mechanical_HVAC_Plan.pdf PDF
29_03_TNP4.0_Plumbing_Plan_-_DWV.pdf PDF
29_01_TNC1.0_Cover_Sheet-Notes.pdf PDF
29_03_TNP1.0_Plumbing_Schematics.pdf PDF
43_19_TCCX2.0_Roof_Drain_Details.pdf PDF
43_19_TCCX1.0_Building_Cross_Section.pdf PDF
29_07_TNFD1.0_Foundation_Plan_and_Details.pdf PDF
36_11_TSE1.1_Electrical_Panel_Schedules.pdf PDF
36_10_TSP3.0_Plumbing_Plan_-_Supply_Phase_1.pdf PDF
05_1-CU1.01_UTILITY_PLAN_-_PHASE_1.pdf PDF
43_20_TCCFD1.0_Foundation_Plan_and_Details.pdf PDF
36_09_TSA4.0-PII_Egress_Plan.pdf PDF
07_ES1-01_-_ELECTRICAL_SITE_PLAN_-_MEDICAL_CLINIC_BUILDING_1465.pdf PDF
36_11_TSE3.0-PII_Task_Lighting_Illumination_Plan_Phase_2.pdf PDF
43_17_TCCE2.0_Illumination_Plan.pdf PDF
29_02_TNA2.1_Interior_Elevations.pdf PDF
Attachment_H_-_TPF_Placement_Area.pdf PDF
36_09_TSA4.0_Egress_Plan.pdf PDF
36_08_TSC1.0_Cover_Sheet.pdf PDF
36_11_TSE1.0_Electrical_Plan.pdf PDF
43_18_TCCM1.0_MECHANICAL_HVAC_PLAN.pdf PDF
08_T6.05-TECHNOLOGY_SITE_RISER_DIAGRAM.pdf PDF
36_13_TSX1.0_Building_Cross_Section.pdf PDF
43_15_TCCC1.0_Cover_Sheet_-_Notes.pdf PDF
28_CS.43_-_DWG_INDEX_PKG_I_VOL_3_OF_4.pdf PDF
29_04_TNE1.1_Electrical_Panel_Schedules.pdf PDF
W9127S19Q6039_Tyndall_TMMF_Response_to_Questions_13Aug19.pdf PDF
Attachment_E_-_Installation_Facility_Standards_&_Plans.pdf PDF
Tyndall_TMMF_Statement_of_Work_10Jul19.pdf PDF
Show all 50

Tyndall AFB Temporary Modular Medical Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONC.

M

A B

A A

B A

ABA

ABA

ABA

ABA

ABA

A B

A A

B A

A B

A A

B A

A B

A A

B A

A B

A A

B A

A B

A A

B A

AREA IS NOT WITHIN

SCOPE OF WORK

10 11

13 14

20 21

LI

TT

LE

R

O C

K D

IV

IS

IO

N

LI

TT

LE

R

O C

K , A

R K

A N

S A

S

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

A

54321

B

C

D

E

54321

B A

S E

C

IV

IL

E

N G

IN

E

E R

/D E

P U

TY

C H

IE

F

E N

G

IN

E E

R

IN

G F

LI

G

H T

(C E

P

C H

IE

F

C O

N

TR

A C

TS

S

E C

TI

O

N (C

E P

M

R E

C O

M M

E N

D E

D

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

R E

V D

A

TE

E N

G

IN

E E

R \D

E S

IG

N

E R

D R

A W

N B

Y

S C

A

LE

S O

LI

C

IT

A

TI

O

N N

U M

B E

R

C O

N

TR

A C

T N

U M

B E

R D

E S

IG

N

T E

A M

JE

D

U N

N

U S

IN

G

A G

E N

C Y

C H

E C

K E

D B

Y

H O

E

FE

R W

Y S

O C

K I

A R

C H

IT

E

C

TS

/0

1/

JE DUNN + HWA

NATIONAL HEALTHCARE DEISGN-BUILD TEAM

S U

B M

I T T

A L

C O

R R

E C

T E

D F

IN

A

L

U S

AF

S S

R

6/

/2

:5 8:

