SPECIFICATIONS
US Army Corps of Engineers® Little Rock District SOLICITATION NO. W9127S-15-R-0010
REFUELING VEHICLE REPAIR SHOP
BUILDING 301
LRAFB JACKSONVILLE, ARKANSAS
VOLUME II – ISSUED FOR CONSTRUCTION
15 JUNE 2015
SPECIFICATIONS
US Army Corps of Engineers®
Little Rock District SOLICITATION NO. W9127S-15-R-0010
REFUELING VEHICLE REPAIR SHOP
BUILDING 301
LRAFB JACKSONVILLE, ARKANSAS
VOLUME I – ISSUED FOR CONSTRUCTION
15 JUNE 2015
SOLICITATION NO. W9127S16R6001
06 NOVEMBER 2015
This page was intentionally left blank.
Refueling Vehicle Repair Shop Building 301 Sol. No. W9127S-16-R-6001 Little Rock, AFB Volume II - Issued For Construction - 2015-11-06
PROJECT TABLE OF CONTENTS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM(S)
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 16 BASE COURSE FOR RIGID PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
PROJECT TABLE OF CONTENTS Page 1
Little Rock, AFB Volume II - Issued For Construction 2015-11-06
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
APPENDIX A – LEAD BASED PAINT AND ASBESTOS REPORT
APPENDIX B – GEOTECHNICAL REPORT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 21 13 13.00 10
WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
05/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1015 (2009) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
ASME INTERNATIONAL (ASME)
ASME B16.1 (2010) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2011) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASTM INTERNATIONAL (ASTM)
ASTM A135/A135M (2009) Standard Specification for Electric-Resistance-Welded Steel Pipe
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide
SECTION 21 13 13.00 10 Page 1 http://www.approvalguide.com/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2013) Standard for the Installation of Sprinkler Systems
NFPA 1963 (2009; Errata 09-1) Standard for Fire Hose Connections
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2010) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
UNDERWRITERS LABORATORIES (UL)
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system inall areas of the building . Except as modified herein, the system shall be designed and installed in accordance with NFPA 13 . Rack sprinklers shall be in accordance with NFPA 13 . Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation.
Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.
1.2.1 Hydraulic Design
Hydraulic calculations shall be in accordance with UFC 3-600-01 with the Area/Density Method of NFPA 13 . Water velocity in the piping shall not exceed 20 ft/s.
1.2.1.1 Hose Demand
Add an allowance for exterior hose streams in accordance with UFC 3-600-01 to the sprinkler system demand at the fire hydrant shown on the drawings closest to the point where the water service enters the building.
1.2.1.2 Basis for Calculations
Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping and 150 for copper tubing.
SECTION 21 13 13.00 10 Page 2
1.2.1.3 Hydraulic Calculations
Submit hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments and as outlined in NFPA 13 , except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows. Elevations of hydraulic reference points (nodes) shall be indicated. Documentation shall identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.
1.2.2 Sprinkler Coverage
Sprinklers shall be uniformly spaced on branch lines. In buildings protected by automatic sprinklers, sprinklers shall provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces.
Coverage per sprinkler shall be in accordance with NFPA 13 , but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G As-Built Drawings; G
SD-03 Product Data
Materials and Equipment; G
Sprinkler System Installer; G
SD-05 Design Data
Hydraulic Calculations; G
SD-06 Test Reports
SECTION 21 13 13.00 10 Page 3
Final Acceptance Test Report; G
SD-10 Operation and Maintenance Data
Operating and Maintenance Manuals
1.4 QUALITY ASSURANCE
Compliance with referenced NFPA standards is mandatory. This includes advisory provisions listed in the appendices of such standards, as though the word "shall" had been substituted for the word "should" wherever it appears. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification shall govern.
1.4.1 Fire Protection Specialist
Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 .
Submit the name and documentation of certification of the proposed Fire Protection Specialists.
1.4.2 Sprinkler System Installer
Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents.
1.4.3 Shop Drawings
Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13 . Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:
a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.
b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
SECTION 21 13 13.00 10 Page 4
d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.
e. Details of each type of riser assembly; pipe hanger; and restraint of underground water main at point-of-entry into the building.
