A.07.23_Amendment_1_18B0001.pdf
PDF 432 KB Posted
- Attached to
- Bank Stabilization IDIQ Invitation for Bid Federal contract opportunity
- Solicitation number
- W9127S18B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.14_Abstract_of_Offerors_FBO.pdf | ||
| A.07.23_Amendment_1_Conformed_IFB.pdf | ||
| A.07.23_Amendment_1_Plans_Updated_Cover_Sheet.pdf | ||
| A.07.23_Amendment_1_Specs_Updated_19_Jun_18.pdf | ||
| A.07.24_Solicitation_18B0001.pdf | ||
| A.04.36_Wage_Rates.pdf | ||
| A.01.29_Specifications.pdf | ||
| A.01.13_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the plans, specifications, bid schedule, amend a FAR clause and extend the due date of the solicitation.
A. The bid schedule has been amended as follow s: CLINs 0006, 1006, and 2006 have been deleted, Sub-CLINs 0003AA, 0003AB, 0004AA, 0004AB, 0005AA, 0005AB w ere added to include these sub-CLIN sets for each option period B. Updated Plans cover page and specif ications included in amendment attachments C. FAR clause 52.216-19 has been amended to reflect different minimum quantities. FAR clause 52.211-16 added.
D. The solicitation due date has been extended to 3 Jul 2018, 12PM CST
1. CONTRACT ID CODE PAGE OF PAGES
J 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S-18-B-0001
X 9B. DATED (SEE ITEM 11)
25-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jun-2018
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S-18-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF1442 AND CLIN SCHEDULE
The required response date/time has changed from 27-Jun-2018 12:00 PM to 03-Jul-
2018 12:00 PM.
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AA:
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AB:
The Acceptance/Inspection Schedule for CLIN 0004 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AB:
The Acceptance/Inspection Schedule for CLIN 0005 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AB:
The Acceptance/Inspection Schedule for CLIN 0006 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1003 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1003AB:
The Acceptance/Inspection Schedule for CLIN 1004 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1004AB:
The Acceptance/Inspection Schedule for CLIN 1005 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1005AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1005AB:
The Acceptance/Inspection Schedule for CLIN 1006 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2003 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2003AB:
The Acceptance/Inspection Schedule for CLIN 2004 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2004AB:
The Acceptance/Inspection Schedule for CLIN 2005 has been changed from:
Destination Government Destination Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2005AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2005AB:
The Acceptance/Inspection Schedule for CLIN 2006 has been changed from:
Destination Government Destination Government
To:
The following Delivery Schedule for CLIN 0003 has been deleted:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
FOB: Destination
96721L
The following Delivery Schedule for SUBCLIN 0003AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 0003AB has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 0004 has been deleted:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 0004AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 0004AB has been added:
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 0005 has been deleted:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 0005AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 0005AB has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 0006 has been deleted:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 1003 has been deleted:
POP 04-JUL-2019 TO
03-JUL-2020
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 1003AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 1003AB has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 1004 has been deleted:
CAGE
POP 04-JUL-2019 TO
03-JUL-2020
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 1004AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 1004AB has been added:
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 1005 has been deleted:
CAGE
POP 04-JUL-2019 TO
03-JUL-2020
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 1005AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 1005AB has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 1006 has been deleted:
CAGE
POP 04-JUL-2019 TO
03-JUL-2020
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 2003 has been deleted:
POP 04-JUL-2020 TO
03-JUL-2021
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 2003AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 2003AB has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 2004 has been deleted:
CAGE
POP 04-JUL-2020 TO
03-JUL-2021
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 2004AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 2004AB has been added:
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 2005 has been deleted:
CAGE
POP 04-JUL-2020 TO
03-JUL-2021
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 2005AA has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for SUBCLIN 2005AB has been added:
CAGE
POP 04-JUL-2018 TO
03-JUL-2019
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
The following Delivery Schedule for CLIN 2006 has been deleted:
CAGE
POP 04-JUL-2020 TO
03-JUL-2021
N/A OPERATIONS DIVISIONS
USACE, PO BOX 867/700 W CAPITOL
LITTLE ROCK AR 72203-0867
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been added by full text:
52.211-16 VARIATION IN QUANTITY (APR 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.
(b) The permissible variation shall be limited to:
10% Percent increase 5% Percent decrease
This increase or decrease shall apply to all estimated quantities related to any subsequent IDIQ contract and task orders resulting from this solicitation.
(End of clause)
The following have been modified:
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 1 Cubic Yard (CY) on any line item or 2,000 Dry Tons, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of the maximum quantity on any line item);
(2) Any order for a combination of items in excess of the maximum quantity on any line item);or
(3) A series of orders from the same ordering office within 10 calendar days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 calendar days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
SECTION 00 73 10 - SUPPLEMENTAL CONTRACT REQUIREMENTS
Global Changes
CLIN 0001 -- CLIN 2006
The IDC type has changed from N/A to Indefinite Quantity.