0'

-0

C :\U se rs

\k la m pl ey \D oc um en ts

\S S

R _T

E C

H _T

Y N

D A

LL

_C en tr al _2

5_ kl am pl ey

.r vt

T E

LE

C

O M

S

IT

E P

LA

N

C

O N

S T

R U

C T

IO

N

P H

A S

E

TY

ND

AL

L

AF

B

T1.10

M

AG

NO

LI

A

CI

RC

LE

TY

ND

AL

L

AF

B, F

L

BH

L

JD

C

W

5-

-R

-6

W

5-

-D

-6

KEYED NOTES

APPROXIMATE LOCATION OF DIRECT BURIED 600-PAIR COPPER SPLICE.

CONTACT BASE COMM FOR EXACT LOCATION. COORDINATE WITH BASE

COMM ON EXACT CABLE NUMBERS ON EXISTING 600-PAIR TO SPLICE

INTO. FURNISH, INSTALL, TERMINATE, PRETEST, AND POST-TEST NEW

100-PAIR COPPER CABLE ROUTED FROM THIS LOCATION TO EXISTING

CLINIC DATA CENTER INDICATED BY KEYED NOTE #9. TERMINATE ALL

100-PAIR COPPER CABLE ON BACK WALL IN PROTECTED ENTRANCE

TERMINAL PER KEYED NOTE #5.

USE EXISTING SPARE 4" CONDUIT NEAR DIRECT BURIED SPLICE BOX

INDICATED BY KEYED NOTE #1 THAT IS CURRENTLY ROUTED INTO

EXISTING DATA CENTER INDICATED BY KEYED NOTE #9.

INDICATES THE LOCATION OF EXISTING LB'S ON EXTERIOR WALL OF THE

MAIN CLINIC. CONTRACTOR TO ROUTE NEW 100-PAIR COPPER CABLE

FROM EXISTING COPPER SPLICE BOX INDICATED BY KEYED NOTE #1, 12-

STRAND SINGLE MODE WITH 25-PAIR COPPER CABLING FROM TPF, AND

12-STRAND SINGLE MODE WITH 25-PAIR COPPER CABLING FROM

COMMAND TPF INTO THE EXISTING MAIN CLINIC THROUGH THIS EXISTING

ENTRY POINT. CONTRACTOR TO COORDINATE WITH BASE COMM ON

WHICH LB TO UTILIZE FOR NEW CABLING. CONTRACTOR WILL HAVE TO

DEMO A PORTION OF CONDUIT EXTENDING FROM THE DESIGNATED LB

INTO THE GROUND TO ACCEPT THE NEW CONDUIT EXTENDING FROM

NEW PULL BOX INDICATED BY KEYED NOTE #18.

INDICATES THE LOCATION OF (4) 4" CONDUIT STUBS WITHIN EXISTING

DATA CENTER THAT EXTEND FROM THE EXTERIOR LB'S INDICATED BY

KEYED NOTE #3. CONTRACTOR TO COORDINATE WITH BASE COMM ON

WHICH CONDUIT STUB TO USE PRIOR TO INSTALLATION.

FURNISH AND INSTALL A WALL MOUNTED PROTECTIVE ENCLOSURE

CAPABLE OF SUPPORTING 100-PAIR COPPER CABLE. COORDINATE WITH

BASE COMM ON EXACT TERMINATION REQUIREMENTS.

FURNISH AND INSTALL A NEW 2-POST 19" WIDE RACK FOR NEW

INCOMING 100-PAIR COOPER CABLE THAT IS TERMINATED AT WALL

MOUNTED PROTECTIVE ENCLOSURE INDICATED BY KEYED NOTE #5.

PROVIDE NEW COPPER PATCH PANELS AS REQUIRED.