1.5 DELIVERY, STORAGE, AND HANDLING
All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
2.2 NAMEPLATES
All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.
2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE
Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE. Submit manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements.
2.4 UNDERGROUND PIPING COMPONENTS
2.4.1 Pipe
Piping from a point 6 inches above the floor to a point up to 5 feet outside the building wall shall be a one-piece stainless steel riser rated at no less than 200 psig. Piping more than 5 feet outside the building walls shall comply with Section 21 30 00 FIRE PUMPS.
2.4.2 Fittings and Gaskets
Fittings shall be ductile iron conforming to AWWA C110/A21.10 with cement mortar lining conforming to AWWA C104/A21.4 . Gaskets shall be suitable in design and size for the pipe with which such gaskets are to be used.
Gaskets for ductile iron pipe joints shall conform to AWWA C111/A21.11 .
2.4.3 Gate Valve and Indicator Posts
Gate valves for underground installation shall be of the inside screw type with counter-clockwise rotation to open. Where indicating type valves are
SECTION 21 13 13.00 10 Page 5 shown or required, indicating valves shall be gate valves with an approved indicator post of a length to permit the top of the post to be located 3 feet above finished grade. Gate valves and indicator posts shall be listed in UL Fire Prot Dir or FM APP GUIDE.
2.5 ABOVEGROUND PIPING COMPONENTS
Aboveground piping shall be schedule 40 steel.
2.5.1 Steel Piping Components
2.5.1.1 Steel Pipe
Except as modified herein, steel pipe shall be blackas permitted by NFPA 13 and shall conform to applicable provisions of ASTM A795/A795M , ASTM A53/A53M, or ASTM A135/A135M . Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of
1.0 or greater after threads or grooves are cut or rolled formed. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.
2.5.1.2 Fittings for Non-Grooved Steel Pipe
Fittings shall be cast iron conforming to ASME B16.4 , steel conforming to ASME B16.9 or ASME B16.11 , or malleable iron conforming to ASME B16.3 .
2.5.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings shall be designed for not less than 175 psi service.
2.5.1.4 Flanges
Flanges shall conform to NFPA 13 and ASME B16.1 . Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21 , 1/16 inch thick, and full face or self-centering flat ring type.
2.5.1.5 Bolts, Nut, and Washers
Bolts shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Flat circular washers shall be provided under all bolt heads and nuts. Bolts, nuts, and washers shall be either galvanized steel or stainless steel.
2.5.2 Pipe Hangers
Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, and pipe type and sized to be supported.
2.5.3 Valves
2.5.3.1 Control Valves
Manually operated sprinkler control valves shall be indicating butterfly type .
SECTION 21 13 13.00 10 Page 6
2.6 ALARM CHECK VALVE ASSEMBLY
Assembly shall include an alarm check valve, standard trim piping, pressure gauges, bypass, retarding chamber, testing valves, main drain, and other components as required for a fully operational system.
2.7 WATERFLOW ALARM
A weatherproof, exterior mounted, audible/ visible notification device shall be provided if indicated on the fire alarm drawings.
2.8 ALARM INITIATING AND SUPERVISORY DEVICES
2.8.1 Sprinkler Waterflow Indicator Switch, Vane Type
Switch shall be vane type with a pipe saddle and cast aluminum housing.
The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe. The device shall sense water movements and be capable of detecting a sustained flow of 10 gpm or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges.
2.8.2 Valve Supervisory (Tamper) Switch
Switch shall be suitable for mounting to the type of control valve to be supervised open.
2.9 FIRE DEPARTMENT CONNECTION
Fire department connection shall be flush type with cast brass body, matching wall escutcheon lettered "Auto Spkr" with a polished brass finish. The connection shall have two inlets with individual self-closing clappers, caps with drip drains and chains. Female inlets shall have 2-1/2 inch diameter American National Fire Hose Connection Screw Threads (NH) per NFPA 1963 .
