ELINS Summary

Grounds Maintenance Services Summary
Service Code: 404
This sheet is filled out automatically as other sheets are completed
CLINTOTAL
0003Base Period Firm Fixed-Price$106,935.84
0004Base Period Indefinite Quantity$70,000.00
0005Base Period Contractor Manpower Reporting$0.00
0006Contractor Submittals$0.00
1003First Option Period Firm Fixed-Price$115,833.60
1004First Option Period Indefinite Quantity$70,000.00
1005First Option Contractor Manpower Reporting$0.00
2003Second Option Period Firm Fixed-Price$117,833.16
2004Second Option Period Indefinite Quantity$70,000.00
2005Second Option Contractor Manpower Reporting$0.00

$550,602.60

&F

&A &P of &N

Site Summary Sheet

GROUNDS MAINTENANCE (1503050)

This sheet is filled out automatically as other sheets are completed
CLIN / SUBCLINFAC IDELINSTotal Price
0003Base Period Firm Fixed-Price
0003AATX011(Items A001 Through A004)$0.00
0003ABTX018(Items A005 Through A008)$39,073.98
0003ACTX019(Items A009 Through A011)$10,674.51
0003ADTX046(Items A012 Through A015)$0.00
0003AETX054(Items A016 Through A018)$0.00
0003AFTX075(Items A019 Through A021)$0.00
0003AGTX078(Items A022 Through A025)$0.00
0003AHTX154(Items A026 Through A029)$57,187.35
0003AJTX160(Items A030 Through A034)$0.00
0003AKTX188(Items A035 Through A039)$0.00
0003ALTX201(Items A040 Through A043)$0.00
0003AMTX210(Items A044 Through A048)$0.00
0003ANTX212(Items A049 Through A051)$0.00
0003APTX232(Items A052 Through A055)$0.00
$106,935.84
0004Base Period Indefinite Quantity
TOTAL IQ LINE ITEMS - A701 THROUGH A741$70,000.00
0005Base Period Contractor Manpower Reporting$0.00
0006Contractor Submittals$0.00
1003First Option Period Firm Fixed-Price
1003AATX011(Items B001 Through B004)$0.00
1003ABTX018(Items B005 Through B008)$43,476.72
1003ACTX019(Items B009 Through B011)$11,767.92
1003ADTX046(Items B012 Through B015)$0.00
1003AETX054(Items B016 Through B018)$0.00
1003AFTX075(Items B019 Through B021)$0.00
1003AGTX078(Items B022 Through B025)$0.00
1003AHTX154(Items B026 Through B029)$60,588.96
1003AJTX160(Items B030 Through B034)$0.00
1003AKTX188(Items B035 Through B039)$0.00
1003ALTX201(Items B040 Through B043)$0.00
1003AMTX210(Items B044 Through B048)$0.00
1003ANTX212(Items B049 Through B051)$0.00
1003APTX232(Items B052 Through B055)$0.00
$115,833.60
1004First Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - B701 THROUGH B741$70,000.00

1005 First Option Period Contractor Manpower Reporting $0.00

2003Second Option Period Firm Fixed-Price
2003AATX011(Items C001 Through C004)$0.00
2003ABTX018(Items C005 Through C008)$44,259.12
2003ACTX019(Items C009 Through C011)$11,894.52
2003ADTX046(Items C012 Through C015)$0.00
2003AETX054(Items C016 Through C018)$0.00
2003AFTX075(Items C019 Through C021)$0.00
2003AGTX078(Items C022 Through C025)$0.00
2003AHTX154(Items C026 Through C029)$61,679.52
2003AJTX160(Items C030 Through C034)$0.00
2003AKTX188(Items C035 Through C039)$0.00
2003ALTX201(Items C040 Through C043)$0.00
2003AMTX210(Items C044 Through C048)$0.00
2003ANTX212(Items C049 Through C051)$0.00
2003APTX232(Items C052 Through C055)$0.00
$117,833.16
2004Second Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - C701 THROUGH C741$70,000.00

