R5_MS_Grounds_Maintenance_ELINS_18-JUN-2019.xlsx
XLSX spreadsheet 121 KB Posted
- Attached to
- Municipal Services_Grounds Maintenance_Region 5_ for 63rd Readiness Division Federal contract opportunity
- Solicitation number
- W9127S19Q0044
About this file
ELINS_R5 MS_GM
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 63d_RD_DPW_Operations_Area_Map.pdf | ||
| Combined_Synopsis_Solicitation_63rd_R5_Grounds_Maint.pdf | ||
| PWS_Final_63RD_R5_Grounds_Maint_18June2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS Summary
| Grounds Maintenance Services Summary | ||
| Service Code: 404 | ||
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | TOTAL | |
| 0001 | Base Period Firm Fixed-Price | $0.00 |
| 0002 | Base Period Indefinite Quantity | $70,000.00 |
| 0003 | Base Period Contractor Manpower Reporting | $0.00 |
| 0004 | Contractor Submittals | $0.00 |
| 1001 | First Option Period Firm Fixed-Price | $0.00 |
| 1002 | First Option Period Indefinite Quantity | $70,000.00 |
| 1003 | First Option Contractor Manpower Reporting | $0.00 |
| 2001 | Second Option Period Firm Fixed-Price | $0.00 |
| 2002 | Second Option Period Indefinite Quantity | $70,000.00 |
| 2003 | Second Option Contractor Manpower Reporting | $0.00 |
$210,000.00
&F Logistics & Technology Services, Inc.
Volume II - Price Volume Submission Date: March 16, 2016 RFP Number W9127S-16-R-0015
&A &P of &N
Site Summary Sheet
GROUNDS MAINTENANCE (1503050)
| This sheet is filled out automatically as other sheets are completed | |||
| CLIN / SUBCLIN | FAC ID | ELINS | Total Price |
| 0001 | Base Period Firm Fixed-Price | ||
| 0001AA | CA002 | (Items A001 Through A003) | $0.00 |
| 0001AB | CA010 | (Items A004 Through A007) | $0.00 |
| 0001AC | CA016 | (Items A008 Through A011) | $0.00 |
| 0001AD | CA065 | (Items A012 Through A016) | $0.00 |
| 0001AE | CA088 | (Items A017 Through A020) | $0.00 |
| 0001AF | CA092 | (Items A021 Through A024) | $0.00 |
| 0001AG | CA093 | (Items A025 Through A028) | $0.00 |
| 0001AH | CA095 | (Items A029 Through A032) | $0.00 |
| 0001AJ | CA160 | (Items A033 Through A036) | $0.00 |
| 0001AK | CA165 | (Items A037 Through A040) | $0.00 |
| 0001AL | CA197 | (Items A041 Through A044) | $0.00 |
| 0001AM | CA202 | (Items A045 Through A049) | $0.00 |
| $0.00 | |||
| 0002 | Base Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A739 | $70,000.00 |
| 0003 | Base Period Contractor Manpower Reporting | $0.00 |
| 0004 | Contractor Submittals | $0.00 |
| 1001 | First Option Period Firm Fixed-Price | ||
| 1001AA | CA002 | (Items B001 Through B003) | $0.00 |
| 1001AB | CA010 | (Items B004 Through B007) | $0.00 |
| 1001AC | CA016 | (Items B008 Through B011) | $0.00 |
| 1001AD | CA065 | (Items B012 Through B016) | $0.00 |
| 1001AE | CA088 | (Items B017 Through B020) | $0.00 |
| 1001AF | CA092 | (Items B021 Through B024) | $0.00 |
| 1001AG | CA093 | (Items B025 Through B028) | $0.00 |
| 1001AH | CA095 | (Items B029 Through B032) | $0.00 |
| 1001AJ | CA160 | (Items B033 Through B036) | $0.00 |
| 1001AK | CA165 | (Items B037 Through B040) | $0.00 |
| 1001AL | CA197 | (Items B041 Through B044) | $0.00 |
| 1001AM | CA202 | (Items B045 Through B049) | $0.00 |
| $0.00 | |||
| 1002 | First Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - B701 THROUGH B739 | $70,000.00 |
1003 First Option Period Contractor Manpower Reporting $0.00
| 2001 | Second Option Period Firm Fixed-Price | ||
| 2001AA | CA002 | (Items C001 Through C003) | $0.00 |
| 2001AB | CA010 | (Items C004 Through C007) | $0.00 |
| 2001AC | CA016 | (Items C008 Through C011) | $0.00 |
| 2001AD | CA065 | (Items C012 Through C016) | $0.00 |
| 2001AE | CA088 | (Items C017 Through C020) | $0.00 |
| 2001AF | CA092 | (Items C021 Through C024) | $0.00 |
| 2001AG | CA093 | (Items C025 Through C028) | $0.00 |
| 2001AH | CA095 | (Items C029 Through C032) | $0.00 |
| 2001AJ | CA160 | (Items C033 Through C036) | $0.00 |
| 2001AK | CA165 | (Items C037 Through C040) | $0.00 |
| 2001AL | CA197 | (Items C041 Through C044) | $0.00 |
| 2001AM | CA202 | (Items C045 Through C049) | $0.00 |
| $0.00 | |||
| 2002 | Second Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - C701 THROUGH C739 | $70,000.00 |
2003 Second Option Period Contractor Manpower Reporting $0.00
&F Logistics & Technology Services, Inc.