2.10 SPRINKLERS
Sprinklers with internal O-rings shall not be used. Sprinklers shall be UL listed and FM approved and shall be used in accordance with their listed coverage limitations. Temperature classification shall be ordinary.
Sprinklers shall be quick response type. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13 .
2.10.1 Sprinklers
Sprinklers shall be quick response pendent and sidewall type with nominal 1/2 inch orifice. Pendant sprinkler shall have a polished chrome finish.
2.11 ACCESSORIES
2.11.1 Sprinkler Cabinet
Spare sprinklers shall be provided in accordance with NFPA 13 and shall be packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed. At least one wrench of
SECTION 21 13 13.00 10 Page 7 each type required shall be provided.
2.11.2 Pendent Sprinkler Escutcheon
Escutcheon shall be adjustable metallic type for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.
2.11.3 Pipe Escutcheon
Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.
2.11.4 Sprinkler Guard
Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage.
2.11.5 Identification Sign
Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background. Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "alarm test," "alarm line," and similar wording as required to identify operational components.
2.12 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY
Double-check backflow prevention assembly shall comply with ASSE 1015 . The configuration shall allow access and repair to internal components without removal of the entire assembly from the piping system. The assembly shall have a bronze, cast-iron or stainless steel body with flanged ends. The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-positive-seating check valve for continuous pressure application, and four test cocks. Assemblies shall be rated for working pressure of 175 psi The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly. A test port for a pressure gauge shall be provided both upstream and downstream of the double check backflow prevention assembly valves.
PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION REQUIREMENTS
The installation shall be in accordance with the applicable provisions of NFPA 13 , NFPA 24 and publications referenced therein.
SECTION 21 13 13.00 10 Page 8
3.3 ABOVEGROUND PIPING INSTALLATION
3.3.1 Piping in Exposed Areas
Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.
3.3.2 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings.
3.3.3 Pendent Sprinklers
Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler shall be threaded.
Hangers shall be provided on arm-overs to drop nipples supplying pendent sprinklers as permitted by NFPA 13.
3.3.4 Upright Sprinklers
Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.
Riser nipples exceeding 30 inches in length shall be individually supported.
3.3.5 Pipe Joints
Pipe joints shall conform to NFPA 13 , except as modified herein. Not more than four threads shall show after joint is made up. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints shall be provided where indicated or required by NFPA 13 . Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification.
3.3.6 Reducers
Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. The use of grooved-end or rubber-gasketed reducing couplings will not be permitted.
3.3.7 Pipe Penetrations
Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13 .
Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 00 FIRESTOPPING. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends.
3.3.8 Escutcheons
Escutcheons shall be provided for pipe penetration of ceilings and walls in exposed locations.
SECTION 21 13 13.00 10 Page 9
3.3.9 Inspector's Test Connection
Unless otherwise indicated, test connection shall consist of 1 inch pipe connected at the riser as a combination test and drain valve; a test valve located approximately 7 feet above the floor; a smooth bore brass outlet equivalent to the smallest orifice sprinkler used in the system; and a painted metal identification sign affixed to the valve with the words "Inspector's Test." The discharge orifice shall be located outside the building wall directed so as not to cause damage to adjacent construction or landscaping during full flow discharge.
3.3.10 Drains
Main drain piping shall be provided to discharge. Auxiliary drains shall be provided as required by NFPA 13 .
3.3.11 Installation of Fire Department Connection
Connection shall be mounted on the exterior wall approximately 3 feet above finished grade. The piping between the connection and the check valve shall be provided with an automatic drip in accordance with NFPA 13 and arranged to drain to the outside.
3.3.12 Identification Signs
Signs shall be affixed to each control valve, inspector test valve, main drain, auxiliary drain, test valve, and similar valves as appropriate or as required by NFPA 13 . Hydraulic design data nameplates shall be permanently affixed to each sprinkler riser as specified in NFPA 13 .