FURNISH AND INSTALL A 25-PAIR COPPER CABLE FROM THE NEW 2-POST

COPPER RACK INDICATED BY KEYED NOTE #6 TO EXISTING FIBER

DISTRIBUTION RACK INDICATED BY KEYED NOTE #8. COORDINATE WITH

BASE COMM ON EXACT LOCATION AND TERMINATION REQUIREMENTS

PRIOR TO INSTALLATION.

INDICATES LOCATION OF THE EXISTING FIBER DISTRIBUTION RACK.

COORDINATE WITH BASE COMM ON EXACT TERMINATION

REQUIREMENTS. PROVIDE NEW COPPER PATCH PANELS AND FIBER

OPTIC DISTRIBUTION PANELS AS REQUIRED.

INDICATES THE LOCATION OF THE EXISTING DATA CENTER.

ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL (1) 4" PVC RIGID

CONDUITS WITH PULL STRING AT 3' BELOW GRADE FROM NEW PULL

BOX INDICATED BY KEYED NOTE #18 FOR CONTINUATION TO EXISTING

MAIN CLINIC DATA CENTER INDICATED BY KEYED NOTE #9.

CONTRACTOR TO ROUTE CABLING TO TPF COMM ROOM INDICATED BY

KEYED NOTE #12.

CONTRACTOR SHALL FURNISH AND INSTALL A 12 STRAND SINGLE

MODE FIBER WITH INNERDUCT AND 25-PAIR COPPER FROM THE MAIN

CLINIC DATA CENTER INDICATED BY KEYED NOTE #9 TO THE TPF

TELECOMMUNICATIONS CLOSET INDICATED BY KEYED NOTE #12.

COORDINATE EXACT TERMINATION POINT WITHIN THE TPF WITH TPF

MANUFACTURER.

INDICATES LOCATION OF TPF IDF/DEMARCATION POINT. TERMINATE

FIBER IN EQUIPMENT RACK.

CONTRACTOR TO FURNISH AND INSTALL A BELOW GRADE PULL BOX

NEXT TO EXTERIOR WALL AT THIS LOCATION TO ROUTE FIBER AND

COPPER UP EXTERIOR WALL AND INTO THE BUILDING.

CONTRACTOR TO ROUTE CONDUIT UP EXTERIOR WALL TO ABOVE

CEILING HEIGHT. CONTRACTOR SHALL ALSO FURNISH AND INSTALL

EXTERIOR WALL MOUNTED JUNCTION BOX TO BE USED AS A PULL POINT

INTO THE FACILITY.

ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL (1) 4" PVC RIGID

CONDUITS WITH PULL STRING AT 3' BELOW GRADE FROM NEW PULL

BOX INDICATED BY KEYED NOTE #18 FOR CONTINUATION TO EXISTING

MAIN CLINIC DATA CENTER INDICATED BY KEYED NOTE #9.

CONTRACTOR TO ROUTE CABLING TO COMMAND TPF COMM ROOM

INDICATED BY KEYED NOTE #17.

CONTRACTOR SHALL FURNISH AND INSTALL A 12 STRAND SINGLE

MODE FIBER WITH INNERDUCT AND 25-PAIR COPPER FROM THE MAIN

CLINIC DATA CENTER INDICATED BY KEYED NOTE #9 TO THE COMMAND

TPF TELECOMMUNICATIONS CLOSET INDICATED BY KEYED NOTE #17.

COORDINATE EXACT TERMINATION POINT WITHIN THE TPF WITH TPF

MANUFACTURER.

INDICATES LOCATION OF COMMAND TPF IDF/DEMARCATION POINT.

TERMINATE FIBER IN EQUIPMENT RACK.

PROVIDE NEW PULL BOX CAPABLE OF ACCEPTING (5) 4" CONDUITS.

PROVIDE (1) 4" CONDUIT FROM NEW PULL BOX INDICATED BY KEYED

NOTE #18 TO EXISTING LB INDICATED BY KEYED NOTE #3 THAT WILL BE

DESIGNATED TO ACCEPT ALL NEW CABLING FROM TPF AND COMMAND

TPF.