Submission Date: March 16, 2016 RFP Number W9127S-16-R-0015
&P of &N
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 THROUGH A049. |
| CLIN 0001 - Base Period - Firm Fixed-Price Work |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA002 | Patton Hall USARC/AMSA | |||
| Firm Fixed-Price Work | ||||
| A001 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A002 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A003 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AA (Items A001 Through A003) | $0.00 |
| CA010 | El Monte USARC | |||
| Firm Fixed-Price Work | ||||
| A004 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A005 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A006 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A007 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AB (Items A004 Through A007) | $0.00 |
| CA016 | Garden Grove USARC | |||
| Firm Fixed-Price Work | ||||
| A008 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A009 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A010 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A011 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AC (Items A008 Through A011) | $0.00 |
| CA065 | Van Deman Hall USARC | |||
| Firm Fixed-Price Work | ||||
| A012 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A013 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A014 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A015 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A016 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AD (Items A012 Through A016) | $0.00 |
| CA088 | Thrall Hall USARC | |||
| Firm Fixed-Price Work | ||||
| A017 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A018 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A019 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A020 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AE (Items A017 Through A020) | $0.00 |
| CA092 | Daniels Hall USARC | |||
| Firm Fixed-Price Work | ||||
| A021 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A022 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A023 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A024 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AF (Items A021 Through A024) | $0.00 |
| CA093 | Van Nuys AMSA | |||
| Firm Fixed-Price Work | ||||
| A025 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A026 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 |
| A027 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A028 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AG (Items A025 Through A028) | $0.00 |
| CA095 | Holderman Hall USARC | |||
| Firm Fixed-Price Work | ||||
| A029 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 |
| A030 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A031 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A032 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AH (Items A029 Through A032) | $0.00 |
| CA160 | Costa Mesa USARC | |||
| Firm Fixed-Price Work | ||||
| A033 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A034 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A035 | Un-Paved Areas (Spect Item C 3.5) | 11.0 | Month | $ - 0 |
| A036 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AJ (Items A033 Through A036) | $0.00 |
| CA165 | March AFRC | |||
| Firm Fixed-Price Work | ||||
| A037 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A038 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A039 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A040 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AK (Items A037 Through A040) | $0.00 |
| CA197 | Bell AFRC | |||
| Firm Fixed-Price Work | ||||
| A041 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A042 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A043 | Un-Paved Areas (Spect Item C 3.5) | 11.0 | Month | $ - 0 |
| A044 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AL (Items A041 Through A044) | $0.00 |
| CA202 | Tustin USARC | |||
| Firm Fixed-Price Work | ||||
| A045 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A046 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A047 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A048 | Un-Paved Areas (Spect Item C 3.5) | 11.0 | Month | $ - 0 |
| A049 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0001AM (Items A045 Through A049) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A049 $0.00
| 0003 | Contractor Manpower Reporting Base Period Section C 0200000 Mgmt & Admin Spec 2.15 | 1 | Each | $0.00 |
| 0004 | Contractor Pre-Work Submittals; Section F Submittals | 1 | Each | $0.00 |
&F Logistics & Technology Services, Inc.
Submission Date: March 16, 2016 RFP Number W9127S-16-R-0015
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A739 |
| CLIN 0002 - Base Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | Each | 1 | |
| A702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | Each | 1 | |
| A703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| A704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| A705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| A706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | Each | 1 | |
| A707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | Each | 1 | |
| A708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | Each | 1 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | Each | 1 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | SF | 50 | |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 10 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | SF | 100 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||
| Work shall be completed within 14 calendar days. | SF | 100 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | SF | 100 | |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | Each | 5 | |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | L.F. | 100 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | SF | 50 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | SF | 100 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | SF | 5,000 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||
| Work shall be completed within 10 calendar days. | LF | 100 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | SF | 50 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | ||||
| A727 | CA002 | Each | 1 | ||
| A728 | CA010 | Each | 1 | ||
| A729 | CA016 | Each | 1 | ||
| A730 | CA065 | Each | 1 | ||
| A731 | CA088 | Each | 1 | ||
| A732 | CA092 | Each | 1 | ||
| A733 | CA093 | Each | 1 | ||
| A734 | CA095 | Each | 1 | ||
| A735 | CA160 | Each | 1 | ||
| A736 | CA165 | Each | 1 | ||
| A737 | CA197 | Each | 1 | ||
| A738 | CA202 | Each | 1 | ||
| A739 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. Each 10
TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A739 $70,000.00
&F Logistics & Technology Services, Inc.