3.4 UNDERGROUND PIPING INSTALLATION
The fire protection water main shall be laid, and joints anchored, in accordance with NFPA 24 . Minimum depth of cover shall be 3 feet. The supply line shall terminate inside the building with a flanged piece, the bottom of which shall be set not less than 6 inches above the finished floor. A blind flange shall be installed temporarily on top of the flanged piece to prevent the entrance of foreign matter into the supply line. A concrete thrust block shall be provided at the elbow where the pipe turns up toward the floor. In addition, joints shall be anchored in accordance with NFPA 24 using pipe clamps and steel rods from the elbow to the flange above the floor and from the elbow to a pipe clamp in the horizontal run of pipe. Buried steel components shall be provided with a corrosion protective coating in accordance with AWWA C203. Piping more than 5 feet outside the building walls shall meet the requirements of Section 21 30 00 FIRE PUMPS.
3.5 PRELIMINARY TESTS
The system, including the underground water mains, and the aboveground piping and system components, shall be tested to assure that equipment and components function as intended. The underground and aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with NFPA 13 and NFPA 24 .
SECTION 21 13 13.00 10 Page 10
3.5.1 Underground Piping
3.5.1.1 Flushing
Underground piping shall be flushed in accordance with NFPA 24 . This includes the requirement to flush the lead-in connection to the fire protection system at a flow rate not less that the calculated maximum water demand rate of the system.
3.5.1.2 Hydrostatic Testing
New underground piping shall be hydrostatically tested in accordance with NFPA 24 . The allowable leakage shall be measured at the specified test pressure by pumping from a calibrated container. The amount of leakage at the joints shall not exceed 2 quarts per hour per 100 gaskets or joints, regardless of pipe diameter.
3.5.2 Aboveground Piping
3.5.2.1 Hydrostatic Testing
Aboveground piping shall be hydrostatically tested in accordance with NFPA 13 . There shall be no drop in gauge pressure or visible leakage when the system is subjected to the hydrostatic test. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested.
3.5.3 Testing of Alarm Devices
Each alarm switch shall be tested by flowing water through the inspector's test connection. Each water-operated alarm devices shall be tested to verify proper operation.
3.5.4 Main Drain Flow Test
Following flushing of the underground piping, a main drain test shall be made to verify the adequacy of the water supply. Static and residual pressures shall be recorded on the certificate specified in paragraph SUBMITTALS. In addition, a main drain test shall be conducted each time after a main control valve is shut and opened.
3.6 FINAL ACCEPTANCE TEST
Begin the Final Acceptance Test only when all flushing, hydrostatic testing, and backflow testing has been completed. Notification shall include a copy of the Contractor's Material & Test Certificates. The Fire Protection Specialist shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system. This shall include operation of control valves and flowing of inspector's test connections to verify operation of associated waterflow alarm switches.
After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position.
Submit as-built shop drawings after completion of the Final Tests, updated to reflect as-built conditions after all related work is completed. The installation shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received.
SECTION 21 13 13.00 10 Page 11
3.7 ONSITE TRAINING
Conduct a training course for operating and maintenance personnel as designated by the Contracting Officer. Training shall be provided as required to fully explain and demonstrate system operation and owner maintenance requirements
-- End of Section --
SECTION 21 13 13.00 10 Page 12
SECTION 21 30 00
FIRE PUMPS
04/08
PART 1 GENERAL
1.1 SUMMARY
Except as modified in this Section or on the drawings, install fire pumps in conformance with NFPA 20 , NFPA 70 , and NFPA 72 , including all recommendations and advisory portions, which shall be considered mandatory; this includes advisory provisions listed in the appendices of such standards, as though the word "shall" had been substituted for the word "should" wherever it appears. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governs. Devices and equipment for fire protection service shall be UL Fire Prot Dir listed or FM APP GUIDE approved.
Interpret all reference to the authority having jurisdiction to mean the Contracting Officer.
1.2 SEQUENCING
1.2.1 Fire Pump
Fire pump shall automatically operate when the pressure drops to 110 psi and manually when the starter is operated. Pump shall continue to run until shut down manually.
1.2.2 Pressure Maintenance (Jockey) Pump
Pressure maintenance pump shall operate when the system pressure drops to 115 psi. Pump shall automatically stop when the system pressure reaches 125 psi and after the pump has operated for the minimum pump run time specified herein.