2005 Second Option Period Contractor Manpower Reporting $0.00

&F

&P of &N

ELINS BASE PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN & PERCENTAGES (%) IN "ADMIN FEE-SOURCE AMERICA (%)" COLUMN, TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 THROUGH A055. MANDATORY SOURCE AMERICA SITES WILL REQUIRE AN ADMIN FEE(%) ONLY, AS MONTHLY PRICING SET BY U.S. ABILITYONE COMMISION IS ALREADY PROVIDED.
CLIN 0003 - Base Period - Firm Fixed-Price Work
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICEAdmin Fee Source America (%)TOTAL
TX011Carl Pipkin USARC48625
Firm Fixed-Price Work
A001Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A002Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A003Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A004Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AA (Items A001 Through A004)$0.00
TX018Conroe USARC/ASF 62481800.00%
Firm Fixed-Price Work
A005Improved Grounds (Spec Item C 3.1)11.0Month$ 1,349.830.00%$ 14,848.13
A006Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ 1,964.000.00%$ 21,604.00
A007Paved Areas (Spec Item C 3.4)11.0Month$ 177.610.00%$ 1,953.71
A008Storm Drainage Systems (Spec Item C 3.6)11.0Month$ 60.740.00%$ 668.14
Total CLIN 0003AB (Items A005 Through A008)$39,073.98
TX019Corpus Christi Memorial USARC486550.00%
Firm Fixed-Price Work
A009Improved Grounds (Spec Item C 3.1)11.0Month$ 830.290.00%$ 9,133.19
A010Paved Areas (Spec Item C 3.4)11.0Month$ 104.250.00%$ 1,146.75
A011Storm Drainage Systems (Spec Item C 3.6)11.0Month$ 35.870.00%$ 394.57
Total CLIN 0003AC (Items A009 Through A011)$10,674.51
TX046Colbern Memorial USARC48705
Firm Fixed-Price Work
A012Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A013Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A014Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A015Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AD (Items A012 Through A015)$0.00
TX054LT Luis Garcia Memorial USARC48785
Firm Fixed-Price Work
A016Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A017Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A018Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AE (Items A016 Through A018)$0.00
TX075Victoria USARC48865
Firm Fixed-Price Work
A019Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A020Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A021Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AF (Items A019 Through A021)$0.00
TX078Yoakum USARC48915
Firm Fixed-Price Work
A022Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A023Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A024Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A025Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AG (Items A022 Through A025)$0.00
TX154E Houston AFRC489940.00%
Firm Fixed-Price Work
A026Improved Grounds (Spec Item C 3.1)11.0Month$ 3,249.760.00%$ 35,747.36
A027Paved Areas (Spec Item C 3.4)11.0Month$ 1,392.820.00%$ 15,321.02
A028Un-paved Areas (Spec Item C 3.5)11.0Month$ 140.230.00%$ 1,542.53
A029Storm Drainage Systems (Spec Item C 3.6)11.0Month$ 416.040.00%$ 4,576.44
Total CLIN 0003AH (Items A026 Through A029)$57,187.35
TX160Robstown CHW Facility48231
Firm Fixed-Price Work
A030Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A031Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A032Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A033Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A034Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AJ (Items A030 Through A034)$0.00
TX188Brownsville AFRC48923
Firm Fixed-Price Work
A035Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A036Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A037Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A038Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A039Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AK (Items A035 Through A039)$0.00
TX201San Marcos AFRC48407
Firm Fixed-Price Work
A040Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A041Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A042Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A043Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AL (Items A040 Through A043)$0.00
TX210Round Rock AFRC48202
Firm Fixed-Price Work
A044Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A045Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A046Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A047Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A048Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AM (Items A044 Through A048)$0.00
TX212Sinton AFRC48958
Firm Fixed-Price Work
A049Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A050Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A051Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AN (Items A049 Through A051)$0.00
TX232North Houston USAR Center48884
Firm Fixed-Price Work
A052Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A053Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A054Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A055Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AP (Items A052 Through A055)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A055 $106,935.84

0005Contractor Manpower Reporting Base Year Section C 0200000 Mgmt & Admin Spec 2.151Each$0.00
0006Contractor Pre-Work Submittals; Section F Submittals1Each$0.00

&F

&P of &N

ELINS BASE PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A741
CLIN 0004 - Base Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
A701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
A702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
A703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
A707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
A708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
A709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
A710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
A711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
A715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
A718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
A719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
A720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
A721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100
A722Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.$ - 0SF50
A723UnderbrushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.$ - 0SF100
A724Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.$ - 0SF5,000
A725Control Undesired VegetationRemove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.$ - 0LF100
A726Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.$ - 0SF50
Special Event Grass Cutting at the following sites:Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site.$ - 0
A727TX011$ - 0Each1
A728TX018$ - 0Each1
A729TX019$ - 0Each1
A730TX046$ - 0Each1
A731TX054$ - 0Each1
A732TX075$ - 0Each1
A733TX078$ - 0Each1
A734TX154$ - 0Each1
A735TX160$ - 0Each1
A736TX188$ - 0Each1
A737TX201$ - 0Each1
A738TX210$ - 0Each1
A739TX212$ - 0Each1
A740TX232$ - 0Each1
A741Plant Native VegetationAll native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape.

Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10

TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A741 $70,000.00

&F

&P of &N

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINS FIRST PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN & PERCENTAGES (%) IN "ADMIN FEE-SOURCE AMERICA (%)" COLUMN, TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 THROUGH B055. MANDATORY SOURCE AMERICA SITES WILL REQUIRE AN ADMIN FEE(%) ONLY, AS MONTHLY PRICING SET BY U.S. ABILITYONE COMMISION IS ALREADY PROVIDED.
CLIN 1003 - First Option Period - Firm Fixed-Price Work
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICEAdmin Fee Source America (%)TOTAL
TX011Carl Pipkin USARC48625
Firm Fixed-Price Work
B001Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B002Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B003Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B004Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AA (Items B001 Through B004)$0.00
TX018Conroe USARC/ASF 62481800.00%
Firm Fixed-Price Work
B005Improved Grounds (Spec Item C 3.1)12.0Month$ 1,376.760.00%$ 16,521.12
B006Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ 2,065.140.00%$ 24,781.68
B007Paved Areas (Spec Item C 3.4)12.0Month$ 139.490.00%$ 1,673.88
B008Storm Drainage Systems (Spec Item C 3.6)12.0Month$ 41.670.00%$ 500.04
Total CLIN 1003AB (Items B005 Through B008)$43,476.72
TX019Corpus Christi Memorial USARC486550.00%
Firm Fixed-Price Work
B009Improved Grounds (Spec Item C 3.1)12.0Month$ 839.270.00%$ 10,071.24
B010Paved Areas (Spec Item C 3.4)12.0Month$ 105.290.00%$ 1,263.48
B011Storm Drainage Systems (Spec Item C 3.6)12.0Month$ 36.100.00%$ 433.20
Total CLIN 1003AC (Items B009 Through B011)$11,767.92
TX046Colbern Memorial USARC48705
Firm Fixed-Price Work
B012Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B013Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B014Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B015Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AD (Items B012 Through B015)$0.00
TX054LT Luis Garcia Memorial USARC48785
Firm Fixed-Price Work
B016Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B017Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B018Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AE (Items B016 Through B018)$0.00
TX075Victoria USARC48865
Firm Fixed-Price Work
B019Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B020Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B021Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AF (Items B019 Through B021)$0.00
TX078Yoakum USARC48915
Firm Fixed-Price Work
B022Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B023Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B024Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B025Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AG (Items B022 Through B025)$0.00
TX154E Houston AFRC489940.00%
Firm Fixed-Price Work
B026Improved Grounds (Spec Item C 3.1)12.0Month$ 3,156.150.00%$ 37,873.80
B027Paved Areas (Spec Item C 3.4)12.0Month$ 1,352.690.00%$ 16,232.28
B028Un-paved Areas (Spec Item C 3.5)12.0Month$ 136.190.00%$ 1,634.28
B029Storm Drainage Systems (Spec Item C 3.6)12.0Month$ 404.050.00%$ 4,848.60
Total CLIN 1003AH (Items B026 Through B029)$60,588.96
TX160Robstown CHW Facility48231
Firm Fixed-Price Work
B030Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B031Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B032Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B033Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B034Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AJ (Items B030 Through B034)$0.00
TX188Brownsville AFRC48923
Firm Fixed-Price Work
B035Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B036Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B037Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B038Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B039Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AK (Items B035 Through B039)$0.00
TX201San Marcos AFRC48407
Firm Fixed-Price Work
B040Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B041Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B042Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B043Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AL (Items B040 Through B043)$0.00
TX210Round Rock AFRC48202
Firm Fixed-Price Work
B044Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B045Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B046Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B047Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B048Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AM (Items B044 Through B048)$0.00
TX212Sinton AFRC48958
Firm Fixed-Price Work
B049Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B050Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B051Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AN (Items B049 Through B051)$0.00
TX232North Houston USAR Center48884
Firm Fixed-Price Work
B052Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B053Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B054Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B055Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AP (Items B052 Through B055)$0.00

TOTAL FFP LINE ITEMS - B001 THROUGH B055 $115,833.60

1005 Contractor Manpower Reporting Option Year 1 Section C 0200000 Mgmt & Admin Spec 2.15 1 Each $ - 0 $0.00

&F

&P of &N

ELINS FIRST PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B741
CLIN 1004 - First Option Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
B701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
B702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
B703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
B707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
B708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
B709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
B710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
B711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
B715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
B716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
B717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
B718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
B719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
B720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
B721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100