PROVIDE (1) 25-PAIR COPPER CABLE FROM THE EXISTING DATA CENTER

INDICATED BY KEYED NOTE #9 TO EXISTING MILCON COMM ROOM 1P148

INDICATED BY KEYED NOTE #22. DEMOLITION CONTRACTOR IS TO

PROPERLY IDENTIFY CABLING AND SHALL ENSURE THAT IT IS

PROTECTED DURING ALL LEVELS OF RENOVATION AFTER INSTALLATION

IS COMPLETE. DEMOLITION CONTRACTOR SHALL BARE ALL COST TO

DAMAGE OF NEWLY INSTALLED COPPER BACK BONE INFRASTRUCTURE.

PROVIDE (1) 25-PAIR COPPER CABLE FROM THE EXISTING DATA CENTER

INDICATED BY KEYED NOTE #9 TO EXISTING MILCON COMM ROOM 1R105

INDICATED BY KEYED NOTE #23. DEMOLITION CONTRACTOR IS TO

PROPERLY IDENTIFY CABLING AND SHALL ENSURE THAT IT IS

PROTECTED DURING ALL LEVELS OF RENOVATION AFTER INSTALLATION

IS COMPLETE. DEMOLITION CONTRACTOR SHALL BARE ALL COST TO

DAMAGE OF NEWLY INSTALLED COPPER BACK BONE INFRASTRUCTURE.

INDICATES LOCATION OF EXISTING MILCON COMM ROOM 1P148.

INDICATES LOCATION OF EXISTING MILCON COMM ROOM 1R105.

EXISTING FIBER INFRASTRUCTURE CURRENTLY SERVING THE MILCON

ADDITION IS TO BE PROPERLY IDENTIFIED AND SHALL BE PROTECTED

DURING ALL LEVELS OF RENOVATION. DEMOLITION CONTRACTOR

SHALL BARE ALL COST TO DAMAGE OF EXISTING FIBER

INFRASTRUCTURE.

GENERAL NOTESGENERAL NOTES

PATHWAYS SHOWN ARE DEDICATED FOR TECHNOLOGY LOW

VOLTAGE SYSTEMS ONLY. PROVIDE FIRESTOPPING WHEN

PENETRATING RATED WALLS TO MATCH WALL TYPE.

THESE DRAWINGS ARE DIAGRAMMTIC IN NATURE TO SHOW INTENT OF

PATHWAY AND CONNECTIVITY REQUIREMENTS. REFER TO CIVIL

ENGINEERING DRAWINGS FOR UNDERGROUND UTILITY COORDINATION

TO DETERMINE EXACT LOCATION AND PLACEMENT OF UNDERGROUND

PATHWAY.

1.

2.

0 15' 45' 60'30'

PLAN NORTH 1" = 30'-0"1 LEVEL 1 - TELECOM SITE PLAN

Sy m bo l

D es cr ip tio n

T ra ck in g N o.

A ct io n D at e

A m en dm en t 0

/1 5/

A m en dm en t 0

/2 8/

June 28, 2017 mtomlin Text Box PATHWAY FOR 25 PAIR COPPER FROM EXISTING DATA CENTER INIDICATED BY KEY NOTE #9 ON SITE PLAN TO MILCON COMM ROOMS 1P148 AND 1R105 IS SCHEMATIC ONLY. LV CONTRACTOR WILL AUDIT SITE AND DETERMINE BEST PATHWAY TO BOTH MILCON COMM ROOMS FROM EXISTING DATA CENTER. LV CONTRACTOR WILL NEED TO COORDINATE WITH BASE COMM TO ENSURE NO LOSS OF SERVICE TO EITHER MILCON COMM ROOMS. LV CONTRACTOR WILL DOCUMENT PATHWAY ON AS-BUILT SUBMITTAL PACKAGE.

mtomlin Ellipse mtomlin Text Box mtomlin Ellipse mtomlin Text Box mtomlin Ellipse mtomlin Text Box

File details come from the government source that posted it.