CLIN 0003
The CLIN type priced has been deleted.
The pricing detail quantity has changed from 7,500.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 237990 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 0004
The pricing detail quantity has changed from 35,000.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 0005
The pricing detail quantity has changed from 45,000.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 0006
The CLIN description has changed from Moving Between Work Locations to CLIN DELETED.
The CLIN extended description has changed from:
Performance IAW Plans, Specs, and contract requirements.
To:
SEE AMENDMENT 1 FOR REASON CLIN DELETED
The pricing detail quantity has changed from 150.00 to UNDEFINED.
The unit of issue Miles has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1003
The pricing detail quantity has changed from 7,500.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1004
The pricing detail quantity has changed from 35,000.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1005
The pricing detail quantity has changed from 45,000.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1006
The CLIN description has changed from Moving Between Work Locations to CLIN DELETED.
OPTION 1: Performance IAW Plans, Specs, and contract requirements.
The pricing detail quantity has changed from 150.00 to UNDEFINED.
The unit of issue Miles has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2003
The pricing detail quantity has changed from 7,500.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2004
The pricing detail quantity has changed from 35,000.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2005
The pricing detail quantity has changed from 45,000.00 to UNDEFINED.
The unit of issue Dry Ton has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2006
The CLIN description has changed from Moving Between Work Locations to CLIN DELETED.
OPTION 2: Performance IAW Plans, Specs, and contract requirements.
The pricing detail quantity has changed from 150.00 to UNDEFINED.
The unit of issue Miles has been deleted.
The FOB Destination has been deleted.
The FSC code Z1QA has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 237990 has been deleted.
SUBCLIN 0003AA is added as follows:
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0003AA 2,500 Dry Ton Graded Stone C, 0 - 100 Miles from Quarr
FFP
Graded Stone C, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, MAX
NET AMT
SUBCLIN 0003AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0003AB 5,000 Dry Ton Graded Stone C, 100+ Miles from Quary
FFP
Graded Stone C, 100+ Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 0004AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0004AA 5,000 Dry Ton Graded Stone B, 0 - 100 Miles from Quar
FFP
Graded Stone B, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 0004AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0004AB 30,000 Dry Ton Graded Stone B, 100+ Miles from Quary
FFP
Graded Stone B, 100+ Miles from Quary with Direct Access by Floating Plant, SUBCLIN 0005AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0005AA 8,000 Dry Ton R2200 Stone, 0 - 100 Miles from Quarry
FFP
R2200 Stone, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 0005AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0005AB 37,000 Dry Ton R2200 Stone, 100+ Miles from Quary
FFP
R2200 Stone, 100+ Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 1003AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
1003AA 2,500 Dry Ton Graded Stone C, 0 - 100 Miles from Quarr
FFP
Graded Stone C, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 1003AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
1003AB 5,000 Dry Ton Graded Stone C, 100+ Miles from Quary
FFP
Graded Stone C, 100+ Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 1004AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
1004AA 5,000 Dry Ton Graded Stone B, 0 - 100 Miles from Quar
FFP
Graded Stone B, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 1004AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
1004AB 30,000 Dry Ton Graded Stone B, 100+ Miles from Quary
FFP
Graded Stone B, 100+ Miles from Quary with Direct Access by Floating Plant, SUBCLIN 1005AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
1005AA 8,000 Dry Ton R2200 Stone, 0 - 100 Miles from Quarry
FFP
R2200 Stone, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 1005AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
1005AB 37,000 Dry Ton R2200 Stone, 100+ Miles from Quary
FFP
R2200 Stone, 100+ Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 2003AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
2003AA 2,500 Dry Ton Graded Stone C, 0 - 100 Miles from Quarr
FFP
Graded Stone C, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 2003AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
2003AB 5,000 Dry Ton Graded Stone C, 100+ Miles from Quary
FFP
Graded Stone C, 100+ Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 2004AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
2004AA 5,000 Dry Ton Graded Stone B, 0 - 100 Miles from Quar
FFP
Graded Stone B, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 2004AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
2004AB 30,000 Dry Ton Graded Stone B, 100+ Miles from Quary
FFP
Graded Stone B, 100+ Miles from Quary with Direct Access by Floating Plant, SUBCLIN 2005AA is added as follows:
UNIT UNIT PRICE MAX AMOUNT
2005AA 8,000 Dry Ton R2200 Stone, 0 - 100 Miles from Quarry
FFP
R2200 Stone, 0 - 100 Miles from Quarry with Direct Access by Floating Plant, SUBCLIN 2005AB is added as follows:
UNIT UNIT PRICE MAX AMOUNT
2005AB 37,000 Dry Ton R2200 Stone, 100+ Miles from Quary
FFP
R2200 Stone, 100+ Miles from Quarry with Direct Access by Floating Plant, (End of Summary of Changes)
File details come from the government source that posted it.