1.3 FIRE PUMP INSTALLATION RELATED SUBMITTALS
The Fire Protection Specialist shall prepare a list of the submittals, from the Contract Submittal Register, that relate to the successful installation of the fire pump(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government.
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA B300 (2010; Addenda 2011) Hypochlorites
AWWA B301 (2010) Liquid Chlorine
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings
SECTION 21 30 00 Page 1 for Water
AWWA C111/A21.11 (2012) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service
AWWA C606 (2011) Grooved and Shouldered Joints
AWWA C900 (2007; Errata 2008) Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In. Through 12 In. (100 mm Through 300 mm), for Water Distribution
ASME INTERNATIONAL (ASME)
ASME B16.18 (2012) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.22 (2013) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.26 (2013) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B16.39 (2009) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
ASME B16.5 (2013) Pipe Flanges and Flanged Fittings:
NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B31.1 (2012; INT 2-6, 8-10, 13, 15, 17-25, 27-31
and 42-46) Power Piping
ASTM INTERNATIONAL (ASTM)
ASTM A183 (2003; R 2009) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A47/A47M (1999; R 2009) Standard Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A536 (1984; R 2009) Standard Specification for Ductile Iron Castings
ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use
ASTM B135 (2010) Standard Specification for Seamless Brass Tube
SECTION 21 30 00 Page 2
ASTM B42 (2010) Standard Specification for Seamless Copper Pipe, Standard Sizes
ASTM B62 (2009) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B75/B75M (2011) Standard Specification for Seamless Copper Tube
ASTM B88 (2009) Standard Specification for Seamless Copper Water Tube
ASTM D2000 (2012) Standard Classification System for Rubber Products in Automotive Applications
ASTM D3308 (2012) PTFE Resin Skived Tape
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2011; Errata 2012) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 1963 (2014) Standard for Fire Hose Connections
NFPA 20 (2013) Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 24 (2013) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NFPA 70 (2014; AMD 1 2013; Errata 2013; AMD 2 2013) National Electrical Code
NFPA 72 (2013) National Fire Alarm and Signaling Code
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2010) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
UNDERWRITERS LABORATORIES (UL)
UL 1247 (2007; Reprint Jun 2011) Diesel Engines for Driving Stationary Fire Pumps
UL 262 (2004; Reprint Oct 2011) Gate Valves for Fire-Protection Service
SECTION 21 30 00 Page 3
UL 448 (2007; Reprint Jul 2013) Centrifugal Stationary Pumps for Fire-Protection Service
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
DEPARTMENT OF DEFENCE
UFC 3-600-01 (2013) Fire Protection Engineering for Facilities
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Fire Pump Installation Related Submittals Fire Protection Specialist; G
No later than 14 days after the Notice to Proceed and prior to the submittal of the fire pump installation drawings
SD-02 Shop Drawings
Installation Drawings; G As-Built Drawings; G Piping Layout; G Pump Enclosure; G
SD-03 Product Data
Catalog Data; G Spare Parts; G Preliminary Tests; G Field Tests; G Manufacturer's Representative; G Field Training; G
SD-06 Test Reports
Preliminary Tests; G
SD-07 Certificates; G
Fire Protection Specialist
No later than 14 days after the Notice to Proceed and prior to the submittal of the fire pump installation drawings
Qualifications of Welders Qualifications of Installer Preliminary Test Certification Final Test Certification
SECTION 21 30 00 Page 4
SD-10 Operation and Maintenance Data
Operating and Maintenance Instructions; G
At least 14 days prior to conducting field training
1.6 EXTRA MATERIALS
Submit Spare Parts data for each different item of equipment and material specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied by the Contractor.
1.7 QUALITY ASSURANCE
1.7.1 Fire Protection Specialist
Work specified in this section shall be performed under the supervision of and certified by the Fire Protection Specialist. Submit the name and documentation of certification of the proposed Fire Protection Specialist.