Submission Date: March 16, 2016 RFP Number W9127S-16-R-0015
&A &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINS FIRST PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 THROUGH B049. |
| CLIN 1001 - First Option Period - Firm Fixed-Price Work |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA002 | Patton Hall USARC/AMSA | |||
| Firm Fixed-Price Work | ||||
| B001 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B002 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B003 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AA (Items B001 Through B003) | $0.00 |
| CA010 | El Monte USARC | |||
| Firm Fixed-Price Work | ||||
| B004 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B005 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B006 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B007 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AB (Items B004 Through B007) | $0.00 |
| CA016 | Garden Grove USARC | |||
| Firm Fixed-Price Work | ||||
| B008 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B009 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B010 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B011 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AC (Items B008 Through B011) | $0.00 |
| CA065 | Van Deman Hall USARC | |||
| Firm Fixed-Price Work | ||||
| B012 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B013 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B014 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B015 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B016 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AD (Items B012 Through B016) | $0.00 |
| CA088 | Thrall Hall USARC | |||
| Firm Fixed-Price Work | ||||
| B017 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B018 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B019 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B020 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AE (Items B017 Through B020) | $0.00 |
| CA092 | Daniels Hall USARC | |||
| Firm Fixed-Price Work | ||||
| B021 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B022 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B023 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B024 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AF (Items B021 Through B024) | $0.00 |
| CA093 | Van Nuys AMSA | |||
| Firm Fixed-Price Work | ||||
| B025 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B026 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 |
| B027 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B028 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AG (Items B025 Through B028) | $0.00 |
| CA095 | Holderman Hall USARC | |||
| Firm Fixed-Price Work | ||||
| B029 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 |
| B030 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B031 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B032 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AH (Items B029 Through B032) | $0.00 |
| CA160 | Costa Mesa USARC | |||
| Firm Fixed-Price Work | ||||
| B033 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B034 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B035 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Month | $ - 0 |
| B036 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AJ (Items B033 Through B036) | $0.00 |
| CA165 | March AFRC | |||
| Firm Fixed-Price Work | ||||
| B037 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B038 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B039 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B040 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AK (Items B037 Through B040) | $0.00 |
| CA197 | Bell AFRC | |||
| Firm Fixed-Price Work | ||||
| B041 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B042 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B043 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Month | $ - 0 |
| B044 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AL (Items B041 Through B044) | $0.00 |
| CA202 | Tustin USARC | |||
| Firm Fixed-Price Work | ||||
| B045 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B046 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B047 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B048 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Month | $ - 0 |
| B049 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1001AM (Items B045 Through B049) | $0.00 |
TOTAL FFP LINE ITEMS - B001 THROUGH B049 $0.00
1003 Contractor Manpower Reporting First Option Period Section C 0200000 Mgmt & Admin Spec 2.15 1 Each $0.00
&F Logistics & Technology Services, Inc.
Submission Date: March 16, 2016 RFP Number W9127S-16-R-0015
&P of &N
ELINS FIRST PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B739 |
| CLIN 1002 - First Option Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| B701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | Each | 1 | |
| B702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | Each | 1 | |
| B703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| B704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| B705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| B706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | Each | 1 | |
| B707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | Each | 1 | |
| B708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | Each | 1 | |||
| B709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | Each | 1 | |
| B710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | SF | 50 | |
| B711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| B712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| B713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |||
| B714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 10 | |
| B715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |
| B716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |||
| B717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | SF | 100 | |
| B718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||
| Work shall be completed within 14 calendar days. | SF | 100 | |||
| B719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | SF | 100 | |
| B720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | Each | 5 | |
| B721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | L.F. | 100 | |||
| B722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | SF | 50 | |
| B723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | SF | 100 | |
| B724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | SF | 5,000 | |
| B725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||
| Work shall be completed within 10 calendar days. | LF | 100 | |||
| B726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | SF | 50 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | ||||
| B727 | CA002 | Each | 1 | ||
| B728 | CA010 | Each | 1 | ||
| B729 | CA016 | Each | 1 | ||
| B730 | CA065 | Each | 1 | ||
| B731 | CA088 | Each | 1 | ||
| B732 | CA092 | Each | 1 | ||
| B733 | CA093 | Each | 1 | ||
| B734 | CA095 | Each | 1 | ||
| B735 | CA160 | Each | 1 | ||
| B736 | CA165 | Each | 1 | ||
| B737 | CA197 | Each | 1 | ||
| B738 | CA202 | Each | 1 | ||
| B739 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. Each 10
TOTAL IQ CAPACITY FOR LINE ITEMS - B701 THROUGH B739 $70,000.00
&F Logistics & Technology Services, Inc.
Submission Date: March 16, 2016 RFP Number W9127S-16-R-0015
&A &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through…