Q&A

NOTE: CHANGES TO SYNOPSIS/SOLICITATION

See, “Change History as of 22Mar17”

1. W9127S-17-R-6040, SB Set-Aside and W9127S-17-R-6042, SDVOSB Set-Aside appear to cover the same requirements. Are both solicitations running concurrently, or will one of the two be dropped?

Both solicitations are running concurrently.

Each solicitation has a separate combined capacity.

Up to three (3) Indefinite Delivery Contracts (IDC) will be awarded from the SB Set-Aside, W9127S-17-R-6040, those IDC will have a combined capacity of $1.9 million.

Up to three (3) Indefinite Delivery Contracts (IDC) will be awarded from the SDVOSB Set-Aside, W9127S-17-R-6042, those IDC will have a combined capacity of $1.9 million.

2. Considering the potential breadth of A-E work associated with the modernization of healthcare facilities for AFMSA, MEDCOM, and other USACE customers, the $1.9M capacity of the combined IDCs seems to be low.

Please confirm.

We are currently in the process of working on multiple IDC that have a combined capacity of $45Mil.

Once it was discovered that we would not be able to get the larger one in place to use for end of fiscal year requirements, we decided to do the smaller one as a stop gap procedure. The $45Mil IDC will have the same type work as the small IDC do.

Although the period of performance is listed as three (3) years, the base IDC will be over once the maximum capacity is reached.

3. Is there a timeframe in which we should expect responses from USACE, Little Rock District? What method of response will be used?

The time frame in which the USACE, Little Rock District will respond is unknown at this time.

Firms that are not selected will receive a letter stating such. The letter will be sent via e-mail to the POC indicated by the firm.

4. Clarification on Sections E, F & G.

Section E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Per SF330 instructions, you must complete a Section E (Resume) for EACH of the Key Personnel proposed for this contract.

Section F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S

QUALIFICATIONS FOR THIS CONTRACT

Per SF330 instructions, you must complete a Section F for EACH project. Projects listed should provide representative examples of completed projects that reflect the firm’s experience in the areas listed in:

“III. SELECTION CRITERIA, B. Specialized Experience and Technical Competence” that have been completed within the last five years from the date of this announcement.

G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS (MATRIX)

Block 26 identifies Key Personnel that are being proposed for THIS contract.

Block 27 identifies the role that the person will be in on THIS contract.

Block 28 indicates if this person was in a same or similar role in any of the projects from Section F.

5. #36. Sustainability Expert – does this mean LEED AP certification. Architects and Engineers can be LEED certified, what discipline are you looking for in particular?

LEED AP Certification is preferable. There is no preference between Architect or Engineer.

6. Please clarify the following roles. What tasks do each of these individuals usually perform?

(22) Construction Engineer:

Task Example: Construction inspection and engineering consultation services during construction. Shop drawing and construction submittal review, engineering advice during construction;

(24) Construction Technician:

Task Example: Assist a Construction Engineer with his/her tasks.

(23) Construction Quality Assurance Representative (QAR):

Task Example: On site Quality Assurance inspections for a construction project, as the Government may not be available to perform these services.

(27) Engineering Technician:

Task Example: Assist Engineers with his/her tasks.