The Fire Protection Specialist shall be an individual who is a registered professional engineer and a Full Member of the Society of Fire Protection Engineers or who is certified as a Level IV Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 . The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the Contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.7.2 Qualifications of Welders
Submit certificates of each welder's qualifications prior to site welding;
certifications shall not be more than one year old.
1.7.3 Qualifications of Installer
Prior to installation, submit data for approval showing that the Contractor has successfully installed fire pumps and associated equipment of the same type and design as specified herein, or that he has a firm contractual agreement with a subcontractor having such required experience. The data shall include the names and locations of at least two installations where the Contractor, or the subcontractor referred to above, has installed such systems. Indicate the type and design of each system and certify that each system has performed satisfactorily in the manner intended for a period of not less than 18 months.
1.7.4 Preliminary Test Certification
When preliminary tests have been completed and corrections made, submit a signed and dated certificate with a request for a formal inspection and tests.
SECTION 21 30 00 Page 5
1.7.5 Final Test Certification
Concurrent with the Final Acceptance Test Report, submit certification by the Fire Protection Specialist that the fire pump installation is in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports.
1.7.6 Manufacturer's Representative
Work specified in this section shall be performed under the supervision of and certified by a representative of the fire pump manufacturer. Submit the name and documentation of certification of the proposed Manufacturer's Representative, concurrent with submittal of the Fire Protection Specialist Qualifications. The Manufacturer's Representative shall be regularly engaged in the installation of the type and complexity of fire pump(s) specified in the Contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.8 DELIVERY, STORAGE, AND HANDLING
Protect all equipment delivered and placed in storage from the weather, excessive humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall be either capped or plugged until installed.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
a. Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
b. Submit manufacturer's catalog data included with the Fire Pump Installation Drawings for each separate piece of equipment proposed for use in the system. Catalog data shall indicate the name of the manufacturer of each item of equipment, with data annotated to indicate model to be provided. In addition, a complete equipment list that includes equipment description, model number and quantity shall be provided. Catalog data for material and equipment shall include, but not be limited to, the following:
(1) Fire pumps, drivers and controllers including manufacturer's certified shop test characteristic curve for each pump. Shop test curve may be submitted after approval of catalog data but shall be submitted prior to the final tests.
(2) Pressure maintenance pump and controller.
(3) Piping components.
(4) Valves, including gate, check, globe and relief valves.
(5) Gauges.
(6) Hose valve manifold test header and hose valves.
SECTION 21 30 00 Page 6
(7) Restrictive orifice union.
(8) Associated devices and equipment.
(9) Insulated enclosure.
c. All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number. Pumps and motors shall have standard nameplates securely affixed in a conspicuous place and easy to read. Fire pump shall have nameplates and markings in accordance with UL 448 . Diesel driver shall have nameplate and markings in accordance with UL 1247 .
Electric motor nameplates shall provide the minimum information required by NFPA 70 , Section 430-7.
2.2 FIRE PUMP
Fire pump, jockey pump, backflow preventer, valves, fittings, controllers, test header, manual bypass, insulated weatherproof enclosure, and all components (excluding the surge tank) required for a complete system shall be factory fabricated on a steel skid. Fire pump shall be electric motor driven. Pump capacity shall be as indicated on the drawings. Fire pump shall furnish not less than 150 percent of rated flow capacity at not less than 65 percent of rated net pressure. Pump shall be centrifugal horizontal split case fire pump. Horizontal pump shall be equipped with automatic air release devices. The maximum rated pump speed shall be 2100 rpm when driving the pump at rated capacity. Pump shall be automatic start and manual stop. Pump shall conform to the requirements of UL 448 and UFC 3-600-01 . Fire pump discharge and suction gauges shall be oil-filled type.
2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE
2.3.1 General Requirements
Materials and Equipment shall have been tested by Underwriters Laboratories, Inc. and listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE.
2.3.2 Alarms
Provide audible and visual alarms as required by NFPA 20 on the controller. Provide remote supervision as required by NFPA 20 , in accordance with NFPA 72 . Provide remote alarm devices located at as indicated. Alarm signal shall be activated upon the following conditions:
Engine drive controller has operated into an engine running condition, engine drive controller main switch has been turned to OFF or to MANUAL position, trouble on engine driven controller or enginer. Exterior alarm devices shall be weatherproof type. Provide alarm silencing switch and red signal lamp, with signal lamp arranged to come on when switch is placed in OFF position.
2.4 UNDERGROUND PIPING COMPONENTS
2.4.1 Pipe and Fittings
Provide AWWA C900 PVC pipe (pressure class DR14) with gasket bell ends.
SECTION 21 30 00 Page 7
Anchor the joints in accordance with NFPA 24 . Minimum depth of cover shall be as required by NFPA 24 , but no less than 3 feet. Utilize one piece stainless steel risers rated at no less than 200 psig for turn-up and turn-down into pump room.
2.4.2 Fittings and Gaskets
Fittings shall be ductile iron conforming to AWWA C110/A21.10 . Gaskets shall be suitable in design and size for the pipe with which such gaskets are to be used. Gaskets for ductile iron pipe joints shall conform to
AWWA C111/A21.11 .
2.4.3 Valves and Valve Boxes
Valves shall be gate valves conforming to AWWA C500 or UL 262 . Valves shall have cast-iron body and bronze trim. Valve shall open by counterclockwise rotation. Except for post indicator valves, all underground valves shall be provided with an adjustable cast-iron or ductile iron valve box of a size suitable for the valve on which the box is to be used, but not less than 5.25 inches in diameter. The box shall be coated with bituminous coating. A cast-iron or ductile-iron cover with the word "WATER" cast on the cover shall be provided for each box.
2.4.4 Gate Valve and Indicator Posts
Gate valves for underground installation shall be of the inside screw type with counterclockwise rotation to open. Where indicating type valves are shown or required, indicating valves shall be gate valves with an approved indicator post of a length to permit the top of the post to be located 3 feet above finished grade. Gate valves and indicator posts shall be provided with one coat of primer and two coats of red enamel paint and shall be listed in UL Fire Prot Dir or FM APP GUIDE.
2.4.5 Buried Utility Warning and Identification Tape
Detectable aluminum foil plastic-backed tape or detectable magnetic plastic tape manufactured specifically for warning and identification of buried piping shall be provided for all buried piping. Tape shall be detectable by an electronic detection instrument. Tape shall be provided in rolls, 3 inches minimum width, color-coded for the utility involved and imprinted in bold black letters continuously and repeatedly over the entire tape length. Warning and identification shall be "CAUTION BURIED WATER PIPING BELOW" or similar wording. Code and lettering shall be permanent and unaffected by moisture and other substances contained in the trench backfill material. Tape shall be buried at a depth of 12 inches below the top surface of earth or the top surface of the subgrade under pavement.
2.5 ABOVEGROUND PIPING COMPONENTS
2.5.1 Pipe Sizes 2.5 inches and Larger
2.5.1.1 Pipe
Piping shall be ASTM A53/A53M, Weight Class STD (Standard), Schedule 40, Type E or Type S, Grade A; black steel pipe. Steel pipe shall be joined by means of flanges welded to the pipe or mechanical grooved joints only.
Piping shall not be jointed by welding or weld fittings.
SECTION 21 30 00 Page 8
2.5.1.2 Grooved Mechanical Joints and Fittings
Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer. Fitting and coupling houses shall be malleable iron conforming to ASTM A47/A47M, Grade 32510;
ductile iron conforming to ASTM A536, Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe.
Nuts and bolts shall be heat-treated steel conforming to ASTM A183 and shall be cadmium plated or zinc electroplated.
2.5.1.3 Flanges
Flanges shall be ASME B16.5 , Class 150 flanges. Flanges shall be provided at valves, connections to equipment, and where indicated.
2.5.1.4 Gaskets
Gaskets shall be AWWA C111/A21.11 , cloth inserted red rubber gaskets.
2.5.1.5 Bolts
Bolts shall be stainless steel. Bolts shall extend no less than three full threads beyond the nut with bolts tightened to the required torque.
2.5.1.6 Nuts
Nuts shall be stainless steel.
2.5.1.7 Washers
Washers shall be stainless steel. Flat circular washers shall be provided under all bolt heads and nuts.
2.5.2 Piping Sizes 2 inches and Smaller
2.5.2.1 Steel Pipe
Steel piping shall be ASTM A795/A795M , Weight Class STD (Standard), Schedule 40, Type E or Type S, Grade A, zinc-coated steel pipe with threaded end connections. Fittings shall be Class 150, zinc-coated threaded fittings. Unions shall be ASME B16.39 , Class 150, zinc-coated unions.
2.5.2.2 Copper Tubing
Copper tubing shall be ASTM B88, Type L or K, soft annealed. Fittings shall be ASME B16.26 , flared joint fittings. Pipe nipples shall be ASTM B42 copper pipe with threaded end connections.
2.5.3 Pipe Hangers and Supports
Pipe hangers and support shall be UL listed UL Fire Prot Dir or FM approved FM APP GUIDE and shall be the adjustable type. Finish of rods, nuts, washers, hangers, and supports shall be zinc-plated after fabrication.
2.5.4 Valves
Valves shall be UL listed UL Fire Prot Dir or FM approved FM APP GUIDE for
SECTION 21 30 00 Page 9 fire protection service. Valves shall have flange or threaded end connections.
2.5.4.1 Gate Valves and Control Valves
Gate valves and control valves shall be outside screw and yoke (O.S.&Y.)
type which open by counterclockwise rotation. Butterfly-type control valves are not permitted.
2.5.4.2 Tamper Switch
The suction control valves, the discharge control valves, valves to test header, and the by-pass control valves shall be equipped with valve tamper switches for monitoring by the fire alarm system.
2.5.4.3 Check Valve
Check valve shall be clear open, swing type check valve with flange or threaded inspection plate.
2.5.4.4 Relief Valve
Relief valve shall be pilot operated or spring operated type conforming to NFPA 20 . A means of detecting water motion in the relief lines shall be provided where the discharge is not visible within the pump house.
2.5.4.5 Circulating Relief Valve
An adjustable circulating relief valve shall be provided for each fire pump in accordance with NFPA 20 .
2.5.4.6 Suction Pressure Regulating Valve
Suction pressure regulating valve shall be FM approved FM APP GUIDE.
Suction pressure shall be monitored through a pressure line to the controlling mechanism of the regulating valve. Valve shall be arranged in accordance with the manufacturer's recommendations.
2.5.5 Hose Valve Manifold Test Header
Construct header of steel pipe. Provide ASME B16.5 , Class 150 flanged inlet connection to hose valve manifold assembly. Provide approved bronze hose gate valve with 2.5 inch National Standard male hose threads with cap and chain; locate 3 feet above grade in the horizontal position for each test header outlet. Welding shall be metallic arc process in accordance with ASME B31.1 .
2.5.6 Pipe Sleeves
A pipe sleeve shall be provided at each location where piping passes entirely through walls, ceilings, roofs, and floors, including pipe entering buildings from the exterior. Secure sleeves in position and location during construction. Provide sleeves of sufficient length to pass through entire thickness of walls, ceilings, and floors. Provide one inch minimum clearance between exterior of piping or pipe insulation, and interior of sleeve or core-drilled hole. Firmly pack space with mineral wool insulation. Seal space at both ends of the sleeve or core-drilled hole with plastic waterproof cement which will dry to a firm but pliable mass, or provide a mechanically adjustable segmented elastomeric seal. In
SECTION 21 30 00 Page 10 fire walls and fire floors, a fire seal shall be provided between the pipe and the sleeve in accordance with Section 07 84 00 FIRESTOPPING.
a. Sleeves in Masonry and Concrete Walls, Ceilings, Roofs, and Floors:
Provide hot-dip galvanized steel, ductile-iron, or cast-iron pipe sleeves. Core drilling of masonry and concrete may be provided in lieu of pipe sleeves provided that cavities in the core-drilled hole be completely grouted smooth.
b. Sleeves in Other Than Masonry and Concrete Walls, Ceilings, Roofs, and…